,                                        ENCLOSURE 1 TENNESSEE VALLEY AUTEORITY BROWNS FERRY NUCLEAR PLANT (EFN)
ENCLOSURE 1 TENNESSEE VALLEY AUTEORITY BROWNS FERRY NUCLEAR PLANT (EFN)
UNITS 1, 2, AND 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE T8-372R1 REVISED AND MARKED PAGES I. REVISED PAGES Unitt 1. 2. and 3 6.0-2 II. MARK-UP PAGE3 Units 1. 2. and 3 6.0-2 9002020:52 900123 DR   ADOCK 050002 9
UNITS 1, 2, AND 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE T8-372R1 REVISED AND MARKED PAGES I.
_ - - _                          _9
REVISED PAGES Unitt 1.
2.
and 3 6.0-2 II.
MARK-UP PAGE3 Units 1.
2.
and 3 6.0-2 9002020:52 900123 DR ADOCK 050002 9
_9


a   e 6.2.1 (Cont'd)
a e
: b. The chief Nuclear Officer shall have corporate responsibility   l for overall plant nuclear safety. This individual shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical--
6.2.1 (Cont'd) b.
The chief Nuclear Officer shall have corporate responsibility l
for overall plant nuclear safety. This individual shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical--
support in the plant so that continued nuclear safety is assured.
support in the plant so that continued nuclear safety is assured.
: c. The Plant Manager shall be responsible for ove.rall unit safe operation, and shall have control over those onsite resources necessary for safe operation and naintenance of the plant.
c.
: d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their indepundence from operating pressures.
The Plant Manager shall be responsible for ove.rall unit safe operation, and shall have control over those onsite resources necessary for safe operation and naintenance of the plant.
6.2.2   Plant Staff
d.
: a. shift manning requirements, shall as a minimum, be as described in Table G.2.A and below, i
The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their indepundence from operating pressures.
: b. A licensed senior rJactor operator shall be present at the site at all times when there is fuel in the reactor.
6.2.2 Plant Staff a.
: c. A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
shift manning requirements, shall as a minimum, be as described in Table G.2.A and below, i
BEN                                     6.0-2 Unit 1
b.
A licensed senior rJactor operator shall be present at the site at all times when there is fuel in the reactor.
c.
A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
BEN 6.0-2 Unit 1


j JUN30'S28           .
j JUN30'S28 p
p        -My/ -~                               -
-My/ -~
                                              #'' ' ' ' f'I N ' '       '4"'   '"            "U p 6.2.1'(Cont'd e                                          .M *
6.2.1'(Cont'd
: b. he          _
#'' ' ' ' 'I N ' '
g dhall have corporate respot:.sibility for overall plant nuclear safety. nis individual shall take any seasures needed to ensure acceptable perfor=ance of the staff in uperating, maintaining, and providing technical support in the plant so that continued nuclear safety is assured.
'4"'
"U f
p
.M
* e g dhall have corporate b.
he respot:.sibility for overall plant nuclear safety. nis individual shall take any seasures needed to ensure acceptable perfor=ance of the staff in uperating, maintaining, and providing technical support in the plant so that continued nuclear safety is assured.
: c. The Plant Manager shall be responsible for overall unit safe operation, and shall have control over those onsite resources necessary for safe operation and maintenance of the plant.
: c. The Plant Manager shall be responsible for overall unit safe operation, and shall have control over those onsite resources necessary for safe operation and maintenance of the plant.
: d. ne individuals who train the operating staff and those who carry out health physics and quality assurance functions say report to the appropriate onsite manassr; however, they shall have sufficient organizational frsedom to ensure their independence         -
: d. ne individuals who train the operating staff and those who carry out health physics and quality assurance functions say report to the appropriate onsite manassr; however, they shall have sufficient organizational frsedom to ensure their independence from operating pressures.
from operating pressures.
6.2.2 Plant Staff
6.2.2         Plant Staff
: a. Shift manning requiresants, shall as.a minimus, be as described in Table 6.2.A and below,
: a. Shift manning requiresants, shall as.a minimus, be as described in Table 6.2.A and below,
: b. A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.                             ;
: b. A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.
I l
I l
: c. A licensed reacter operator shall be in the control roca whenever               i there is fuel in the reactor.
: c. A licensed reacter operator shall be in the control roca whenever i
i SI N                                                     6.0-2 Unit 1
there is fuel in the reactor.
                                                                                    -                      H raor Ts fu AMENOMENT NO.14 9
i SI N 6.0-2 Unit 1 H
Ts fu raor AMENOMENT NO.14 9


e-   e.
e-e.
6.2.1 (cont'd)
6.2.1 (cont'd) b.
: b. The chief Nuclear Officer shall have corporate responsibility   l for overall plant nucienr safety. This individual shall take any m>asurea needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support in the plant so that continued nuc!     eafety is assured.
The chief Nuclear Officer shall have corporate responsibility l
: c. The Plant Manager shall be responsib1w for overall unit safe operatirs, and shall have control over those onsite resources neceanery for safe operation and maintenance of the plant.
for overall plant nucienr safety. This individual shall take any m>asurea needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support in the plant so that continued nuc!
: d. The individuals who train the operating staff and those who carry out heelth physics and quality assurance functions may report to the appropriate onsite manager; however, thry shall have sufficient organizational freedom to ensure their independence from operating pressures.
eafety is assured.
6.2.2   Plant Staff
c.
: a. shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below.
The Plant Manager shall be responsib1w for overall unit safe operatirs, and shall have control over those onsite resources neceanery for safe operation and maintenance of the plant.
: b. A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.
d.
: c. A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
The individuals who train the operating staff and those who carry out heelth physics and quality assurance functions may report to the appropriate onsite manager; however, thry shall have sufficient organizational freedom to ensure their independence from operating pressures.
BFN                                       6.0-2 Unit 2
6.2.2 Plant Staff a.
shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below.
b.
A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.
c.
A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
BFN 6.0-2 Unit 2


