=Text=
=Text=
{{#Wiki_filter:r                                                                                                       ,
{{#Wiki_filter:r
  *
,
      eAI'"'Deg                                    UNITED S7' YS                                     ,
eAI'"'De
*
UNITED S7' YS
    p           g                 NUCLEAR REGULATC). ' COMMISSION
*
    b           f                                   REGloNIv
g
                [                           6!1 RYAN PLAZA DRIVE, SUITE 400
,
      ',g,                                     ARLINGTON, texas 76011-8064                               ;
*
                                                  April 6,1999                                           l
p
                                                                                                          i
g
        Garry L. Randolph, Vice President and                                                             l
NUCLEAR REGULATC). ' COMMISSION
          Chief Nuclear Officer                                                                           l
b
        Union Electric Company                                                                           l
f
        P.O. Box 620
REGloNIv
        Fulton, Missouri 65251                                                                           l
[
        SUBJECT: NRC INSPECTION REPORT NO. 50-483/99-02
6!1 RYAN PLAZA DRIVE, SUITE 400
                                        '
',g,
        Dear Mr. Randolph:
ARLINGTON, texas 76011-8064
                Thank you for your letter (ULNRC-3984) dated March 17,1999, in response to our NRC
April 6,1999
        Inspection Report 50-483/99-02, dated February 25,1999. Your letter documented a verbal           I
i
        commitment made during the exit meeting for this inspection. We have reviewed your reply
Garry L. Randolph, Vice President and
        and understand that the next revision to your security plan will include increased minimum
Chief Nuclear Officer
        staffing of three armed security force response personnel per shift. This change will reflect
Union Electric Company
        your security staffing at the level demonstrated during your Operational Safeguards Response
P.O. Box 620
        Evaluation.
Fulton, Missouri 65251
                                                        Sincerely,
SUBJECT: NRC INSPECTION REPORT NO. 50-483/99-02
                                                        Gail M. Good, Chief
Dear Mr. Randolph:
                                                        Plant Support Branch
'
                                                        Division of Reactor Safety
Thank you for your letter (ULNRC-3984) dated March 17,1999, in response to our NRC
        Docket No.:     50-483
Inspection Report 50-483/99-02, dated February 25,1999. Your letter documented a verbal
        License No.: NPF-30
commitment made during the exit meeting for this inspection. We have reviewed your reply
        cc w/ enclosure:
and understand that the next revision to your security plan will include increased minimum
        Professional Nuclear Consulting, Inc.
staffing of three armed security force response personnel per shift. This change will reflect
        19041 Raines Drive
your security staffing at the level demonstrated during your Operational Safeguards Response
        Derwood, Maryland 20855
Evaluation.
      9904120224 990406
Sincerely,
      PDR   ADOCK 05000483
Gail M. Good, Chief
      G                     PDR
Plant Support Branch
Division of Reactor Safety
Docket No.:
50-483
License No.: NPF-30
cc w/ enclosure:
Professional Nuclear Consulting, Inc.
19041 Raines Drive
Derwood, Maryland 20855
9904120224 990406
PDR
ADOCK 05000483
G
PDR


