ML20199C130: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- - . - | {{#Wiki_filter:- -. -. | ||
OM S.S j | |||
y; | |||
.t L | .t L | ||
OCT 181985 l | |||
Dayco Corporation. | |||
'P.O. Box.3258 | |||
t | ._ 25804. | ||
i Springfield, M0 t | |||
t ji | |||
Form NRC-591, SAFETY INSPECTION..is issued for.your NRC general license. . You l | - Gentlemen. | ||
' As a resultLof the inspection conducted on July 10 to July 24, 1985, a Form NRC-591, SAFETY INSPECTION..is issued for.your NRC general license.. You l | |||
will note that this form indicates that no item of noncompliance was found. | |||
It is not necessary that you acknowledge receipt of this form. | It is not necessary that you acknowledge receipt of this form. | ||
a | a The enclosed copy of our inspection report identifies areas examined during I | ||
p' gpb i-the inspection. | |||
Within these areas, the inspection consisted of a selective examination of procedures'and representative records, observations, and | |||
- telephone-interviews with your personnel. | |||
4 | |||
\\ | |||
If you have any questions or require clarification on any of the information | If you have any questions or require clarification on any of the information | ||
- stated'above', you may. contact us at (312) 790-5616. | |||
-l | |||
-Thank you for your cooperation. | |||
Sincer ly, | Sincer ly, I | ||
4,/ | |||
p | p | ||
. G. Wiedeman, Chief _ | |||
-l Nuclear Materials Safety Section 1 | |||
==Enclosures:== | ==Enclosures:== | ||
As stated | As stated I | ||
bec w/ enclosures: - | |||
.L. Cobb, 01E | |||
.S.:Baggett, NMSS t | |||
\\ | |||
q i@Ol RIII Wiedeman/1d | \\ | ||
q i@Ol RIII Wiedeman/1d 1 | |||
010/16/85 | |||
'9901140216 851018 PDR..RC-SSD-PDR | |||
m. | |||
4 GENERAL LICENSE GAUGE DATA COLLECTION FORM I | |||
I | 1. | ||
Name and Address of General Licensee: | |||
Dayco Corporation | Dayco Corporation j | ||
P.O. Box 3258 i | |||
Rubber Manufacturer - V. Belts | Springfield, M0 25804 (417) 881-7440 2. | ||
Principal Business of Licensee: | |||
Rubber Manufacturer - V. Belts 1 | |||
4 3. | |||
Purpose for which gauge (s) are used (e.g., measurement of level, dent,ity, flow, thickness,etc.): | |||
1 Density.and Thickness 4. | |||
Gauge Specifics: | |||
a. | |||
Manufacturer: | |||
i Measurex Corporation | Measurex Corporation b. | ||
Model Number: | |||
Yes | 1202 Measurex System Number 162 c. | ||
Isotope / Activity: | |||
strontium-90/50 millicuries d. | |||
Date Received: May 31, 1974 e. | |||
Date Replaced: | |||
September 29, 1980 5. | |||
Name of specific licensee that installed gauge: | |||
i Measurex Corporation 6. | |||
Does the gauge have a durable, legible and visible label: | |||
Yes 7. | |||
'Was an Initial Radiation Survey performed at time of installation and do they have a record (list results) NOTE: | |||
records only required for 2 year period: | |||
N/A - Past two years since installation. | N/A - Past two years since installation. | ||
- 8. | |||
Leak Tests: | |||
Yes. No source leakage indicated, removable contamination < .004 pCi. | a. | ||
Have the tests been performed (list results): | |||
Yes. | |||
No source leakage indicated, removable contamination <.004 pCi. | |||
b. | |||
Name of firm / person conducting test: | |||
Measurex Corporation - Ken Rice o | Measurex Corporation - Ken Rice o | ||
r | |||
R | R c. | ||
Are records available of tests (list date of last test): | |||
Yes. June 21, 1985; December 19, 1984; June 26, 1984; December 27, | l NOTE: | ||
records only maintained for 2 years t | |||
l Yes. June 21, 1985; December 19, 1984; June 26, 1984; December 27, | |||
) | |||
Yes. All radiation warning lights, shutters, interlocks were tested and found to be functioning correctly. | 1983; and June 28, 1983 9. | ||
Operational Test of Gauge: | |||
1 a. | |||
Measurex Corporation - Ken Rice | Have any tests been performed of the on/off mechanism: | ||
Yes. All radiation warning lights, shutters, interlocks were tested and found to be functioning correctly. | |||
i Yes. ' June 21, 1985; December 19, 1984; June 26, 1984; December 27, | i 4 | ||
l b. | |||
Name of firm / person who performed test-i i | |||
Measurex Corporation - Ken Rice | |||
] | |||
c. | |||
Are records maintained of tests (list dates): | |||
.] | |||
i Yes. ' June 21, 1985; December 19, 1984; June 26, 1984; December 27, 1983; and June 28, 1983. | |||
10. | |||
Has the gauge been moved from its original location? If so, by whom: | |||
No. | No. | ||
11. | |||
Does the licensee have personnel who are responsible for assuring compliance with the General License Conditions (10 CFR 31, 31.5(c) | |||
..(1.through 10): | |||
Yes, Jim Chipman. | |||
12. | |||
Has the licensee made any transfers of gauges: | |||
No. | No. | ||
' 13. | |||
Measurex Corporation One Results Way Cupertino, CA 95014 | Name and Address of Gauge Manufacturer: | ||
Measurex Corporation One Results Way Cupertino, CA 95014 14. | |||
N/A 15.- Name of ORAU Reviewer L | Onsite inspection of gauge (s) (list observations / measurements): | ||
[ | N/A 15.- Name of ORAU Reviewer L | ||
,/ | |||
[ | |||
p 5 : = | |||
.)< a sy A-/7-W j | |||
Date | |||
.2 | |||
p | p | ||
: t. - | : t. - | ||
l | l | ||
.4 16. | |||
Signature and Date of NRC'Reviqwer 1 | |||
l 1p | l 1p hw pv7-fr | ||
'/ | |||
Date 1 | |||
6 4 | |||
S i | |||
i l | |||
i | |||
3 | 3 | ||
._.}} | |||
Latest revision as of 08:27, 10 December 2024
| ML20199C130 | |
| Person / Time | |
|---|---|
| Issue date: | 10/18/1985 |
| From: | Wiedeman D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML20199C135 | List: |
| References | |
| SSD, NUDOCS 9901140216 | |
| Download: ML20199C130 (4) | |
Text
- -. -.
