ML20199G997: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:d GeorgiaJoisBGRoa0@                                               Office of Radiological Safety i                 echnagy                                                           e00 ^tleet>c o<>ve Atlanta, Georgia 30332-0425
{{#Wiki_filter:d GeorgiaJoisBGRoa0@
Office of Radiological Safety i
echnagy e00 ^tleet>c o<>ve
{
{
m                                                                 (404) 894-3605 FAX: (404) 894-9325 November 17,1997 United States Nuclear Regulatory Commission Washington, D.C.       20555-0001 Attention:     Document Control Desk
Atlanta, Georgia 30332-0425 m
(404) 894-3605 FAX: (404) 894-9325 November 17,1997 United States Nuclear Regulatory Commission Washington, D.C.
20555-0001 Attention:
Document Control Desk


==Subject:==
==Subject:==
Line 28: Line 33:
Enclosed for your information is the Georgia Tech Research Reactor 1997 Emergency Preparedness Exercise Scenario. The exercise is scheduled for the morning of December i1, 1997.
Enclosed for your information is the Georgia Tech Research Reactor 1997 Emergency Preparedness Exercise Scenario. The exercise is scheduled for the morning of December i1, 1997.
The distribution of the scenario is for exercise evaluator's use only. The scenario is not for general distribution.
The distribution of the scenario is for exercise evaluator's use only. The scenario is not for general distribution.
Sincerely, f9Yec-R.D. Ice, Ph.D., CHP Y
Sincerely, f9Yec-Y y
y g
R.D. Ice, Ph.D., CHP g
Emergency Coordinator Radiation Safety Officer
Emergency Coordinator
[dd RDl/ars
[dd Radiation Safety Officer RDl/ars


==Enclosure:==
==Enclosure:==
as stated Cc:     Mr. Marvin M. Mendonca, USNRC Dr. G. Wayne Clough, President Dr. Jean-Lou Chameau, Dean of Engineering
as stated Cc:
    ' " ',7+-
Mr. Marvin M. Mendonca, USNRC Dr. G. Wayne Clough, President Dr. Jean-Lou Chameau, Dean of Engineering
            '' 7 4     Technical Safety and Review Committee Mr. Bob liarty, Director of communications g!gg'. ' . . .gc s i.1 Mr. Craig Bassett, USN~RC 1                                   ~      *^
' " ', '' 7 4 Technical Safety and Review Committee g!gg'. '...g i.1 7+-
An Equal Education and Employment Opportunity instituton 9711250'351''971117 ADOCK 05000160 l        PDR F                       PDR
Mr. Bob liarty, Director of communications c s Mr. Craig Bassett, USN~RC 1
9711250'351''971117 An Equal Education and Employment Opportunity instituton
~
*^
l PDR ADOCK 05000160 F
PDR