JUN 3 0 ;ggg
__~-
__~-
JUN 3 0 ;ggg
-hnd;;,p s, n, _ p... !:a e A - J (,$1lC t',$'VllVd( $ hhby i ri
                                  -hnd;; ,p s , n,i _ri p . . . !:a e A - J (,$1lC t',$'VllVd( $ hhby 6.2.1 (04n     )                       /                                                        -t         "
/
:.                                                                  v
6.2.1 (04n
: b. 7.'       " - - "'-- ' - - ' ' - - -
)
                                                                                      ''---- /shall have torpcrate           I.
-t v
: b. 7.'
''---- /shall have torpcrate I
respons1 M for overall plant nuclear safety. Bis individual shall take any :sasures needed to ensure acceptable perfor:ance of the staff in operating, saistaining, and providing tect.nical support in the plant sa that tantinued nuclear safety is assured,
respons1 M for overall plant nuclear safety. Bis individual shall take any :sasures needed to ensure acceptable perfor:ance of the staff in operating, saistaining, and providing tect.nical support in the plant sa that tantinued nuclear safety is assured,
: c. na Plant Manager'shall be respcasible for overall unit safe operation, and shall have control over thosa ensita resources f
: c. na Plant Manager'shall be respcasible for overall unit safe operation, and shall have control over thosa ensita resources f
necessary for safe operation and sairtenance of the plant.                                       I
necessary for safe operation and sairtenance of the plant.
I
: d. *he individuals veo train the operating staff and those who carr/ -
: d. *he individuals veo train the operating staff and those who carr/ -
out healt.h physics and :iuality assurance funct:cens =ay report to the appropriate casite sanagert however, they shall have sufficient organizational freedom to ensure their independence                                 -
out healt.h physics and :iuality assurance funct:cens =ay report to the appropriate casite sanagert however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.
from operating pressures.
6.2.2 Plant Statt
6.2.2   Plant Statt
: a. Shift aanning requirsaants, shall as a minimum, be as described in Table 6.0. A and below.
: a. Shift aanning requirsaants, shall as a minimum, be as described in Table 6.0. A and below.
: c. A 'icensed aantor reactor operator .ull te present at tne nts it all times vnen there is fuel in the reactor.
: c. A 'icensed aantor reactor operator.ull te present at tne nts it all times vnen there is fuel in the reactor.
:. A licensed reactor operator shall be in the control room when6ver thers is fuel in the reactor.
:. A licensed reactor operator shall be in the control room when6ver thers is fuel in the reactor.
e 3TN                                                             6.3-2
e 3TN 6.3-2
      *l nit 2                                                                     .
*l nit 2 t s - 101 AMEN 0 MENT N0.14 5
t s - 101     '
 
AMEN 0 MENT N0.14 5
c.
: c.      ..
6.2.1 (Cont'd)
\
\\
6.2.1   (Cont'd)
b.
: b. The chief Nuclear Officer shall have corporate               l responsibility for overall plant nuclear safety. This individual shall take any measures needed to ensure acceptable performance of the staff in ope.ating, naintaining, and providing technical support in the plant so that continued nuclear safety is assured.
The chief Nuclear Officer shall have corporate l
: c. The Plant Manager shall be responsible for overall unit safe operation, and shall have control over those onsite resources necessary for safe operation and maintenance of the plant.
responsibility for overall plant nuclear safety.
l                             d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite nanagers however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.
This individual shall take any measures needed to ensure acceptable performance of the staff in ope.ating, naintaining, and providing technical support in the plant so that continued nuclear safety is assured.
6.2.2   Plant Staff
c.
: a. shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below,
The Plant Manager shall be responsible for overall unit safe operation, and shall have control over those onsite resources necessary for safe operation and maintenance of the plant.
: b. A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.
l d.
: c. A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite nanagers however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.
BrN                                   6.0-2 Unit 3
6.2.2 Plant Staff a.
shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below, b.
A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.
c.
A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
BrN 6.0-2 Unit 3


  . o JUN 3 01988 a v <s vw s s s s s ss- -
o JUN 3 01988 a v <s vw s s s s s ss- -
6.2.1 (Cont'd)       %w %,_                                          s-       w^ ha
%w %,_
                            \,
6.2.1 (Cont'd) w^ ha s-
: b. ne 9 V- _ . _ _ _ . . _ _ _ _ _ _ . . ,        ._..... ....., shall have corporate responsibility for overall plant nuclear safety. nis individual shall take any seasures needed to ensure acceptable performance of the at:ff in operating, maintaining, and providing technical support in the plant so that continued nucicar safety is assured.
\\,
: b. ne 9 V- _.
._.........., shall have corporate responsibility for overall plant nuclear safety. nis individual shall take any seasures needed to ensure acceptable performance of the at:ff in operating, maintaining, and providing technical support in the plant so that continued nucicar safety is assured.
: c. no Plant Manager shall be responsible for overall unit safe operation and shall have control over those onsite resources necessary for safe operation and saintenance of the plant.
: c. no Plant Manager shall be responsible for overall unit safe operation and shall have control over those onsite resources necessary for safe operation and saintenance of the plant.
: d. De inoividuals who train the operating staff and those who carry-out health physics and quality . assurance ft*nctions may report to the appropriate onsite manager; however, they shall have                                 -
: d. De inoividuals who train the operating staff and those who carry-out health physics and quality. assurance ft*nctions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.
sufficient organizational freedom to ensure their independence from operating pressures.                                                                 I 6.2.2     Plant Staff                                                                                     3
I 6.2.2 Plant Staff 3
: a. Shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below.                                                                           q
: a. Shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below.
: 3. A licensed senior reactor operator shall be present it the site at all tisee when there is fue'l in the reactor.                                                 i
q
: 3. A licensed senior reactor operator shall be present it the site at all tisee when there is fue'l in the reactor.
i
: c. A licensed reactor operator shall be in the control room whanever there ig fuiil in the reactor.
: c. A licensed reactor operator shall be in the control room whanever there ig fuiil in the reactor.
3rN-Unit 3                                               6.0-2                       , [ p p, c g 1s-30L AMEN 0 MENT NO 12 0
, [
p p, c g 3rN-Unit 3 6.0-2 1s-30L AMEN 0 MENT NO 12 0


O'   O' ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWN 8 FERRY NUCLEAR PLANT (BFN)
O' O'
                                                          'JNITS 1, 2, AND 3 PROPOSED IMPROVED TECHNICAL SPECIFICATION (ITS) CHANGE T8-362 SECTION 5.0 REVISION SUPPLEMENT 14 k
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWN 8 FERRY NUCLEAR PLANT (BFN)
'JNITS 1, 2,
AND 3 PROPOSED IMPROVED TECHNICAL SPECIFICATION (ITS) CHANGE T8-362 SECTION 5.0 REVISION SUPPLEMENT 14 k
1
1


    .. e BROWNS FERRY NUCLEAR PLANT IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0
e BROWNS FERRY NUCLEAR PLANT IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES REVISED IMPROVED TECHNICAL SPECIFICATICNS Unit i. Replaced 5.0-2 Rev. I with 5.0-2 Rev. 2 Unit 2 Replaced 5.0-2 Rev. I with 5.0-2 Rev. 2 Unit 3 Replaced 5.0-2 Rev. I with 5.0-2 Rev. 2
                      ,      ,                        LIST OF REVISED PAGES REVISED IMPROVED TECHNICAL SPECIFICATICNS Unit i . Replaced 5.0-2 Rev. I with 5.0-2 Rev. 2 Unit 2 Replaced 5.0-2 Rev. I with 5.0-2 Rev. 2 Unit 3 Replaced 5.0-2 Rev. I with 5.0-2 Rev. 2
=_
                                                                                      =_


