Director, Office of Resource Management March Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | |||
50/395 UNIT V. C. SUMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 1 | |||
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
(MWe-Net) 1. | |||
791 17. | |||
-11 2. | |||
802 18. | |||
-8 3. | |||
801 19. | |||
-4 4. | |||
802 20. | |||
-12 5. | |||
799 21. | |||
-8 6. | |||
336 22. | |||
-8 7. | |||
-34 23. | |||
-8 8. | |||
-32 24. | |||
-8 | |||
~ | ~ | ||
9. | |||
-32 25. | |||
-8 10. | |||
-13 26. | |||
-8 11. | |||
-12 27. | |||
-11 12. | |||
-12 28. | |||
R | -11 13. | ||
-12 29. | |||
-7 14. | |||
-11 30. | |||
-7 15. | |||
-11 31. | |||
-7 16. | |||
-11 kDj40 870333 | |||
} | |||
R 05000395 PDR | |||
\\\\ | |||
Director, Office of Resource Management March Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. | Director, Office of Resource Management March Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. | ||
: 1. Reporting Period: | 50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS | ||
: 2. Currently Authorized Power Level (MWt): | : 1. Reporting Period: | ||
March 1987 Gross Hours in Reporting Period: | |||
744 | |||
: 2. Currently Authorized Power Level (MWt): | |||
2775 Max. Depend. Capacity (MWe-Net): | |||
885 Design Electrical Rating (MWe-Net): | |||
900 | |||
: 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A | : 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A | ||
: 4. Reasons for Restrictions: N/A THIS MONTH | : 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE | ||
: 5. Number of Hours Reactor Critical | : 5. Number of Hours Reactor Critical 141.2 1557.2 22003.7 | ||
: 6. Reactor Reserve Shutdown Hours | : 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 | ||
: 7. Hours Generator on Line | : 7. Hours Generator on Line 140.2 1556.2 21547.4 | ||
: 8. Unit Reserve Shutdown Hours | : 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | ||
: 9. Gross Thermal Energy Generated (MWH) | : 9. Gross Thermal Energy Generated (MWH) 333,666 4,149,036 56,543,356 | ||
: 10. Gross Electrical Energy (MWH) 109,290 1,366,570 18,776,029 | |||
: 11. Net Electrical Energy Generated (MWH) 96,797 | : 11. Net Electrical Energy Generated (MWH) 96,797 1,300,832 17,884,109 | ||
: 12. Reactor Service Factor | : 12. Reactor Service Factor 19.0 72.1 77.3 | ||
: 13. Reactor Availability Factor | : 13. Reactor Availability Factor 19.0 72.1 77.3 | ||
: 14. Unit Service Factor | : 14. Unit Service Factor 18.8 72.0 75.7 1 | ||
: 15. Unit Availability Factor | : 15. Unit Availability Factor 18.8 72.0 75.7 | ||
: 16. Unit Capacity Factor (Using MDC) | : 16. Unit Capacity Factor (Using MDC) 14.7 68.0 71.0 | ||
: 17. Unit Capacity Factor (Design MWe) | : 17. Unit Capacity Factor (Design MWe) 14.5 66.9 69.8 | ||
: 18. Unit Forced Outage Rate | : 18. Unit Forced Outage Rate 0.0 0.0 6.4 | ||
: 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each): | : 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each): | ||
N/A i | N/A i | ||
: 20. If Shut Down at End of Report Period, Estimated Date of Startup: | : 20. If Shut Down at End of Report Period, Estimated Date of Startup: | ||
MAY 7,1987 | MAY 7,1987 | ||
: 21. Units in Test Status (Prior to Commercial Operation): | : 21. Units in Test Status (Prior to Commercial Operation): | ||
N/A | |||
-l. | |||
-l . | Director, Office of Resource Management March Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. | ||
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 Method of TYPE Shutting F or S Duration Down the Corrective Actions / | |||
No. | No. | ||
Date Reason Forced or (Hours) | |||
Reactor or Comments Scheduled Reducing Power 2 | |||
870306 S | |||
603.8 C | |||
2 62 DAY OUTAGE | |||
i . | i. | ||
