W ENCLOSURE OPERATING DATA REPORT DOCKET NO. | |||
50-424 UNIT Voatle 1 | |||
DATE 03/01/87 COMPLETED BY R. J. Florian (404) 554-9961 TELEPHONE ext. 4148 OPERATING STATUS 1. | |||
REPORTING PERIOD: | |||
Feb., 1987 GROSS HOURS IN REPORTIP8G PERIOD: | |||
672 2. | |||
CURRENTLY AUTHORIZED POWER LEVEL (Wt): | |||
170 MAX. DEPND. CAPACITY OGie-Net): | |||
n/a m' | |||
DESIGN ELECTRICAL RATING (IGie-Net): | |||
ifoi 3. | |||
POWER LEVEL TO 1AIICH RESTRICTED (IF ANY) OGie-Met): | |||
5: | |||
4. | |||
N atMt FOR RESTRICTION (IF ANY): condition of initial low-power license NPF-61. | |||
THIS MONTH YR TO DATE CUMULATIVE 5. | |||
INatBER OF HOURS REACTOR WAS CRITICAL 0 | |||
0 0 | |||
6. | |||
REACTOR RESERVE SHUTDOWN HOURS 0 | |||
0 0 | |||
7. | |||
HOURS GENERATOR ON LINE O | |||
O O | |||
8. | |||
UNIT RESERVE SHUTDOWN HOURS 0 | |||
o o | |||
9. | |||
GROSS THERMAL ENERGY GENERATED (MWH) 0 o | |||
n 10. | |||
GROSS ELECTRICAL ENERGY GENERATED (MWH) o n | |||
n 11. | |||
NET ELECTRICAL ENERGY CENERATED (MWH) o n | |||
n k | |||
$$8 2gg!! $8 24 | |||
_ w_ " | |||
R | |||
l | |||
~ | |||
OPERATING DATA REPORT (continued) | |||
I l | |||
THIS MONTH YR TO DATE CUMULATIVE 12. | |||
REACTOR SERVIG FACTOR o | |||
o o | |||
13. | |||
REACTOR AVAIIABILITY FACTOR o | |||
o o | |||
14. | |||
WIT SERVI m FACTtR o | |||
o o | |||
l 15. | |||
UNIT AVAIIABILITY FACTOR n | |||
n n | |||
o o | |||
o j | |||
16. | |||
UNIT CAPACITY FACTOR (Using MDC) o o | |||
o l | |||
17. | |||
UNIT CAPACITY FACTOR (Using Design We) 18. | |||
UNIT FORCED OUTAGE RATE o | |||
o o | |||
l | |||
[ | |||
19. | |||
SHUTDOINIS SCHEDULE OVER M XT 6 MONTH (TYPE, DATE, A M DtRATION OF EACH): | |||
N/A | |||
} | |||
l 1 | |||
20. | |||
IF SNUTDOINI AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
N/A i | |||
l 21. | |||
IRIITS IN TEST STATUS (PRIDE TO C000ERCIAL OPERATION): | |||
I FORECAST ACHIEVED I | |||
INITIAL CRITICALITY 03/05/87 f | |||
INITIAL ELECTR1 CITY n3/1s/87 CODGERCIAL OPERATION 06/01/87 e | |||
i n | |||
1 Xy i | |||
M | |||
e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-424 REPORT MONTH Feb., 1987 UNIT NAME Vogtle 1 q | |||
DATE 03/01/87 COMPLETED BY R.J.Florian TELEPHONE (404)554-9961, t | |||
ext.4148 Met M of Licensee Bysteg C-- | |||
cause & Corr. | |||
1 2 | |||
Code' t No. | |||
Date Type Duraties a.maan Shutting Event Code Action to l | |||
(Bours) | |||
Doun Report (If Prevent t | |||
ReactorQ Applicable) | |||
Recurrence i' | |||
a w | |||
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 3 | |||
I I | |||
Z 3 | |||
4 F: Forced Beseen: | |||
Method: | |||
IEEE 805-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance of Test 2-Manual Scram 5 | |||
C-Befueling 3-Automatic Scram IEEE 803A-1983 D-Begulatory Restriction 4-Continuations E-Operator Training & Lic. Exam. | |||
5-Imad Reduction Attachment yes no 1 i | |||
F-Administrative 9-Other (Explain) | |||
Number of pages _None C-Operational Error (Explain) | |||
N-Other (Explain) x3 | |||
.t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | |||
50-424 UNIT NO. | |||
Voatle i DATE 03/01/87 COMPLETED BY | |||
: a__, | |||
p, ne i.,n (404) 554-9901 TELEPHONE ext. 4148 MONTH February 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
(MWe-Net) 1 0 | |||
17 o | |||
2 a | |||
18 o | |||
19 n | |||
3 n | |||
20 n | |||
4 n | |||
5 o | |||
21 o | |||
6 o | |||
22 o | |||
23 n | |||
7 n | |||
8 0 | |||
24 0 | |||
9 0 | |||
25 0 | |||
10 0 | |||
26 0 | |||
11 o | |||
27 0 | |||
12 o | |||
28 a | |||
29 FUA 13 n | |||
N/A 14 0 | |||
30 15 0 | |||
31 N/A 16 0 | |||
3 gg7 I E-4}} | |||
Latest revision as of 20:11, 7 December 2024
| ML20204F350 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/28/1987 |
| From: | Florian R GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20204F283 | List: |
| References | |
| NUDOCS 8703260177 | |
| Download: ML20204F350 (4) | |
Text
,
W ENCLOSURE OPERATING DATA REPORT DOCKET NO.
