| title = Responds to 881012 Ltr Re Request for Restart of Plant. Issues Raised Already Addressed by NRC W/Exception of Emergency Planning
| title = Responds to Re Request for Restart of Plant. Issues Raised Already Addressed by NRC W/Exception of Emergency Planning
| author name = Zech L
| author name = Zech L
| author affiliation = NRC COMMISSION (OCM)
| author affiliation = NRC COMMISSION (OCM)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 2.206, NUDOCS 8811170067
| document report number = 2.206, NUDOCS 8811170067
| title reference date = 10-12-1988
| package number = ML20206D402
| package number = ML20206D402
| document type = CORRESPONDENCE-LETTERS, NRC TO STATE/LOCAL GOVERNMENT, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO STATE/LOCAL GOVERNMENT, OUTGOING CORRESPONDENCE
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:.       _ _ _ _ - - _ _            -                  .__
{{#Wiki_filter:.
    ''*'                                  #                                                                  Distribution:
Distribution:
Docket File y/                             ' .Ip uoglo,,
Docket File y/
* UNITE 3 STATES             NRC & Local PDRs
' Ip uoglo,,
  ))-                         ?                       o              NUCLEAR REGULATORY COMMISSION         ED0 4016
UNITE 3 STATES NRC & Local PDRs
{                         i                       WASHING TON. o. C. 20065     y$te))o t                   /                                                     JTaylor-JBlaha
))-
                                      **4 * . . . . /                           November 10, 1988 TMurley/JSniezek CHAIRMAN                                                           DCrutchfield
?
* PDI-3 r/f SVarga(2)           i BBoger               .
NUCLEAR REGULATORY COMMISSION ED0 4016 o
0GC SECY                 [
{
DMossburg           ;
i WASHING TON. o. C. 20065 y$te))o t
The Honorable Nicholas J. Costello                       PMAS Chairman, Joint Committee on Energy                       DMcDonald Commonwealth of liassachusetts Senate                     MRushbrook State House, Room 540                                     FMiraglia           !
/
Boston, Massachusetts       02133                       FGillespie         !
JTaylor-
WRussell, RI
**4 *.... /
JBlaha November 10, 1988 TMurley/JSniezek CHAIRMAN DCrutchfield PDI-3 r/f SVarga(2) i BBoger 0GC SECY
[
DMossburg The Honorable Nicholas J. Costello PMAS Chairman, Joint Committee on Energy DMcDonald Commonwealth of liassachusetts Senate MRushbrook State House, Room 540 FMiraglia Boston, Massachusetts 02133 FGillespie WRussell, RI


