ML20199K057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[ST-HL-AE-0057, Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2]]
| number = ML20199K057
| issue date = 10/31/1997
| title = Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2
| author name = Hill R, Mcburnett M
| author affiliation = HOUSTON LIGHTING & POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000498, 05000499
| license number =
| contact person =
| document report number = ST-HL-AE-005789, ST-HL-AE-5789, NUDOCS 9711280304
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 14
}}
 
=Text=
{{#Wiki_filter:'The Light
  '  c o mp a ny8"'h L'** P' ject untric cennating sinitonP.                            o. no. 289 w d.wonh, Toa. 774as Ilotliton 1.lghting & Power November 13,1997 ST-HL-AE-005789 File No. G02 STl30470405 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 50uth Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthlv Oneratine Renorts for October 1997 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for October 1997.
If you should have any questions on this matter, please contact T. E. Underwood at (512)972-7108.
Sincerely,
                                                                  $hh M. A. McDurnett
                                                                                      'ffs/
Director, Nuclear Licensing RLH/sl
                                                                                                                      \
                                                                                                                        \
Attachments: 1) STPEGS Unit 1 Monthly Operating Repor:- October 1997                                              'l
: 2) STPEGS Unit 2 Monthly Operating Report - October 1997
                                                                                                              '(c3' yv
                                                , ,4 9711280304 971031                                                              l ***'''**
bNbNllblbbblflbN!
gp,    ApocK050004y8 Project Manager on Behalf of the Participants in the South Texas Project
 
              .-          . -  .    .~  --          ..  ..      -              . . -    - - . . _ . - . . . -
Houston Lighting & Power Company                                    ST-ilL-AE-5789 South Texas Project Electric Generating Station                    File No.: G02 Page 2 Ellis W. Merschoff                            Rufus S. Scott Regional Administrator, Region IV              Associate General Counsel U. S. Nuclear Regulatory Commission            110tston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400                P. O. Box 61067 Arlington, TX 76011-8064                      Ilouston,TX 77208 Thomas W. Alexion                              Institute of Nuclear Power Project Manager, Mail Code 13113              Operations - Records Center U. S. Nuclear Regulatory Commission            700 Galleria Parkway Washington, DC 20555-0001                      Atlanta, GA 30339-5957                                  ;
David P. Loveless                              Dr. Bertram Wolfe Sr. Resident inspector                          15453 Via Vaquero c/o U. S. Nuclear Regulatory Comm.            Monte Sereno, CA 95030 P. O. Box 910 1            Bay City, TX 77404-0910                        Richard A. Ratliff Buree's of Radiation Control l
J. R. Newman, Esquire                        Texas Department ofIIcalth Morgan, Lewis & Bockius                      1100 West 49th Street I800 M Street, N.W.                        Austin, TX 78756-3189 Washington, DC 20036-5869 J. R. Egan, Esquire M. T. liardt/W. C. Gunst                    Egan & Associates, P.C.
City Nblic Service                          2300 N Street, N.W.
P. O. Box 1771                              Washington, D.C. 20037 San Antonio,TX 78296 J. C. Lanier/M. B. Lee                      U. S. Nuclear Regulatory Commission City of Austin                              Attention: Document Control Desk Electric Utility Department                Washington, D.C. 20555-0001 72: Barton Springs Road Austin,TX 78704 Central Power and Light Company -
ATTN: G. E. Vaughn/C. A. Johnson.
P. O. Box 289, Mail Code: N5012 -
Wadsworth,TX 77483 1
 
        ,                    .          . -      . - . .  .,.      ..          . . ~      . . - _ .  -    - . .          . .-- .- - ..-_. - . . . .
y*                      :,---.
e              ,
h i
1
                                                                                                                                                          ,1 f
SOUTil TEXAS PROJECT '
e                                                                              ..
ELECTRIC GENERATING STATION
                                                                                                                                                            )
UNIT I' MONhILY OPERATING REPORT                                                              ,
OCTOBER 1997 -
IlOUSTON LIGIITING AND POWER CO.
3 NRC DOCKET NO 50 498 -                                                            ,
1,1 CENSE NO. NPi.76 Reviewed By: T                                                          8 8l /3/f 7 T.E. UNDERWOOD                                          Date Approved By:              !              -                            t([/J/f 7                            +
                                                            . G.L. PARKEY-              6                            Date' l      1
                                                                                                                                                            )
t A.        .m..-                g 1
j
 
