ML20206E042: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . | {{#Wiki_filter:. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. | ||
RECD \n | RECD \\n NRC | ||
",!EGioN j m | |||
ammes | |||
t November 1, 1988 | 'Y U l0'/ 'l Pl2 *' l $ | ||
Docket 50-344 1.icenso NPF-1 i | David W. Cockfield Vice President Nuclear t | ||
November 1, 1988 l | |||
Trojan Nucitar Plant Docket 50-344 1.icenso NPF-1 i | |||
i Mr. John D. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lano, Suite 210 Walnut Creek CA 94596-5368 | i Mr. John D. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lano, Suite 210 Walnut Creek CA 94596-5368 | ||
==Dear Mr. Martin:== | ==Dear Mr. Martin:== | ||
Nuclear Regulatory Commission (NRC) Bulletin 88-02, Rapidly Propage. ting Fatigue Cracks in Steam Cenerator Tubes NRC Bulletin 88-02 requested licenseos with Westinghosso-designed r,uclear i | |||
Nuclear Regulatory Commission (NRC) Bulletin 88-02, Rapidly Propage. ting Fatigue Cracks in Steam Cenerator Tubes NRC Bulletin 88-02 requested licenseos with Westinghosso-designed r,uclear i | power reactors with stoam r,enerators containing carbon steel support platos, to implement actions necessary to minimize the potential for a steam generator tutio rupture event caused by a rapidly propagating fatigue i | ||
crack such as occurred at North Anna Unit 1. | |||
The evaluation of this event l | |||
conclusion of this evaluation is that the steam generator tubes remaining in service at Trojrei are not expected to be susceptibio to fatigua rupture at the top support plate in a manner similar to the rupture that occurred a'. North Anna Unit 1. | for its applicability to the Trojan Nuclear Plant has been completed. The | ||
) | |||
conclusion of this evaluation is that the steam generator tubes remaining in service at Trojrei are not expected to be susceptibio to fatigua rupture at the top support plate in a manner similar to the rupture that occurred a'. North Anna Unit 1. | |||
Thereforo, no modifications, preventivo tubo plugging, or other mossures are necessary to provent a Noeth Anna-typo tube rupture at Trojan. | |||
i i | i i | ||
i l | i l | ||
l l | l l | ||
i j | i j | ||
FDR | 8311170370 381101 FDR ADOCK 05000344 i | ||
O PDC | |||
>,c 3 | |||
: j. y | : j. y | ||
,i | |||
l I | |||
4 PorUtirid NM M W i | |||
Mr. John B. Martin November 1, 1988 page 2 | f Mr. John B. Martin November 1, 1988 page 2 l | ||
I Though the detailed evaluation is complete, the final report from our contractor has not been received. We expect to receive the report by mid-November, at which timo it will bo submitted for NRC review. | |||
Though the detailed evaluation is complete, the final report from our | I Sincerely, t | ||
contractor has not been received. We expect to receive the report by mid-November, at which timo it will bo submitted for NRC review. | t c: | ||
t | U.S. Nuclear Regulatory Commission i | ||
ATTN: Document Control Desk Washington DC i | |||
ATTN: Document Control Desk | 4 Mr. William T. Dixon I | ||
Washington DC | State of Oregon | ||
) | |||
) | Department of Energy i | ||
i | I i | ||
] | ] | ||
NRC Resident Inspect.or | Mr. R. C. Barr | ||
{ | |||
NRC Resident Inspect.or j | |||
Trojan Nuclear Plant i | |||
Subscribed and sworn to before me this 1st day of November 1988. | |||
I I | |||
r I | |||
i fi 3 & | |||
f./-hj l | |||
Notary Public of Oregon l | |||
l 1 | |||
My Commissior Expires | |||
/ M a n., ? >). /, ); / | |||
// | |||
r | |||
'/ / | |||
I i | |||
i | i | ||
) | |||
1 i | 1 i | ||
i i | i i | ||
j l | j l, | ||
1 | 1 I | ||
l!. | |||
.}} | |||
Latest revision as of 01:56, 7 December 2024
| ML20206E042 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 11/01/1988 |
| From: | Cockfield D PORTLAND GENERAL ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| IEB-88-002, IEB-88-2, NUDOCS 8811170370 | |
| Download: ML20206E042 (2) | |
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
RECD \\n NRC
",!EGioN j m
ammes
'Y U l0'/ 'l Pl2 *' l $
David W. Cockfield Vice President Nuclear t
November 1, 1988 l
Trojan Nucitar Plant Docket 50-344 1.icenso NPF-1 i
i Mr. John D. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lano, Suite 210 Walnut Creek CA 94596-5368
Dear Mr. Martin:
Nuclear Regulatory Commission (NRC)Bulletin 88-02, Rapidly Propage. ting Fatigue Cracks in Steam Cenerator Tubes NRC Bulletin 88-02 requested licenseos with Westinghosso-designed r,uclear i
power reactors with stoam r,enerators containing carbon steel support platos, to implement actions necessary to minimize the potential for a steam generator tutio rupture event caused by a rapidly propagating fatigue i
crack such as occurred at North Anna Unit 1.
The evaluation of this event l
for its applicability to the Trojan Nuclear Plant has been completed. The
)
conclusion of this evaluation is that the steam generator tubes remaining in service at Trojrei are not expected to be susceptibio to fatigua rupture at the top support plate in a manner similar to the rupture that occurred a'. North Anna Unit 1.
Thereforo, no modifications, preventivo tubo plugging, or other mossures are necessary to provent a Noeth Anna-typo tube rupture at Trojan.
i i
i l
l l
i j
8311170370 381101 FDR ADOCK 05000344 i
O PDC
>,c 3
- j. y
,i
l I
4 PorUtirid NM M W i
f Mr. John B. Martin November 1, 1988 page 2 l
I Though the detailed evaluation is complete, the final report from our contractor has not been received. We expect to receive the report by mid-November, at which timo it will bo submitted for NRC review.
I Sincerely, t
t c:
U.S. Nuclear Regulatory Commission i
ATTN: Document Control Desk Washington DC i
4 Mr. William T. Dixon I
State of Oregon
)
Department of Energy i
I i
]
Mr. R. C. Barr
{
NRC Resident Inspect.or j
Trojan Nuclear Plant i
Subscribed and sworn to before me this 1st day of November 1988.
I I
r I
i fi 3 &
f./-hj l
Notary Public of Oregon l
l 1
My Commissior Expires
/ M a n., ? >). /, ); /
//
r
'/ /
I i
i
)
1 i
i i
j l,
1 I
l!.
.