{{#Wiki_filter:I
{{#Wiki_filter:-l AVERAGE DAILY UNIT POWER LEVEL e
                                                                                                -l
DOCKET NO. 50-245 UNIT Millstone 1 DATE 881008 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Extension 4400 MONTH September, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
:                                                                                l e                            AVERAGE DAILY UNIT POWER LEVEL                               l DOCKET NO. 50-245 UNIT Millstone 1 DATE 881008 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Extension 4400 MONTH September, 1988 DAY     AVERAGE DAILY POWER LEVEL           DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                             (MWe-Net) 4 1               649                       17           652 2               642                       18           65?
(MWe-Net) 4 1
3               650                       19           651 4               649                       20           651 5               649                       21           650 6               650                       22           650 7               651                       23           638 8               534                       24           649 9               650                       25           653 10               651                       26           653 11               653                       27           653 12               652                       28           552 13               652                         29           653 14               563                       30           646 15               652                         31           N/A 16               653 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
649 17 652 2
!                                      4 00       >
642 18 65?
                                      ,[                                                  A N
3 650 19 651 4
649 20 651 5
649 21 650 6
650 22 650 7
651 23 638 8
534 24 649 9
650 25 653 10 651 26 653 11 653 27 653 12 652 28 552 13 652 29 653 14 563 30 646 15 652 31 N/A 16 653 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
,[
4 00 A
N


OPERATING DATA REPORT DOCKET NO. 50-245 OATE 881008 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791
OPERATING DATA REPORT DOCKET NO. 50-245 OATE 881008 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791
_ Extension 4400 OPERATING STATUS
_ Extension 4400 OPERATING STATUS 1.
: 1.   . Unit Name:. Millstone 1                         l Notes                             'l i      2.     Reporting Period: September, 1988               l                                       l
. Unit Name:. Millstone 1 l Notes
.      3. '   Licensed. Thermal Power (HWt): 2011             l                                       l J
'l 2.
: 4. Nameplate Rating (Gross MWe): 662               l                                       l S. Design Electrical Rating (Net MWe): 660         l                                       l
Reporting Period: September, 1988 l
: 6. Maximum. Dependable Capacity (Gross MWe): 684 l                                           l
l i
: 7. Maximum Deperadable Capacity (Net MWej 654       l ,,                                     l
: 3. '
: 8.     If Changes.0ccur in Capacity Ratings (1tems Number 3 Through 7)
Licensed. Thermal Power (HWt): 2011 l
Since Last Report, Give Reasons:-       N/A 57     Power Level To Which Restricted, If Any (Net MWe):           N/A
l J
: 10. Reasons For Restrictions, If Any:      N/A                                          ((
4.
l This Month          Yr.-to-Date        Cumulative
Nameplate Rating (Gross MWe): 662 l
: 11. Hours In Reporting Period                      720                6,575          156,383
l S.
: 12. Number Of Hours Reactor Was Critical          720                6,S45.8        --122,871.8
Design Electrical Rating (Net MWe): 660 l
: 13. Reactor Reserve Shutdown Hours                    0                  0              3,283.3 119,729.1
l 6.
: 14. Hours Generator On-Line                        720        ~~
Maximum. Dependable Capacity (Gross MWe): 684 l l
6,536.6
7.
: 15. Unit Reserve Shutdown Hours                        0                  0                    93.7
Maximum Deperadable Capacity (Net MWej 654 l,,
: 16. Gross Thermal Energy Generated (MWH) 1,429,250          [12,933,153          2232 139,248
l 8.
: 17. Gross Elec. Energy Generated (MWH)        484,500            4,408,300      _75,184,896
If Changes.0ccur in Capacity Ratings (1tems Number 3 Through 7)
: 18. Net Electrical Energy Generated (MWH)      463,272            4,218,196      ;71,732,916
Since Last Report, Give Reasons:-
: 19. Unit Service Factor                            100                    99.4                  76.6
N/A 57 Power Level To Which Restricted, If Any (Net MWe):
: 20. Unit Availability Factor                      100                    99.4                  76.6
N/A 10.
: 21. Unit Capacity Factor (Using M00 Net)            98.4                  98.1                  70.1
Reasons For Restrictions, If Any:
: 22. Unit Capacity Factor (Using DER Net)            97.5                  97.2                  69.5
: 23. Unit Forced Outage Rate                            0                  0.6                  10.7
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
N/A
                                        ~
((
: 25. If Shut Down At End Of Report Period, Lstimated Date of Startup:             N/A
l This Month Yr.-to-Date Cumulative 11.
: 26. Units In Test Status (Prior to Commercial Operation):               Forecast         Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                             N/A COMMERCIAL OPERATION
Hours In Reporting Period 720 6,575 156,383 12.
Number Of Hours Reactor Was Critical 720 6,S45.8
--122,871.8 13.
Reactor Reserve Shutdown Hours 0
0 3,283.3 14.
Hours Generator On-Line 720 6,536.6 119,729.1
~~
15.
Unit Reserve Shutdown Hours 0
0 93.7 16.
Gross Thermal Energy Generated (MWH) 1,429,250
[12,933,153 223 139,248 2
17.
Gross Elec. Energy Generated (MWH) 484,500 4,408,300
_75,184,896 18.
Net Electrical Energy Generated (MWH) 463,272 4,218,196
;71,732,916 19.
Unit Service Factor 100 99.4 76.6 20.
Unit Availability Factor 100 99.4 76.6 21.
Unit Capacity Factor (Using M00 Net) 98.4 98.1 70.1 22.
Unit Capacity Factor (Using DER Net) 97.5 97.2 69.5 23.
Unit Forced Outage Rate 0
0.6 10.7 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
~
25.
If Shut Down At End Of Report Period, Lstimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION


O DOCKET NO. 50-245                   .  -
O DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 681083 COMPLETED BY G. Newburgh REPORT MONTH September, 1988 TELEPHONE (203) 447-1791 Extension 4400 No.
UNIT SHUTDOWNS AND POWER REDUCTIONS       UNIT NAME Millstone 1 DATE 681083 COMPLETED BY G. Newburgh
Date Type Duration Reason 2 Method of Licensee System Component Cause & Corrective l
* REPORT MONTH September, 1988         TELEPHONE (203) 447-1791 Extension 4400 No. Date     Type l Duration     Reason 2     Method of     Licensee   System   Component       Cause & Corrective (Hours)                   Shutting       Event       Codei     Code 5               Action to Down Reactor 3 Report #                               Prevent Recurrence
(Hours)
<                                                        N/A                                                     ,>-
Shutting Event Codei Code 5 Action to Down Reactor 3 Report #
1            2                                                     3                     4 F: Forced     Reason:                                               Method:                 Exhibit G - Instructions 5: Scheduled A-Equipment Failure (Explain)                           1-Manual                 for Preparation of Data B-Maintenance or Test                                 2-Manual Scram           Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram       Event Report (LER) File D-Regulatory Restriction                             4-Continued from         (NUREG-0161)
Prevent Recurrence N/A 1
E-Operator Training & License Examination               previous month F-Administrative                                     5-Power Reduction     5 G-Operational Error (Explain)                           (Duration = 0)         Exhibit 1 - Same Source H-Other (Explain)                                     6-Other (Explain)
2 3
: s.     :
4 F: Forced Reason:
REFUELING INFORMATION REQUEST
Method:
: 1. Name of facility:                                   Millstone 1
Exhibit G - Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
: 2. Scheduled date for next refueling shutdown:                                     April 1989
E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5
: 3. Schedule date for restart following refueling: May 1989
G-Operational Error (Explain)
: 4. Will refueling or esumption of operation thereafter require a technical specification change or other license amendment?
(Duration = 0)
Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain)
 
