Tennessee vatiey Authonty. Post Offce Box 2000. SoddcDaisy Tennessee 37379 January 14, 1999 U.S. Nuclear Regulatory Commission ATTN:           Document Control Desk Washington, D.C. 20555 Gentlemen:
Tennessee vatiey Authonty. Post Offce Box 2000. SoddcDaisy Tennessee 37379 January 14, 1999 U.S.
In the Matter of                                               )             Docket Nos. 50-327 Tennessee Valley Authority                                     )                         50-328 SEQUOYAH NUCLEAR PLANT (SQN) - DECEMBER MONTHLY OPERATING REPORT The enclosure provides the December Monthly Operating Report as required by SON Technical Specifications Section 6.9.1.10.
Nuclear Regulatory Commission ATTN:
If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D.                                   Smith at (423) 843-6672.
Document Control Desk Washington, D.C.
Sincerely,                         &
20555 Gentlemen:
Pe to Salas Licensing and Industry Affairs Manager Enclosure cc:       See page 2 ge\           '
In the Matter of
220013 9901220274 981231                                         ~
)
gDR             ADOCK 05000327 PDR
Docket Nos.
50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - DECEMBER MONTHLY OPERATING REPORT The enclosure provides the December Monthly Operating Report as required by SON Technical Specifications Section 6.9.1.10.
If you have any questions concerning this matter, please call me at (423) 843-7170 or J.
D. Smith at (423) 843-6672.
Sincerely, Pe to Salas Licensing and Industry Affairs Manager Enclosure cc:
See page 2 ge\\
220013 9901220274 981231
~
gDR ADOCK 05000327 PDR


l U.S. Nuclear Regulatory Commission                                                                                           i Page 2 January 14, 1999 JDS:JWP:PMB cc (Enclosure):
l U.S.
Mr. R. W. Hernan, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5947 Ms. Barbara Lewis, Assistant Editor, Database McGraw-Hill, Inc.
Nuclear Regulatory Commission i
Page 2 January 14, 1999 JDS:JWP:PMB cc (Enclosure):
Mr.
R. W.
Hernan, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5947 Ms. Barbara Lewis, Assistant Editor, Database McGraw-Hill, Inc.
1200 G Street, NW, Suite 1100
1200 G Street, NW, Suite 1100
                      ' Washington, D.C. 20005 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624                                                                                 q Regional Administrator U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, suite 23T85                                                                               ;
' Washington, D.C.
Atlanta, Georgia.30303-3415                                                                                       l l
20005 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 q
Regional Administrator U.S.
Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, suite 23T85 Atlanta, Georgia.30303-3415


    ,. 's ENCLOSURE l
's ENCLOSURE l
i i
i i
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN) l l
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN) l l
l MONTHLY OPERATING REPORT 1
l MONTHLY OPERATING REPORT l
l l
1 l
DECEMBER 1998 I
DECEMBER 1998 l
l UNIT 1 DOCKET NUMBER 50-327 l
UNIT 1 DOCKET NUMBER 50-327 l
l                 LICENSE NUMBER DPR-77 1
l LICENSE NUMBER DPR-77 1
UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 l
UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 l
l r
l r
l l
l l


  .. 's 1       .    .
's 1
1 l
1 l
t OPERATIONAL SUMIGRY DECEMBER 1998 l
t OPERATIONAL SUMIGRY DECEMBER 1998 l
I. SEQUOYAH OPERATIONAL  
I.
SEQUOYAH OPERATIONAL  