      ? a
?
  ,-3 e
a
Emergency Exercise Scenario ~                                                 R.D. Ice, Ph.D., CilP Georgia Tech Research Reactor .                                               Emergency Coordinator Atlanta, GA                                                                   404 894 3621 Exercise Date: December I1, 1997 OBJECTIVES:
,-3 e
: 1.       To test the NNRC Emergency Organization's response to an "NOUE" emergency event;
Emergency Exercise Scenario ~
: 2.       To demonstrate a New Emergency Directors ability to handle and emergency situation;
R.D. Ice, Ph.D., CilP Georgia Tech Research Reactor.
: 3.       To demonstrate that NNRC personnel are trained properly and respond appropriately to an emergency situation;
Emergency Coordinator Atlanta, GA 404 894 3621 Exercise Date: December I1, 1997 OBJECTIVES:
: 4.       To demonstrate that the emergency procedures are adequate and can be followed; and
1.
            $.        To demonstrate that the emergency communications system is functional.
To test the NNRC Emergency Organization's response to an "NOUE" emergency event; 2.
SET-UP             De Radiation Safety Officer (Ice) and Reactor Supervisor (Statham) are not available.
To demonstrate a New Emergency Directors ability to handle and emergency situation; 3.
To demonstrate that NNRC personnel are trained properly and respond appropriately to an emergency situation; 4.
To demonstrate that the emergency procedures are adequate and can be followed; and To demonstrate that the emergency communications system is functional.
SET-UP De Radiation Safety Officer (Ice) and Reactor Supervisor (Statham) are not available.
Dey will serve as exercise controllers. ne reactor is non-functional with the fuel removed and stored off site. De llot Cell is in operation with one source up and survey meter calibrations are taking place involving a student and a stalT health physicist. All other GTRR personnel are available and located in their respective orrices, ne containment facility is accessible. Dewayne Blaylock is acting GTRR Director.
Dey will serve as exercise controllers. ne reactor is non-functional with the fuel removed and stored off site. De llot Cell is in operation with one source up and survey meter calibrations are taking place involving a student and a stalT health physicist. All other GTRR personnel are available and located in their respective orrices, ne containment facility is accessible. Dewayne Blaylock is acting GTRR Director.
Students may participate in the exercise providing they 1) llave ID card with " STUDENT" pinned on front of shirt; 2) Stays out of the way; 3) Says nothing while in the facility and 4) Only one student per team formed and one student with ED. Student may ge into restricted zone accompanied by team providing heAhe has on a film badge or PIC.
Students may participate in the exercise providing they 1) llave ID card with " STUDENT" pinned on front of shirt; 2) Stays out of the way; 3) Says nothing while in the facility and 4) Only one student per team formed and one student with ED. Student may ge into restricted zone accompanied by team providing heAhe has on a film badge or PIC.
9.00 AM CONTROLLER ONE (Card No.1) initiates telephone call to 894-3600 and states "nere is a bomb planted in the radiation area, it is set to go ofTat 10.00 AM".
9.00 AM CONTROLLER ONE (Card No.1) initiates telephone call to 894-3600 and states "nere is a bomb planted in the radiation area, it is set to go ofTat 10.00 AM".
Expected Actions:
Expected Actions:
: 1. Receiver of call attempts to keep person on line to extract more information.
1.
Receiver of call attempts to keep person on line to extract more information.
CONTROLLER ONE (Card No. 2) stays on line temporarily and gives partial answers to questions:
CONTROLLER ONE (Card No. 2) stays on line temporarily and gives partial answers to questions:
: a. Where is it? In the radiation area.
a.
: b. What does it hxA like? Just better get away from it.
Where is it? In the radiation area.
: c. What kind of bomb 7 Military explosives.
b.
: d. Why and all other questions? Ilang.up
What does it hxA like? Just better get away from it.
: 2. Receiver of call notifies supervisor or director.
c.
: 3. Director: (No order of priority)
What kind of bomb 7 Military explosives.
: a. Notifies police
d.
: b. Makes early waming to statTvia PA system. Shut down operations. Stay Put.
Why and all other questions? Ilang.up 2.
Receiver of call notifies supervisor or director.
3.
Director: (No order of priority) a.
Notifies police b.
Makes early waming to statTvia PA system. Shut down operations. Stay Put.
9:05 AM Police Respond and Meet with GTRR Director.
9:05 AM Police Respond and Meet with GTRR Director.
CONTROLLER ONE (Card No. 3)"%ere is a history of bomb threats to the facility"
CONTROLLER ONE (Card No. 3)"%ere is a history of bomb threats to the facility" i.
: i.       GTRR Acting Director assumes role of ED.
GTRR Acting Director assumes role of ED.
: 2.         ED appoints Asst. ED
2.
: 3.         ED' Asst. ED/ Police meet with call receiver and confirms authenticity of call and resiews " Bomb Threat Check Off List"
ED appoints Asst. ED 3.
: 4.         Police search Outside Parking Lot, special emphasis on personnel assembly area.
ED' Asst. ED/ Police meet with call receiver and confirms authenticity of call and resiews " Bomb Threat Check Off List" 4.
Police search Outside Parking Lot, special emphasis on personnel assembly area.
(Controller Two goes outside with search team).
(Controller Two goes outside with search team).
9:15 AM Police report back to ED CONTROLLER TWO (Card No. 4) to Police after they search outside of building. "No evidence of Bomb outside the building" l
9:15 AM Police report back to ED CONTROLLER TWO (Card No. 4) to Police after they search outside of building. "No evidence of Bomb outside the building" l
Line 73: Line 93:
o P
o P
9 9:16 AM Emergency Director, Assistant Emergency Director and Police Commander reconvene in Director's OfTice. Expected Action:
9 9:16 AM Emergency Director, Assistant Emergency Director and Police Commander reconvene in Director's OfTice. Expected Action:
1,       Bomb threat with potential radiological involvement
1, Bomb threat with potential radiological involvement 2.
: 2.       Evacuate facility using PA announcement 9:20 AM Personnel assemble in parking lot.
Evacuate facility using PA announcement 9:20 AM Personnel assemble in parking lot.
Expected Actions:
Expected Actions:
: 1.     Roster completed
1.
: 2.       Contamination survey of personnel completed CONTROLLER TWO (Card No. 5) "No personnel contamination"
Roster completed 2.
: 3.       ED takes charge and directs personnel to stay away from the building
Contamination survey of personnel completed CONTROLLER TWO (Card No. 5) "No personnel contamination" 3.
: 4.       ED queries personnel
ED takes charge and directs personnel to stay away from the building 4.
: a.        Anyone seen anyone strange in the building the last couple of day.?
ED queries personnel Anyone seen anyone strange in the building the last couple of day.?
: b.         Anyone seen anything resembling a txxnb in the building?
a.
: 5.       Police set up barriers
b.
: a.         Auto lane
Anyone seen anything resembling a txxnb in the building?
: b.         Building Front Access Control 9:25 AM Search of Building Expeded Actions:
5.
: 1.       Police officer and natimember (as many teams as necessary) search building. Special instructions given: Searches are to be complete prior to 9:55 AM
Police set up barriers a.
: 2.       Rad waste barn is searched.
Auto lane b.
: 3.       ED and Asst . ED and One Policemen remain in ECC.
Building Front Access Control 9:25 AM Search of Building Expeded Actions:
: 4.       Assistant Director and policeman search ECC for possible bomb.
1.
Police officer and natimember (as many teams as necessary) search building. Special instructions given: Searches are to be complete prior to 9:55 AM 2.
Rad waste barn is searched.
3.
ED and Asst. ED and One Policemen remain in ECC.
4.
Assistant Director and policeman search ECC for possible bomb.
9:50 AM Search of Building completed.
9:50 AM Search of Building completed.
9:55 AM ECC Evacuated.
9:55 AM ECC Evacuated.
10:00 AM CONTROLLER ONE (Card No. 6) to ED. "No Bomb Blast" 10:05 AM ED, Asst. ED. Return to ECC Expected Actions
10:00 AM CONTROLLER ONE (Card No. 6) to ED. "No Bomb Blast" 10:05 AM ED, Asst. ED. Return to ECC Expected Actions 1.
: 1.     Assessment: NOUE
Assessment: NOUE 2.
: 2.       Make notilications 10:15 AM Allclear signalgisen.
Make notilications 10:15 AM Allclear signalgisen.
10:20 AM Emergency Critique in Conference Room i1:00 AM Normal Operations resumed.}}
10:20 AM Emergency Critique in Conference Room i1:00 AM Normal Operations resumed.}}