OM S.S j
y;
.t L
OCT 181985 l
Dayco Corporation.
'P.O. Box.3258
._ 25804.
i Springfield, M0 t
t ji
- Gentlemen.
' As a resultLof the inspection conducted on July 10 to July 24, 1985, a Form NRC-591, SAFETY INSPECTION..is issued for.your NRC general license.. You l
will note that this form indicates that no item of noncompliance was found.
It is not necessary that you acknowledge receipt of this form.
a The enclosed copy of our inspection report identifies areas examined during I
p' gpb i-the inspection.
Within these areas, the inspection consisted of a selective examination of procedures'and representative records, observations, and
- telephone-interviews with your personnel.
4
\\
If you have any questions or require clarification on any of the information
- stated'above', you may. contact us at (312) 790-5616.
-l
-Thank you for your cooperation.
Sincer ly, I
4,/
p
. G. Wiedeman, Chief _
-l Nuclear Materials Safety Section 1
Enclosures:
As stated I
bec w/ enclosures: -
.L. Cobb, 01E
.S.:Baggett, NMSS t
\\
\\
q i@Ol RIII Wiedeman/1d 1
010/16/85
'9901140216 851018 PDR..RC-SSD-PDR
m.
4 GENERAL LICENSE GAUGE DATA COLLECTION FORM I
1.
Name and Address of General Licensee:
Dayco Corporation j
P.O. Box 3258 i
Springfield, M0 25804 (417) 881-7440 2.
Principal Business of Licensee:
Rubber Manufacturer - V. Belts 1
4 3.
Purpose for which gauge (s) are used (e.g., measurement of level, dent,ity, flow, thickness,etc.):
1 Density.and Thickness 4.
Gauge Specifics:
a.
Manufacturer:
Measurex Corporation b.
Model Number:
1202 Measurex System Number 162 c.
Isotope / Activity:
strontium-90/50 millicuries d.
Date Received: May 31, 1974 e.
Date Replaced:
September 29, 1980 5.
Name of specific licensee that installed gauge:
i Measurex Corporation 6.
Does the gauge have a durable, legible and visible label:
Yes 7.
'Was an Initial Radiation Survey performed at time of installation and do they have a record (list results) NOTE:
records only required for 2 year period:
N/A - Past two years since installation.
- 8.
Leak Tests:
a.
Have the tests been performed (list results):
Yes.
No source leakage indicated, removable contamination <.004 pCi.
b.
Name of firm / person conducting test:
Measurex Corporation - Ken Rice o
r
R c.
Are records available of tests (list date of last test):
l NOTE:
records only maintained for 2 years t
l Yes. June 21, 1985; December 19, 1984; June 26, 1984; December 27,
)
1983; and June 28, 1983 9.
Operational Test of Gauge:
1 a.
Have any tests been performed of the on/off mechanism:
Yes. All radiation warning lights, shutters, interlocks were tested and found to be functioning correctly.
i 4
l b.
Name of firm / person who performed test-i i
Measurex Corporation - Ken Rice
]
c.
Are records maintained of tests (list dates):
.]
i Yes. ' June 21, 1985; December 19, 1984; June 26, 1984; December 27, 1983; and June 28, 1983.
10.
Has the gauge been moved from its original location? If so, by whom:
No.
11.
Does the licensee have personnel who are responsible for assuring compliance with the General License Conditions (10 CFR 31, 31.5(c)
..(1.through 10):
Yes, Jim Chipman.
12.
Has the licensee made any transfers of gauges:
No.
' 13.
Name and Address of Gauge Manufacturer:
Measurex Corporation One Results Way Cupertino, CA 95014 14.
Onsite inspection of gauge (s) (list observations / measurements):
N/A 15.- Name of ORAU Reviewer L
,/
[
p 5 : =
.)< a sy A-/7-W j
Date
.2
p
- t. -
l
.4 16.
Signature and Date of NRC'Reviqwer 1
l 1p hw pv7-fr
'/
Date 1
6 4
S i
i l
3
._.