==SUMMARY==
==SUMMARY==
 
UNIT 1 Unit 1 generated 883,974 megawatthours (MWh) (gross) electrical power during December with a capacity factor of 102.3 percent.
UNIT 1 Unit 1 generated 883,974 megawatthours (MWh) (gross) electrical power during December with a capacity factor of 102.3 percent. Unit 1 operated at 100 percent power       i throughout the month of December.                         '
Unit 1 operated at 100 percent power i
throughout the month of December.
UNIT 2 l
UNIT 2 l
l Unit 2 generated 879,909 MWh (gross) electrical power during December with a capacity factor of 102.3 percent. l Unit 2 operated at 100 percent power throughout the month '
Unit 2 generated 879,909 MWh (gross) electrical power during December with a capacity factor of 102.3 percent.
of December.
Unit 2 operated at 100 percent power throughout the month of December.
l l
l II.
II. CHALLENGES TO THE PRESSURIZER POWER-OPERATED RELIEF VALVES (PORVs) OR PRESSURIZER SAFETY VALVES No PORVs or safety valves were challenged in December.
CHALLENGES TO THE PRESSURIZER POWER-OPERATED RELIEF VALVES (PORVs) OR PRESSURIZER SAFETY VALVES No PORVs or safety valves were challenged in December.
1
1 l
!                                                                          l l
l E-l l
l                                         E-l l
l
l


  .. 's AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.         50-327     UNIT NO.         ONE       DATE: January 8,   1999 COMPLETED BY:           Tanya J. Hollomon TELEPHONE:                 (423) 843-7528 MONTH:       DECEMBER 1998 AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL DAY                 (MWe-Net)                       DAY             (MWe-Net)
's AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
: 1.                     1154                         17.                 1153
50-327 UNIT NO.
: 2.                     1152                         18.                 1153
ONE DATE:
: 3.                     1151                         19.                 1153
January 8, 1999 COMPLETED BY:
: 4.                     1151                         20.                 1156
Tanya J. Hollomon TELEPHONE:
: 5.                     1153                         21.                 1152
(423) 843-7528 MONTH:
: 6.                     1150                         22.                 1152
DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
: 7.                     1150                         23.                 1153
DAY (MWe-Net) 1.
: 8.                     1150                         24.                 1155
1154 17.
: 9.                   1151                         25.                 1153
1153 2.
: 10.                       1153                         26.                 1156
1152 18.
: 11.                       1151                         27.                 1154 12                       1152                         28.                 1154
1153 3.
: 13.                       1152                         29.                 1154
1151 19.
: 14.                       1153                         30.                 1153
1153 4.
: 15.                       1153                         31.                 1155
1151 20.
: 16.                       1152 E-2 l           .    .. .  .
1156 5.
1153 21.
1152 6.
1150 22.
1152 7.
1150 23.
1153 8.
1150 24.
1155 9.
1151 25.
1153 10.
1153 26.
1156 11.
1151 27.
1154 12 1152 28.
1154 13.
1152 29.
1154 14.
1153 30.
1153 15.
1153 31.
1155 16.
1152 E-2 l


;  o  's                                                                                 l l
's o
I l
I AVERAGE DAILY UNIT POWER LEVEL 2
AVERAGE DAILY UNIT POWER LEVEL                             2 l
l DOCKET NO.
l DOCKET NO.     50-328     UNIT NO. TWO   DATE: January 8,   1999       )
50-328 UNIT NO.
COMPLETED BY:       Tanya J. Ho11omon TELEPHONE:       (423) 843-7528       i l
TWO DATE:
MONTH:     DECEMBER 1998                                                   j l
January 8, 1999 COMPLETED BY:
AVERAGE DAILY POWER LEVEL                 AVERAGE DAILY POWER LEVEL l DAY             (MWe-Net)               DAY             (MWe-Net)       l
Tanya J. Ho11omon TELEPHONE:
: 1.                 1153                 17.               1152 1
(423) 843-7528 i
: 2.                 1151                 18.               1150         l
l MONTH:
: 3.                 1151                 19.               1152         i l
DECEMBER 1998 j
: 4.                 1149                 20.               1152         l S.                 1153                 21.               1152
l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
: 6.                 1151                 22.               1149
DAY (MWe-Net) l 1.
: 7.                 1146                 23.               1152
1153 17.
: 8.                 1150                 24.               1152         i I
1152 2.
: 9.                 1151                 25.               1147
1151 18.
: 10.                   1146                 26.               1145
1150 3.
: 11.                   1153                 27.               1146         l 12                     1153                 28.               1146
1151 19.
: 13.                   1151                 29.               1146
1152 i
: 14.                   1142                 30.               1143
4.
: 15.                   1149                 31.               1145
1149 20.
: 16.                   1149 l
1152 S.
1153 21.
1152 6.
1151 22.
1149 7.
1146 23.
1152 8.
1150 24.
1152 i
9.
1151 25.
1147 10.
1146 26.
1145 11.
1153 27.
1146 12 1153 28.
1146 13.
1151 29.
1146 14.
1142 30.
1143 15.
1149 31.
1145 16.
1149 l
I i
I i
E-3
E-3