r
r
  '*
'*
      ,                                           .r
,
      Union Electric Company                   -2-
.r
      John O'Neill, Esq.         .
Union Electric Company
                                          .
-2-
      Shaw, Pittman, Potts & Trowbridge               !
John O'Neill, Esq.
      2300 N. Street, N.W.
.
      Washington, D.C. 20037                           ,
.
                                                      l
Shaw, Pittman, Potts & Trowbridge
      H. D. Bono, Supervising Engineer
2300 N. Street, N.W.
      Quality Assurance Regulatory Support           j
Washington, D.C. 20037
      Union Electric Company
,
                                                      '
l
      P.O. Box 620
H. D. Bono, Supervising Engineer
      Fulton, Missouri 65251
Quality Assurance Regulatory Support
                                                      J
j
      Manager- Electric Department
Union Electric Company
      Missouri Public Service Commission
'
      301 W. High ;               - . .
P.O. Box 620
    ' P.O. Box 360
Fulton, Missouri 65251
      Jefferson City, Missouri 65102
J
      Ronald A. Kucera, Deputy Director
Manager- Electric Department
      Department of Natural Resources
Missouri Public Service Commission
      P.O. Box 176
301 W. High ;
      Jefferson City, Missouri 65102
- . .
      Otto L. Maynard, President and
' P.O. Box 360
i         Chief Executive Officer
Jefferson City, Missouri 65102
      Wolf Creak Nuclear Operating Corporation       ;
Ronald A. Kucera, Deputy Director
Department of Natural Resources
P.O. Box 176
Jefferson City, Missouri 65102
Otto L. Maynard, President and
i
Chief Executive Officer
Wolf Creak Nuclear Operating Corporation
;
I
I
      P.O. Box 411                                   l
P.O. Box 411
        Burlington, Kansas 66839                       '
'
l
Burlington, Kansas 66839
Dan 1. Bolef, President
,
Kay Drey, Representative
l
. Board of Directors Coalition
i
for the Environment
6267 Delmar Boulevard
I
' University City, Missouri 63130
Lee Fritz, Presiding Commissioner
~ Callaway County Court House
.10 East Fifth Street
Fulton, Missourl 65151
Alan C. Passwater, Manager
Licensing and Fuels -
AmorenUE
One Ameren Plaza-
1901 Chouteau Avenue
P.O. Box 66149
St. Louis, Missouri 63166-6149 _
,
.
1
l
l
      Dan 1. Bolef, President                        ;
,      Kay Drey, Representative                      l
l    . Board of Directors Coalition                    i
          for the Environment                          l
      6267 Delmar Boulevard                          I
    ' University City, Missouri 63130
        Lee Fritz, Presiding Commissioner
    ~ Callaway County Court House
      .10 East Fifth Street
        Fulton, Missourl 65151
      Alan C. Passwater, Manager                      !
        Licensing and Fuels -
      AmorenUE                                        i
        One Ameren Plaza-
        1901 Chouteau Avenue
        P.O. Box 66149                                ,
        St. Louis, Missouri 63166-6149 _
                      .
                                                      1
                                                      l


  *
*
                                            ,
,
0
0
                                      .
.
      Union Electric Company             -3-
Union Electric Company
      J. V. Laux, Manager
-3-
      Quality Assurance
J. V. Laux, Manager
      Union Electric Company
Quality Assurance
      P.O. Box 620
Union Electric Company
    ' Fulton, Missouri 65251
P.O. Box 620
      Jerry Uhlmann, Director
' Fulton, Missouri 65251
      State Emergency Management Agency
Jerry Uhlmann, Director
      P.O. Box 116.
State Emergency Management Agency
      Jefferson City, Missouri 65101
P.O. Box 116.
                                  -
Jefferson City, Missouri 65101
                                              %
-
                                                f
%
f