i MONTHLY
 
==SUMMARY==
 
                          - South Texas Project Unit I began the reporting period shutdown for refueling and scheduled -                      >
maintenance.                                                                                                      ,
The unit was returned to service on October 4, at 1433. On October 6, at 1115 a relief valve on the #11 Moisture Separator Reheater opened with the unit at 75% reactor power. The unit was removed from service at 132! to investigate the cause and make the necessary repairs. Following repairs, the unit was          ,
returned to service on October 8, at 0530 and full power achieved on October 11; at 1425.                        ;
The unit operated for the remainder of the period at full pcwer with no unit shutdowns or significant power reductions.
i:
f 4
4 J
l f
9  g    ==W    d pr              &4 -iW F T4'f  W *                            '
 
      . - . . -      .-            -      - ~ - .    - .      -. .. ~ - . -                    ..    ---          . - . -    -        . _ _ ~ .
1    ,
l OPERATING DATA REPORT DOCKET NO. - 50498 UNIT 1 DATE Nov. I 1.1997 COMPLETED BY RL 11111
,                                                                                                        TELEPHONE 512 972-7667                      .
OPERATING STATUS
: 1.          REPORTING PERIOD: 10/1/97-10'31/97 GROSS IlOURS IN REPORTING PERIOD: 245
: 2.          CURRENTLY AUTilORIZED POWER LEVEL (Mwt): .3.800                  ,
MAXIMUM DEPENDADI E CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RA flNG (MWe Net): 1250.6 l
: 3.          POWER LEVEL TO WillCil RESTRICTED (IF ANY) (MWe-Net): Nant
: 4.          REASONS FOR RESTRlCTION(IF ANY): N/A                                                                            ,
TlilS MONTH          YR TO DATE          CUMULATIVE-
: 5.      NUMBER OF llOURS REACTOR CRITICAL                            6.82.1            6.728.4          56.607.9
.i
: 6.      REACTOR RESERVE S11UTDOWN ilOURS                                  Q                    Q                    Q 7,      llOURS GENERATOR ON 1.INE                                    6263            . 6.646.8          55.200.2
: 8.      UNIT RESERVE SHUTDOWN llOURS                                      Q                    Q                    Q t
: 9.      GROSS TilERMAL ENERGY GbNERATED (MWil)                  2.170.904          24.908.398        204.143.663
.                        10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                        741.631            8.523.391        69.585.101
: 11. NET ELECTRICAL, ENERGY GENERATED (MWil)                        707.637            8.171.851        66.211.371
                        - 12. REACTOR SERVICE FACTOR                                          91.6 %              92.2 %              20.,3%
: 13. REACTOR AVAILABILITY FACTOP                                    . 91.6%                92.2 %              70.3 %
: 14. UNIT SERVICE FACTOR                                            84.1 %              91.1 %              68.6 %
: 15. UNIT AVAILABILITY FACTOR                                        84.1 %              91.1 %              68.6 %
: 16. UNIT CAPACITY FACTOR (Usmg MDC)                                76.0 %              89.6 %              618%          '
: 17. U' NIT CAPACITY FACTOR (Using Design MWe)                  16 0 %              89 3 %              65.8 %
: 18. UNIT FORCED OUTAGE RATE                                          fLDS                04 %                20.8%
L 19. - SilUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
p N/A k  __
20.- IP SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i
o
                            ,            _                                    ,                                                    ,~
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE Nov. I1. [222 COMPLETED BY R.L. Hill
                                                            'lELEPHONE 512 972-7667 MONTil OCTOBER DAY    AVERAGE DAILY POWER                    DAY    AVERAGE DAILY POWER LEVEL                                          LEVEL (MWe Net)                                      (MWe-Net) 1              0                            17            1260 2              0                            18            1260 1              0                            19            1263 4              81                            20            1212
!        5            462                            21            1261 i
6            321                            22            1261 7            0                            23            1262 8            182                            24            1260 9            E10                            25            1260
!        10          luta                            26            1261 l        11          1212                            27            1262 i
12          1216                            28            1261 13          1218                            29            1261 l
l4          1260                            30            J260 i5          1261                            31            1260 16          .1260
 
