ML20207J273: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:''
{{#Wiki_filter:''
WASHINGTON PUBLI         VER SUPPLY SYSTEM
WASHINGTON PUBLI VER SUPPLY SYSTEM
*y     -
*y SAFEGUARDS INF
SAFEGUARDS INF             !0N (IOCFR73.21)
!0N (IOCFR73.21)
LOCKEDS           REQUIRED
LOCKEDS REQUIRED WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
,                            WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
* 3000 George Washington Way
* 3000 George Washington Way
* Richland, Washington 99352 August 25, 1988 Docket No. 50-397 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
* Richland, Washington 99352 August 25, 1988 Docket No. 50-397 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Line 27: Line 26:
==Subject:==
==Subject:==
NUCLEAR PLANT N0. 2 LICENSEE Nn. NPF-2 REPORT N0. 50-397/88-17 (IE-Y-853)
NUCLEAR PLANT N0. 2 LICENSEE Nn. NPF-2 REPORT N0. 50-397/88-17 (IE-Y-853)
The Washington Public Power Supply System hereby replies to the Notice of Violation contained in your letter dated July 26, 1988. Our reply, pursuant to the provisions of section 2.201, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached).
The Washington Public Power Supply System hereby replies to the Notice of Violation contained in your {{letter dated|date=July 26, 1988|text=letter dated July 26, 1988}}.
Our reply, pursuant to the provisions of section 2.201, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached).
In Appendix A an explanation of our position regarding the validity of the violation is provided.
In Appendix A an explanation of our position regarding the validity of the violation is provided.
The   enclosure     contains     Safeguards Information concerning security measures for the physical protection of Supply System facilities in which special nuclear material is used.                     This information is to be protected in accordance with 10CFR 73.21.
The enclosure contains Safeguards Information concerning security measures for the physical protection of Supply System facilities in which special nuclear material is used.
This information is to be protected in accordance with 10CFR 73.21.
Shoula you have any questions concerning our response, please do not hesitate to contact me.
Shoula you have any questions concerning our response, please do not hesitate to contact me.
                              %24~
%24~
G. C./ Sorensen, Manager Regulatory Progeains
G. C./ orensen, Manager S
Regulatory Progeains


==Enclosure:==
==Enclosure:==
Response to Notice of Violation (rt, copies)
Response to Notice of Violation (rt, copies)
So     cc: J. B Martin, P.egional Administrator, Rc-glon V (with attachment)
So cc:
  $$@            C. J. Bosted, Resident Inspector, Nuclear Regulatory Commission gg                 (w/o attachment)                                                                 J NM
J. B Martin, P.egional Administrator, Rc-glon V (with attachment)
  $0                                     TlilS PAGE UNCONTROLLED WHEN 2-gh                                     SIPARATED Fr.0i.i E;; CLOSURES.
C. J. Bosted, Resident Inspector, Nuclear Regulatory Commission gg (w/o attachment)
o                                                                                                   ,
J NM
. (0 m.e WASHINGTON PUBLIC POWER SUPPLY SYSTEM SAFEGUARDS INFORMATION (10CFR73.21)
$0 TlilS PAGE UNCONTROLLED WHEN 2-gh SIPARATED Fr.0i.i E;; CLOSURES.
o
. (0m.e WASHINGTON PUBLIC POWER SUPPLY SYSTEM SAFEGUARDS INFORMATION (10CFR73.21)
LOCKED STORAGE REQUIRED
LOCKED STORAGE REQUIRED


q ,-               -                  .
q,-
STATE OF WASHINGTON)                                                                                
STATE OF WASHINGTON)


==Subject:==
==Subject:==
nonnrt 80-297/88-17
nonnrt 80-297/88-17
                                                                                    )
)
COUNTY OF BENTON                                                     )
COUNTY OF BENTON
I,         G.           C.           Sorensen, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full aLthority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true. The enclosure contains Safeguards information concerning security measures and is to be protected in accordance with 10CFR 73.21.
)
DATE             N                        1 , 1988                                                                               *
I, G.
[           ~
C.
                                                                                                  /G. C. firorensen, Manager Regulatory Programs On this day personally appeared before me G. C. Sorensen to me known to be the                                                     l indivldual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
Sorensen, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full aLthority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true. The enclosure contains Safeguards information concerning security measures and is to be protected in accordance with 10CFR 73.21.
GIVEN under my hand and seal this A D day of % M                                                                       1988.
N DATE 1, 1988
[
~
/G. C. firorensen, Manager Regulatory Programs On this day personally appeared before me G.
C.
Sorensen to me known to be the l
indivldual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this A D day of % M 1988.
n
n
: b. N u r-b m A.
: b. N u r-b m A.
Notary Public irb-and for the STATE OF WASHINGTON Residing at 1,-%\r. M t M.         '
Notary Public irb-and for the STATE OF WASHINGTON Residing at 1,-%\\r. M t M.
                                                                                                                                                  +
+
hoeq>
hoeq>
t l
t
    . . _ _ _ _ _ _ - - - - - _ - _ _ - - _ - - - - - - - - - - - - _ _ - - - - - - - _ - - - - -}}
-}}

Latest revision as of 21:02, 6 December 2024

Forwards Response to 880726 Notice of Violation Re Insp Rept 50-397/88-17.Encl Withheld (Ref 10CFR73.21)
ML20207J273
Person / Time
Site: Columbia 
Issue date: 08/25/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808300332
Download: ML20207J273 (1)


Text

WASHINGTON PUBLI VER SUPPLY SYSTEM

  • y SAFEGUARDS INF

!0N (IOCFR73.21)

LOCKEDS REQUIRED WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

  • Richland, Washington 99352 August 25, 1988 Docket No. 50-397 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

NUCLEAR PLANT N0. 2 LICENSEE Nn. NPF-2 REPORT N0. 50-397/88-17 (IE-Y-853)

The Washington Public Power Supply System hereby replies to the Notice of Violation contained in your letter dated July 26, 1988.

Our reply, pursuant to the provisions of section 2.201, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached).

In Appendix A an explanation of our position regarding the validity of the violation is provided.

The enclosure contains Safeguards Information concerning security measures for the physical protection of Supply System facilities in which special nuclear material is used.

This information is to be protected in accordance with 10CFR 73.21.

Shoula you have any questions concerning our response, please do not hesitate to contact me.

%24~

G. C./ orensen, Manager S

Regulatory Progeains

Enclosure:

Response to Notice of Violation (rt, copies)

So cc:

J. B Martin, P.egional Administrator, Rc-glon V (with attachment)

C. J. Bosted, Resident Inspector, Nuclear Regulatory Commission gg (w/o attachment)

J NM

$0 TlilS PAGE UNCONTROLLED WHEN 2-gh SIPARATED Fr.0i.i E;; CLOSURES.

o

. (0m.e WASHINGTON PUBLIC POWER SUPPLY SYSTEM SAFEGUARDS INFORMATION (10CFR73.21)

LOCKED STORAGE REQUIRED

q,-

STATE OF WASHINGTON)

Subject:

nonnrt 80-297/88-17

)

COUNTY OF BENTON

)

I, G.

C.

Sorensen, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full aLthority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true. The enclosure contains Safeguards information concerning security measures and is to be protected in accordance with 10CFR 73.21.

N DATE 1, 1988

[

~

/G. C. firorensen, Manager Regulatory Programs On this day personally appeared before me G.

C.

Sorensen to me known to be the l

indivldual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this A D day of % M 1988.

n

b. N u r-b m A.

Notary Public irb-and for the STATE OF WASHINGTON Residing at 1,-%\\r. M t M.

+

hoeq>

t

-