      a
a
                                                                                                                              '
'
_./ _
_./ _
          Union Electric Company                                     -4-
Union Electric Company
          DISTRIBUTION w/coov of licensee's letter dated March 17.1999:
-4-
          Regional Administrator
DISTRIBUTION w/coov of licensee's letter dated March 17.1999:
          Resident inspector
Regional Administrator
          DRS Director
Resident inspector
          DRP Director
DRS Director
          SRI (Callaway, RIV)
DRP Director
                                                                                                                                    '
SRI (Callaway, RIV)
          DRS Director
'
          Branch Chief (DRP/B)                                                                                                     1
DRS Director
          Branch Chief, DRS/PSB)                                                                                                   l
Branch Chief (DRP/B)
          Project Engineer (DRP/B)
1
          MIS System
Branch Chief, DRS/PSB)
          RIV Docket File
l
          Elaine Koup NRR/DRPM/SGB (MS: OWFN 12E-11)
Project Engineer (DRP/B)
          Ellen Poteat, OCFO/LFARB (MS: TWFN 9E-10)
MIS System
        ' DRS Action item File (99-G-0042)(Goines)
RIV Docket File
        (OPEllE04)*
Elaine Koup NRR/DRPM/SGB (MS: OWFN 12E-11)
                                                                                                                                    1
Ellen Poteat, OCFO/LFARB (MS: TWFN 9E-10)
                                                                                                                                    l
' DRS Action item File (99-G-0042)(Goines)
                                                                                                                                    l
(OPEllE04)*
                                                                                                                                    !
1
                                                                                                                                    ,
,
                                                                                                                              (
(
                                                                                                                                  I
1200 @
                                                    1200 @                                                                      1
I
                                                                                                                                    '
1
          DOCUMENT NAME: R:\_CW\CW902AK.DWS
'
          To recolve copy of document, Indicate in box: "C* = copy without enclosures *E" = copy with enclosures "N" = No copy
DOCUMENT NAME: R:\\_CW\\CW902AK.DWS
          RIV:PSB               Eg C:PSB/DRS
To recolve copy of document, Indicate in box: "C* = copy without enclosures *E" = copy with enclosures "N" = No copy
          DWSchaefer:nh])(/d GMGood (4TW
RIV:PSB
                                  '
Eg C:PSB/DRS
          04/ 0 6 /99                   04/ (o /99
DWSchaefer:nh])(/d GMGood (4TW
                                                      OFFICIAL RECORD COPY
04/ 0 6 /99
04/ (o /99
'
OFFICIAL RECORD COPY


e
e
  .
.
.
      Union Electric Company                                     -4-
.
      DISTRIBUTION w/coov of licensee's letter dated March 17.1999:
Union Electric Company
      Regional Administrator
-4-
      Resident inspector
DISTRIBUTION w/coov of licensee's letter dated March 17.1999:
      DRS Director
Regional Administrator
      DRP Director
Resident inspector
    . SRI (Callaway, RIV)
DRS Director
      DRS Director
DRP Director
      Branch Chief (DRP/B)
. SRI (Callaway, RIV)
      Branch Chief, DRS/PSB)
DRS Director
      Project Engineer (DRP/B)
Branch Chief (DRP/B)
      MIS System
Branch Chief, DRS/PSB)
      RIV Docket File
Project Engineer (DRP/B)
      Elaine Koup NRR/DRPM/SGB (MS: OWFN 12E-11)
MIS System
      Ellen Poteat, OCFO/LFARB (MS: TWFN 9E-10)
RIV Docket File
      DRS Action item File (99-G-0042)(Goines)
Elaine Koup NRR/DRPM/SGB (MS: OWFN 12E-11)
      DMB (IE04)
Ellen Poteat, OCFO/LFARB (MS: TWFN 9E-10)
                                                                                                                          l!
DRS Action item File (99-G-0042)(Goines)
      DOCUMENT NAME: R:\_CW\CW902AK.DWS
DMB (IE04)
      To receive copy of document, Indicato in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
!
      RIV:PSB                 Eg C:PSB/DRS
DOCUMENT NAME: R:\\_CW\\CW902AK.DWS
      DWSchaefer:ntLftfM GMGood (.Js&
To receive copy of document, Indicato in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
                              '
RIV:PSB
      04/ 0 6 /99                   04/ (o /99
Eg C:PSB/DRS
                                                  OFFICIAL RECORD COPY
DWSchaefer:ntLftfM GMGood (.Js&
                                                                                                                            )
'
                                                                                                                          i
04/ 0 6 /99
                                                                                                                          j
04/ (o /99
OFFICIAL RECORD COPY
)
i
j