Organization 5.2 5.0 : ADMINISTRATIVE CONTROLS 5.2 Organization
Organization 5.2 5.0 : ADMINISTRATIVE CONTROLS 5.2 Organization
[                   5.2.1 -       Onsite and offsite Oraanintions Onsite and offsite organizations shall be established for itnit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities-affecting safety of the nuclear power plant.
[
: a. Lines of authority, res>onsibility, and communication shall be defined and establisied throughout highest management levels, intermediate levels, and all operating organization-positions. These relationships shall be documented and               ''
5.2.1 -
updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and
Onsite and offsite Oraanintions Onsite and offsite organizations shall be established for itnit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities-affecting safety of the nuclear power plant.
                                      -relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NP0089-A);
a.
: b. The Plant Manager shall be responsible for overall safe operation of the plant and shall have control over~those onsite activities necessary for safe operation and maintenance of-the plant;=
Lines of authority, res>onsibility, and communication shall be defined and establisied throughout highest management levels, intermediate levels, and all operating organization-positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and
l               c. The Chief Nuclear Officer shall have corporate
-relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NP0089-A);
.                                        responsibility for overall_ plant nuclear safety and shall take any measures needed to ensure acceptable performance.of the staff in operating, maintaining,-and providing technical support to the plant to ensure nuclear safety; and
b.
: d. The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appro)riate onsite manager;-
The Plant Manager shall be responsible for overall safe operation of the plant and shall have control over~those onsite activities necessary for safe operation and maintenance of-the plant;=
however, .these individuals shall 1 ave sufficient organizational freedom to ensure their independence from operating pressures.
l c.
5.2.2-       Unit Staff
The Chief Nuclear Officer shall have corporate responsibility for overall_ plant nuclear safety and shall take any measures needed to ensure acceptable performance.of the staff in operating, maintaining,-and providing technical support to the plant to ensure nuclear safety; and d.
                                  -The unit staff organization-shall include the following:
The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appro)riate onsite manager;-
however,.these individuals shall 1 ave sufficient organizational freedom to ensure their independence from operating pressures.
5.2.2-Unit Staff
-The unit staff organization-shall include the following:
(continued)
(continued)
BFN-UNIT 1-                             5.0-2                         Amendment *R2 4
BFN-UNIT 1-5.0-2 Amendment *R2 4


  .. u ..
.. u Organization 5.2 5:0 ADMINISTRATIVE CONTROLS 5.2 Organization 5.2.1 Onsite and Offsite Oraanizations Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear power plant, a.
Organization 5.2 5:0 ADMINISTRATIVE CONTROLS 5.2 Organization                                                                   '
Lines of authority, res >onsibility, and communication shall be defined and establisted throughout highest management levels, intermediate levals, and all operating organization positions. These relationships shall be documented and updated, as appropriatt., in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NPOD89-A);
5.2.1       Onsite and Offsite Oraanizations                                       ,
b.
Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear power plant,
The Plant Manager shall be responsible for overall safe operation of the plant and shall have c.ontrol over those onsite activities necessary for safe operation and maintenance of the plant; l
: a. Lines of authority, res >onsibility, and communication shall be defined and establisted throughout highest management levels, intermediate levals, and all operating organization positions. These relationships shall be documented and updated, as appropriatt., in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NPOD89-A);
c.
: b. The Plant Manager shall be responsible for overall safe operation of the plant and shall have c.ontrol over those onsite activities necessary for safe operation and maintenance of the plant; l             c. The Chief Nuclear Officer shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety; and
The Chief Nuclear Officer shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety; and d.
: d. The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appro)riate onsite manager; however, these individuals shall lave sufficient organizational freedom to ensure their independence from operati% pressures.
The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appro)riate onsite manager; however, these individuals shall lave sufficient organizational freedom to ensure their independence from operati% pressures.
5.2.2       Unit Staff Tr.. unit staff organization shall include the following:
5.2.2 Unit Staff Tr.. unit staff organization shall include the following:
(continued)
(continued)
BfN UNIT 2                             5.0-2                       Amendment *R2
BfN UNIT 2 5.0-2 Amendment *R2


l Organization 5.2 5.4 ADMINISTRATIVE CONTROLS 5.2 Orgatiization 5.2.1       Qasite and Offsite Oraanizations Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear power plant.
l Organization 5.2 5.4 ADMINISTRATIVE CONTROLS 5.2 Orgatiization 5.2.1 Qasite and Offsite Oraanizations Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear power plant.
: a. Lines of authority, res >onsibility, and communication shall be defined and establis1ed throughout highest management levels, intermediate levels, and all o>erating organization positions. These relationships shall se documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NP0089-A);
a.
: b. The Plant Manager shall be responsible for overall safe operation of the plant and shall have control over those onsite activities necessary for safe operation and maintenance of the plant; l             c. The Chief Nuclear Officer shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, tnd providing technical support to the plant to ensure nuclear safety; and
Lines of authority, res >onsibility, and communication shall be defined and establis1ed throughout highest management levels, intermediate levels, and all o>erating organization positions. These relationships shall se documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NP0089-A);
: d. The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their independence from operating pressures.
b.
5.2.2       Unit St*ff The unit staff organization shall include the following:
The Plant Manager shall be responsible for overall safe operation of the plant and shall have control over those onsite activities necessary for safe operation and maintenance of the plant; l
c.
The Chief Nuclear Officer shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, tnd providing technical support to the plant to ensure nuclear safety; and d.
The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their independence from operating pressures.
5.2.2 Unit St*ff The unit staff organization shall include the following:
(continued)
(continued)
BFN-UNIT 3                             5.0-2                       Amendment *R2
BFN-UNIT 3 5.0-2 Amendment *R2


  , u .
u BROWNS FERRY NUCLEAR PLANT IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES REVISED CURRENT TECHNICAL SPECIFICATIONS MARK UPs.
BROWNS FERRY NUCLEAR PLANT IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES REVISED CURRENT TECHNICAL SPECIFICATIONS MARK UPs.
Unit 1 Replaced page 5 of 50 Rev. I with page 5 of 50 Rev. 2 Unit 2 Replaced page 5 of 49 Rey, I with page 5 of 49 Rev. 2 Unit 3 Replaced page 5 of 51 Rev. I with page 5 of $1 Rev. 2 4
Unit 1 Replaced page 5 of 50 Rev. I with page 5 of 50 Rev. 2 Unit 2 Replaced page 5 of 49 Rey, I with page 5 of 49 Rev. 2 Unit 3 Replaced page 5 of 51 Rev. I with page 5 of $1 Rev. 2 4
                                                          =_           -
=_