==Dear Chairman Costello:==
==Dear Chairman Costello:==
JWiggins, RI WKennedy I am responding to your letter dated O nober 12. 1988,                       !
JWiggins, RI WKennedy I am responding to your letter dated O nober 12. 1988, concerning the restart of the Pilgrim.lant.
concerning the restart of the Pilgrim .lant. The Commission                   :
The Commission has not yet reached a decision on whetter Pilgrim is ready to restart.
:                                                has not yet reached a decision on whetter Pilgrim is ready to restart. However, all of the issues you raised, with the exception of those concerning emergency preparedness, have already been addressed by the Nuclear Regulatory Commission                   !
However, all of the issues you raised, with the exception of those concerning emergency preparedness, have already been addressed by the Nuclear Regulatory Commission (NRC) staff.
(NRC) staff.
tour concerns about management and containment have been i
tour concerns about management and containment have been                       i addressed in detail by the Director of Nuclear Reactor                         .
addressed in detail by the Director of Nuclear Reactor Regulation in his decisions on two petitions submitted to the NRC under the provisions of 10 CFR 2.206.
Regulation in his decisions on two petitions submitted to the NRC under the provisions of 10 CFR 2.206. Copies of the                       i interim and fina' decisions on the petition filed by                         l l                                               Massachusetts Senator William B. Golden on behalf of your-                     i 4
Copies of the i
selves and others, amt interim decisions on the petition                       j filed by Governor filc.hael S. Dukakis and Attorney General James li. Shannon on behalf of the Commonwealth and its                       t citizens are enclosed for your information. Based on actions                   i taken by Boston Edison Company, as confirmed by the staff's                   !
interim and fina' decisions on the petition filed by l
extensive ir.spection efforts, the NRC staff concluded that                   I the management deficiencies at Pilgrim have been resolved and                 [
l Massachusetts Senator William B. Golden on behalf of your-i selves and others, amt interim decisions on the petition j
4                                             that the Pilgrim Mark I containment continues to be acequate                   i to protect public health and safety. I would also note that                   {
4 filed by Governor filc.hael S. Dukakis and Attorney General James li. Shannon on behalf of the Commonwealth and its t
Boston Edison has voluntarily implemented containment                           !
citizens are enclosed for your information.
improvements at Pilgrim that gc beyond current regulatory                     ;
Based on actions i
requirements.                                                                 l The HRC staff has reviewed the Massachusetts Public Interest                   i Research Group (NASSPIRG) report and has made a presiminary                   i determination that there is no new significant information                       <
taken by Boston Edison Company, as confirmed by the staff's extensive ir.spection efforts, the NRC staff concluded that I
that the staff had not already considered. A response to the                   !
the management deficiencies at Pilgrim have been resolved and
'                                                ilASSPIRG report will be provided to you shortly.                               ,
[
es11170067 881110
4 that the Pilgrim Mark I containment continues to be acequate i
* i PDR     ADOCK 05000293 y                     PDC                                                   g Originated:NRR:Rushbrook                                             fi/\
to protect public health and safety.
(dentical ltr to:   Thi Honorable Lawrence R. Alexander Chairman, Joint Committee on Energy i                                                                      Cononwealth of Mac achusetts House of Rep-   Jntatives
I would also note that
    ,_..-,. - _ _ .. =-
{
Boston Edison has voluntarily implemented containment improvements at Pilgrim that gc beyond current regulatory requirements.
l The HRC staff has reviewed the Massachusetts Public Interest i
Research Group (NASSPIRG) report and has made a presiminary i
determination that there is no new significant information that the staff had not already considered.
A response to the ilASSPIRG report will be provided to you shortly.
es11170067 881110 i
PDR ADOCK 05000293 y
PDC g
Originated:NRR:Rushbrook fi/\\
(dentical ltr to:
Thi Honorable Lawrence R. Alexander Chairman, Joint Committee on Energy Cononwealth of Mac achusetts House of Rep-Jntatives i
,_..-,. - _ _.. =-