50-424 UNIT Voatle 1
DATE 03/01/87 COMPLETED BY R. J. Florian (404) 554-9961 TELEPHONE ext. 4148 OPERATING STATUS 1.
REPORTING PERIOD:
Feb., 1987 GROSS HOURS IN REPORTIP8G PERIOD:
672 2.
CURRENTLY AUTHORIZED POWER LEVEL (Wt):
170 MAX. DEPND. CAPACITY OGie-Net):
n/a m'
DESIGN ELECTRICAL RATING (IGie-Net):
ifoi 3.
POWER LEVEL TO 1AIICH RESTRICTED (IF ANY) OGie-Met):
5:
4.
N atMt FOR RESTRICTION (IF ANY): condition of initial low-power license NPF-61.
THIS MONTH YR TO DATE CUMULATIVE 5.
INatBER OF HOURS REACTOR WAS CRITICAL 0
0 0
6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
7.
HOURS GENERATOR ON LINE O
O O
8.
UNIT RESERVE SHUTDOWN HOURS 0
o o
9.
GROSS THERMAL ENERGY GENERATED (MWH) 0 o
n 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) o n
n 11.
NET ELECTRICAL ENERGY CENERATED (MWH) o n
n k
$$8 2gg!! $8 24
_ w_ "
R
l
~
OPERATING DATA REPORT (continued)
I l
THIS MONTH YR TO DATE CUMULATIVE 12.
REACTOR SERVIG FACTOR o
o o
13.
REACTOR AVAIIABILITY FACTOR o
o o
14.
WIT SERVI m FACTtR o
o o
l 15.
UNIT AVAIIABILITY FACTOR n
n n
o o
o j
16.
UNIT CAPACITY FACTOR (Using MDC) o o
o l
17.
UNIT CAPACITY FACTOR (Using Design We) 18.
UNIT FORCED OUTAGE RATE o
o o
l
[
19.
SHUTDOINIS SCHEDULE OVER M XT 6 MONTH (TYPE, DATE, A M DtRATION OF EACH):
N/A
}
l 1
20.
IF SNUTDOINI AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A i
l 21.
IRIITS IN TEST STATUS (PRIDE TO C000ERCIAL OPERATION):
I FORECAST ACHIEVED I
INITIAL CRITICALITY 03/05/87 f
INITIAL ELECTR1 CITY n3/1s/87 CODGERCIAL OPERATION 06/01/87 e
i n
1 Xy i
M
e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-424 REPORT MONTH Feb., 1987 UNIT NAME Vogtle 1 q
DATE 03/01/87 COMPLETED BY R.J.Florian TELEPHONE (404)554-9961, t
ext.4148 Met M of Licensee Bysteg C--
cause & Corr.
1 2
Code' t No.
Date Type Duraties a.maan Shutting Event Code Action to l
(Bours)
Doun Report (If Prevent t
ReactorQ Applicable)
Recurrence i'
a w
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 3
I I
Z 3
4 F: Forced Beseen:
Method:
IEEE 805-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance of Test 2-Manual Scram 5
C-Befueling 3-Automatic Scram IEEE 803A-1983 D-Begulatory Restriction 4-Continuations E-Operator Training & Lic. Exam.
5-Imad Reduction Attachment yes no 1 i
F-Administrative 9-Other (Explain)
Number of pages _None C-Operational Error (Explain)
N-Other (Explain) x3
.t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-424 UNIT NO.
Voatle i DATE 03/01/87 COMPLETED BY
- a__,
p, ne i.,n (404) 554-9901 TELEPHONE ext. 4148 MONTH February 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 o
2 a
18 o
19 n
3 n
20 n
4 n
5 o
21 o
6 o
22 o
23 n
7 n
8 0
24 0
9 0
25 0
10 0
26 0
11 o
27 0
12 o
28 a
29 FUA 13 n
N/A 14 0
30 15 0
31 N/A 16 0
3 gg7 I E-4