ML20206E211: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project =  
| project = TAC:MA5061
| stage = Other
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:k                   Mr. Lew W. Mysrs
{{#Wiki_filter:k
                                                            /                        April 29, 1999 Distribution:                       ~
/
    *j "l               Vice President - Nucbir, Parry f                 ~
April 29, 1999 Mr. Lew W. Mysrs Distribution:
PUBLIC;                   OCMETf4EV tg@RHermann                                 l FirstEnergy Nuclear Operating Company               PDill R/F P.O. Box 97, A200                                 'OGC                       ACRS 3 '
*j "l Vice President - Nucbir, Parry f
                      . Perry, OH ;44081                                     JZwolinski                 GHill (2)                               j THiltz, OEDO               GGrant, R3 WBateman                                                           !
~
PUBLIC; OCMETf4EV
~
tg@RHermann FirstEnergy Nuclear Operating Company PDill R/F P.O. Box 97, A200
'OGC ACRS 3
. Perry, OH ;44081 JZwolinski GHill (2) j THiltz, OEDO GGrant, R3 WBateman


==SUBJECT:==
==SUBJECT:==
SAFETY EVALUATION OF PROPOSED ALTERNATIVES TO ASME CODE REQUIREMENTS FOR REPAIR AND INSPECTION OF A FEEDWATER                                                 !
SAFETY EVALUATION OF PROPOSED ALTERNATIVES TO ASME CODE REQUIREMENTS FOR REPAIR AND INSPECTION OF A FEEDWATER
                                          . NOZZLE TO SAFE-END WELD - PERRY NUCLEAR POWER PLANT (TAC NO.
. NOZZLE TO SAFE-END WELD - PERRY NUCLEAR POWER PLANT (TAC NO.
MA5061)                                                                                               i l
MA5061) i


==Dear Mr. Myers:==
==Dear Mr. Myers:==
By letters dated March 25 (PY-CEl/NRR-2380L) and April 1,1999 (PY-CEl/NRR-2384L), the FirstEnergy Nuclear Operating Company proposed an alternative to the American Society of                               j Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI repair requirements along with a separate alternative to the ASME Code, Section Ill ultrasonic                                 !
By letters dated March 25 (PY-CEl/NRR-2380L) and April 1,1999 (PY-CEl/NRR-2384L), the FirstEnergy Nuclear Operating Company proposed an alternative to the American Society of j
examination acceptance criteria pursuant to 10 CFR 50.55a(a)(3). The proposed alternatives                             !
Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI repair requirements along with a separate alternative to the ASME Code, Section Ill ultrasonic examination acceptance criteria pursuant to 10 CFR 50.55a(a)(3). The proposed alternatives consist of the use of Code Case N-504, " Alternative Rules for Repair of Class 1,2 and 3 Austenitic Stainless Steel Piping," to perform a weld overlay repair on a feedwater nozzle to safe-end weld N4C-KB at the Perry Nuclear Power Plant (PNPP), and the use of ASME Section XI acceptance criteria of Table IWB-3514-3 for the laminar fiaws when inspecting the overlay repaired weld. The subject weld was found cracked during refuel outage (RFO) 2. The licensee proposed to perform a weld overlay repair on the subject weld during the current refueling j
consist of the use of Code Case N-504, " Alternative Rules for Repair of Class 1,2 and 3                               1 Austenitic Stainless Steel Piping," to perform a weld overlay repair on a feedwater nozzle to safe-end weld N4C-KB at the Perry Nuclear Power Plant (PNPP), and the use of ASME Section XI acceptance criteria of Table IWB-3514-3 for the laminar fiaws when inspecting the overlay repaired weld. The subject weld was found cracked during refuel outage (RFO) 2. The licensee                           !
' outage (RF0 7) that began on March 26,1999.
proposed to perform a weld overlay repair on the subject weld during the current refueling                             j
i
                      ' outage (RF0 7) that began on March 26,1999.                                                                               i
- Based on our review, the staff concludes that the proposed alternatives will result in an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50 55a(a)(3)(i), the staff authorizes the use of Code Case N-504 for a weld overlay repair of the subject feedwater nozzle i
                      - Based on our review, the staff concludes that the proposed alternatives will result in an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50 55a(a)(3)(i), the staff authorizes the use of Code Case N-504 for a weld overlay repair of the subject feedwater nozzle                         i weld at PNPP and the use of ASME Code Section XI Table IWB-3514 for the acceptance criteria of the laminar flaws l
weld at PNPP and the use of ASME Code Section XI Table IWB-3514 for the acceptance criteria of the laminar flaws l
l'                       The staff's safety evaluation is attached.
l' The staff's safety evaluation is attached.
I Sincerely                                                           !
I Sincerely kn J.bholkChief, Section 2 Project Directorate lll Division of Licensing Project Management pO, g
kn         J.bholkChief, Section 2 Project Directorate lll                                       g
y Office of Nuclear Reactor Regulation Docket No. 50-440 g gY
            .                                                                  Division of Licensing Project Management                 pO, y
Office of Nuclear Reactor Regulation Docket No. 50-440