s.
REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 1 2.
Scheduled date for next refueling shutdown:
April 1989 3.
Schedule date for restart following refueling: May 1989 4.
Will refueling or esumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technical Specification Changes Regarding:
Yes, Technical Specification Changes Regarding:
(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio
(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.
: 5. Scheduled date(s) for submitting licensing action and supporting information:
Scheduled date(s) for submitting licensing action and supporting information:
Winter 1988-89
Winter 1988-89 6.
: 6. Important licensing considerations associated with refueling, e.g.,
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
196 GE8B Fuel Assemblies
196 GE8B Fuel Assemblies 7.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)   In Core: (a) 580                                                 (b) 1732
(a)
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed s+orage capacity that has been requested or is planned, in number of fuel assemblies:
In Core: (a) 580 (b) 1732 8.
Present capacity, 2184 assemblies Recuested increase, 1045 assemblies
The present licensed spent fuel pool storage capacity and the size of any increase in licensed s+orage capacity that has been requested or is planned, in number of fuel assemblies:
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Present capacity, 2184 assemblies Recuested increase, 1045 assemblies 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1987, Spent Fuel pool, Full Core Off Load Capability is Reached.
1987, Spent Fuel pool, Full Core Off Load Capability is Reached.
Temporary rack approved for installation if required; plans f or additional capacity in progress.
Temporary rack approved for installation if required; plans f or additional capacity in progress.


  %r       's a PJORTHEAST UTILITIES                                         o.n.r.i Ome.. . s.m.n sir..i. s.rnn. Connecocui l           - v   ~~ "s w. -c vw --                                 P.O. 80X 270
%r
                - w. .. . .4.e*****
's PJORTHEAST UTILITIES o.n.r.i Ome... s.m.n sir..i. s.rnn. Connecocui a
HARTF0F D. CONNECTICUT 061414270 k   k     J ''. U .(.V C ,7 Z ',
l
                .                                                        '203)6 % -5000 October 12, 1988 MP-12317 Re:     10CFR50.71(a)
- v
~~ "s w. -c vw --
P.O. 80X 270
- w....
.4.e*****
HARTF0F D. CONNECTICUT 061414270 k
k J ''. U.(.V C,7 Z ',
'203)6 % -5000 October 12, 1988 MP-12317 Re:
10CFR50.71(a)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555


Line 91: Line 147:


==Dear Sir:==
==Dear Sir:==
In accordance w th Millstone Unit 1 Technical Specification 6.9.1.6, i
In accordance w th Millstone Unit 1 Technical Specification 6.9.1.6, i
the following monthly operating data report for Millstone Unit 1 is enclosed.         One additional copy of the report is enclosed.
the following monthly operating data report for Millstone Unit 1 is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY ef/Wf         e4t o St6 phen E. Scace Station Superintendent Millstone Nuclear Power Station SES/GSN:
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
/
ef Wf e4t o St6 phen E. Scace Station Superintendent Millstone Nuclear Power Station SES/GSN:


==Enclosures:==
==Enclosures:==
(4) cc:   Regional Administrator, Region I William Raymond, Senior Resident inspector
(4) cc:
                                                                                                              . ? 'f
Regional Administrator, Region I William Raymond, Senior Resident inspector
                                                                                                                  ,}}
. ? 'f
.}}

Latest revision as of 20:11, 6 December 2024

Monthly Operating Rept for Sept 1988 for Millstone Unit 1
ML20207N451
Person / Time
Site: Millstone 
Issue date: 09/30/1988
From: Newburgh G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
MP-121317, NUDOCS 8810190160
Download: ML20207N451 (5)


Text

-l AVERAGE DAILY UNIT POWER LEVEL e

DOCKET NO. 50-245 UNIT Millstone 1 DATE 881008 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Extension 4400 MONTH September, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 4 1

649 17 652 2

642 18 65?

