i ES-1.1 | . = - - - - | ||
i ES-1.1 SI TERMINATION Rev. 0 12-27-85 1 | |||
ACTION / EXPECTED RESPONSE | STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED A. | ||
B. | PURPOSE This procedure provides the necessary_ instructions to terminate safety injection and stabilize plant conditions. | ||
B. | |||
SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from: | |||
: 1) E-0, REACTOR TRIP OR SAFETY INJECTION, and E-1, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are satisfied. | : 1) E-0, REACTOR TRIP OR SAFETY INJECTION, and E-1, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are satisfied. | ||
i | i | ||
: 2) FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI is terminated. | : 2) FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI is terminated. | ||
870$O50113 870428 PDR | 870$O50113 870428 PDR ADOCK 05000295 q | ||
PDR 0516E 1 | |||
ES-1.1 | ES-1.1 SI TERMINATION Rev. 0 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION If offsite power is lost after SI reset, manual action will be required to restart | ||
* some safeguards equipment. | * some safeguards equipment. | ||
NOTE | |||
- Foldout page should be open. | |||
- A discretion of Shift Supervisor, steps 21 through 23 may be performed at any time as conditions allow. | |||
These steps secure DGs running unloaded, check Source Range detectors energized, and shutdown unnecessary plant equipment. | |||
: a. Verify safeguards breaker targets | 1. | ||
Reset SI: | |||
: a. Verify safeguards breaker targets | |||
: a. Match targets. | |||
- MATCHED | |||
: b. Depress both SI RESET pushbuttons | : b. Depress both SI RESET pushbuttons | ||
: c. Verify the following: | : c. Verify the following: | ||
: c. Locally place both trains of safeguards in TEST. | |||
- SAFETY INJECTION ACTIVATED annunciator blue light - OUT AUTO SAFETY INJECTION BLOCKED annunciator blue light - ON 2. | |||
Reset Containment Spray / Isolation Phase B, IF Actuated | |||
\\ | |||
l 0516E | l 0516E 2 | ||
i ES-1.1 | i ES-1.1 SI TERMINATION Rev. O 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 3. | ||
Establish Instrument Air To Containment: | |||
ACTION / EXPECTED RESPONSE | : a. Verify an air compressor - | ||
: a. Start air compressors as RUNNING necessary, | |||
: a. Verify an air compressor - | : b. Open valves FCV-IA01A and B 4. | ||
: b. Open valves FCV-IA01A and B | Stop All Charging Pumps But One Centrifugal i | ||
5. | |||
Centrifugal i | Check RCS Pressure - STABLE OR Perform the following: | ||
INCREASING | |||
: 1) Operate charging and SI pumps l | |||
: 1) Operate charging and SI pumps l | as necessary. | ||
: 2) Go to ES-1.2 POST-LOCA C00LDOWN AND DEPRESSURIZATION. | : 2) Go to ES-1.2 POST-LOCA C00LDOWN AND DEPRESSURIZATION. | ||
6. | |||
: a. Check containment conditions: | Close Appropriate IVSW Valves: | ||
Containment radiation - NORMAL | : a. Check containment conditions: | ||
: a. Perform the following: | |||
Containment radiation - NORMAL | |||
: 1) Close IVSW injection valves to MOV-VC8100 Containment pressure - NORMAL and A0V-VC8152 and 8153: | |||
Containment temperature - NORMAL FCV-IWO8 FCV-IW12 FCV-IWO9 FCV-IW13 | |||
: 2) Go to step 7. | : 2) Go to step 7. | ||
: b. Close all IVSW injection valves: | : b. Close all IVSW injection valves: | ||
FC | FC WO8 FCV-IW13 F | ||
09 FCV-IW14 j | |||
l | F 10 FCV-IW15 FCV-IW11 FCV-IW16 FCV-IW12 FCV-IW17 i | ||
l 0516E 3 | |||
ES-1.1 | ES-1.1 SI TERMINATION Rev. 0 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 7. | ||
Establish Normal Charging Flow: | |||
ACTION / EXPECTED RESPONSE | : a. Verify charging pump miniflow | ||
: a. Open valves. | |||