==Enclosure:==
==Enclosure:==
As stated g gY DOCUMENT NAME: G:\PD3-3\ PERRY \A5061LTR.WPD
As stated DOCUMENT NAME: G:\\PD3-3\\ PERRY \\A5061LTR.WPD
        - To receive a copy of this document. Indcate in the box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy 0FFICE         PM:R32<P                 LA:PD31             ff   SC:EMCB                   OGC                     SC:PD12 4 NAME-           DPicYett                 EBarnhill W             RHermann*                 N8adtrung               Nfen#616I%
- To receive a copy of this document. Indcate in the box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy 0FFICE PM:R32<P LA:PD31 ff SC:EMCB OGC SC:PD12 4 NAME-DPicYett EBarnhill W RHermann*
DATE           04/2d/99'               04/A$/99                 04/19/99                   04/27/99                 04hf/99   Q   '
N8adtrung Nfen#616I%
                          *See 04/19/99 memo from Rhermann to-CThomas                             OFFICIAL RECORD COPY 040041               "
DATE 04/2d/99' 04/A$/99 04/19/99 04/27/99 04hf/99 Q
9905050053 990429                                                                                                           !
*See 04/19/99 memo from Rhermann to-CThomas OFFICIAL RECORD COPY 040041 9905050053 990429 PDit ADOCK 05000440 P
:                    PDit ADOCK 05000440 P                           PDR           a
PDR a


r L. Myers                               Perry Nuclear Power Plant, Units 1 and 2 FirstEnergy Nuclear Operating Company cc:
r L. Myers Perry Nuclear Power Plant, Units 1 and 2 FirstEnergy Nuclear Operating Company cc:
James R. Wdliams Mary E. O'Reilly                       Chief of Staff FirstEnergy Corporation                 Ohio Emergency Management Agency 76 South Main St.                       2855 West Dublin Granville Road Akron, OH 44308                         Columbus, OH 43235-7150 Resident inspector's Office             Mayor, Village of Perry U.S. Nuclear Regulatory Commission     P.O. Box 100 P.O. Box 331                           Perry, OH 44081-0100 Perry, OH 44081-0331
James R. Wdliams Mary E. O'Reilly Chief of Staff FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St.
                                              . Radiological Health Program Regior al Administrator, Region 111     Ohio Department of Health U.S. Nuclear Regulatory Commission     P.O. Box 118 801 Warrenville Road                   Columbus, OH 43266-0118 Lisle, IL 60532-4531 Ohio Environmental Protection Sue Hiatt                               Agency OCRE Interim Representative             DERR-Compliance Unit 8275 Munson                             ATTN: Mr. Zack A. Clayton Mentor, OH 44060                       P.O. Box 1049 Columbus, OH 43266-0149 Henry L. Hegrat Regulatory Affairs Manager             Chairman FirstEnergy Nuclear Operating Company   Perry Township Board of Trustees Perry Nuclear Power Plant               3750 Center Road, Box 65 P.O. Box 97, A210                       Perry, OH 44081 Perry, OH 44081 State of Ohio William R. Kanda, Jr., Plant Manager   Public Utilities Commission FirstEnergy Nuclear Operating Company   East Broad Street Perry Nuclear Power Plant               Columbus, OH 43266-0573 P.O. Box 97, SB306 Perry, OH 44081 Mayor, Village of North Perry North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009
2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Resident inspector's Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Radiological Health Program Regior al Administrator, Region 111 Ohio Department of Health U.S. Nuclear Regulatory Commission P.O. Box 118 801 Warrenville Road Columbus, OH 43266-0118 Lisle, IL 60532-4531 Ohio Environmental Protection Sue Hiatt Agency OCRE Interim Representative DERR-Compliance Unit 8275 Munson ATTN: Mr. Zack A. Clayton Mentor, OH 44060 P.O. Box 1049 Columbus, OH 43266-0149 Henry L. Hegrat Regulatory Affairs Manager Chairman FirstEnergy Nuclear Operating Company Perry Township Board of Trustees Perry Nuclear Power Plant 3750 Center Road, Box 65 P.O. Box 97, A210 Perry, OH 44081 Perry, OH 44081 State of Ohio William R. Kanda, Jr., Plant Manager Public Utilities Commission FirstEnergy Nuclear Operating Company East Broad Street Perry Nuclear Power Plant Columbus, OH 43266-0573 P.O. Box 97, SB306 Perry, OH 44081 Mayor, Village of North Perry North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009
                                            .-}}
.-}}