l   ..    .                                                                                                                              \
\\
\
l
l l                                                   OPERATING DATA REPORT l
\\
Docket No.                     50-327 Date:                           January 8,1999 Completed By:                   T. J. IIollomon Telephone:                     (423) 843-7528
l l
: 1.       Unit Name:                                                           SQN Unit 1
OPERATING DATA REPORT l
: 2.       Reporting Period:                                                   December 1998
Docket No.
: 3.       Licensed Thermal Power (MWt):                                       3411.0
50-327 Date:
: 4.       Nameplate Rating (Gross Mwe):                                       1220.6 5,       Design Electrical Rating (Net Mwe):                                 1148.0
January 8,1999 Completed By:
: 6.       Maximum Dependable Capacity (Gross MWe):                             1161 l
T. J. IIollomon Telephone:
l          7.       Maximum Dependable Capacity (Net MWe):                               1122                                           l i
(423) 843-7528 1.
: 8.       If changes Occur in Capacity Rating (Item Numbers 3 & 7) Since Last Report, Give Reasons: N/A                       {
Unit Name:
l           9.       Power Level To Which Restricted, if any (net MWe): N/A                                                               I I          10..     Reasons for Restrictions,if any: N/A                                                                                 l This Month             Yr-to-Date         Cumulative     i l 1.     Ilours in Reporting Period                                 744                     8,760             153,433       l
SQN Unit 1 2.
: 12.       Number of flours Reactor was Critical                     744.0                   8,021.4           92,877
Reporting Period:
: 13.       Reactor Reserve Shutdown Ilours                           0.0                     0.0               0.0
December 1998 3.
: 14.       Hours Generator On-Line                                   744.0                   7,967.7           91,027.3
Licensed Thermal Power (MWt):
: 15.       Unit Resen'e Shutdown IIours                               0.0                     0.0               0.0           i l         16.       Gross Thermal Energy Generated (MWh)                       2,536,077.6             26,677,425.1       297,921,420   l
3411.0 4.
: 17.       Gross Electric Energy Generated (MWh)                     883,974                 9,214,498         101,615,625 l         18.       Net Electrical Energy Generated (MWh)                     856,646                 8,905,682         97,605,579
Nameplate Rating (Gross Mwe):
: 19.       Unit Sen' ice Factor                                       100.0                   91.0               59.3
1220.6 5,
: 20.       Unit Availability Factor                                   100.0                   91.0               59.3 l         21.       Unit Capacity Factor (Using MDC Net)                       102.6                   90.6               56.7
Design Electrical Rating (Net Mwe):
: 22.       Unit Capacity Factor (Using DER Net)                       100.3                   88.6             55.4           1
1148.0 6.
: 23.       Unit Forced Outage Rate                                   0.0                     1.1               28.2         )
Maximum Dependable Capacity (Gross MWe):
: 24.       Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): This information is no loncer reauired by NRC.
1161 l
: 25.       If Shutdown at End of Report Period, Estimate Date of Startup. N/A l
7.
Maximum Dependable Capacity (Net MWe):
1122 i
8.
If changes Occur in Capacity Rating (Item Numbers 3 & 7) Since Last Report, Give Reasons: N/A
{
l 9.
Power Level To Which Restricted, if any (net MWe): N/A I
10..
Reasons for Restrictions,if any: N/A This Month Yr-to-Date Cumulative i
l 1.
Ilours in Reporting Period 744 8,760 153,433 12.
Number of flours Reactor was Critical 744.0 8,021.4 92,877 13.
Reactor Reserve Shutdown Ilours 0.0 0.0 0.0 14.
Hours Generator On-Line 744.0 7,967.7 91,027.3 15.
Unit Resen'e Shutdown IIours 0.0 0.0 0.0 i
l 16.
Gross Thermal Energy Generated (MWh) 2,536,077.6 26,677,425.1 297,921,420 l
17.
Gross Electric Energy Generated (MWh) 883,974 9,214,498 101,615,625 l
18.
Net Electrical Energy Generated (MWh) 856,646 8,905,682 97,605,579 19.
Unit Sen' ice Factor 100.0 91.0 59.3 20.
Unit Availability Factor 100.0 91.0 59.3 l
21.
Unit Capacity Factor (Using MDC Net) 102.6 90.6 56.7 22.
Unit Capacity Factor (Using DER Net) 100.3 88.6 55.4 1
23.
Unit Forced Outage Rate 0.0 1.1 28.2
)
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): This information is no loncer reauired by NRC.
25.
If Shutdown at End of Report Period, Estimate Date of Startup. N/A l
l 1
l 1
s E-4
s E-4