  r         .                                                                                                                1
r
      1
1
        ,        .
.
                            Union Electric
1
                                                                                                              Box 620
Union Electric
                            CallawayMont
.
                                                                                                gQ
Box 620
          .
,
  ,                                                                                                      P,ulton, M0 05251
CallawayMont
                                                                                '$ p*                     '\
gQ
                          March 17,1999                                                                         1
P,ulton, M0 05251
                                                                                          gc og _ -
.
                          U. S. Nuclear Regulatory Commission
,
                          Attn: Document Control Desk
'$ p*
                          Mail Stop Pl-137
'\\
                          Washington, DC 20555-0001                                     ULNRC-3984
March 17,1999
                          Gentlemen:
1
                                                                    REPLY TO
gc og _ -
U. S. Nuclear Regulatory Commission
Attn: Document Control Desk
Mail Stop Pl-137
Washington, DC 20555-0001
ULNRC-3984
Gentlemen:
REPLY TO
b
8
8
    b                                                  INSPECTION REPORT NO. 50-483/99002
INSPECTION REPORT NO. 50-483/99002
              fffgf'g/f                                         CALLAWAY PLANT
fffgf'g/f
                                                              UNION ELECTRIC CO.
CALLAWAY PLANT
                        This responds to Ms. Gail M. Good's letter dated February 25,1999, which transmitted
UNION ELECTRIC CO.
                        Inspection Report 50-483/99002.
This responds to Ms. Gail M. Good's letter dated February 25,1999, which transmitted
                        This letter confirms that Union Electric Company commits to revise its Security Plan to
Inspection Report 50-483/99002.
                        increase the minimum staffing by three armed security force response personnel per shift.
This letter confirms that Union Electric Company commits to revise its Security Plan to
                        This plan change was discussed between the Manager, Operations Support and the
increase the minimum staffing by three armed security force response personnel per shift.
                        Region IV Safeguards Inspector during the NRC physical security program inspection
This plan change was discussed between the Manager, Operations Support and the
                        conducted the week of February 8,1999. It should be noted that Callaway Plant has
Region IV Safeguards Inspector during the NRC physical security program inspection
                        never utilized the lower numbers of personnel allowed by the plan; but rather treats the
conducted the week of February 8,1999. It should be noted that Callaway Plant has
                        number of personnel necessary to repel the design basis threat as its minimum armed
never utilized the lower numbers of personnel allowed by the plan; but rather treats the
                        staffing level. Although not mentioned in the inspection report, the following additional
number of personnel necessary to repel the design basis threat as its minimum armed
                        information was also agreed upon to be included in the Security Plan revision to clarify
staffing level. Although not mentioned in the inspection report, the following additional
                        Callaway Plant's commitment to increase its minimum armed response staffing to those
information was also agreed upon to be included in the Security Plan revision to clarify
                        levels used during the Operational Safeguard Response Evaluation (OSRE):
Callaway Plant's commitment to increase its minimum armed response staffing to those
                        .
levels used during the Operational Safeguard Response Evaluation (OSRE):
                              " Changes to the Callaway Plant defensive strategy, target sets or system / hardware
" Changes to the Callaway Plant defensive strategy, target sets or system / hardware
                              demonstrated during the OSRE (e.g. delay barriers, response center locations,
.
                              weaponry, etc.,) may warrant a reduction in the total number of armed response
demonstrated during the OSRE (e.g. delay barriers, response center locations,
                              personnel. Reduction in the number of armed responders will be tested through the
weaponry, etc.,) may warrant a reduction in the total number of armed response
                              use of force-on-force drills or exercises and will be validated by the NRC prior to
personnel. Reduction in the number of armed responders will be tested through the
                              submittal of the change in accordance with 10CFR50.54(p)." and,
use of force-on-force drills or exercises and will be validated by the NRC prior to
                        .
submittal of the change in accordance with 10CFR50.54(p)." and,
                            "The number of armed response personnel may be up to two less than the minimum
"The number of armed response personnel may be up to two less than the minimum
                            requirements for a period of time not to exceed two hours in order to accommodate
.
                            unexpected absence of security force members provided immediate action is taken to
requirements for a period of time not to exceed two hours in order to accommodate
                            restore security force composition to the minimum numbers established by this plan."
unexpected absence of security force members provided immediate action is taken to
                        These changes will be added during the next Callaway Plant Security Plan revision
restore security force composition to the minimum numbers established by this plan."
                        submittal.
These changes will be added during the next Callaway Plant Security Plan revision
                          a substsry of Ameren Corpornhan
submittal.
                                                                    9ct-094 o
9ct-094 o
a substsry of Ameren Corpornhan


