ML20203P023: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20203P023 | | number = ML20203P023 | ||
| issue date = 05/05/1986 | | issue date = 05/05/1986 | ||
| title = Ack Receipt of | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Violation & Nonconformance Noted in Insp Rept 99901037/85-01.Addl Info Required within 25 Days of Ltr Date to Clarify Training Course Completion Record | ||
| author name = Zech G | | author name = Zech G | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) | ||
| Line 12: | Line 12: | ||
| case reference number = REF-QA-99901037 | | case reference number = REF-QA-99901037 | ||
| document report number = NUDOCS 8605060284 | | document report number = NUDOCS 8605060284 | ||
| title reference date = 03-05-1986 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO ENGINEERING/CONSTRUCTION/CONSULTING FIRM, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO ENGINEERING/CONSTRUCTION/CONSULTING FIRM, OUTGOING CORRESPONDENCE | ||
| page count = 2 | | page count = 2 | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:_ | ||
gn ne rg#o g | gn ne rg#o g | ||
UNITED STATES | |||
,_y NUCLEAR REGULATORY COMMISSION o | |||
h | |||
.E WASHING TON, D. C. 20555 | |||
/ | |||
flay 5, 1986 Docket No. 99901037/85-01 Zetec, Inc. | |||
ATTN: Mr. Clyde Denton General Manager Post Office Box 140 Issaquah, Washington 98027 Gentlemen: | ATTN: Mr. Clyde Denton General Manager Post Office Box 140 Issaquah, Washington 98027 Gentlemen: | ||
Thank you for your letter of March 5,1986, in response to our letter dated February 14, 1986. As noted in our letter, Zetec was requested to describe steps that have been or will be taken tc correct and prevent recurrence of the findings and the dates for completion of the corrective actions and preventive measures. We have reviewed your response and find that it does not adequately address the concerns raised in our Notice of Violation and Notice of Nonconformance. The following additional information is needed. | Thank you for your letter of March 5,1986, in response to our {{letter dated|date=February 14, 1986|text=letter dated February 14, 1986}}. As noted in our letter, Zetec was requested to describe steps that have been or will be taken tc correct and prevent recurrence of the findings and the dates for completion of the corrective actions and preventive measures. We have reviewed your response and find that it does not adequately address the concerns raised in our Notice of Violation and Notice of Nonconformance. The following additional information is needed. | ||
(85-01-10) - Clarify if the " Training Course Completion Record" (TCCR) l | (85-01-10) - Clarify if the " Training Course Completion Record" (TCCR) l is a part of the qualification records for NDE personnel. | ||
If this is i | |||
not the case, describe the measures taken and the date of implementation for incorporating the TCCR in the qualification records. | not the case, describe the measures taken and the date of implementation for incorporating the TCCR in the qualification records. | ||
Please provide this additional information within 25 days from the date of this letter in order that we may complete our review in a timely manner. | Please provide this additional information within 25 days from the date of this letter in order that we may complete our review in a timely manner. | ||
Sincerely, | Sincerely, | ||
~ | |||
L | L | ||
) c'l v | |||
'Ga ry'G Zech', | |||
ief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement | |||
[8 l | |||
8605060284 860505 PDR GA999 EECZETEC | |||
,f | |||
( | ( | ||
99901037 PDR l8 w | |||
9 4 Zetec, Inc. | 9 4 | ||
Zetec, Inc. | |||
May 5, 1986 DISTRIBUTION: | May 5, 1986 DISTRIBUTION: | ||
.4RB:IE:09 VPB Reading DQAVT Reading JTaylor RVollmer BGrimes HMiller EMerschoff JConway VP AVT | |||
:DQAVT BC/V T | |||
JCo ia. sam e choff GGje 6 | |||
5 | |||
/86 5/9 5/ l}} | |||
Latest revision as of 20:58, 7 December 2024
| ML20203P023 | |
| Person / Time | |
|---|---|
| Issue date: | 05/05/1986 |
| From: | Zech G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Denton C ZETEC, INC. |
| References | |
| REF-QA-99901037 NUDOCS 8605060284 | |
| Download: ML20203P023 (2) | |
Text
_
gn ne rg#o g
UNITED STATES
,_y NUCLEAR REGULATORY COMMISSION o
h
.E WASHING TON, D. C. 20555
/
flay 5, 1986 Docket No. 99901037/85-01 Zetec, Inc.
ATTN: Mr. Clyde Denton General Manager Post Office Box 140 Issaquah, Washington 98027 Gentlemen:
Thank you for your letter of March 5,1986, in response to our letter dated February 14, 1986. As noted in our letter, Zetec was requested to describe steps that have been or will be taken tc correct and prevent recurrence of the findings and the dates for completion of the corrective actions and preventive measures. We have reviewed your response and find that it does not adequately address the concerns raised in our Notice of Violation and Notice of Nonconformance. The following additional information is needed.
(85-01-10) - Clarify if the " Training Course Completion Record" (TCCR) l is a part of the qualification records for NDE personnel.
If this is i
not the case, describe the measures taken and the date of implementation for incorporating the TCCR in the qualification records.
Please provide this additional information within 25 days from the date of this letter in order that we may complete our review in a timely manner.
Sincerely,
~
L
) c'l v
'Ga ry'G Zech',
ief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement
[8 l
8605060284 860505 PDR GA999 EECZETEC
,f
(
99901037 PDR l8 w
9 4
Zetec, Inc.
May 5, 1986 DISTRIBUTION:
.4RB:IE:09 VPB Reading DQAVT Reading JTaylor RVollmer BGrimes HMiller EMerschoff JConway VP AVT
- DQAVT BC/V T
JCo ia. sam e choff GGje 6
5
/86 5/9 5/ l