      ..  .r l
.r l
l l
l OPERATING DATA REPORT i
OPERATING DATA REPORT                                                               ,
Docket No.
i Docket No.                     50-328                     l Date:                         January 8,1999             j Completed By:                 T. J. Hollomon             ;
50-328 l
Telephone:                     (423) 843-7528             l
Date:
: 1. Unit Name:                                                       SQN Unit 2
January 8,1999 j
: 2. Reporting Period:                                                 December 1998                                 I
Completed By:
: 3. Licensed Thermal Power (MWt):                                   3411.0
T. J. Hollomon Telephone:
: 4. Nameplate Rating (Gross Mwe):                                     1220.6
(423) 843-7528 l
: 5. Design Electrical Rating (Net Mwe):                               1148.0
1.
: 6. Maximum Dependable Capacity (Gross MWe):                         1156                                           !
Unit Name:
: 7.   ' Maximum Dependable Capacity (Net MWe):                           1117                                           *
SQN Unit 2 2.
: 8.   , if changes Occur in Capacity Rating (Item Numbers 3 & 7) Since Last Report, Give Reasons: N/A
Reporting Period:
: 9. : Power Level To Which Restricted, If any (net MWe): N/A
December 1998 I
: 10. Reasons for Restrictions,If any: N/A l                                                                           This Month       Yr-to-Date               Cumulative
3.
: 11. Hours in Reporting Period                             744             8,760                     145,393
Licensed Thermal Power (MWt):
: 12. Number of Hours Reactor was Critical                   744.0           8,674.4                   96,330 l           13. Reactor Reserve Shutdown Hours                         0.0             0.0                       0.0 l           14. Hours Generator On-Line                               744.0           8,657.3                   94,331.8
3411.0 4.
: 15. Unit Reserve Shutdown Hours                           0.0             0.0                       0.0 l           16. Gross Thermal Energy Generated (MWh)                   2,535,727.2     29,430,137.1             303,407,474 l           17. Gross Electric Energy Generated (MWh)                 879.909         10,106,721               103,332,085 l           18. Net Electrical Energy Generated (MWh)                 854,149         9,799.593                 99,204,955
Nameplate Rating (Gross Mwe):
: 19. Unit Service Factor                                   100.0           98.8                     64.9
1220.6 5.
: 20. Unit Availability Factor                               100.0           98.8                     64.9 i           21. Unit Capacity Factor (Using MDC Net)                   102.8           100.1                     61.1
Design Electrical Rating (Net Mwe):
: 22. Unit Capacity Factor (Using DER Net)                   100.0           97.4                     59.4
1148.0 6.
: 23. Unit Forced Outage Rate                                 0.0             1.2                       27.3 l           24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): This information is no i                   longer reauired by NRC.
Maximum Dependable Capacity (Gross MWe):
: 25. If Shutdown at End of Report Period, Estimate Date of Startup. N/A i
1156 7.
a E-5
' Maximum Dependable Capacity (Net MWe):
1117 8.
, if changes Occur in Capacity Rating (Item Numbers 3 & 7) Since Last Report, Give Reasons: N/A 9.
: Power Level To Which Restricted, If any (net MWe): N/A 10.
Reasons for Restrictions,If any: N/A l
This Month Yr-to-Date Cumulative 11.
Hours in Reporting Period 744 8,760 145,393 12.
Number of Hours Reactor was Critical 744.0 8,674.4 96,330 l
13.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 l
14.
Hours Generator On-Line 744.0 8,657.3 94,331.8 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16.
Gross Thermal Energy Generated (MWh) 2,535,727.2 29,430,137.1 303,407,474 l
17.
Gross Electric Energy Generated (MWh) 879.909 10,106,721 103,332,085 l
18.
Net Electrical Energy Generated (MWh) 854,149 9,799.593 99,204,955 19.
Unit Service Factor 100.0 98.8 64.9 20.
Unit Availability Factor 100.0 98.8 64.9 i
21.
Unit Capacity Factor (Using MDC Net) 102.8 100.1 61.1 22.
Unit Capacity Factor (Using DER Net) 100.0 97.4 59.4 23.
Unit Forced Outage Rate 0.0 1.2 27.3 l
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): This information is no i
longer reauired by NRC.
25.
If Shutdown at End of Report Period, Estimate Date of Startup. N/A i
a
('
('
E-5


