{{#Wiki_filter:-                 . ..        _-              . . = - - - -                     ..            .  ..                    ._ - .. .
{{#Wiki_filter:-
i ES-1.1                                               SI TERMINATION                                                       Rev. 0 12-27-85 1
. = - - - -
    -  STEP       -
i ES-1.1 SI TERMINATION Rev. 0 12-27-85 1
ACTION / EXPECTED RESPONSE                                           RESPONSE NOT OBTAINED A.         PURPOSE This procedure provides the necessary_ instructions to terminate safety injection and stabilize plant conditions.
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED A.
B.       SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from:
PURPOSE This procedure provides the necessary_ instructions to terminate safety injection and stabilize plant conditions.
B.
SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from:
: 1) E-0, REACTOR TRIP OR SAFETY INJECTION, and E-1, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are satisfied.
: 1) E-0, REACTOR TRIP OR SAFETY INJECTION, and E-1, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are satisfied.
i
i
: 2) FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI is terminated.
: 2) FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI is terminated.
870$O50113 870428 PDR q        ADOCK 05000295 PDR 0516E                                                                   1
870$O50113 870428 PDR ADOCK 05000295 q
PDR 0516E 1


ES-1.1                                 SI TERMINATION                                   Rev. 0 12-27-85
ES-1.1 SI TERMINATION Rev. 0 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION If offsite power is lost after SI reset, manual action will be required to restart
    -  STEP ACTION / EXPECTED RESPONSE                         RESPONSE NOT OBTAINED
* CAUTION                                         *
* If offsite power is lost after SI reset,                               *
* manual action will be required to restart                             *
* some safeguards equipment.
* some safeguards equipment.
* NOTE
NOTE
                        - Foldout page should be open.
- Foldout page should be open.
                        - A discretion of Shift Supervisor, steps 21 through 23 may be performed at any time as conditions allow. These steps secure DGs running unloaded, check Source Range detectors energized, and shutdown unnecessary plant equipment.
- A discretion of Shift Supervisor, steps 21 through 23 may be performed at any time as conditions allow.
: 1. Reset SI:
These steps secure DGs running unloaded, check Source Range detectors energized, and shutdown unnecessary plant equipment.
: a. Verify safeguards breaker targets                     a. Match targets.
1.
                  - MATCHED
Reset SI:
: a. Verify safeguards breaker targets
: a. Match targets.
- MATCHED
: b. Depress both SI RESET pushbuttons
: b. Depress both SI RESET pushbuttons
: c. Verify the following:                                 c. Locally place both trains of safeguards in TEST.
: c. Verify the following:
                  - SAFETY INJECTION ACTIVATED annunciator blue light - OUT
: c. Locally place both trains of safeguards in TEST.
                  -  AUTO SAFETY INJECTION BLOCKED annunciator blue light - ON
- SAFETY INJECTION ACTIVATED annunciator blue light - OUT AUTO SAFETY INJECTION BLOCKED annunciator blue light - ON 2.
: 2. Reset Containment Spray / Isolation Phase B, IF Actuated
Reset Containment Spray / Isolation Phase B, IF Actuated
                                                  \
\\
l 0516E                                       2
l 0516E 2