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-493 UNIT 1 DATE Nov. I L 1907
* COMPLETED BY RL llill                                  i TELEPilONE 512 972-7667                            l REPORT MONTil OCTOBER
                    ~
2'          3                    4        5 l
Reason    Method of Licenwe    Sys**m  Component      Cause & Corrective Action to Prevent Recurrence No.      Date  Type        Duration Shutting      Event    Code      Code (flours)
Down    Report #
keactor 4          N/A      N/A      N/A      Refueling and scheduled maintenance outage.
97-05    970913  S            77.2      C N/A      TA      TRB      Main Turbine Overspeed Trip Test.
97-06    971004  S              1.3      B          1 N/A      SB      RV      While gradually increasing pow er level, a relief valve ca 97-07    971006    F          40.1      A          I the # 1 I Moisture Separator Reheater (MSR) opened with the unit at 75% reactor power. It sas determined that the valve opened below setpoint pressure due to i
degredation/ failure of the main disc seal. De failed valve was replaced. Similar valves that were worked in the refueling outage were disassembled and inspected with no discrepancies noted.
De root cause of the seal degradation has not yet been
                                                                                                ?-termined. Further analysis will be performed.
3                              4                          5 I                    2 Method:                        IEEE 805-1983              IEEE 803-1983 F. Forced            hoason:
A-Equipment Failure (Explain)            1-Manua!
S: Scheduled l                      B-Maintenance or Test                  2-Manual Scram C-Refueling                            3-Automatic Scram D-Regulatory Restriction                4-Cont. of Existing E-Operator Training & License Exam        Outage F-Administrative                        5-Reduction G-Operational Error (Explain)          a Other li-Other (Explain)
                                                                                                                          -                                n
 
PORYS AND SAFETY VALVE
 
==SUMMARY==
 
There were no PORV or Safety Valves challenged during the reporting peri-A.
4
 
SOUTil TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTiiLY OPER ATING REPORT OCTOBER 1997 IlOUSTON LIGitTING AND POWER CO.
NRC DOCKET NO. 50-499 LICENSC NO. NPF 50 Reviewed By:    T 6. l b ~                                                                                                n l F3 N7  '
T.E. UNDERWOdD                                                                                            Dat6 Approved By:                                                                    d** ~ "'
                                                                                                                                                        " M/f 7 R.E. h1ASSE                                                                                              Date I.___._______.____._________.____________.____  _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ . . _ _
 
MONTIILY
 
==SUMMARY==
 
South Texas Project Unit 2 operated during the reponing period at full power with no unit shutdowns or significant power reductions,
 