l f                                                                                       .
l f
                                          ~.
~.
p)
p)
TS3%
TS3%
s,,aag,un < ,
s,,aag,un <,
g [ .1         (Cont'd)               41 Mscer+ c movteo)                                         '
g [.1 (Cont'd) 41 Mscer+ c movteo)
t                                C. A V.i As h ,'vA                       lk
C. A V.i As h,'vA lk t
: c. [ [wwi9at. --" Wel:= ;.r.pchief INelear of f seed                 -n-shall                1  M have_ corporate responsibility for overall plant nuclear safety Di ;f M ahall take any measures needed to ensure acceptable performance of the staff in operating, miataining, and providing technical support in the plan                 : NY- __    _
: c. [ [wwi9at. --" Wel:= ;.r.pchief INelear of f seed shall 1 M
nuclear safety p ..... J/ Q af fne /At]
-n-have_ corporate responsibility for overall plant nuclear safety Di ;f M ahall take any measures needed to ensure acceptable performance of the staff in operating, miataining, NY- __
h         Tha Plant Manager shall be responsible for overall u.rtr. saf e operation andshallhavecontroloverthoseonsitere'sNr s) necessary for s&fe operation and maintenance of the plant)
and providing technical support in the plan nuclear safety p..... J/ Q af fne /At]
Radek tri tentnit, er Moon
h Tha Plant Manager shall be responsible for overall u.rtr. saf e operation andshallhavecontroloverthoseonsitere'sNr s) necessary for s&fe operation and maintenance of the plant)
: d. The indiv uals whs train the operating staff Q h::r_D                     ^
Radek tri tentnit, er Moon d.
The indiv uals whs train the operating staff Q h::r_D
^
carry out t.al;r ph;:ir: :nf quality assuraace functions may report to the appropriate onsite managers however, they shall hr.ve sufficient organizational freedom to ensure their independence from operating pressures.
carry out t.al;r ph;:ir: :nf quality assuraace functions may report to the appropriate onsite managers however, they shall hr.ve sufficient organizational freedom to ensure their independence from operating pressures.
6         Uni +
6 Uni +
              /.2.2     M ew staff
/.2.2 M ew staff ne un;+ sw a saesaw s>nu ineWe the httuise:
* ne un;+ sw a saesaw s>nu ineWe the httuise:
a.
: a.       hatt             quarements,       1 as a min       be as g ertbe in able 6.2.           d below.
hatt quarements, 1 as a min be as g ertbe in able 6.2.
          &.0-2Ag k
d below.
                  ~.2              lace       en or re         operato         be p         at         e g          a all. ti         when ther     a fuel in t     eacto p 4+ /es6t aHD               CAD)       W b A / licensed /eactor [ e, tor shall be in the control room wheny -"-- i2) fuelftn the reactor.
~.2
B F'N                                           6.0-2 Paas            c+            Stu        '
&.0-2Ag k
        '?- s e 1                                                                                             0< .
lace en or re operato be p at e
a all. ti when ther a fuel in t eacto p g
4+ /es6t aHD CAD)
W b A / licensed /eactor [ e, tor shall be in the control room wheny -"-- i2) fuelftn the reactor.
Paas c+ Stu B F'N 6.0-2
'?- s e 1 0<.


  . o .
o T5 1i L.
T5 1i L.
sw:l:est;,- r z.
sw:l:est;,- r z.
5(.2.1 (cont'd)                                                          ( creepf as m M )
( creepf as m M )
(& Qkuu~VdtfksLh yE c f. hresidtht[TVLM6c1(Sr'pnBichief Nuclear Of fice[shall                                   U have corporate responsibility for overall plant nuclear safety.a.
5(.2.1 (cont'd)
b ' - '. 4 m-d "i' S aha11 take any measures needed to ensure acceptable performance of the staff M operating, maintaining, and providing technical support in at plant h k_.$*:                   _
(& Qkuu~VdtfksLh yE c f. hresidtht[TVLM6c1(Sr'pnBichief Nuclear Of fice[shall U
nuclear safety Ch% . /-)
have corporate responsibility for overall plant nuclear safety.a.
                                                                    } }Li(k.D 6 4. The Plant Manager shall be responsible for overal1 @ safe operation) and shall have control over those onsite Y$$E$E$7 necessary for safe operation anti maintenanceoftheplanh
b ' - '. 4 m-d "i' S aha11 take any measures needed to ensure acceptable performance of the staff M operating, maintaining, and providing technical support in at plant h k_.$*:
                                                                                  ,a.gga. .+L:x9 d.
nuclear safety Ch%. /-)
                                                                                            ~                          _
} }Li(k.D 6 4.
The individuals who train the operating staf                       " g : _-Q carry out ::10. r..,;.;s and quality assurance functions may report to the appropriate onsite managers however, they shall have sufficient organisational freedom to ensure their independance from operating pressures, u '.h j #.2.2                           Merre Staff iJi,'e/ t4 /4 4/kg tat   u.. / s4 # ,9..cwhem a.
The Plant Manager shall be responsible for overal1 @ safe operation) and shall have control over those onsite Y$$E$E$7 necessary for safe operation anti maintenanceoftheplanh
ift manning r           trements, a         e, a miniane, be as @ cribe n Tab e 6.2.A and below.
,a.gga..+L:x9 d.
1       9
The individuals who train the operating staf
          ~
" g : _-Q
g,",               f             . A licen 3s saator rea or operato                   hall be pres         t the site at aH times when there is fuel in the reactor, f                     m w.w.-D w . ,. -   ,+
~
b 4.         licensed glactor gera or shall be in the control room o
carry out ::10. r..,;.;s and quality assurance functions may report to the appropriate onsite managers however, they shall have sufficient organisational freedom to ensure their independance from operating pressures, u '.h j #.2.2 Merre Staff tat u.. / s4 #,9..cwhem iJi,'e/ t4 /4 4/kg a.
wha ,_ _;if.;;_; i;) fuel n the reactor.
ift manning r trements, a e, a miniane, be as @ cribe n Tab e 6.2.A and below.
PAGE    b     OF BFN                                                                       6.0-2 Unit 2                                                                                                                         g,q_)
1 9
g,", f A licen 3s saator rea or operato hall be pres t the site
~
at aH times when there is fuel in the reactor, f
m w.w.-D w.,. -
,+
b 4.
licensed glactor gera or shall be in the control room o
wha,_ _;if.;;_; i;) fuel n the reactor.
b OF PAGE BFN 6.0-2 Unit 2 g,q_)


T559%                             e Stes@ cati a F.2.
T559%
f        2.1      (cont'd)
e Stes@ cati a F.2.
(A W hL          ,J.~ N.Su. w iym Q R2l c [ dh( fred 14enV17A' bkseptVa@ thief Nuclear of fice shall                                             l $1 have corpo p responsibility for overall plant nuclear safety / I                          L'M:jshalltakeanymeasuresneededto ensure acceptable performance ,cf the staff in operating,
(A W h
                                            'm_a_ int aininig , an_d providing technical support in the plant
,J.~ N.Su. w iym Q R2l f
(;; .0.                           $-"hnuclear safetyb :::ur:dj ead) f 4Ac 6, M         The Plant Manager shall be responsible for overal1 M ufe       ration and shall have control over those onsite e
2.1 (cont'd)
(_ :::;_,
L c [ dh( fred 14enV17A' bkseptVa@ thief Nuclear of fice shall l $1 have corpo p responsibility for overall plant nuclear I
e        - necessary for safe operation and maintenance of nud:elnitsl fonweis,sr f d.
safety /
The individuals who train the operating staf [ xd e- r D carry ou M                         1-' -'"-*- c/ quality assurance functions may report to the appropriate onsite managers however, they shall have aufficient organizational freedom to ensure their independence from operating pressures.
L'M:jshalltakeanymeasuresneededto ensure acceptable performance,cf the staff in operating,
t b                                 Iln.'F f     .2.2       M es& staff The us't staff **pesineHm Stj inc.lde tM bll***'**);
'm_a_ int aininig, an_d providing technical support in the plant
a         hitt                         ing r     ireme     s, shall a a mini       , be s d cribe                           n Table     .2.A     d below.
(;;.0.
                  'I4
$-"hnuclear safetyb :::ur:dj ead) f 4Ac 6, M The Plant Manager shall be responsible for overal1 M ufe ration and shall have control over those onsite
                    . Wit
(_ e e
* j 6.0 24)               -
:::;_, - necessary for safe operation and maintenance of nud:elnitsl fonweis,sr f The individuals who train the operating staf [ xd e-r D d.
: b.         license senior                               tor ope       shall         asen     th j           ,      si     at all imes wh                             there in     =1 in the     actor.
carry ou M 1-' -'"-*- c/ quality assurance functions may report to the appropriate onsite managers however, they shall have aufficient organizational freedom to ensure their independence from operating pressures.
                                                      /ederat)                                                       fIfa I
t b
                                $, M ] licensed /eactor per 7 tgshall be in the control roem whe t t- '                                  uel in the reactor.
Iln.'F f
4 BrN Unit 3 6.0-2                        FAG.5_ 8         Cf. 5 %
.2.2 M es& staff The us't staff **pesineHm Stj inc.lde tM bll***'**);
a hitt ing r ireme s, shall a a mini
, be s
'. Wit d cribe n Table
.2.A d below.
I4 j 6.0 24) b.
license senior tor ope shall asen th j
si at all imes wh there in
=1 in the actor.
/ederat) fIfa I
$, M ] licensed /eactor per 7 tgshall be in the control roem whe t t-uel in the reactor.
4 FAG.5_ 8 Cf. 5 %
BrN 6.0-2 Unit 3