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                             ;
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 1998 DOCKET NO:
REPORT MONTH: DECEMBER 1998 DOCKET NO:                                       50-327 UNIT NAME:                                       SQN-1           ,
50-327 UNIT NAME:
DATE:                                             January 8,1999 COMPLETED BY: T. J. Hollomon TELEPHONE:                                         (423) 843-7528 No. Date Type'     Duration           Reason
SQN-1 DATE:
* Method of Licensee                                                 System Component Cause and Corrective Action to Prevent d                                         5 (Hours)                                               Shutting     Event Report Code                                   Code                                                               Recurrence Down         No.
January 8,1999 COMPLETED BY: T. J. Hollomon TELEPHONE:
Reactor3 There were no outages or power reductions of greater than 20 percent in the average daily power level during December.
(423) 843-7528 No.
2                                                                          3
Date Type' Duration Reason
' F: Forced     Reason:                                                                   Method                                                                               ' Exhibit G - Instructions for (NUREG S: Scheduled   A-Equipment Failure (Explain)                                               1-Manual                                                                                 Preparation of Data Entry sheets B-Maintenance or Test                                                     2-Manual Scram                                                                           for Licensee Event Report (LER)
* Method of Licensee System Component Cause and Corrective Action to Prevent d
C-Refueling                                                               3-Automatic Scram                                                                         File - NUREG - 1022 D-Regulatory Restriction                                                   4-Continuation of Existing E-Operator Training and License                                             Outage 8
5 (Hours)
Examination                                                               S-Reduction                                                                                 Exhibit I-Same Source F-Administrative                                                         9-Other G-Operational Error (Explain) 11- Other (Exp?ain)
Shutting Event Report Code Code Recurrence Down No.
3 Reactor There were no outages or power reductions of greater than 20 percent in the average daily power level during December.
' F: Forced 2 Reason:
Method
' Exhibit G - Instructions for (NUREG 3
S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER)
C-Refueling 3-Automatic Scram File - NUREG - 1022 D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage 8
Examination S-Reduction Exhibit I-Same Source F-Administrative 9-Other G-Operational Error (Explain) 11-Other (Exp?ain)
E-6
E-6