: a. Verify charging pump miniflow | |||
valves MOV-VC8110 and 8111 - | valves MOV-VC8110 and 8111 - | ||
OPEN | OPEN | ||
| Line 81: | Line 85: | ||
: d. Open charging header isolation valves MOV-VC8105 and 8106 | : d. Open charging header isolation valves MOV-VC8105 and 8106 | ||
: e. Open RCP seal water return containment isolation valve MOV-VC8100 | : e. Open RCP seal water return containment isolation valve MOV-VC8100 | ||
: f. Check RCP LBRTH AP - BETWEEN | : f. Check RCP LBRTH AP - BETWEEN | ||
: f. Adjust RCP LBRTH AP 20 AND 60 INCHES control valve HCV-182. | |||
(BETWEEN 50% AND 80% FOR ADVERSE CONTAINMENT) | 8. | ||
Control Charging Flow to Maintain | |||
- IF PZR level continues to PZR Level - BETWEEN 20% AND 50% | |||
decrease, THEN: | |||
(BETWEEN 50% AND 80% FOR ADVERSE CONTAINMENT) | |||
: 1) Isolate normal charging flow path and realign charging flow path through BIT. | |||
: 2) Go to ES-1.2, POST-LOCA C00LDOWN AND DEPRESSURIZATION. | : 2) Go to ES-1.2, POST-LOCA C00LDOWN AND DEPRESSURIZATION. | ||
- IF PZR level is greater than 50% | |||
(80% for adverse containment), | (80% for adverse containment), | ||
THEN align letdown using step 13 WHILE continuirg with step 9. | |||
0516E | 0516E 4 | ||
ES-1.1 | ES-1.1 SI TERMINATION Rev. O 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 9. | ||
Check If SI Pumps Should Be Stopped: | |||
: a. RCS pressure: | |||
ACTION / EXPECTED RESPONSE | : a. Perform the following: | ||
STABLE OR INCREASING | |||
: 1) E any SG is faulted, THEN do NOT proceed until AND faulted SG depressurization stops. | |||
STABLE OR INCREASING | GREATER THAN 1600 PSIG (1900 PSIG for ADVERSE CONTAINMENT) | ||
GREATER THAN 1600 PSIG (1900 PSIG for ADVERSE CONTAINMENT) | : 2) E EITHER: | ||
NO SG is faulted. | NO SG is faulted. | ||
QE | QE Criteria for stopping SI pumps can NOT be satisfied after faulted SG depressurization 4 | ||
stops. | |||
i THEN go to ES-1.2, POST-LOCA COOLDOWN AND | i THEN go to ES-1.2, POST-LOCA COOLDOWN AND DEPRESSURIZATION. | ||
: b. Stop both SI pumps i | |||
: b. Stop both SI pumps i | : 10. Align RHR Pumps: | ||
: a. Stop both RHR pumps | : a. Stop both RHR pumps | ||
: b. Close MOV-CC9412A and B | : b. Close MOV-CC9412A and B | ||
: 11. Verify ECCS Flow Not Required: | : 11. Verify ECCS Flow Not Required: | ||
: a. RCS subcooling - | Perform the following: | ||
HOT LEG TEMPERATURES ABOVE FIGURE ON FOLDOUT PAGE FOR | : a. RCS subcooling - | ||
: 1) Operate charging and SI GREATER THAN 30*F (RCS PRESSURE - | |||
pumps as necessary. | |||
HOT LEG TEMPERATURES ABOVE FIGURE ON FOLDOUT PAGE FOR | |||
: 2) Go to ES-1.2, POST-LOCA ADVERSE CONTAINMENT) | |||
C00LDOWN AND DEPRESSURIZATION.. | |||
: b. PZR level - GREATER THAN 4% | : b. PZR level - GREATER THAN 4% | ||
(30% for ADVERSE CONTAINMENT) 4 0516E | (30% for ADVERSE CONTAINMENT) 4 0516E 5 (.( 2 7,.u l.) | ||
_}} | |||
Latest revision as of 17:16, 6 December 2024
| ML20210A565 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 12/27/1985 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20210A494 | List: |
| References | |
| ES-1.1, NUDOCS 8705050113 | |
| Download: ML20210A565 (5) | |
Text
-
. = - - - -
i ES-1.1 SI TERMINATION Rev. 0 12-27-85 1
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED A.
PURPOSE This procedure provides the necessary_ instructions to terminate safety injection and stabilize plant conditions.
B.
SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from:
- 1) E-0, REACTOR TRIP OR SAFETY INJECTION, and E-1, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are satisfied.
i
- 2) FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI is terminated.