N                    1'\                          .N1 1
OPERATING DATA REPORT DOCENT, 50-499 UNIT 2 DATE Nov.11.1997 COMPLETE'.) BY R L. Hill TELEP'.10NE 512 972-?667 OPERATING STATUS
: 1.            REPORTING PERIOD: 10/1/97-10/31/97 GROSS IlOURS IN REPORTING PERIOD: 24.1
: 2.              CURRENTLY AUTilORIZED POWER LEVEL (Mwt): .3100 MAXIMUM DFPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN tILECT R! CAL RATING (MWO-Net): 1250.6
: 3.              POWER LEVEL TO WillCil RESTRICTED (IF ANY) (MWe-Net): Nonc
: 4.              REASONS FOR RESTRICTION (IF ANY): N/A Tills MONTil                              YR TO DATE        CUMULATIVE
: 5.          NUMiiER OF llOURS REACTOR CRITICAL                                                            231Q                  6.798.1          53.352.5
: 6.          REACTOR RESERVE SilUTDOWN llOURS                                                                            Q              Q                  Q
: 7.          IlOURS GENERATOR ON LINE                                                                        2410                6.721.9          iL9.1dd
: 8.        UNIT RESERVE SilUTDOWN llOURS                                                                              Q              Q                  Q
: 9.        G00SS TilERMAL ENERGY GENERATED (MWil)                                      2.843.3 3                            25.305.519        102.122.129
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWii)                                                  974.475                        8.631.587        65.380.868 11        NET ELECTRIC AL ENERGY GENERATED (MWil)                                            933.920                      8.262 031        62.369.307
: 12. REACTOR SERVICE FACTOR                                                                      100.0 %                        232%              72.7 %
: 13. REACTOR AVA LABILITY FACTOR                                                                  100 0 %                      93.2 %            72.7 %
: 14. UNIT SERVIC E FACTOli                                                                          100.0 %                      92.1 %            70.8 %
: 15. UNIT AVAILABILITY FACTOR                                                                    100 & %                        92 1%              70.8 %
: 16. IMIT CAPACITY FACTOR (Using MDC)                                                              100.2 %                    20 4 %            68.0 %
: 17. UNIT CAPACITY FACTOR (Using Design MWe)                                                      1012%                        90.6 %            68.0 %
18 UNIT FORCED OUTAGE RATE                                                                                    Qa%              2.2%              20.1 %
li. SilVTDOWNS SCilEDIILED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACH):
N/A
: 20. [F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l
l l
--    _a- - - - - - _ - ._ _ _                    __----    _ - - - _ _ - . _ _ _ _ - - - - - __-            _ _ - - _ _ _ _ _ _ . -                        ___ _              .
Q
 
l        .
l AVERAGE DAILY UNIT POWEP. LEVEL DOCKETNO. 50-499 UNIT 2 DATE Nov.1 ~1.1997 COMPLETED BY E!dlill TELEPlIONE 512 972-7667 MONTil OCTOBER DAY                  AVERAGE DAILY POWER                                                                                                  DAY    AVERAGE DAILY IOWER LEVEL                                                                                                                        LEVEL (MWe Net)                                                                                                                    (MWe-Net) 1                  J228                                                                                                          17            1251 2                    1232                                                                                                          18            J25%
3                  1212                                                                                                          19            1212 4                  1211                                                                                                          20            1216 5                1211                                                                                                          21            1252 6                  1211                                                                                                          22            1211 7                1248                                                                                                          23            1211 8                12it                                                                                                          24            1252 9                  1251                                                                                                        25            1216 10                1251                                                                                                        26              1218 11                J211                                                                                                        27              1218 12                1214                                                                                                        28              1211 13                1214                                                                                                          29            1260 14              1212                                                                                                          30            .!218 15              1252                                                                                                          31            1258 16              1252
  ,1 -        _ _ _ - - - - - _ -                    - _ _ - - _ - _ - _ - - _ _ - _ _ - _ - _ - - _ _ _ _ - - - - _ _ _ - - - - - _ _ _ - - - _ _ _ _                          ___ __ - _ _
 
i l
UNIT SIIUTDOWNS AND POWER REDUCTIONS                                                            .
DOCKETNO. 50-409 UNIT 2 DATE Nov.11 1997 COMPLETED BY R.L llill
                                                                                                                                        'ELEP110NE 512 972-7667 REPORTMONTil OCTOBER I                      2l          3 System 4        5 Component      Cause & Corrective Action to Prevent Recurrence No.      Date          Type    Duration    Reason
* Method on    Licensee Shutting    Event      Code      Code (Ifours)
Down      Report #
Reactor TilERE WERE NO UNIT SilUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING TIIE REPORTING PERIOD i
3                      4                      5 1                          2 Reason:                                  Method:                        IEEE 805-1983          iEEE 803-1983 F: Forced S: Scheduled              A-Equipment Faisre (Explain)            1-Manual I
B-Maintenance or Test                    2-Manual Scram                                                                          '
C-Refueling                              3-Automstic Scram D-Regulatory Restriction                4-Cont. of Existing E-Operatar Training & License Exam        Outage F-Administrative                        5-Reduction G-Operational Error (Explain)            9-Other II-Other(Explain)
L - - ------ .    .
 
PORYS AND SAFETY VALVE
 
==SUMMARY==
 
There were no PORV or Safety Valves challenged during the reponing per 3d.
8}}

Revision as of 04:16, 8 December 2024