l Director, Office of Resource Management March Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.         50/395 UNIT V. C. SUMER I DATE       4/01/87 COMPLETED BY     G. A. LOIGNON TELEPHONE (803) 345-5209 1                                                MARCH 1987 DAY AVERAGE DAILY POWER LEVEL       DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                             (MWe-Net)
Director, Office of Resource Management March Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
: 1.           791                     17.           -11
50/395 UNIT V. C. SUMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 1
: 2.           802                     18.             -8
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: 3.           801                     19.             -4
(MWe-Net) 1.
: 4.           802                     20.           -12
791 17.
: 5.           799                     21.             -8
-11 2.
: 6.           336                     22.             -8
802 18.
: 7.           -34                     23.             -8
-8 3.
: 8.           -32                     24.             -8
801 19.
                                                                            -8
-4 4.
802 20.
-12 5.
799 21.
-8 6.
336 22.
-8 7.
-34 23.
-8 8.
-32 24.
-8
~
~
: 9.           -32                     25.
9.
: 10.           -13                     26.             -8
-32 25.
: 11.           -12                     27.           -11
-8 10.
: 12.           -12                     28.           -11
-13 26.
: 13.           -12                     29.             -7
-8 11.
: 14.           -11                     30.             -7
-12 27.
: 15.           -11                     31.             -7
-11 12.
: 16.           -11 kDj40         870333                                             }
-12 28.
R             05000395 PDR                                               \\
-11 13.
-12 29.
-7 14.
-11 30.
-7 15.
-11 31.
-7 16.
-11 kDj40 870333
}
R 05000395 PDR
\\\\


Director, Office of Resource Management March Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.             50/395 UNIT   V. C. SUMMER I DATE       4/01/87 COMPLETED BY         G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS
Director, Office of Resource Management March Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
: 1. Reporting Period:               March     1987 Gross Hours in Reporting Period:           744
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS
: 2. Currently Authorized Power Level (MWt):   2775 Max. Depend. Capacity (MWe-Net):           885 Design Electrical Rating (MWe-Net):         900
: 1. Reporting Period:
March 1987 Gross Hours in Reporting Period:
744
: 2. Currently Authorized Power Level (MWt):
2775 Max. Depend. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):
900
: 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
: 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
: 4. Reasons for Restrictions: N/A THIS MONTH     YR TO DATE           CUMULATIVE
: 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
: 5. Number of Hours Reactor Critical             141.2             1557.2               22003.7
: 5. Number of Hours Reactor Critical 141.2 1557.2 22003.7
: 6. Reactor Reserve Shutdown Hours                   0.0                 0.0                 0.0
: 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
: 7. Hours Generator on Line                       140.2             1556.2               21547.4
: 7. Hours Generator on Line 140.2 1556.2 21547.4
: 8. Unit Reserve Shutdown Hours                       0.0                 0.0                 0.0
: 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 9. Gross Thermal Energy Generated (MWH)     333,666         4,149,036           56,543,356
: 9. Gross Thermal Energy Generated (MWH) 333,666 4,149,036 56,543,356
,      10. Gross Electrical Energy (MWH)             109,290         1,366,570           18,776,029
: 10. Gross Electrical Energy (MWH) 109,290 1,366,570 18,776,029
: 11. Net Electrical Energy Generated (MWH) 96,797         1,300,832           17,884,109
: 11. Net Electrical Energy Generated (MWH) 96,797 1,300,832 17,884,109
: 12. Reactor Service Factor                         19.0                 72.1                 77.3
: 12. Reactor Service Factor 19.0 72.1 77.3
: 13. Reactor Availability Factor                     19.0                 72.1                 77.3
: 13. Reactor Availability Factor 19.0 72.1 77.3
: 14. Unit Service Factor                             18.8                 72.0                 75.7 1
: 14. Unit Service Factor 18.8 72.0 75.7 1
: 15. Unit Availability Factor                       18.8                 72.0                 75.7
: 15. Unit Availability Factor 18.8 72.0 75.7
: 16. Unit Capacity Factor (Using MDC)               14.7                 68.0                 71.0
: 16. Unit Capacity Factor (Using MDC) 14.7 68.0 71.0
: 17. Unit Capacity Factor (Design MWe)               14.5                 66.9                 69.8
: 17. Unit Capacity Factor (Design MWe) 14.5 66.9 69.8
: 18. Unit Forced Outage Rate                           0.0                 0.0                 6.4
: 18. Unit Forced Outage Rate 0.0 0.0 6.4
: 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
: 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
N/A i
N/A i
: 20. If Shut Down at End of Report Period, Estimated Date of Startup:
: 20. If Shut Down at End of Report Period, Estimated Date of Startup:
MAY 7,1987
MAY 7,1987
: 21. Units in Test Status (Prior to Commercial Operation):       N/A
: 21. Units in Test Status (Prior to Commercial Operation):
N/A