Latest revision as of 07:25, 10 December 2024

Forwards Ga Tech Research Reactor 1997 Emergency Preparedness Exercise Scenario.Exercise Scheduled for 971211
ML20199G997
Person / Time
Site: Neely Research Reactor
Issue date: 11/17/1997
From: Ice R
Neely Research Reactor, ATLANTA, GA
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9711250351
Download: ML20199G997 (3)


Text

d GeorgiaJoisBGRoa0@

Office of Radiological Safety i

echnagy e00 ^tleet>c o<>ve

{

Atlanta, Georgia 30332-0425 m

(404) 894-3605 FAX: (404) 894-9325 November 17,1997 United States Nuclear Regulatory Commission Washington, D.C.

20555-0001 Attention:

Document Control Desk

Subject:

Georgia Institute of Technology License No. R-97, Docket No. 50-160 Annual Emergency Drill

References:

1. Georgia Tech Emergency Plan, Rev. 03, Oct. 27,1994
2. License No. R-97 Gentlemen:

Enclosed for your information is the Georgia Tech Research Reactor 1997 Emergency Preparedness Exercise Scenario. The exercise is scheduled for the morning of December i1, 1997.

The distribution of the scenario is for exercise evaluator's use only. The scenario is not for general distribution.

Sincerely, f9Yec-Y y

R.D. Ice, Ph.D., CHP g

Emergency Coordinator

[dd Radiation Safety Officer RDl/ars

Enclosure:

as stated Cc:

Mr. Marvin M. Mendonca, USNRC Dr. G. Wayne Clough, President Dr. Jean-Lou Chameau, Dean of Engineering

' " ', 7 4 Technical Safety and Review Committee g!gg'. '...g i.1 7+-

Mr. Bob liarty, Director of communications c s Mr. Craig Bassett, USN~RC 1

9711250'351971117 An Equal Education and Employment Opportunity instituton

~

  • ^

l PDR ADOCK 05000160 F

PDR

?

a

,-3 e

Emergency Exercise Scenario ~

R.D. Ice, Ph.D., CilP Georgia Tech Research Reactor.

