ML20205A197: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:[c
l
6
j
.
70
-
>
w
l
l
APR 4
1985
Docket No. 50-483
Union Electric Company
ATTN:
Mr. Donald F. Schnell
Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, MO 63166
Gentlemen:
This refers to the routine inspection conducted by Mr. J. H. Neisler of this
office on December 1 through March 15, 1985, of activities at Callaway Plant,
Unit-1, authorized by Operating License No. NPF-30 and to the discussion of
our findings with members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative' records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 t,f the Commission's regulations, a copy of
this letter and the enclosure (s) will be placed in the NRC Public Document
Room.
Oh $$$o0hgg
h1
PDR
gg
.
 
f.
._
-
s.
..
.
Union Electric Company
2
APR 4
565
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original' Signed by W. L. Forney" for
R. F. Warnick, Chief
Reactor Projects Branch 1
Enclosure: ' Inspection Report
No. 50-483/84-49(DRP)
cc w/ enc 1:
W..H. Weber, Manager, Nuclear
-Construction
S. E. Miltenberger, Plant Manager
R. L. Powers, Assistant Manager
Quality Assurance
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Region IV
K. Drey
Chris R. Rogers, P.E.
Utility Division, Missouri
Public Service Commission
SNUPPS
,
.
RIII
RIII
RI I
y4
forney
i
arnick
/rr
,
04/03/85
9
f[
l.
..
.--
-.
. . . -
.- .
-
. . .
-
.
. - .
_--
}}
}}

Latest revision as of 19:27, 7 December 2024

Forwards Insp Rept 50-483/84-49 on 841201-850315.No Noncompliance Noted
ML20205A197
Person / Time
Site: Callaway 
Issue date: 04/04/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20205A201 List:
References
NUDOCS 8504250451
Download: ML20205A197 (2)


See also: IR 05000483/1984049

Text

[c

l

6

j

.

70

-

>

w

l

l

APR 4

1985

Docket No. 50-483

Union Electric Company

ATTN:

Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Gentlemen:

This refers to the routine inspection conducted by Mr. J. H. Neisler of this

office on December 1 through March 15, 1985, of activities at Callaway Plant,

Unit-1, authorized by Operating License No. NPF-30 and to the discussion of

our findings with members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative' records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 t,f the Commission's regulations, a copy of

this letter and the enclosure (s) will be placed in the NRC Public Document

Room.

Oh $$$o0hgg

h1

PDR

gg

.

f.

._

-

s.

..

.

Union Electric Company

2

APR 4

565

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original' Signed by W. L. Forney" for

R. F. Warnick, Chief

Reactor Projects Branch 1

Enclosure: ' Inspection Report

No. 50-483/84-49(DRP)

cc w/ enc 1:

W..H. Weber, Manager, Nuclear

-Construction

S. E. Miltenberger, Plant Manager

R. L. Powers, Assistant Manager

Quality Assurance

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Region IV

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

SNUPPS

,

.

RIII

RIII

RI I

y4

forney

i

arnick

/rr

,

04/03/85

9

f[

l.

..

.--

-.

. . . -

.- .

-

. . .

-

.

. - .

_--