BROWNS FERRY NUCLEAR PLANF IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES REVISED CURRENT TECHNICAL SPECIFICATIONS JUSTIFIC ATION FOk CHANGES Replaced kstification for Change Section 5.1 page ! !tev. O v4th Justification for Change Section 5.1 page 1 and 2 Rev.1 y
BROWNS FERRY NUCLEAR PLANF IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES REVISED CURRENT TECHNICAL SPECIFICATIONS JUSTIFIC ATION FOk CHANGES Replaced kstification for Change Section 5.1 page ! !tev. O v4th Justification for Change Section 5.1 page 1 and 2 Rev.1 y
--y
--y
-                                                                                    ~
~
s.
s.


  , s. .
s.
JUSTIFICATION FOR CHANGES SECTION 5.1 - RESPONSIBILITY ADMINISTRATIVE CHANSES Al     Reformatting and renumbering are in accordance with the BWR Standard Technical Specifications, NUREG 1433. As a result the Technical Specifications should be more readily-readable, and therefore, understandable by plant operators as well as other users. -The reformatting, renumbering, and rewording process involves no technical changes to existing Technical Specifications.
JUSTIFICATION FOR CHANGES SECTION 5.1 - RESPONSIBILITY ADMINISTRATIVE CHANSES Al Reformatting and renumbering are in accordance with the BWR Standard Technical Specifications, NUREG 1433. As a result the Technical Specifications should be more readily-readable, and therefore, understandable by plant operators as well as other users. -The reformatting, renumbering, and rewording process involves no technical changes to existing Technical Specifications.
Editorial- rewording (either adding or deletir,g) is done to make consistent with NUREG-1433. During ISTS development certain wording preferences or English language conventions were adopted which resulted to the in no technical Technical        changes (either Specifications.          actual Additional    or interpretational)been infomation   has also         added to more fully describe each subsection. This wording is consistent with the BWR Standard Technical Specifications, NUREG-1433. Since the design is already approved, adding more detail does not result in a technical change.
Editorial-rewording (either adding or deletir,g) is done to make consistent with NUREG-1433. During ISTS development certain wording preferences or English language conventions were adopted which resulted in no technical changes (either actual or interpretational)been added to to the Technical Specifications.
A2     Site Vice President (SVP) added to BFN ISTS 5.1.1 to clarify that the SVP is responsible for the overall activities of the site and to require him to delegate that responsibility when absent.- Changed the position title " Site Director" to " Site Vice President." - This is not new information in terms of present site organization but does detail not described in existing Technical Specifications. provide Also, in ISTS 5.2.1.c, the title Chief Nuclear Officer is used to reflect the title of corporate executive position responsible for overall plant safety.
Additional infomation has also more fully describe each subsection. This wording is consistent with the BWR Standard Technical Specifications, NUREG-1433.
TECHNICAL CHANGES - NORE RESTRICTIVE M1     This change proposes to add a requirement in Technical Specifications-for the Plant Manager, or his designee, to approve prior to implementation, each proposed test, or experiment to systems or equipment that affect nuclear safety. This change ensures the Plant Manager is aware of all changes with the potential to affect nuclear safety. This change adds requirements to the Technical Specifications e'               which constitute a more restrictive change. This change is consistent
Since the design is already approved, adding more detail does not result in a technical change.
                -with NUREG-1433, Rev. 1.
A2 Site Vice President (SVP) added to BFN ISTS 5.1.1 to clarify that the SVP is responsible for the overall activities of the site and to require him to delegate that responsibility when absent.- Changed the position title " Site Director" to " Site Vice President." - This is not new information in terms of present site organization but does detail not described in existing Technical Specifications. provide Also, in ISTS 5.2.1.c, the title Chief Nuclear Officer is used to reflect the title of corporate executive position responsible for overall plant safety.
BFN UNITS 1, 2, & 3                         1                             Revision 1
TECHNICAL CHANGES - NORE RESTRICTIVE M1 This change proposes to add a requirement in Technical Specifications-for the Plant Manager, or his designee, to approve prior to implementation, each proposed test, or experiment to systems or equipment that affect nuclear safety. This change ensures the Plant Manager is aware of all changes with the potential to affect nuclear safety. This change adds requirements to the Technical Specifications e'
which constitute a more restrictive change. This change is consistent
-with NUREG-1433, Rev. 1.
BFN UNITS 1, 2, & 3 1
Revision 1


JUSTIFICATION FOR CHANGES SECTION 5.1 - RESPON51BILITY M2     This change proposed to specify the qualifications of the individual, who is designated to be responsible for the control room command                                     '
JUSTIFICATION FOR CHANGES SECTION 5.1 - RESPON51BILITY M2 This change proposed to specify the qualifications of the individual, who is designated to be responsible for the control room command function in the absence of the Shift Manager.
function in the absence of the Shift Manager. In the CTS, no qualifications are specified for the designated individual. The change                               '
In the CTS, no qualifications are specified for the designated individual.
will require one of the two licensed operators to have an SRO during Modes 1.-2, and 3. Since this requirement will require one of the licensed operators to have an SR0 (whereas currently both could have an RO) this is considered a more restrictive change. This change it                                     ,
The change will require one of the two licensed operators to have an SRO during Modes 1.-2, and 3.
consistent with NUREG-1433, Rev. 1.
Since this requirement will require one of the licensed operators to have an SR0 (whereas currently both could have an RO) this is considered a more restrictive change. This change it consistent with NUREG-1433, Rev. 1.
BFN-UNITS 1, 2, & 3                       2                         Revision 1
BFN-UNITS 1, 2, & 3 2
Revision 1