UNIT SilUTDOWNS AND POWER REDUCTIONS                                                                                                                           ;
UNIT SilUTDOWNS AND POWER REDUCTIONS REPORT MONTil: DECEMBER 1998 DOCKET NO:
REPORT MONTil: DECEMBER 1998 DOCKET NO:                   50-328 UNIT NAME:                 SQN-2                                               .
50-328 UNIT NAME:
DATE:                       January 8,1999 COMPLETED BY: T. J. IIollomon TELEPIIONE:                 (423) 843-7528 No.             Date               Type'         Duration                     Reason
SQN-2 DATE:
* Method of Licensee Event System Component                                                                                       Cause and Corrective Action to 5
January 8,1999 COMPLETED BY: T. J. IIollomon TELEPIIONE:
(Hours)                                                             Shutting                                     Report No.           Code'   Code                 Prevent Recurrence Down-Reactor' There were no outages or power reductions of greater than 20 percent in the average daily power level during December.
(423) 843-7528 No.
i 2
Date Type' Duration Reason
' F: Forced                            Reason:                                                                                                                     ' Method
* Method of Licensee Event System Component Cause and Corrective Action to (Hours)
* Exhibit G - Instructions for (NUREG S: Scheduled                         A-Equipment Failure (Explain)                                                                                                 1-Manual                               Preparation of Data Entry sheets B-Maintenance or Test                                                                                                         2-Manual Scram                         for Licensee Event Report (LER)
Shutting Report No.
C-Refueling                                                                                                                   3-Automatic Scram                       File - NUREG - 1022 D-Regulatory Restriction                                                                                                     4-Continuation of Existing E-Operator Training and License                                                                                                   Outage 8                                                                                           '
Code' Code Prevent Recurrence 5
Examination                                                                                                                   5-Reduction                             Exhibit I-Same Source F-Administrative                                                                                                             9-Other G-Operational Error (Explain) 11- Other (Explain)
Down-Reactor' There were no outages or power reductions of greater than 20 percent in the average daily power level during December.
i Reason:
' Method
* Exhibit G - Instructions for (NUREG
' F: Forced 2
S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER)
C-Refueling 3-Automatic Scram File - NUREG - 1022 D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage 8
Examination 5-Reduction Exhibit I-Same Source F-Administrative 9-Other G-Operational Error (Explain) 11-Other (Explain)
E-7
E-7
_ _ _ . .                          _ _ _ _    -._ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ . _ _                                          - _. _ . -        ___                    _- _ _ _ _ _ _ _ _                          .-}}
.-}}

Latest revision as of 07:34, 10 December 2024

Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20199G364
Person / Time
Site: Sequoyah  
Issue date: 12/31/1998
From: Hollomon T, Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9901220274
Download: ML20199G364 (10)


Text

......

Tennessee vatiey Authonty. Post Offce Box 2000. SoddcDaisy Tennessee 37379 January 14, 1999 U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos.

50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - DECEMBER MONTHLY OPERATING REPORT The enclosure provides the December Monthly Operating Report as required by SON Technical Specifications Section 6.9.1.10.

If you have any questions concerning this matter, please call me at (423) 843-7170 or J.

D. Smith at (423) 843-6672.

Sincerely, Pe to Salas Licensing and Industry Affairs Manager Enclosure cc:

See page 2 ge\\

220013 9901220274 981231

~

gDR ADOCK 05000327 PDR

l U.S.

Nuclear Regulatory Commission i

Page 2 January 14, 1999 JDS:JWP:PMB cc (Enclosure):

Mr.

R. W.

Hernan, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5947 Ms. Barbara Lewis, Assistant Editor, Database McGraw-Hill, Inc.

1200 G Street, NW, Suite 1100

' Washington, D.C.

20005 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 q

Regional Administrator U.S.

Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, suite 23T85 Atlanta, Georgia.30303-3415

's ENCLOSURE l

i i

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN) l l

l MONTHLY OPERATING REPORT l

1 l

DECEMBER 1998 l

UNIT 1 DOCKET NUMBER 50-327 l

l LICENSE NUMBER DPR-77 1

UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 l

l r

l l

's 1

1 l

t OPERATIONAL SUMIGRY DECEMBER 1998 l

I.

SEQUOYAH OPERATIONAL

SUMMARY

UNIT 1 Unit 1 generated 883,974 megawatthours (MWh) (gross) electrical power during December with a capacity factor of 102.3 percent.