i ES-1.1                                                                     SI TERMINATION                                                   Rev. O 12-27-85
i ES-1.1 SI TERMINATION Rev. O 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 3.
        -      STEP     -
Establish Instrument Air To Containment:
ACTION / EXPECTED RESPONSE                                                   RESPONSE NOT OBTAINED
: a. Verify an air compressor -
: 3.     Establish Instrument Air To Containment:
: a. Start air compressors as RUNNING necessary,
: a. Verify an air compressor -                                                         a. Start air compressors as RUNNING                                                                           necessary,
: b. Open valves FCV-IA01A and B 4.
: b. Open valves FCV-IA01A and B
Stop All Charging Pumps But One Centrifugal i
: 4.     Stop All Charging Pumps But One                                                 ,
5.
Centrifugal i
Check RCS Pressure - STABLE OR Perform the following:
: 5.     Check RCS Pressure - STABLE OR                                                         Perform the following:
INCREASING
I INCREASING                                                                                                                 .
: 1) Operate charging and SI pumps l
: 1) Operate charging and SI pumps l                                                                                                                   as necessary.
as necessary.
: 2) Go to ES-1.2 POST-LOCA C00LDOWN AND DEPRESSURIZATION.
: 2) Go to ES-1.2 POST-LOCA C00LDOWN AND DEPRESSURIZATION.
: 6.     Close Appropriate IVSW Valves:
6.
: a. Check containment conditions:                                                     a. Perform the following:
Close Appropriate IVSW Valves:
Containment radiation - NORMAL                                               1) Close IVSW injection valves to MOV-VC8100
: a. Check containment conditions:
                                  -    Containment pressure - NORMAL                                                     and A0V-VC8152 and 8153:
: a. Perform the following:
                                  -    Containment temperature - NORMAL                                                 FCV-IWO8                         FCV-IW12 FCV-IWO9                         FCV-IW13
Containment radiation - NORMAL
: 1) Close IVSW injection valves to MOV-VC8100 Containment pressure - NORMAL and A0V-VC8152 and 8153:
Containment temperature - NORMAL FCV-IWO8 FCV-IW12 FCV-IWO9 FCV-IW13
: 2) Go to step 7.
: 2) Go to step 7.
: b. Close all IVSW injection valves:
: b. Close all IVSW injection valves:
FC           WO8                             FCV-IW13 F                 09                         FCV-IW14 j                                 F                 10                       FCV-IW15 FCV-IW11                                     FCV-IW16
FC WO8 FCV-IW13 F
:                                FCV-IW12                                     FCV-IW17 i
09 FCV-IW14 j
l                 0516E                                                                           3
F 10 FCV-IW15 FCV-IW11 FCV-IW16 FCV-IW12 FCV-IW17 i
l 0516E 3


ES-1.1                             SI TERMINATION                             Rev. 0 12-27-85
ES-1.1 SI TERMINATION Rev. 0 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 7.
  -    STEP -
Establish Normal Charging Flow:
ACTION / EXPECTED RESPONSE               RESPONSE NOT OBTAINED
: a. Verify charging pump miniflow
: 7. Establish Normal Charging Flow:
: a. Open valves.
: a. Verify charging pump miniflow                 a. Open valves.
valves MOV-VC8110 and 8111 -
valves MOV-VC8110 and 8111 -
OPEN
OPEN
Line 81: Line 85:
: d. Open charging header isolation valves MOV-VC8105 and 8106
: d. Open charging header isolation valves MOV-VC8105 and 8106
: e. Open RCP seal water return containment isolation valve MOV-VC8100
: e. Open RCP seal water return containment isolation valve MOV-VC8100
: f. Check RCP LBRTH AP - BETWEEN                 f. Adjust RCP LBRTH AP 20 AND 60 INCHES                                 control valve HCV-182.
: f. Check RCP LBRTH AP - BETWEEN
: 8. Control Charging Flow to Maintain             - IF PZR level continues to PZR Level - BETWEEN 20% AND 50%                 decrease, THEN:
: f. Adjust RCP LBRTH AP 20 AND 60 INCHES control valve HCV-182.
(BETWEEN 50% AND 80% FOR ADVERSE CONTAINMENT)                                     1) Isolate normal charging flow path and realign charging flow path through BIT.
8.
Control Charging Flow to Maintain
- IF PZR level continues to PZR Level - BETWEEN 20% AND 50%
decrease, THEN:
(BETWEEN 50% AND 80% FOR ADVERSE CONTAINMENT)
: 1) Isolate normal charging flow path and realign charging flow path through BIT.
: 2) Go to ES-1.2, POST-LOCA C00LDOWN AND DEPRESSURIZATION.
: 2) Go to ES-1.2, POST-LOCA C00LDOWN AND DEPRESSURIZATION.
                                                            - IF PZR level is greater than 50%
- IF PZR level is greater than 50%
(80% for adverse containment),
(80% for adverse containment),
    ,                                                          THEN align letdown using step 13 WHILE continuirg with step 9.
THEN align letdown using step 13 WHILE continuirg with step 9.
0516E                                     4
0516E 4