      -
.
                                                              - - -
- - -
n--           .
n--
        ,                                                                                                     ,
-
    :     *
,
            *
,
                *
:
.   .
*
                  ULNRC-3984
*
                  March 17,1999
*
                  Page 2
.
                  None of the material in the response is considered proprietary by Union Electric.
.
                  If you have any questions regarding this reponse, or if additional information is required,
ULNRC-3984
                  please let me know.
March 17,1999
                                                                              Very truly yours,
Page 2
                                                                                      /w
None of the material in the response is considered proprietary by Union Electric.
                                                                                . D. Blosser
If you have any questions regarding this reponse, or if additional information is required,
                                                                              Manager, Operations Support
please let me know.
                  JDB/ MAR /cjs
Very truly yours,
/w
. D. Blosser
Manager, Operations Support
JDB/ MAR /cjs


            .
.
      J
J
    : *
:
          *
*
  . .
*
              ULNRC-3984
. .
              March 17,1999
ULNRC-3984
              Page 3
March 17,1999
              cc: ; Mr. Ellis W. Merschoff
Page 3
                    Regional Administrator
cc: ; Mr. Ellis W. Merschoff
                    U.S. Nuclear Regulatory Commission
Regional Administrator
                  Region IV
U.S. Nuclear Regulatory Commission
                  611 Ryan Plaza Drive, Suite 400
Region IV
                  Arlington, TX 76011-8064
611 Ryan Plaza Drive, Suite 400
                  Senior Resident Inspector
Arlington, TX 76011-8064
                  Callaway Resident Office
Senior Resident Inspector
                  U.S. Nuclear Regulatory Commission       '
Callaway Resident Office
                    8201 NRC Road
U.S. Nuclear Regulatory Commission
                  Steedman,MO 65077
'
                  Mr. Melvin K. Gray (2 copies)
8201 NRC Road
                  Licensing Project Manager, Callaway Plant
Steedman,MO 65077
                  Office of Nuclear Reactor Regulation
Mr. Melvin K. Gray (2 copies)
                  U. S. Nuclear Regulatory Commission
Licensing Project Manager, Callaway Plant
Office of Nuclear Reactor Regulation
U. S. Nuclear Regulatory Commission
'
'
                  Mail Stop 13E16
Mail Stop 13E16
                  Washington, DC 20555-2738
Washington, DC 20555-2738
                  Manager, Electric Department
Manager, Electric Department
                  Missouri Public Service Commission
Missouri Public Service Commission
                  PO Box 360
PO Box 360
                  Jefferson City, MO 65102
Jefferson City, MO 65102
,                  Superintendent, Licensing
Superintendent, Licensing
                  Wolf Creek Nuclear Operating Corporation
,
                  PO Box 411
Wolf Creek Nuclear Operating Corporation
                  Burlington, KS 66839
PO Box 411
Burlington, KS 66839
}}
}}

Latest revision as of 16:44, 7 December 2024

Ack Receipt of ,In Response to NRC Insp Rept 50-483/99-02,dtd 990225 Re Verbal Commitment Made During Exit Meeting for Insp.Understands Next Rev of Security Plan Will Include Increased Min Staffing of Three Armed Guards
ML20205J870
Person / Time
Site: Callaway 
Issue date: 04/06/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
References
50-483-99-02, 50-483-99-2, NUDOCS 9904120224
Download: ML20205J870 (5)


See also: IR 05000483/1999002

Text

r

,

eAI'"'De

UNITED S7' YS

g

,

p

g

NUCLEAR REGULATC). ' COMMISSION

b

f

REGloNIv

[

6!1 RYAN PLAZA DRIVE, SUITE 400

',g,

ARLINGTON, texas 76011-8064

April 6,1999

i

Garry L. Randolph, Vice President and

Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

SUBJECT: NRC INSPECTION REPORT NO. 50-483/99-02

Dear Mr. Randolph:

'

Thank you for your letter (ULNRC-3984) dated March 17,1999, in response to our NRC

Inspection Report 50-483/99-02, dated February 25,1999. Your letter documented a verbal

commitment made during the exit meeting for this inspection. We have reviewed your reply

and understand that the next revision to your security plan will include increased minimum

staffing of three armed security force response personnel per shift. This change will reflect

your security staffing at the level demonstrated during your Operational Safeguards Response

Evaluation.