Unit 1 operated at 100 percent power i

throughout the month of December.

UNIT 2 l

Unit 2 generated 879,909 MWh (gross) electrical power during December with a capacity factor of 102.3 percent.

Unit 2 operated at 100 percent power throughout the month of December.

l II.

CHALLENGES TO THE PRESSURIZER POWER-OPERATED RELIEF VALVES (PORVs) OR PRESSURIZER SAFETY VALVES No PORVs or safety valves were challenged in December.

1 l

l E-l l

l

's AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-327 UNIT NO.

ONE DATE:

January 8, 1999 COMPLETED BY:

Tanya J. Hollomon TELEPHONE:

(423) 843-7528 MONTH:

DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1.

1154 17.

1153 2.

1152 18.

1153 3.

1151 19.

1153 4.

1151 20.

1156 5.

1153 21.

1152 6.

1150 22.

1152 7.

1150 23.

1153 8.

1150 24.

1155 9.

1151 25.

1153 10.

1153 26.

1156 11.

1151 27.

1154 12 1152 28.

1154 13.

1152 29.

1154 14.

1153 30.

1153 15.

1153 31.

1155 16.

1152 E-2 l

's o

I AVERAGE DAILY UNIT POWER LEVEL 2

l DOCKET NO.

50-328 UNIT NO.

TWO DATE:

January 8, 1999 COMPLETED BY:

Tanya J. Ho11omon TELEPHONE:

(423) 843-7528 i

l MONTH:

DECEMBER 1998 j

l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)

DAY (MWe-Net) l 1.

1153 17.

1152 2.

1151 18.

1150 3.

1151 19.

1152 i

4.

1149 20.

1152 S.

1153 21.

1152 6.

1151 22.

1149 7.

1146 23.

1152 8.

1150 24.

1152 i

9.

1151 25.

1147 10.

1146 26.

1145 11.

1153 27.

1146 12 1153 28.

1146 13.

1151 29.

1146 14.

1142 30.

1143 15.

1149 31.

1145 16.

1149 l

I i

E-3

\\

l

\\

l l

OPERATING DATA REPORT l

Docket No.

50-327 Date:

January 8,1999 Completed By:

T. J. IIollomon Telephone:

(423) 843-7528 1.

Unit Name:

SQN Unit 1 2.

Reporting Period:

December 1998 3.

Licensed Thermal Power (MWt):

3411.0 4.

Nameplate Rating (Gross Mwe):

1220.6 5,

Design Electrical Rating (Net Mwe):

1148.0 6.

Maximum Dependable Capacity (Gross MWe):

1161 l

7.

Maximum Dependable Capacity (Net MWe):

1122 i

8.

If changes Occur in Capacity Rating (Item Numbers 3 & 7) Since Last Report, Give Reasons: N/A

{

l 9.

Power Level To Which Restricted, if any (net MWe): N/A I

10..

Reasons for Restrictions,if any: N/A This Month Yr-to-Date Cumulative i

l 1.

Ilours in Reporting Period 744 8,760 153,433 12.

Number of flours Reactor was Critical 744.0 8,021.4 92,877 13.

Reactor Reserve Shutdown Ilours 0.0 0.0 0.0 14.

Hours Generator On-Line 744.0 7,967.7 91,027.3 15.

Unit Resen'e Shutdown IIours 0.0 0.0 0.0 i

l 16.

Gross Thermal Energy Generated (MWh) 2,536,077.6 26,677,425.1 297,921,420 l

17.

Gross Electric Energy Generated (MWh) 883,974 9,214,498 101,615,625 l

18.

Net Electrical Energy Generated (MWh) 856,646 8,905,682 97,605,579 19.

Unit Sen' ice Factor 100.0 91.0 59.3 20.

Unit Availability Factor 100.0 91.0 59.3 l

21.

Unit Capacity Factor (Using MDC Net) 102.6 90.6 56.7 22.

Unit Capacity Factor (Using DER Net) 100.3 88.6 55.4 1

23.