ES-1.1                                             SI TERMINATION                                           Rev. O
ES-1.1 SI TERMINATION Rev. O 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 9.
;                                                                                                                              12-27-85 1
Check If SI Pumps Should Be Stopped:
!      -    STEP     -
: a. RCS pressure:
ACTION / EXPECTED RESPONSE                                     RESPONSE NOT OBTAINED
: a. Perform the following:
: 9. Check If SI Pumps Should Be Stopped:
STABLE OR INCREASING
!                      a. RCS pressure:                                                         a. Perform the following:
: 1) E any SG is faulted, THEN do NOT proceed until AND faulted SG depressurization stops.
STABLE OR INCREASING                                                 1) E any SG is faulted, THEN do NOT proceed until AND                                                             faulted SG depressurization stops.
GREATER THAN 1600 PSIG (1900 PSIG for ADVERSE CONTAINMENT)
GREATER THAN 1600 PSIG (1900 PSIG for ADVERSE CONTAINMENT)                                 2) E EITHER:
: 2) E EITHER:
NO SG is faulted.
NO SG is faulted.
QE
QE Criteria for stopping SI pumps can NOT be satisfied after faulted SG depressurization 4
                                                                                                            -  Criteria for stopping SI pumps can NOT be satisfied after faulted SG depressurization 4                                                                                                               stops.
stops.
i THEN go to ES-1.2, POST-LOCA COOLDOWN AND
i THEN go to ES-1.2, POST-LOCA COOLDOWN AND DEPRESSURIZATION.
:                                                                                                            DEPRESSURIZATION.
: b. Stop both SI pumps i
: b. Stop both SI pumps i                 10. Align RHR Pumps:
: 10. Align RHR Pumps:
: a. Stop both RHR pumps
: a. Stop both RHR pumps
: b. Close MOV-CC9412A and B
: b. Close MOV-CC9412A and B
: 11. Verify ECCS Flow Not Required:                                           Perform the following:
: 11. Verify ECCS Flow Not Required:
: a. RCS subcooling -                                                     1) Operate charging and SI GREATER THAN 30*F (RCS PRESSURE -                                       pumps as necessary.
Perform the following:
HOT LEG TEMPERATURES ABOVE FIGURE ON FOLDOUT PAGE FOR                                           2) Go to ES-1.2, POST-LOCA ADVERSE CONTAINMENT)                                                     C00LDOWN AND DEPRESSURIZATION..
: a. RCS subcooling -
: 1) Operate charging and SI GREATER THAN 30*F (RCS PRESSURE -
pumps as necessary.
HOT LEG TEMPERATURES ABOVE FIGURE ON FOLDOUT PAGE FOR
: 2) Go to ES-1.2, POST-LOCA ADVERSE CONTAINMENT)
C00LDOWN AND DEPRESSURIZATION..
: b. PZR level - GREATER THAN 4%
: b. PZR level - GREATER THAN 4%
(30% for ADVERSE CONTAINMENT) 4 0516E                                                     5 (.( 2 7           ,.u l .)
(30% for ADVERSE CONTAINMENT) 4 0516E 5 (.( 2 7,.u l.)
                                                                                                                            .--            _}}
_}}

Latest revision as of 17:16, 6 December 2024

Rev 0 to Emergency Procedure ES-1.1, SI Termination
ML20210A565
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/27/1985
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20210A494 List:
References
ES-1.1, NUDOCS 8705050113
Download: ML20210A565 (5)


Text

-

. = - - - -

i ES-1.1 SI TERMINATION Rev. 0 12-27-85 1

STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED A.

PURPOSE This procedure provides the necessary_ instructions to terminate safety injection and stabilize plant conditions.

B.

SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from:

1) E-0, REACTOR TRIP OR SAFETY INJECTION, and E-1, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are satisfied.

i

2) FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI is terminated.

870$O50113 870428 PDR ADOCK 05000295 q

PDR 0516E 1

ES-1.1 SI TERMINATION Rev. 0 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION If offsite power is lost after SI reset, manual action will be required to restart

  • some safeguards equipment.

NOTE

- Foldout page should be open.

- A discretion of Shift Supervisor, steps 21 through 23 may be performed at any time as conditions allow.

These steps secure DGs running unloaded, check Source Range detectors energized, and shutdown unnecessary plant equipment.