The NRC staff also has extensively revieweo the use of Kapton-insulated wire at the Pilgrim plant.                                                 As discussed between the NRC Senior Resident Inspector at Pilgrim and a member of your staff on October 18, 1988, the NRC staff has completed an on-site inspection and has concluded thet the nse of Kapton-insulated wire at Pilgrim is ecceptable.                                                 The detailed results of this effort are being documented in Inspection Report 50-293/88-33 and will be provided to you when the report is issued.
The NRC staff also has extensively revieweo the use of Kapton-insulated wire at the Pilgrim plant.
As discussed between the NRC Senior Resident Inspector at Pilgrim and a member of your staff on October 18, 1988, the NRC staff has completed an on-site inspection and has concluded thet the nse of Kapton-insulated wire at Pilgrim is ecceptable.
The detailed results of this effort are being documented in Inspection Report 50-293/88-33 and will be provided to you when the report is issued.
Regarding emergency preparedness, the Commission heard views from Congressional and Commonwealth officials as well as from the NRC staff and the licensee on the status and adequacy of emergency preparedness during our October 14, 1988 meeting.
Regarding emergency preparedness, the Commission heard views from Congressional and Commonwealth officials as well as from the NRC staff and the licensee on the status and adequacy of emergency preparedness during our October 14, 1988 meeting.
We hav     deferred our decision regarding restart of Pilgrim to reflect on the views provided on emergency planning.                                                 In the meantime, I have encouraggd the licensee, the Commonwealth, and local officials, with the involvement of the Federal Emergency llanagement Agency (FEMA), as necessary, to continue working together on the emergency planning issue at Pilgrim.
We hav deferred our decision regarding restart of Pilgrim to reflect on the views provided on emergency planning.
In the meantime, I have encouraggd the licensee, the Commonwealth, and local officials, with the involvement of the Federal Emergency llanagement Agency (FEMA), as necessary, to continue working together on the emergency planning issue at Pilgrim.
In response to requests from local officials, the NRC staff has met with civil defense authorities from seven of the communities to discuss the status of emergency planning.
In response to requests from local officials, the NRC staff has met with civil defense authorities from seven of the communities to discuss the status of emergency planning.
I want to assure you that before reaching a decision on the restart of Pilgri:1, the Commission will take the necessary steps to assure that safe operations can be resumed and that the public health and safety is protected.
I want to assure you that before reaching a decision on the restart of Pilgri:1, the Commission will take the necessary steps to assure that safe operations can be resumed and that the public health and safety is protected.
1 Sincerely, Oneu w.
1 Sincerely, Oneu w.
Lando W.                                 I h,J G.    .
G.
Lando W.
I h,J


==Enclosures:==
==Enclosures:==
As stated
As stated


PO ,
PO A.
A.
. #y* ~ '*g UNITE 3 STATES
            *  . #y* ~ '*g
.o NUCLEAR RECULATORY COMMISSION f
                      .                                      UNITE 3 STATES
WASHINGTON. o. c. 20665 a
        .-    !"              .o               NUCLEAR RECULATORY COMMISSION f                                         WASHINGTON. o. c. 20665 a
EDO Princio:-
                  %,                        EDO Princio:-     Correspondence Control
Correspondence Control
    'FSOM:                                     DUE: 10/2S/08                     EDO COfJTROL: '0004016 DOC DT   10/12/09 FINAL REPLY:
'FSOM:
SENATOR NICliOLAS J . COSTELLO
DUE: 10/2S/08 EDO COfJTROL: '0004016 DOC DT 10/12/09 FINAL REPLY:
    . REPRESENTATIVE LAWREtJCE R. ALEXANDER COMMONWEM.TH OF MASSACHUSETTS TOs CHAIRMAN ZECH FOR SIGNATUFE OF:                         4$ FR1   **                          CRC NO: 79-0916 CHAIRMAN DESC:                                                                         ROUTING:
SENATOR NICliOLAS J. COSTELLO
RESTART OF PILGRIM                                                             STELLO TAYLOR DATE: 10/'.7/88                                                                   HOYLE RUSSELL. RI ASGIGNED TO:                       CONTACT:
. REPRESENTATIVE LAWREtJCE R.
NRR                 MURLEY SPECIAL IMSTRUCT10NG OR RtiMARKS:
ALEXANDER COMMONWEM.TH OF MASSACHUSETTS TOs CHAIRMAN ZECH FOR SIGNATUFE OF:
WtR RECEIVED: OCTORER 17, 1988 ACTION:             IN GaVanGA ._
4$ FR1 CRC NO: 79-0916 CHAIRMAN DESC:
i NRR ROUTING:         MJRt.EY/SNIEZEK CRifF3tFIELD MIRAGLIA GILIASPIE POSSIRJRG
ROUTING:
RESTART OF PILGRIM STELLO TAYLOR DATE: 10/'.7/88 HOYLE RUSSELL. RI ASGIGNED TO:
CONTACT:
NRR MURLEY SPECIAL IMSTRUCT10NG OR RtiMARKS:
WtR RECEIVED: OCTORER 17, 1988 ACTION:
IN GaVanGA i
NRR ROUTING:
MJRt.EY/SNIEZEK CRifF3tFIELD MIRAGLIA GILIASPIE POSSIRJRG