. so BROWNS FERRY NUCLEAR PLANT . IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0
. so BROWNS FERRY NUCLEAR PLANT. IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES
                      +
+
LIST OF REVISED PAGES NUREG 1433 BWR/4 STANDARD TECHNICAL SPECIFICATIONS MARK UP Replaced page 449 of 478 Rev.1 (STS page 5.0 2) with page 449 of 478 Rev. 2
NUREG 1433 BWR/4 STANDARD TECHNICAL SPECIFICATIONS MARK UP Replaced page 449 of 478 Rev.1 (STS page 5.0 2) with page 449 of 478 Rev. 2
                                                    . . .          . - . ~       -
. -. ~


e Organization 5.2 l
e Organization 5.2 l
5.0 ADMINISTRATIVE CONTROLS 1
5.0 ADMINISTRATIVE CONTROLS 5.2 Organization j
5.2 Organization                                                                                                 j 5.2.1               Onsite and Offsite Oraanizatigni Onsite thd offsite organizations shall be established fo unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities                             ,
5.2.1 Onsite and Offsite Oraanizatigni Onsite thd offsite organizations shall be established fo unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of ti,e nuclear power plant.
affecting safety of ti,e nuclear power plant.                                                 l
l a.
: a.       Lines of authority, responsibility, and communication shall be defined and estab'lished throughout highest management levels, intermediate levels, and all operating organization positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descrit.tions of departmental responsibilities and relatior. ships, and job descriptions for key personnel positions, or in equivalent forms of documentation. The ta __-
Lines of authority, responsibility, and communication shall be defined and estab'lished throughout highest management levels, intermediate levels, and all operating organization positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descrit.tions of departmental responsibilities and relatior. ships, and job descriptions for key personnel positions, or in equivalent forms of documentation. The ta __-
requirements shall be doraaented in they"".);                 ,Jf' A p,    ,
requirements shall be doraaented in they"".);
                                                                                                    &cr d$onAh b.hThe (Plant 5"aM"Ta,daa9 shall be responsible or overall                         -
,Jf' A
safe operation of the plant and shall have control over those onsite activities necessary fer safe operation and maintenance of the plant; U           c.       T         -{ e W 'hd       w, pume wee ,a p;-iti: ) shall have
&cr d$onAh p,
                      --=                    orporate responsibility for overall plant nuclear safety FM k TrA                   and shall take any measures needed to ensure acceptable
b.hThe (Plant 5"aM"Ta,daa9 shall be responsible or overall safe operation of the plant and shall have control over those onsite activities necessary fer safe operation and maintenance of the plant; U
              #*        5-J           performance of the staff in operating, maintaining, and e6;d N k                 providing technical support to the_ plant to ensure nuclear e/A eq _
c.
safety; and                     ,
T
                                                                            ,,],gga yf,1@(                             91
-{ e W 'hd w, pume wee,a p;-iti: ) shall have orporate responsibility for overall plant nuclear safety
    , Md h We               d.       The individuals who train the operating staff, carry out M   . e c.:u u >a                   Mt' PyFq or perform quality assurance functions may E .y'     22 4,e               report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their independence from operating pressures.
--=
5.2.2               Unit Staff The unit staff organization shall include the following:
FM k TrA and shall take any measures needed to ensure acceptable 5-J performance of the staff in operating, maintaining, and e6;d N k providing technical support to the_ plant to ensure nuclear e/A eq _
: a.       A non licensed operator shall be assigned to each reactor containing fuel and an additional non licensed operator PAGE IM 9 OF       NM q ,, 3   (continued) l l
safety; and
n'" " M S                                                   5.0 2                   fJ*     "W                   ,
,,],gga yf,1@(
91
, Md h We d.
The individuals who train the operating staff, carry out M
. e c.:u u >a Mt' PyFq or perform quality assurance functions may E.y' 22 4,e report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their independence from operating pressures.
5.2.2 Unit Staff The unit staff organization shall include the following:
a.
A non licensed operator shall be assigned to each reactor containing fuel and an additional non licensed operator PAGE IM 9 OF NM q,, 3 (continued) n'" " M S 5.0 2 fJ*
"W


e ** A ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BRONNS FERRY NUCLEAR PLANT (BFN)
e ** A ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BRONNS FERRY NUCLEAR PLANT (BFN)
Line 256: Line 339:


==SUMMARY==
==SUMMARY==
The next revision of the NOAP will reflect the new position title for the Senior Nuclear Officer and will provide a general update description of the TVA Nuclear crganization. The target date for submittal of this revision to NRC is March 31, 1998.
The next revision of the NOAP will reflect the new position title for the Senior Nuclear Officer and will provide a general update description of the TVA Nuclear crganization.
The target date for submittal of this revision to NRC is March 31, 1998.
s}}
s}}

Latest revision as of 07:53, 10 December 2024

Proposed Tech Specs Section 5.0 Re Administrative Controls
ML20199E805
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/23/1998
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20199E803 List:
References
NUDOCS 9802020252
Download: ML20199E805 (22)


Text

{{#Wiki_filter:, o' e ENCLOSURE 1 TENNESSEE VALLEY AUTEORITY BROWNS FERRY NUCLEAR PLANT (EFN) UNITS 1, 2, AND 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE T8-372R1 REVISED AND MARKED PAGES I. REVISED PAGES Unitt 1. 2. and 3 6.0-2 II. MARK-UP PAGE3 Units 1. 2. and 3 6.0-2 9002020:52 900123 DR ADOCK 050002 9 _9

a e 6.2.1 (Cont'd) b. The chief Nuclear Officer shall have corporate responsibility l for overall plant nuclear safety. This individual shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical-- support in the plant so that continued nuclear safety is assured. c. The Plant Manager shall be responsible for ove.rall unit safe operation, and shall have control over those onsite resources necessary for safe operation and naintenance of the plant. d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their indepundence from operating pressures. 6.2.2 Plant Staff a. shift manning requirements, shall as a minimum, be as described in Table G.2.A and below, i b. A licensed senior rJactor operator shall be present at the site at all times when there is fuel in the reactor. c. A licensed reactor operator shall be in the control room whenever there is fuel in the reactor. BEN 6.0-2 Unit 1

j JUN30'S28 p -My/ -~ 6.2.1'(Cont'd

  1. ' ' ' 'I N ' '

'4"' "U f p .M

  • e g dhall have corporate b.

he respot:.sibility for overall plant nuclear safety. nis individual shall take any seasures needed to ensure acceptable perfor=ance of the staff in uperating, maintaining, and providing technical support in the plant so that continued nuclear safety is assured.

c. The Plant Manager shall be responsible for overall unit safe operation, and shall have control over those onsite resources necessary for safe operation and maintenance of the plant.
d. ne individuals who train the operating staff and those who carry out health physics and quality assurance functions say report to the appropriate onsite manassr; however, they shall have sufficient organizational frsedom to ensure their independence from operating pressures.

6.2.2 Plant Staff

a. Shift manning requiresants, shall as.a minimus, be as described in Table 6.2.A and below,
b. A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.

I l

c. A licensed reacter operator shall be in the control roca whenever i

there is fuel in the reactor. i SI N 6.0-2 Unit 1 H Ts fu raor AMENOMENT NO.14 9

e-e. 6.2.1 (cont'd) b. The chief Nuclear Officer shall have corporate responsibility l for overall plant nucienr safety. This individual shall take any m>asurea needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support in the plant so that continued nuc! eafety is assured. c. The Plant Manager shall be responsib1w for overall unit safe operatirs, and shall have control over those onsite resources neceanery for safe operation and maintenance of the plant. d. The individuals who train the operating staff and those who carry out heelth physics and quality assurance functions may report to the appropriate onsite manager; however, thry shall have sufficient organizational freedom to ensure their independence from operating pressures. 6.2.2 Plant Staff a. shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below. b. A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor. c. A licensed reactor operator shall be in the control room whenever there is fuel in the reactor. BFN 6.0-2 Unit 2

JUN 3 0 ;ggg __~- -hnd;;,p s, n, _ p... !:a e A - J (,$1lC t',$'VllVd( $ hhby i ri / 6.2.1 (04n ) -t v

b. 7.'