Sincerely,

Gail M. Good, Chief

Plant Support Branch

Division of Reactor Safety

Docket No.:

50-483

License No.: NPF-30

cc w/ enclosure:

Professional Nuclear Consulting, Inc.

19041 Raines Drive

Derwood, Maryland 20855

9904120224 990406

PDR

ADOCK 05000483

G

PDR

r

'*

,

.r

Union Electric Company

-2-

John O'Neill, Esq.

.

.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C. 20037

,

l

H. D. Bono, Supervising Engineer

Quality Assurance Regulatory Support

j

Union Electric Company

'

P.O. Box 620

Fulton, Missouri 65251

J

Manager- Electric Department

Missouri Public Service Commission

301 W. High ;

- . .

' P.O. Box 360

Jefferson City, Missouri 65102

Ronald A. Kucera, Deputy Director

Department of Natural Resources

P.O. Box 176

Jefferson City, Missouri 65102

Otto L. Maynard, President and

i

Chief Executive Officer

Wolf Creak Nuclear Operating Corporation

I

P.O. Box 411

'

l

Burlington, Kansas 66839

Dan 1. Bolef, President

,

Kay Drey, Representative

l

. Board of Directors Coalition

i

for the Environment

6267 Delmar Boulevard

I

' University City, Missouri 63130

Lee Fritz, Presiding Commissioner

~ Callaway County Court House

.10 East Fifth Street

Fulton, Missourl 65151

Alan C. Passwater, Manager

Licensing and Fuels -

AmorenUE

One Ameren Plaza-

1901 Chouteau Avenue

P.O. Box 66149

St. Louis, Missouri 63166-6149 _

,

.

1

l

,

0

.

Union Electric Company

-3-

J. V. Laux, Manager

Quality Assurance

Union Electric Company

P.O. Box 620

' Fulton, Missouri 65251

Jerry Uhlmann, Director

State Emergency Management Agency

P.O. Box 116.

Jefferson City, Missouri 65101

-

%

f

a

'

_./ _

Union Electric Company

-4-

DISTRIBUTION w/coov of licensee's letter dated March 17.1999:

Regional Administrator

Resident inspector

DRS Director

DRP Director

SRI (Callaway, RIV)

'

DRS Director

Branch Chief (DRP/B)

1

Branch Chief, DRS/PSB)

l

Project Engineer (DRP/B)

MIS System

RIV Docket File

Elaine Koup NRR/DRPM/SGB (MS: OWFN 12E-11)

Ellen Poteat, OCFO/LFARB (MS: TWFN 9E-10)

' DRS Action item File (99-G-0042)(Goines)

(OPEllE04)*

1

,

(

1200 @

I

1

'

DOCUMENT NAME: R:\\_CW\\CW902AK.DWS

To recolve copy of document, Indicate in box: "C* = copy without enclosures *E" = copy with enclosures "N" = No copy

RIV:PSB

Eg C:PSB/DRS

DWSchaefer:nh])(/d GMGood (4TW

04/ 0 6 /99

04/ (o /99

'

OFFICIAL RECORD COPY

e

.

.

Union Electric Company

-4-

DISTRIBUTION w/coov of licensee's letter dated March 17.1999:

Regional Administrator

Resident inspector

DRS Director

DRP Director

. SRI (Callaway, RIV)

DRS Director

Branch Chief (DRP/B)

Branch Chief, DRS/PSB)

Project Engineer (DRP/B)

MIS System

RIV Docket File

Elaine Koup NRR/DRPM/SGB (MS: OWFN 12E-11)

Ellen Poteat, OCFO/LFARB (MS: TWFN 9E-10)

DRS Action item File (99-G-0042)(Goines)

DMB (IE04)

!