                                                                                                                                                                          )
-l.
-l .
Director, Office of Resource Management March Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.
* i Director, Office of Resource Management March Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.                               50/395 UNIT     V. C. SUMMER I DATE                         4/01/87 COMPLETED BY                           G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 Method of TYPE                         Shutting Date F or S   Duration     Reason Down the                 Corrective Actions /
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.                                             Reactor or Forced or   (Hours)                                                         Comments Scheduled                       Reducing Power 2   870306       S         603.8       C       2                 62 DAY OUTAGE
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power 2
870306 S
603.8 C
2 62 DAY OUTAGE


i .
i.
Director, Office of Resource Management March Monthly Operating Report
Director, Office of Resource Management March Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE  
      ,    Page 4 ATTACHMENT IV NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.                   50/395 UNIT V. C. SUMMER I DATE             4/01/87 COMPLETED BY         G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 On March 1, 1987, the V. C. Summer Nuclear Station continued to operate at approximately 92% power due to the removal of 'B' Main Feedwater Pump from service on February 24, 1987.
OF OPERATING EXPERIENCE DOCKET NO.
On March 6, 1987, at 0100, a reactor shutdown commenced for the third refueling 4
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 On March 1, 1987, the V. C. Summer Nuclear Station continued to operate at approximately 92% power due to the removal of 'B' Main Feedwater Pump from service on February 24, 1987.
outage. The plant was held at 60% power to flush oil from the secondary side.
On March 6, 1987, at 0100, a reactor shutdown commenced for the third refueling outage. The plant was held at 60% power to flush oil from the secondary side.
1 On March 6, 1987, at 2010, the plant was taken off line for the outage. The I           expected duration of the outage is approximately 62 days.
4 On March 6, 1987, at 2010, the plant was taken off line for the outage. The 1
I expected duration of the outage is approximately 62 days.
On March 31, 1987, the reactor remained shutdown.
On March 31, 1987, the reactor remained shutdown.
i t
i t
  , ,                  _,__    ,  .        _  _ _ _ ,    .,          . - - - ,    --  .- - - - .        -                - --}}
--}}

Latest revision as of 02:48, 7 December 2024

Monthly Operating Rept for Mar 1987
ML20205T146
Person / Time
Site: Summer 
Issue date: 03/31/1987
From: Loignon G
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20205T150 List:
References
NUDOCS 8704070222
Download: ML20205T146 (4)


Text

.

J l

Director, Office of Resource Management March Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50/395 UNIT V. C. SUMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

791 17.

-11 2.

802 18.

-8 3.

801 19.

-4 4.

802 20.

-12 5.

799 21.

-8 6.

336 22.

-8 7.

-34 23.

-8 8.

-32 24.

-8

~

9.

-32 25.

-8 10.

-13 26.

-8 11.

-12 27.

-11 12.

-12 28.

-11 13.

-12 29.

-7 14.

-11 30.

-7 15.

-11 31.

-7 16.

-11 kDj40 870333

}

R 05000395 PDR

\\\\

Director, Office of Resource Management March Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS

1. Reporting Period:

March 1987 Gross Hours in Reporting Period:

744

2. Currently Authorized Power Level (MWt):

2775 Max. Depend. Capacity (MWe-Net):

885 Design Electrical Rating (MWe-Net):

900

3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor Critical 141.2 1557.2 22003.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator on Line 140.2 1556.2 21547.4
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 333,666 4,149,036 56,543,356
10. Gross Electrical Energy (MWH) 109,290 1,366,570 18,776,029
11. Net Electrical Energy Generated (MWH) 96,797 1,300,832 17,884,109
12. Reactor Service Factor 19.0 72.1 77.3
13. Reactor Availability Factor 19.0 72.1 77.3
14. Unit Service Factor 18.8 72.0 75.7 1
15. Unit Availability Factor 18.8 72.0 75.7
16. Unit Capacity Factor (Using MDC) 14.7 68.0 71.0
17. Unit Capacity Factor (Design MWe) 14.5 66.9 69.8
18. Unit Forced Outage Rate 0.0 0.0 6.4
19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):

N/A i

20. If Shut Down at End of Report Period, Estimated Date of Startup:

MAY 7,1987

21. Units in Test Status (Prior to Commercial Operation):

N/A

-l.

Director, Office of Resource Management March Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.

50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 Method of TYPE Shutting F or S Duration Down the Corrective Actions /

No.

Date Reason Forced or (Hours)

Reactor or Comments Scheduled Reducing Power 2

870306 S

603.8 C

2 62 DAY OUTAGE

i.

Director, Office of Resource Management March Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 On March 1, 1987, the V. C. Summer Nuclear Station continued to operate at approximately 92% power due to the removal of 'B' Main Feedwater Pump from service on February 24, 1987.

On March 6, 1987, at 0100, a reactor shutdown commenced for the third refueling outage. The plant was held at 60% power to flush oil from the secondary side.

4 On March 6, 1987, at 2010, the plant was taken off line for the outage. The 1

I expected duration of the outage is approximately 62 days.

On March 31, 1987, the reactor remained shutdown.