---- /shall have torpcrate I respons1 M for overall plant nuclear safety. Bis individual shall take any :sasures needed to ensure acceptable perfor:ance of the staff in operating, saistaining, and providing tect.nical support in the plant sa that tantinued nuclear safety is assured,

c. na Plant Manager'shall be respcasible for overall unit safe operation, and shall have control over thosa ensita resources f

necessary for safe operation and sairtenance of the plant. I

d. *he individuals veo train the operating staff and those who carr/ -

out healt.h physics and :iuality assurance funct:cens =ay report to the appropriate casite sanagert however, they shall have sufficient organizational freedom to ensure their independence from operating pressures. 6.2.2 Plant Statt

a. Shift aanning requirsaants, shall as a minimum, be as described in Table 6.0. A and below.
c. A 'icensed aantor reactor operator.ull te present at tne nts it all times vnen there is fuel in the reactor.
. A licensed reactor operator shall be in the control room when6ver thers is fuel in the reactor.

e 3TN 6.3-2

  • l nit 2 t s - 101 AMEN 0 MENT N0.14 5

c. 6.2.1 (Cont'd) \\ b. The chief Nuclear Officer shall have corporate l responsibility for overall plant nuclear safety. This individual shall take any measures needed to ensure acceptable performance of the staff in ope.ating, naintaining, and providing technical support in the plant so that continued nuclear safety is assured. c. The Plant Manager shall be responsible for overall unit safe operation, and shall have control over those onsite resources necessary for safe operation and maintenance of the plant. l d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite nanagers however, they shall have sufficient organizational freedom to ensure their independence from operating pressures. 6.2.2 Plant Staff a. shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below, b. A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor. c. A licensed reactor operator shall be in the control room whenever there is fuel in the reactor. BrN 6.0-2 Unit 3

o JUN 3 01988 a v onsibility, and communication shall be defined and establisied throughout highest management levels, intermediate levels, and all operating organization-positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and -relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NP0089-A); b. The Plant Manager shall be responsible for overall safe operation of the plant and shall have control over~those onsite activities necessary for safe operation and maintenance of-the plant;= l c. The Chief Nuclear Officer shall have corporate responsibility for overall_ plant nuclear safety and shall take any measures needed to ensure acceptable performance.of the staff in operating, maintaining,-and providing technical support to the plant to ensure nuclear safety; and d. The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appro)riate onsite manager;- however,.these individuals shall 1 ave sufficient organizational freedom to ensure their independence from operating pressures. 5.2.2-Unit Staff -The unit staff organization-shall include the following: (continued) BFN-UNIT 1-5.0-2 Amendment *R2 4

.. u Organization 5.2 5:0 ADMINISTRATIVE CONTROLS 5.2 Organization 5.2.1 Onsite and Offsite Oraanizations Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear power plant, a. Lines of authority, res >onsibility, and communication shall be defined and establisted throughout highest management levels, intermediate levals, and all operating organization positions. These relationships shall be documented and updated, as appropriatt., in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NPOD89-A); b. The Plant Manager shall be responsible for overall safe operation of the plant and shall have c.ontrol over those onsite activities necessary for safe operation and maintenance of the plant; l c. The Chief Nuclear Officer shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety; and d. The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appro)riate onsite manager; however, these individuals shall lave sufficient organizational freedom to ensure their independence from operati% pressures. 5.2.2 Unit Staff Tr.. unit staff organization shall include the following: (continued) BfN UNIT 2 5.0-2 Amendment *R2

l Organization 5.2 5.4 ADMINISTRATIVE CONTROLS 5.2 Orgatiization 5.2.1 Qasite and Offsite Oraanizations Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear power plant. a. Lines of authority, res >onsibility, and communication shall be defined and establis1ed throughout highest management levels, intermediate levels, and all o>erating organization positions. These relationships shall se documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Nuclear Power Organization Topical Report (TVA-NP0089-A); b. The Plant Manager shall be responsible for overall safe operation of the plant and shall have control over those onsite activities necessary for safe operation and maintenance of the plant; l c. The Chief Nuclear Officer shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, tnd providing technical support to the plant to ensure nuclear safety; and d. The individuals who train the operating staff, carry out radiological controls, or perform quality assurance functions may report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their independence from operating pressures. 5.2.2 Unit St*ff The unit staff organization shall include the following: (continued) BFN-UNIT 3 5.0-2 Amendment *R2

u BROWNS FERRY NUCLEAR PLANT IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES REVISED CURRENT TECHNICAL SPECIFICATIONS MARK UPs. Unit 1 Replaced page 5 of 50 Rev. I with page 5 of 50 Rev. 2 Unit 2 Replaced page 5 of 49 Rey, I with page 5 of 49 Rev. 2 Unit 3 Replaced page 5 of 51 Rev. I with page 5 of $1 Rev. 2 4 =_

l f ~. p) TS3% s,,aag,un <, g [.1 (Cont'd) 41 Mscer+ c movteo) C. A V.i As h,'vA lk t

c. [ [wwi9at. --" Wel:= ;.r.pchief INelear of f seed shall 1 M

-n-have_ corporate responsibility for overall plant nuclear safety Di ;f M ahall take any measures needed to ensure acceptable performance of the staff in operating, miataining, NY- __ and providing technical support in the plan nuclear safety p..... J/ Q af fne /At] h Tha Plant Manager shall be responsible for overall u.rtr. saf e operation andshallhavecontroloverthoseonsitere'sNr s) necessary for s&fe operation and maintenance of the plant) Radek tri tentnit, er Moon d. The indiv uals whs train the operating staff Q h::r_D ^ carry out t.al;r ph;:ir: :nf quality assuraace functions may report to the appropriate onsite managers however, they shall hr.ve sufficient organizational freedom to ensure their independence from operating pressures. 6 Uni + /.2.2 M ew staff ne un;+ sw a saesaw s>nu ineWe the httuise: a. hatt quarements, 1 as a min be as g ertbe in able 6.2. d below. ~.2 &.0-2Ag k lace en or re operato be p at e a all. ti when ther a fuel in t eacto p g 4+ /es6t aHD CAD) W b A / licensed /eactor [ e, tor shall be in the control room wheny -"-- i2) fuelftn the reactor. Paas c+ Stu B F'N 6.0-2 '?- s e 1 0<.

o T5 1i L. sw:l:est;,- r z. ( creepf as m M ) 5(.2.1 (cont'd) (& Qkuu~VdtfksLh yE c f. hresidtht[TVLM6c1(Sr'pnBichief Nuclear Of fice[shall U have corporate responsibility for overall plant nuclear safety.a. b ' - '. 4 m-d "i' S aha11 take any measures needed to ensure acceptable performance of the staff M operating, maintaining, and providing technical support in at plant h k_.$*: nuclear safety Ch%. /-) } }Li(k.D 6 4. The Plant Manager shall be responsible for overal1 @ safe operation) and shall have control over those onsite Y$$E$E$7 necessary for safe operation anti maintenanceoftheplanh ,a.gga..+L:x9 d. The individuals who train the operating staf " g : _-Q ~ carry out ::10. r..,;.;s and quality assurance functions may report to the appropriate onsite managers however, they shall have sufficient organisational freedom to ensure their independance from operating pressures, u '.h j #.2.2 Merre Staff tat u.. / s4 #,9..cwhem iJi,'e/ t4 /4 4/kg a. ift manning r trements, a e, a miniane, be as @ cribe n Tab e 6.2.A and below. 1 9 g,", f A licen 3s saator rea or operato hall be pres t the site ~ at aH times when there is fuel in the reactor, f m w.w.-D w.,. - ,+ b 4. licensed glactor gera or shall be in the control room o wha,_ _;if.;;_; i;) fuel n the reactor. b OF PAGE BFN 6.0-2 Unit 2 g,q_)