DOCUMENT NAME: R:\\_CW\\CW902AK.DWS

To receive copy of document, Indicato in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:PSB

Eg C:PSB/DRS

DWSchaefer:ntLftfM GMGood (.Js&

'

04/ 0 6 /99

04/ (o /99

OFFICIAL RECORD COPY

)

i

j

r

1

.

1

Union Electric

.

Box 620

,

CallawayMont

gQ

P,ulton, M0 05251

.

,

'$ p*

'\\

March 17,1999

1

gc og _ -

U. S. Nuclear Regulatory Commission

Attn: Document Control Desk

Mail Stop Pl-137

Washington, DC 20555-0001

ULNRC-3984

Gentlemen:

REPLY TO

b

8

INSPECTION REPORT NO. 50-483/99002

fffgf'g/f

CALLAWAY PLANT

UNION ELECTRIC CO.

This responds to Ms. Gail M. Good's letter dated February 25,1999, which transmitted

Inspection Report 50-483/99002.

This letter confirms that Union Electric Company commits to revise its Security Plan to

increase the minimum staffing by three armed security force response personnel per shift.

This plan change was discussed between the Manager, Operations Support and the

Region IV Safeguards Inspector during the NRC physical security program inspection

conducted the week of February 8,1999. It should be noted that Callaway Plant has

never utilized the lower numbers of personnel allowed by the plan; but rather treats the

number of personnel necessary to repel the design basis threat as its minimum armed

staffing level. Although not mentioned in the inspection report, the following additional

information was also agreed upon to be included in the Security Plan revision to clarify

Callaway Plant's commitment to increase its minimum armed response staffing to those

levels used during the Operational Safeguard Response Evaluation (OSRE):

" Changes to the Callaway Plant defensive strategy, target sets or system / hardware

.

demonstrated during the OSRE (e.g. delay barriers, response center locations,

weaponry, etc.,) may warrant a reduction in the total number of armed response

personnel. Reduction in the number of armed responders will be tested through the

use of force-on-force drills or exercises and will be validated by the NRC prior to

submittal of the change in accordance with 10CFR50.54(p)." and,

"The number of armed response personnel may be up to two less than the minimum

.

requirements for a period of time not to exceed two hours in order to accommodate

unexpected absence of security force members provided immediate action is taken to

restore security force composition to the minimum numbers established by this plan."

These changes will be added during the next Callaway Plant Security Plan revision

submittal.

9ct-094 o

a substsry of Ameren Corpornhan

.

- - -

n--

-

,

,

.

.

ULNRC-3984

March 17,1999

Page 2

None of the material in the response is considered proprietary by Union Electric.

If you have any questions regarding this reponse, or if additional information is required,

please let me know.

Very truly yours,

/w

. D. Blosser

Manager, Operations Support

JDB/ MAR /cjs

.

J

. .

ULNRC-3984

March 17,1999

Page 3

cc: ; Mr. Ellis W. Merschoff

Regional Administrator

U.S. Nuclear Regulatory Commission

Region IV

611 Ryan Plaza Drive, Suite 400

Arlington, TX 76011-8064

Senior Resident Inspector

Callaway Resident Office

U.S. Nuclear Regulatory Commission

'

8201 NRC Road

Steedman,MO 65077

Mr. Melvin K. Gray (2 copies)

Licensing Project Manager, Callaway Plant

Office of Nuclear Reactor Regulation

U. S. Nuclear Regulatory Commission

'

Mail Stop 13E16

Washington, DC 20555-2738

Manager, Electric Department

Missouri Public Service Commission

PO Box 360

Jefferson City, MO 65102

Superintendent, Licensing

,

Wolf Creek Nuclear Operating Corporation

PO Box 411

Burlington, KS 66839