870$O50113 870428 PDR ADOCK 05000295 q
PDR 0516E 1
ES-1.1 SI TERMINATION Rev. 0 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION If offsite power is lost after SI reset, manual action will be required to restart
- some safeguards equipment.
NOTE
- Foldout page should be open.
- A discretion of Shift Supervisor, steps 21 through 23 may be performed at any time as conditions allow.
These steps secure DGs running unloaded, check Source Range detectors energized, and shutdown unnecessary plant equipment.
1.
Reset SI:
- a. Verify safeguards breaker targets
- a. Match targets.
- MATCHED
- b. Depress both SI RESET pushbuttons
- c. Verify the following:
- c. Locally place both trains of safeguards in TEST.
- SAFETY INJECTION ACTIVATED annunciator blue light - OUT AUTO SAFETY INJECTION BLOCKED annunciator blue light - ON 2.
Reset Containment Spray / Isolation Phase B, IF Actuated
\\
l 0516E 2
i ES-1.1 SI TERMINATION Rev. O 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 3.
Establish Instrument Air To Containment:
- a. Verify an air compressor -
- a. Start air compressors as RUNNING necessary,
- b. Open valves FCV-IA01A and B 4.
Stop All Charging Pumps But One Centrifugal i
5.
Check RCS Pressure - STABLE OR Perform the following:
INCREASING
- 1) Operate charging and SI pumps l
as necessary.
- 2) Go to ES-1.2 POST-LOCA C00LDOWN AND DEPRESSURIZATION.
6.
Close Appropriate IVSW Valves:
- a. Check containment conditions:
- a. Perform the following:
Containment radiation - NORMAL
- 1) Close IVSW injection valves to MOV-VC8100 Containment pressure - NORMAL and A0V-VC8152 and 8153:
Containment temperature - NORMAL FCV-IWO8 FCV-IW12 FCV-IWO9 FCV-IW13
- 2) Go to step 7.
- b. Close all IVSW injection valves:
FC WO8 FCV-IW13 F
09 FCV-IW14 j
F 10 FCV-IW15 FCV-IW11 FCV-IW16 FCV-IW12 FCV-IW17 i
l 0516E 3
ES-1.1 SI TERMINATION Rev. 0 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 7.
Establish Normal Charging Flow:
- a. Verify charging pump miniflow
- a. Open valves.
valves MOV-VC8110 and 8111 -
OPEN
- b. Close BIT inlet isol. valves MOV-SI8803A and B
- c. Close BIT discharge isol. valves MOV-SI8801A and B
- d. Open charging header isolation valves MOV-VC8105 and 8106
- e. Open RCP seal water return containment isolation valve MOV-VC8100
8.
Control Charging Flow to Maintain
- IF PZR level continues to PZR Level - BETWEEN 20% AND 50%
decrease, THEN:
(BETWEEN 50% AND 80% FOR ADVERSE CONTAINMENT)
- 1) Isolate normal charging flow path and realign charging flow path through BIT.
- 2) Go to ES-1.2, POST-LOCA C00LDOWN AND DEPRESSURIZATION.
- IF PZR level is greater than 50%
(80% for adverse containment),
THEN align letdown using step 13 WHILE continuirg with step 9.
0516E 4
ES-1.1 SI TERMINATION Rev. O 12-27-85 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 9.
Check If SI Pumps Should Be Stopped:
- a. RCS pressure:
- a. Perform the following:
STABLE OR INCREASING
GREATER THAN 1600 PSIG (1900 PSIG for ADVERSE CONTAINMENT)
- 2) E EITHER:
NO SG is faulted.
QE Criteria for stopping SI pumps can NOT be satisfied after faulted SG depressurization 4
stops.
i THEN go to ES-1.2, POST-LOCA COOLDOWN AND DEPRESSURIZATION.
- b. Stop both SI pumps i
- 10. Align RHR Pumps:
- a. Stop both RHR pumps
- b. Close MOV-CC9412A and B
- 11. Verify ECCS Flow Not Required:
Perform the following:
- a. RCS subcooling -
pumps as necessary.
HOT LEG TEMPERATURES ABOVE FIGURE ON FOLDOUT PAGE FOR
- 2) Go to ES-1.2, POST-LOCA ADVERSE CONTAINMENT)
C00LDOWN AND DEPRESSURIZATION..
- b. PZR level - GREATER THAN 4%
(30% for ADVERSE CONTAINMENT) 4 0516E 5 (.( 2 7,.u l.)