            *    .          OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:     CRC-88-0916                   LOGGING DATE: Oct 14 88 ACTION OFFICE:   EDO AUTHOR:           N.J. Costello/LR Alexander AFFILIATION:     MA (MASSACHUSETTS)
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:
LETTER DATE:     Oct 12 88     FILE CODE:
CRC-88-0916 LOGGING DATE: Oct 14 88 ACTION OFFICE:
EDO AUTHOR:
N.J. Costello/LR Alexander AFFILIATION:
MA (MASSACHUSETTS)
LETTER DATE:
Oct 12 88 FILE CODE:


==SUBJECT:==
==SUBJECT:==
Pilgrim Restart Issues ACTION:           Signature of Chairman DISTRIBUTION:     COMRS, OGC, RF SPECIAL HANDLING:
Pilgrim Restart Issues ACTION:
Signature of Chairman DISTRIBUTION:
COMRS, OGC, RF SPECIAL HANDLING:
NOTES:
NOTES:
DATE DUE:         Oct 28 88 SIGNATURE:         .                            DATE SIGNED:
DATE DUE:
Oct 28 88 SIGNATURE:
DATE SIGNED:
AFFILIATION:
AFFILIATION:
i Ret'd OH. EDO DML    I D '' f 4F ' P f tw -       FM
i Ret'd OH. EDO I D '' f 4F ' P f DML FM tw -
                                                                              ~}}
~}}

Latest revision as of 02:06, 7 December 2024

Responds to Re Request for Restart of Plant. Issues Raised Already Addressed by NRC W/Exception of Emergency Planning
ML20206D398
Person / Time
Site: Pilgrim
Issue date: 11/10/1988
From: Zech L
NRC COMMISSION (OCM)
To: Costello N
MASSACHUSETTS, COMMONWEALTH OF
Shared Package
ML20206D402 List:
References
2.206, NUDOCS 8811170067
Download: ML20206D398 (4)


Text

.

Distribution:

Docket File y/

' Ip uoglo,,

UNITE 3 STATES NRC & Local PDRs

))-

?

NUCLEAR REGULATORY COMMISSION ED0 4016 o

{

i WASHING TON. o. C. 20065 y$te))o t

/

JTaylor-

    • 4 *.... /

JBlaha November 10, 1988 TMurley/JSniezek CHAIRMAN DCrutchfield PDI-3 r/f SVarga(2) i BBoger 0GC SECY

[

DMossburg The Honorable Nicholas J. Costello PMAS Chairman, Joint Committee on Energy DMcDonald Commonwealth of liassachusetts Senate MRushbrook State House, Room 540 FMiraglia Boston, Massachusetts 02133 FGillespie WRussell, RI

Dear Chairman Costello:

JWiggins, RI WKennedy I am responding to your letter dated O nober 12. 1988, concerning the restart of the Pilgrim.lant.

The Commission has not yet reached a decision on whetter Pilgrim is ready to restart.

However, all of the issues you raised, with the exception of those concerning emergency preparedness, have already been addressed by the Nuclear Regulatory Commission (NRC) staff.

tour concerns about management and containment have been i

addressed in detail by the Director of Nuclear Reactor Regulation in his decisions on two petitions submitted to the NRC under the provisions of 10 CFR 2.206.

Copies of the i

interim and fina' decisions on the petition filed by l

l Massachusetts Senator William B. Golden on behalf of your-i selves and others, amt interim decisions on the petition j

4 filed by Governor filc.hael S. Dukakis and Attorney General James li. Shannon on behalf of the Commonwealth and its t

citizens are enclosed for your information.

Based on actions i

taken by Boston Edison Company, as confirmed by the staff's extensive ir.spection efforts, the NRC staff concluded that I

the management deficiencies at Pilgrim have been resolved and

[

4 that the Pilgrim Mark I containment continues to be acequate i

to protect public health and safety.