Unit Forced Outage Rate 0.0 1.1 28.2

)

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): This information is no loncer reauired by NRC.

25.

If Shutdown at End of Report Period, Estimate Date of Startup. N/A l

l 1

s E-4

.r l

l OPERATING DATA REPORT i

Docket No.

50-328 l

Date:

January 8,1999 j

Completed By:

T. J. Hollomon Telephone:

(423) 843-7528 l

1.

Unit Name:

SQN Unit 2 2.

Reporting Period:

December 1998 I

3.

Licensed Thermal Power (MWt):

3411.0 4.

Nameplate Rating (Gross Mwe):

1220.6 5.

Design Electrical Rating (Net Mwe):

1148.0 6.

Maximum Dependable Capacity (Gross MWe):

1156 7.

' Maximum Dependable Capacity (Net MWe):

1117 8.

, if changes Occur in Capacity Rating (Item Numbers 3 & 7) Since Last Report, Give Reasons: N/A 9.

Power Level To Which Restricted, If any (net MWe): N/A 10.

Reasons for Restrictions,If any: N/A l

This Month Yr-to-Date Cumulative 11.

Hours in Reporting Period 744 8,760 145,393 12.

Number of Hours Reactor was Critical 744.0 8,674.4 96,330 l

13.

Reactor Reserve Shutdown Hours 0.0 0.0 0.0 l

14.

Hours Generator On-Line 744.0 8,657.3 94,331.8 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 l

16.

Gross Thermal Energy Generated (MWh) 2,535,727.2 29,430,137.1 303,407,474 l

17.

Gross Electric Energy Generated (MWh) 879.909 10,106,721 103,332,085 l

18.

Net Electrical Energy Generated (MWh) 854,149 9,799.593 99,204,955 19.

Unit Service Factor 100.0 98.8 64.9 20.

Unit Availability Factor 100.0 98.8 64.9 i

21.

Unit Capacity Factor (Using MDC Net) 102.8 100.1 61.1 22.

Unit Capacity Factor (Using DER Net) 100.0 97.4 59.4 23.

Unit Forced Outage Rate 0.0 1.2 27.3 l

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): This information is no i

longer reauired by NRC.

25.

If Shutdown at End of Report Period, Estimate Date of Startup. N/A i

a

('

E-5

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 1998 DOCKET NO:

50-327 UNIT NAME:

SQN-1 DATE:

January 8,1999 COMPLETED BY: T. J. Hollomon TELEPHONE:

(423) 843-7528 No.

Date Type' Duration Reason

  • Method of Licensee System Component Cause and Corrective Action to Prevent d

5 (Hours)

Shutting Event Report Code Code Recurrence Down No.

3 Reactor There were no outages or power reductions of greater than 20 percent in the average daily power level during December.

' F: Forced 2 Reason:

Method

' Exhibit G - Instructions for (NUREG 3

S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER)

C-Refueling 3-Automatic Scram File - NUREG - 1022 D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage 8

Examination S-Reduction Exhibit I-Same Source F-Administrative 9-Other G-Operational Error (Explain) 11-Other (Exp?ain)

E-6

UNIT SilUTDOWNS AND POWER REDUCTIONS REPORT MONTil: DECEMBER 1998 DOCKET NO:

50-328 UNIT NAME:

SQN-2 DATE:

January 8,1999 COMPLETED BY: T. J. IIollomon TELEPIIONE:

(423) 843-7528 No.

Date Type' Duration Reason

  • Method of Licensee Event System Component Cause and Corrective Action to (Hours)

Shutting Report No.

Code' Code Prevent Recurrence 5

Down-Reactor' There were no outages or power reductions of greater than 20 percent in the average daily power level during December.

i Reason:

' Method

  • Exhibit G - Instructions for (NUREG

' F: Forced 2

S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER)

C-Refueling 3-Automatic Scram File - NUREG - 1022 D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage 8

Examination 5-Reduction Exhibit I-Same Source F-Administrative 9-Other G-Operational Error (Explain) 11-Other (Explain)

E-7

.-