1.

Reset SI:

a. Verify safeguards breaker targets
a. Match targets.

- MATCHED

b. Depress both SI RESET pushbuttons
c. Verify the following:
c. Locally place both trains of safeguards in TEST.

- SAFETY INJECTION ACTIVATED annunciator blue light - OUT AUTO SAFETY INJECTION BLOCKED annunciator blue light - ON 2.

Reset Containment Spray / Isolation Phase B, IF Actuated

\\

l 0516E 2

i ES-1.1 SI TERMINATION Rev. O 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 3.

Establish Instrument Air To Containment:

a. Verify an air compressor -
a. Start air compressors as RUNNING necessary,
b. Open valves FCV-IA01A and B 4.

Stop All Charging Pumps But One Centrifugal i

5.

Check RCS Pressure - STABLE OR Perform the following:

INCREASING

1) Operate charging and SI pumps l

as necessary.

2) Go to ES-1.2 POST-LOCA C00LDOWN AND DEPRESSURIZATION.

6.

Close Appropriate IVSW Valves:

a. Check containment conditions:
a. Perform the following:

Containment radiation - NORMAL

1) Close IVSW injection valves to MOV-VC8100 Containment pressure - NORMAL and A0V-VC8152 and 8153:

Containment temperature - NORMAL FCV-IWO8 FCV-IW12 FCV-IWO9 FCV-IW13

2) Go to step 7.
b. Close all IVSW injection valves:

FC WO8 FCV-IW13 F

09 FCV-IW14 j

F 10 FCV-IW15 FCV-IW11 FCV-IW16 FCV-IW12 FCV-IW17 i

l 0516E 3

ES-1.1 SI TERMINATION Rev. 0 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 7.

Establish Normal Charging Flow:

a. Verify charging pump miniflow
a. Open valves.

valves MOV-VC8110 and 8111 -

OPEN

b. Close BIT inlet isol. valves MOV-SI8803A and B
c. Close BIT discharge isol. valves MOV-SI8801A and B
d. Open charging header isolation valves MOV-VC8105 and 8106
e. Open RCP seal water return containment isolation valve MOV-VC8100
f. Check RCP LBRTH AP - BETWEEN
f. Adjust RCP LBRTH AP 20 AND 60 INCHES control valve HCV-182.

8.

Control Charging Flow to Maintain

- IF PZR level continues to PZR Level - BETWEEN 20% AND 50%

decrease, THEN:

(BETWEEN 50% AND 80% FOR ADVERSE CONTAINMENT)

1) Isolate normal charging flow path and realign charging flow path through BIT.
2) Go to ES-1.2, POST-LOCA C00LDOWN AND DEPRESSURIZATION.

- IF PZR level is greater than 50%

(80% for adverse containment),

THEN align letdown using step 13 WHILE continuirg with step 9.

0516E 4

ES-1.1 SI TERMINATION Rev. O 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 9.

Check If SI Pumps Should Be Stopped:

a. RCS pressure:
a. Perform the following:

STABLE OR INCREASING

1) E any SG is faulted, THEN do NOT proceed until AND faulted SG depressurization stops.

GREATER THAN 1600 PSIG (1900 PSIG for ADVERSE CONTAINMENT)

2) E EITHER:

NO SG is faulted.

QE Criteria for stopping SI pumps can NOT be satisfied after faulted SG depressurization 4

stops.

i THEN go to ES-1.2, POST-LOCA COOLDOWN AND DEPRESSURIZATION.

b. Stop both SI pumps i
10. Align RHR Pumps:
a. Stop both RHR pumps
b. Close MOV-CC9412A and B
11. Verify ECCS Flow Not Required:

Perform the following:

a. RCS subcooling -
1) Operate charging and SI GREATER THAN 30*F (RCS PRESSURE -

pumps as necessary.

HOT LEG TEMPERATURES ABOVE FIGURE ON FOLDOUT PAGE FOR

2) Go to ES-1.2, POST-LOCA ADVERSE CONTAINMENT)

C00LDOWN AND DEPRESSURIZATION..

b. PZR level - GREATER THAN 4%

(30% for ADVERSE CONTAINMENT) 4 0516E 5 (.( 2 7,.u l.)

_