I would also note that

{

Boston Edison has voluntarily implemented containment improvements at Pilgrim that gc beyond current regulatory requirements.

l The HRC staff has reviewed the Massachusetts Public Interest i

Research Group (NASSPIRG) report and has made a presiminary i

determination that there is no new significant information that the staff had not already considered.

A response to the ilASSPIRG report will be provided to you shortly.

es11170067 881110 i

PDR ADOCK 05000293 y

PDC g

Originated:NRR:Rushbrook fi/\\

(dentical ltr to:

Thi Honorable Lawrence R. Alexander Chairman, Joint Committee on Energy Cononwealth of Mac achusetts House of Rep-Jntatives i

,_..-,. - _ _.. =-

The NRC staff also has extensively revieweo the use of Kapton-insulated wire at the Pilgrim plant.

As discussed between the NRC Senior Resident Inspector at Pilgrim and a member of your staff on October 18, 1988, the NRC staff has completed an on-site inspection and has concluded thet the nse of Kapton-insulated wire at Pilgrim is ecceptable.

The detailed results of this effort are being documented in Inspection Report 50-293/88-33 and will be provided to you when the report is issued.

Regarding emergency preparedness, the Commission heard views from Congressional and Commonwealth officials as well as from the NRC staff and the licensee on the status and adequacy of emergency preparedness during our October 14, 1988 meeting.

We hav deferred our decision regarding restart of Pilgrim to reflect on the views provided on emergency planning.

In the meantime, I have encouraggd the licensee, the Commonwealth, and local officials, with the involvement of the Federal Emergency llanagement Agency (FEMA), as necessary, to continue working together on the emergency planning issue at Pilgrim.

In response to requests from local officials, the NRC staff has met with civil defense authorities from seven of the communities to discuss the status of emergency planning.

I want to assure you that before reaching a decision on the restart of Pilgri:1, the Commission will take the necessary steps to assure that safe operations can be resumed and that the public health and safety is protected.

1 Sincerely, Oneu w.

G.

Lando W.

I h,J

Enclosures:

As stated

PO A.

. #y* ~ '*g UNITE 3 STATES

.o NUCLEAR RECULATORY COMMISSION f

WASHINGTON. o. c. 20665 a

EDO Princio:-

Correspondence Control

'FSOM:

DUE: 10/2S/08 EDO COfJTROL: '0004016 DOC DT 10/12/09 FINAL REPLY:

SENATOR NICliOLAS J. COSTELLO

. REPRESENTATIVE LAWREtJCE R.

ALEXANDER COMMONWEM.TH OF MASSACHUSETTS TOs CHAIRMAN ZECH FOR SIGNATUFE OF:

4$ FR1 CRC NO: 79-0916 CHAIRMAN DESC:

ROUTING:

RESTART OF PILGRIM STELLO TAYLOR DATE: 10/'.7/88 HOYLE RUSSELL. RI ASGIGNED TO:

CONTACT:

NRR MURLEY SPECIAL IMSTRUCT10NG OR RtiMARKS:

WtR RECEIVED: OCTORER 17, 1988 ACTION:

IN GaVanGA i

NRR ROUTING:

MJRt.EY/SNIEZEK CRifF3tFIELD MIRAGLIA GILIASPIE POSSIRJRG

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:

CRC-88-0916 LOGGING DATE: Oct 14 88 ACTION OFFICE:

EDO AUTHOR:

N.J. Costello/LR Alexander AFFILIATION:

MA (MASSACHUSETTS)

LETTER DATE:

Oct 12 88 FILE CODE:

SUBJECT:

Pilgrim Restart Issues ACTION:

Signature of Chairman DISTRIBUTION:

COMRS, OGC, RF SPECIAL HANDLING:

NOTES:

DATE DUE:

Oct 28 88 SIGNATURE:

DATE SIGNED:

AFFILIATION:

i Ret'd OH. EDO I D f 4F ' P f DML FM tw -

~