T559% e Stes@ cati a F.2. (A W h ,J.~ N.Su. w iym Q R2l f 2.1 (cont'd) L c [ dh( fred 14enV17A' bkseptVa@ thief Nuclear of fice shall l $1 have corpo p responsibility for overall plant nuclear I safety / L'M:jshalltakeanymeasuresneededto ensure acceptable performance,cf the staff in operating, 'm_a_ int aininig, an_d providing technical support in the plant (;;.0. $-"hnuclear safetyb :::ur:dj ead) f 4Ac 6, M The Plant Manager shall be responsible for overal1 M ufe ration and shall have control over those onsite (_ e e

_, - necessary for safe operation and maintenance of nud
elnitsl fonweis,sr f The individuals who train the operating staf [ xd e-r D d.

carry ou M 1-' -'"-*- c/ quality assurance functions may report to the appropriate onsite managers however, they shall have aufficient organizational freedom to ensure their independence from operating pressures. t b Iln.'F f .2.2 M es& staff The us't staff **pesineHm Stj inc.lde tM bll***'**); a hitt ing r ireme s, shall a a mini , be s '. Wit d cribe n Table .2.A d below. I4 j 6.0 24) b. license senior tor ope shall asen th j si at all imes wh there in =1 in the actor. /ederat) fIfa I $, M ] licensed /eactor per 7 tgshall be in the control roem whe t t-uel in the reactor. 4 FAG.5_ 8 Cf. 5 % BrN 6.0-2 Unit 3

BROWNS FERRY NUCLEAR PLANF IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES REVISED CURRENT TECHNICAL SPECIFICATIONS JUSTIFIC ATION FOk CHANGES Replaced kstification for Change Section 5.1 page ! !tev. O v4th Justification for Change Section 5.1 page 1 and 2 Rev.1 y --y ~ s.

s. JUSTIFICATION FOR CHANGES SECTION 5.1 - RESPONSIBILITY ADMINISTRATIVE CHANSES Al Reformatting and renumbering are in accordance with the BWR Standard Technical Specifications, NUREG 1433. As a result the Technical Specifications should be more readily-readable, and therefore, understandable by plant operators as well as other users. -The reformatting, renumbering, and rewording process involves no technical changes to existing Technical Specifications. Editorial-rewording (either adding or deletir,g) is done to make consistent with NUREG-1433. During ISTS development certain wording preferences or English language conventions were adopted which resulted in no technical changes (either actual or interpretational)been added to to the Technical Specifications. Additional infomation has also more fully describe each subsection. This wording is consistent with the BWR Standard Technical Specifications, NUREG-1433. Since the design is already approved, adding more detail does not result in a technical change. A2 Site Vice President (SVP) added to BFN ISTS 5.1.1 to clarify that the SVP is responsible for the overall activities of the site and to require him to delegate that responsibility when absent.- Changed the position title " Site Director" to " Site Vice President." - This is not new information in terms of present site organization but does detail not described in existing Technical Specifications. provide Also, in ISTS 5.2.1.c, the title Chief Nuclear Officer is used to reflect the title of corporate executive position responsible for overall plant safety. TECHNICAL CHANGES - NORE RESTRICTIVE M1 This change proposes to add a requirement in Technical Specifications-for the Plant Manager, or his designee, to approve prior to implementation, each proposed test, or experiment to systems or equipment that affect nuclear safety. This change ensures the Plant Manager is aware of all changes with the potential to affect nuclear safety. This change adds requirements to the Technical Specifications e' which constitute a more restrictive change. This change is consistent -with NUREG-1433, Rev. 1. BFN UNITS 1, 2, & 3 1 Revision 1

JUSTIFICATION FOR CHANGES SECTION 5.1 - RESPON51BILITY M2 This change proposed to specify the qualifications of the individual, who is designated to be responsible for the control room command function in the absence of the Shift Manager. In the CTS, no qualifications are specified for the designated individual. The change will require one of the two licensed operators to have an SRO during Modes 1.-2, and 3. Since this requirement will require one of the licensed operators to have an SR0 (whereas currently both could have an RO) this is considered a more restrictive change. This change it consistent with NUREG-1433, Rev. 1. BFN-UNITS 1, 2, & 3 2 Revision 1

. so BROWNS FERRY NUCLEAR PLANT. IMPROVED TECHNICAL SPECIFICATIONS SECTION 5.0 LIST OF REVISED PAGES + NUREG 1433 BWR/4 STANDARD TECHNICAL SPECIFICATIONS MARK UP Replaced page 449 of 478 Rev.1 (STS page 5.0 2) with page 449 of 478 Rev. 2 . -. ~

e Organization 5.2 l 5.0 ADMINISTRATIVE CONTROLS 5.2 Organization j 5.2.1 Onsite and Offsite Oraanizatigni Onsite thd offsite organizations shall be established fo unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of ti,e nuclear power plant. l a. Lines of authority, responsibility, and communication shall be defined and estab'lished throughout highest management levels, intermediate levels, and all operating organization positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descrit.tions of departmental responsibilities and relatior. ships, and job descriptions for key personnel positions, or in equivalent forms of documentation. The ta __- requirements shall be doraaented in they"".); ,Jf' A &cr d$onAh p, b.hThe (Plant 5"aM"Ta,daa9 shall be responsible or overall safe operation of the plant and shall have control over those onsite activities necessary fer safe operation and maintenance of the plant; U c. T -{ e W 'hd w, pume wee,a p;-iti: ) shall have orporate responsibility for overall plant nuclear safety --= FM k TrA and shall take any measures needed to ensure acceptable 5-J performance of the staff in operating, maintaining, and e6;d N k providing technical support to the_ plant to ensure nuclear e/A eq _ safety; and ,,],gga yf,1@( 91 , Md h We d. The individuals who train the operating staff, carry out M . e c.:u u >a Mt' PyFq or perform quality assurance functions may E.y' 22 4,e report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their independence from operating pressures. 5.2.2 Unit Staff The unit staff organization shall include the following: a. A non licensed operator shall be assigned to each reactor containing fuel and an additional non licensed operator PAGE IM 9 OF NM q,, 3 (continued) n'" " M S 5.0 2 fJ* "W

e ** A ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BRONNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 PROFDSED TECHNICAL SPECIFICATION (TS) CHANGE TS-372R1 COMMITMENT

SUMMARY

The next revision of the NOAP will reflect the new position title for the Senior Nuclear Officer and will provide a general update description of the TVA Nuclear crganization. The target date for submittal of this revision to NRC is March 31, 1998. s}}