Emergency Coordinator Atlanta, GA 404 894 3621 Exercise Date: December I1, 1997 OBJECTIVES:

1.

To test the NNRC Emergency Organization's response to an "NOUE" emergency event; 2.

To demonstrate a New Emergency Directors ability to handle and emergency situation; 3.

To demonstrate that NNRC personnel are trained properly and respond appropriately to an emergency situation; 4.

To demonstrate that the emergency procedures are adequate and can be followed; and To demonstrate that the emergency communications system is functional.

SET-UP De Radiation Safety Officer (Ice) and Reactor Supervisor (Statham) are not available.

Dey will serve as exercise controllers. ne reactor is non-functional with the fuel removed and stored off site. De llot Cell is in operation with one source up and survey meter calibrations are taking place involving a student and a stalT health physicist. All other GTRR personnel are available and located in their respective orrices, ne containment facility is accessible. Dewayne Blaylock is acting GTRR Director.

Students may participate in the exercise providing they 1) llave ID card with " STUDENT" pinned on front of shirt; 2) Stays out of the way; 3) Says nothing while in the facility and 4) Only one student per team formed and one student with ED. Student may ge into restricted zone accompanied by team providing heAhe has on a film badge or PIC.

9.00 AM CONTROLLER ONE (Card No.1) initiates telephone call to 894-3600 and states "nere is a bomb planted in the radiation area, it is set to go ofTat 10.00 AM".

Expected Actions:

1.

Receiver of call attempts to keep person on line to extract more information.

CONTROLLER ONE (Card No. 2) stays on line temporarily and gives partial answers to questions:

a.

Where is it? In the radiation area.

b.

What does it hxA like? Just better get away from it.

c.

What kind of bomb 7 Military explosives.

d.

Why and all other questions? Ilang.up 2.

Receiver of call notifies supervisor or director.

3.

Director: (No order of priority) a.

Notifies police b.

Makes early waming to statTvia PA system. Shut down operations. Stay Put.

9:05 AM Police Respond and Meet with GTRR Director.

CONTROLLER ONE (Card No. 3)"%ere is a history of bomb threats to the facility" i.

GTRR Acting Director assumes role of ED.

2.

ED appoints Asst. ED 3.

ED' Asst. ED/ Police meet with call receiver and confirms authenticity of call and resiews " Bomb Threat Check Off List" 4.

Police search Outside Parking Lot, special emphasis on personnel assembly area.

(Controller Two goes outside with search team).

9:15 AM Police report back to ED CONTROLLER TWO (Card No. 4) to Police after they search outside of building. "No evidence of Bomb outside the building" l

o P

9 9:16 AM Emergency Director, Assistant Emergency Director and Police Commander reconvene in Director's OfTice. Expected Action:

1, Bomb threat with potential radiological involvement 2.

Evacuate facility using PA announcement 9:20 AM Personnel assemble in parking lot.

Expected Actions:

1.

Roster completed 2.

Contamination survey of personnel completed CONTROLLER TWO (Card No. 5) "No personnel contamination" 3.

ED takes charge and directs personnel to stay away from the building 4.

ED queries personnel Anyone seen anyone strange in the building the last couple of day.?

a.

b.

Anyone seen anything resembling a txxnb in the building?

5.

Police set up barriers a.

Auto lane b.

Building Front Access Control 9:25 AM Search of Building Expeded Actions:

1.

Police officer and natimember (as many teams as necessary) search building. Special instructions given: Searches are to be complete prior to 9:55 AM 2.

Rad waste barn is searched.

3.

ED and Asst. ED and One Policemen remain in ECC.

4.

Assistant Director and policeman search ECC for possible bomb.

9:50 AM Search of Building completed.

9:55 AM ECC Evacuated.

10:00 AM CONTROLLER ONE (Card No. 6) to ED. "No Bomb Blast" 10:05 AM ED, Asst. ED. Return to ECC Expected Actions 1.

Assessment: NOUE 2.

Make notilications 10:15 AM Allclear signalgisen.

10:20 AM Emergency Critique in Conference Room i1:00 AM Normal Operations resumed.