3 650 19 651 4

649 20 651 5

649 21 650 6

650 22 650 7

651 23 638 8

534 24 649 9

650 25 653 10 651 26 653 11 653 27 653 12 652 28 552 13 652 29 653 14 563 30 646 15 652 31 N/A 16 653 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

,[

4 00 A

N

OPERATING DATA REPORT DOCKET NO. 50-245 OATE 881008 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791

_ Extension 4400 OPERATING STATUS 1.

. Unit Name:. Millstone 1 l Notes

'l 2.

Reporting Period: September, 1988 l

l i

3. '

Licensed. Thermal Power (HWt): 2011 l

l J

4.

Nameplate Rating (Gross MWe): 662 l

l S.

Design Electrical Rating (Net MWe): 660 l

l 6.

Maximum. Dependable Capacity (Gross MWe): 684 l l

7.

Maximum Deperadable Capacity (Net MWej 654 l,,

l 8.

If Changes.0ccur in Capacity Ratings (1tems Number 3 Through 7)

Since Last Report, Give Reasons:-

N/A 57 Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A

((

l This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 720 6,575 156,383 12.

Number Of Hours Reactor Was Critical 720 6,S45.8

--122,871.8 13.

Reactor Reserve Shutdown Hours 0

0 3,283.3 14.

Hours Generator On-Line 720 6,536.6 119,729.1

~~

15.

Unit Reserve Shutdown Hours 0

0 93.7 16.

Gross Thermal Energy Generated (MWH) 1,429,250

[12,933,153 223 139,248 2

17.

Gross Elec. Energy Generated (MWH) 484,500 4,408,300

_75,184,896 18.

Net Electrical Energy Generated (MWH) 463,272 4,218,196

71,732,916 19.

Unit Service Factor 100 99.4 76.6 20.

Unit Availability Factor 100 99.4 76.6 21.

Unit Capacity Factor (Using M00 Net) 98.4 98.1 70.1 22.

Unit Capacity Factor (Using DER Net) 97.5 97.2 69.5 23.

Unit Forced Outage Rate 0

0.6 10.7 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

~

25.

If Shut Down At End Of Report Period, Lstimated Date of Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION

O DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 681083 COMPLETED BY G. Newburgh REPORT MONTH September, 1988 TELEPHONE (203) 447-1791 Extension 4400 No.

Date Type Duration Reason 2 Method of Licensee System Component Cause & Corrective l

(Hours)

Shutting Event Codei Code 5 Action to Down Reactor 3 Report #

Prevent Recurrence N/A 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain)

s.

REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 1 2.

Scheduled date for next refueling shutdown:

April 1989 3.

Schedule date for restart following refueling: May 1989 4.

Will refueling or esumption of operation thereafter require a technical specification change or other license amendment?

Yes, Technical Specification Changes Regarding:

(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Winter 1988-89 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

196 GE8B Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a)

In Core: (a) 580 (b) 1732 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed s+orage capacity that has been requested or is planned, in number of fuel assemblies:

Present capacity, 2184 assemblies Recuested increase, 1045 assemblies 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1987, Spent Fuel pool, Full Core Off Load Capability is Reached.

Temporary rack approved for installation if required; plans f or additional capacity in progress.

%r

's PJORTHEAST UTILITIES o.n.r.i Ome... s.m.n sir..i. s.rnn. Connecocui a

l

- v

~~ "s w. -c vw --

P.O. 80X 270

- w....

.4.e*****

HARTF0F D. CONNECTICUT 061414270 k

k J . U.(.V C,7 Z ',

'203)6 % -5000 October 12, 1988 MP-12317 Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License DPR-21 Docket No. 50-245

Dear Sir:

In accordance w th Millstone Unit 1 Technical Specification 6.9.1.6, i

the following monthly operating data report for Millstone Unit 1 is enclosed.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

/

ef Wf e4t o St6 phen E. Scace Station Superintendent Millstone Nuclear Power Station SES/GSN:

Enclosures:

(4) cc:

Regional Administrator, Region I William Raymond, Senior Resident inspector

. ? 'f

.