{{#Wiki_filter:April 23, 1999 1
{{#Wiki_filter:April 23, 1999 1
Mr. M. Reddemann Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road
Mr. M. Reddemann Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road
  - Two Rivers, WI 54241                                                                           l
- Two Rivers, WI 54241


==Dear Mr. Reddemann:==
==Dear Mr. Reddemann:==
j We received the enclosed Federal Emergency Management Agency (FEMA) correspondence on April 5,1999, transmitting the FEMA evaluation report for the November 3,1998 En.argency Preparedness Exercise at the Point Beach Nuclear Power Plant.
j We received the enclosed Federal Emergency Management Agency (FEMA) correspondence on April 5,1999, transmitting the FEMA evaluation report for the November 3,1998 En.argency Preparedness Exercise at the Point Beach Nuclear Power Plant.
A Deficiency was identified for Manitowoc County as a result of this exercise; however, the county corrected it immediately after the exercise. FEMA also reported that the State of         i I
A Deficiency was identified for Manitowoc County as a result of this exercise; however, the county corrected it immediately after the exercise. FEMA also reported that the State of i
Wisconsin had adequately addressed a planning issue.
Wisconsin had adequately addressed a planning issue.
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed FEMA correspondence will be placed in the NRC Public Document Room.
I in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed FEMA correspondence will be placed in the NRC Public Document Room.
Sincerely, Original /s/ G. L. Shear Gary L. Shear, Chief Plant Support Branch Docket Nos. 50-266;50-301 License Nos. DPR-24; DPR-27 Enc!osure: As stated See Attached Distribution                                                                       j l
Sincerely, Original /s/ G. L. Shear Gary L. Shear, Chief Plant Support Branch Docket Nos. 50-266;50-301 License Nos. DPR-24; DPR-27 Enc!osure: As stated See Attached Distribution j
l DOCUMENT NAME: G:DRS\ pol 042_9.WPD                                                             1
DOCUMENT NAME: G:DRS\\ pol 042_9.WPD 1
: v. ,   .  .r   - m. m oi.       c c- .u.c,.n.num v . c.       .n.c n. eve v . rm           i OFFICE     Rlll           1/3 Rlli           ]N                   l                     l   i NAME       JFoster:tb ef/7- - GShear /k$
: v.,
I DATE       04/$9               04/3/99
.r
                                          /
- m. m oi.
c c-.u.c,.n.num v. c.
.n.c n. eve v. rm i
OFFICE Rlll 1/3 Rlli
]N l
l i
NAME JFoster:tb ef/7- -
GShear /k$
DATE 04/$9 04/3/99
/
OFFICIAL RECORD COPY i
OFFICIAL RECORD COPY i
i 9904300088 990423 PDR     ADOCK 05000266 F                     PDR         ,
i 9904300088 990423 PDR ADOCK 05000266 F
i
PDR i


i M.' Reddeman                                                                                                           I cc w/enci:     R. Grigg, President and Chief Operating Officer, WEPCO M. Sellman, Senior Vice President, Chief Nuclear Officer R. Mende, Plant Manager J. O'Neill, Jr., Shaw, Pittman,             i Potts & Trowbridge _                       {
i M.' Reddeman cc w/enci:
R. Grigg, President and Chief Operating Officer, WEPCO M. Sellman, Senior Vice President, Chief Nuclear Officer R. Mende, Plant Manager J. O'Neill, Jr., Shaw, Pittman, i
Potts & Trowbridge _
{
K. Duveneck, Town Chaim1an Town of Two Creeks B. Burks, P.E., Director Bureau of Field Operations -
K. Duveneck, Town Chaim1an Town of Two Creeks B. Burks, P.E., Director Bureau of Field Operations -
J. Mettner, Chairman, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer -
J. Mettner, Chairman, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer -
l C         ail)
C ail)
RPC (E-Mail)                                                 1 Project Mgr., NRR w/enci                                     !
RPC (E-Mail) 1 Project Mgr., NRR w/enci J. Caldwell, Rlll w/ enc!
J. Caldwell, Rlll w/ enc!
B. Clayton, Rlli w/enci
B. Clayton, Rlli w/enci
      . SRI Point Beach w/enci                                     ,
. SRI Point Beach w/enci DRP w/enci DRS w/ encl Rill PRR w/ encl PUBLIC IE-35 w/enci
DRP w/enci DRS w/ encl Rill PRR w/ encl PUBLIC IE-35 w/enci Docket File w/enci GREENS
[
[    ,
Docket File w/enci GREENS IEO (E-Mail)
IEO (E-Mail)                                                 !
}'
DOCDESK (E-Mail)                                         }'  !
DOCDESK (E-Mail) 300031.
300031.
)}}
l
                                                                    )}}

Latest revision as of 02:21, 7 December 2024

Forwards FEMA Evaluation Rept for 981103 Emergency Preparedness Exercise at Point Beach Nuclear Power Plant. Deficiency Identified for Manitowoc County as Result of Exercise.County Corrected Deficiency Immediately
ML20206B812
Person / Time
Site: Point Beach  
Issue date: 04/23/1999
From: Shear G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddemann M
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20206B815 List:
References
NUDOCS 9904300088
Download: ML20206B812 (2)


Text

April 23, 1999 1

Mr. M. Reddemann Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road

- Two Rivers, WI 54241

Dear Mr. Reddemann:

j We received the enclosed Federal Emergency Management Agency (FEMA) correspondence on April 5,1999, transmitting the FEMA evaluation report for the November 3,1998 En.argency Preparedness Exercise at the Point Beach Nuclear Power Plant.

A Deficiency was identified for Manitowoc County as a result of this exercise; however, the county corrected it immediately after the exercise. FEMA also reported that the State of i

Wisconsin had adequately addressed a planning issue.

I in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed FEMA correspondence will be placed in the NRC Public Document Room.

Sincerely, Original /s/ G. L. Shear Gary L. Shear, Chief Plant Support Branch Docket Nos. 50-266;50-301 License Nos. DPR-24; DPR-27 Enc!osure: As stated See Attached Distribution j

DOCUMENT NAME: G:DRS\\ pol 042_9.WPD 1

v.,

.r

- m. m oi.

c c-.u.c,.n.num v. c.

.n.c n. eve v. rm i

OFFICE Rlll 1/3 Rlli

]N l

l i

NAME JFoster:tb ef/7- -

GShear /k$

DATE 04/$9 04/3/99

/

OFFICIAL RECORD COPY i

i 9904300088 990423 PDR ADOCK 05000266 F

PDR i

i M.' Reddeman cc w/enci:

R. Grigg, President and Chief Operating Officer, WEPCO M. Sellman, Senior Vice President, Chief Nuclear Officer R. Mende, Plant Manager J. O'Neill, Jr., Shaw, Pittman, i

Potts & Trowbridge _

{

K. Duveneck, Town Chaim1an Town of Two Creeks B. Burks, P.E., Director Bureau of Field Operations -

J. Mettner, Chairman, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer -

C ail)

RPC (E-Mail) 1 Project Mgr., NRR w/enci J. Caldwell, Rlll w/ enc!

B. Clayton, Rlli w/enci

. SRI Point Beach w/enci DRP w/enci DRS w/ encl Rill PRR w/ encl PUBLIC IE-35 w/enci

[

Docket File w/enci GREENS IEO (E-Mail)

}'

DOCDESK (E-Mail) 300031.

)