Director, Office of Resource Management March Monthly Operating Report | Director, Office of Resource Management March Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO. | OF OPERATING EXPERIENCE DOCKET NO. | ||
On March 6, 1987, at 0100, a reactor shutdown commenced for the third refueling | 50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 On March 1, 1987, the V. C. Summer Nuclear Station continued to operate at approximately 92% power due to the removal of 'B' Main Feedwater Pump from service on February 24, 1987. | ||
outage. The plant was held at 60% power to flush oil from the secondary side. | On March 6, 1987, at 0100, a reactor shutdown commenced for the third refueling outage. The plant was held at 60% power to flush oil from the secondary side. | ||
4 On March 6, 1987, at 2010, the plant was taken off line for the outage. The 1 | |||
I expected duration of the outage is approximately 62 days. | |||
On March 31, 1987, the reactor remained shutdown. | On March 31, 1987, the reactor remained shutdown. | ||
i t | i t | ||
--}} | |||
Latest revision as of 02:48, 7 December 2024
| ML20205T146 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 03/31/1987 |
| From: | Loignon G SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | |
| Shared Package | |
| ML20205T150 | List: |
| References | |
| NUDOCS 8704070222 | |
| Download: ML20205T146 (4) | |
Text
.
J l
Director, Office of Resource Management March Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395 UNIT V. C. SUMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
791 17.
-11 2.
802 18.
-8 3.
801 19.
-4 4.
802 20.
-12 5.
799 21.
-8 6.
336 22.
-8 7.
-34 23.
-8 8.
-32 24.
-8
~
9.
-32 25.
-8 10.
-13 26.
-8 11.
-12 27.
-11 12.
-12 28.
-11 13.
-12 29.
-7 14.
-11 30.
-7 15.
-11 31.
-7 16.
-11 kDj40 870333
}
R 05000395 PDR
\\\\
Director, Office of Resource Management March Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS
- 1. Reporting Period:
March 1987 Gross Hours in Reporting Period:
744
- 2. Currently Authorized Power Level (MWt):
2775 Max. Depend. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):
900
- 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
- 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. Number of Hours Reactor Critical 141.2 1557.2 22003.7
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 140.2 1556.2 21547.4
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 333,666 4,149,036 56,543,356
- 10. Gross Electrical Energy (MWH) 109,290 1,366,570 18,776,029
- 11. Net Electrical Energy Generated (MWH) 96,797 1,300,832 17,884,109
- 12. Reactor Service Factor 19.0 72.1 77.3
- 13. Reactor Availability Factor 19.0 72.1 77.3
- 14. Unit Service Factor 18.8 72.0 75.7 1
- 15. Unit Availability Factor 18.8 72.0 75.7
- 16. Unit Capacity Factor (Using MDC) 14.7 68.0 71.0
- 17. Unit Capacity Factor (Design MWe) 14.5 66.9 69.8
- 18. Unit Forced Outage Rate 0.0 0.0 6.4
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
N/A i
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
MAY 7,1987
- 21. Units in Test Status (Prior to Commercial Operation):
N/A
-l.
Director, Office of Resource Management March Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power 2
870306 S
603.8 C
2 62 DAY OUTAGE
i.
Director, Office of Resource Management March Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 On March 1, 1987, the V. C. Summer Nuclear Station continued to operate at approximately 92% power due to the removal of 'B' Main Feedwater Pump from service on February 24, 1987.
On March 6, 1987, at 0100, a reactor shutdown commenced for the third refueling outage. The plant was held at 60% power to flush oil from the secondary side.
4 On March 6, 1987, at 2010, the plant was taken off line for the outage. The 1
I expected duration of the outage is approximately 62 days.
On March 31, 1987, the reactor remained shutdown.
i t
--