Latest revision as of 01:44, 7 December 2024

Discusses Alternative Proposed by Licensee on 990325 & 990401 to ASME BPV Code,Section XI Repair Requirements Along with Separate Alternative to Ultrasonic Exam Acceptance Criteria.Forwards SE Approving Proposed Alternatives
ML20206E211
Person / Time
Site: Perry 
Issue date: 04/29/1999
From: Anthony Mendiola
NRC (Affiliation Not Assigned)
To: Myers L
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20206E214 List:
References
TAC-MA5061, NUDOCS 9905050053
Download: ML20206E211 (2)


Text

k

/

April 29, 1999 Mr. Lew W. Mysrs Distribution:

  • j "l Vice President - Nucbir, Parry f

~

PUBLIC; OCMETf4EV

~

tg@RHermann FirstEnergy Nuclear Operating Company PDill R/F P.O. Box 97, A200

'OGC ACRS 3

. Perry, OH ;44081 JZwolinski GHill (2) j THiltz, OEDO GGrant, R3 WBateman

SUBJECT:

SAFETY EVALUATION OF PROPOSED ALTERNATIVES TO ASME CODE REQUIREMENTS FOR REPAIR AND INSPECTION OF A FEEDWATER

. NOZZLE TO SAFE-END WELD - PERRY NUCLEAR POWER PLANT (TAC NO.

MA5061) i

Dear Mr. Myers:

By letters dated March 25 (PY-CEl/NRR-2380L) and April 1,1999 (PY-CEl/NRR-2384L), the FirstEnergy Nuclear Operating Company proposed an alternative to the American Society of j

Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI repair requirements along with a separate alternative to the ASME Code, Section Ill ultrasonic examination acceptance criteria pursuant to 10 CFR 50.55a(a)(3). The proposed alternatives consist of the use of Code Case N-504, " Alternative Rules for Repair of Class 1,2 and 3 Austenitic Stainless Steel Piping," to perform a weld overlay repair on a feedwater nozzle to safe-end weld N4C-KB at the Perry Nuclear Power Plant (PNPP), and the use of ASME Section XI acceptance criteria of Table IWB-3514-3 for the laminar fiaws when inspecting the overlay repaired weld. The subject weld was found cracked during refuel outage (RFO) 2. The licensee proposed to perform a weld overlay repair on the subject weld during the current refueling j

' outage (RF0 7) that began on March 26,1999.

i

- Based on our review, the staff concludes that the proposed alternatives will result in an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50 55a(a)(3)(i), the staff authorizes the use of Code Case N-504 for a weld overlay repair of the subject feedwater nozzle i

weld at PNPP and the use of ASME Code Section XI Table IWB-3514 for the acceptance criteria of the laminar flaws l

l' The staff's safety evaluation is attached.

I Sincerely kn J.bholkChief, Section 2 Project Directorate lll Division of Licensing Project Management pO, g

y Office of Nuclear Reactor Regulation Docket No. 50-440 g gY

Enclosure:

As stated DOCUMENT NAME: G:\\PD3-3\\ PERRY \\A5061LTR.WPD

- To receive a copy of this document. Indcate in the box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy 0FFICE PM:R32<P LA:PD31 ff SC:EMCB OGC SC:PD12 4 NAME-DPicYett EBarnhill W RHermann*

N8adtrung Nfen#616I%

DATE 04/2d/99' 04/A$/99 04/19/99 04/27/99 04hf/99 Q

  • See 04/19/99 memo from Rhermann to-CThomas OFFICIAL RECORD COPY 040041 9905050053 990429 PDit ADOCK 05000440 P

PDR a

r L. Myers Perry Nuclear Power Plant, Units 1 and 2 FirstEnergy Nuclear Operating Company cc:

James R. Wdliams Mary E. O'Reilly Chief of Staff FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St.

2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Resident inspector's Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Radiological Health Program Regior al Administrator, Region 111 Ohio Department of Health U.S. Nuclear Regulatory Commission P.O. Box 118 801 Warrenville Road Columbus, OH 43266-0118 Lisle, IL 60532-4531 Ohio Environmental Protection Sue Hiatt Agency OCRE Interim Representative DERR-Compliance Unit 8275 Munson ATTN: Mr. Zack A. Clayton Mentor, OH 44060 P.O. Box 1049 Columbus, OH 43266-0149 Henry L. Hegrat Regulatory Affairs Manager Chairman FirstEnergy Nuclear Operating Company Perry Township Board of Trustees Perry Nuclear Power Plant 3750 Center Road, Box 65 P.O. Box 97, A210 Perry, OH 44081 Perry, OH 44081 State of Ohio William R. Kanda, Jr., Plant Manager Public Utilities Commission FirstEnergy Nuclear Operating Company East Broad Street Perry Nuclear Power Plant Columbus, OH 43266-0573 P.O. Box 97, SB306 Perry, OH 44081 Mayor, Village of North Perry North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009

.-