ML20210S742: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:r SEP 2 51986 MEMORANDUM FOR:         Harry B. Kister, Chief Reactor Projects Branch No. 1, DRP FROM:                 Jack R. Strosnider, Chief Reactor Projects Section IB, DRP
{{#Wiki_filter:r SEP 2 51986 MEMORANDUM FOR:
Harry B. Kister, Chief Reactor Projects Branch No. 1, DRP FROM:
Jack R. Strosnider, Chief Reactor Projects Section IB, DRP


==SUBJECT:==
==SUBJECT:==
ALLEGATION RI-86-A-28:   " Auxiliary Operators leaving Site Prio* to Relief, Causing Shortage of Reactor Qualified Operators."
ALLEGATION RI-86-A-28:
" Auxiliary Operators leaving Site Prio* to Relief, Causing Shortage of Reactor Qualified Operators."
Our investigation into the subject matter has been completed with the following results:
Our investigation into the subject matter has been completed with the following results:
The personnel referred to in the allegation are Auxiliary System Operators (circulating water system, service water system, makeup demineralizer system and the like) not Reactor Operators.
The personnel referred to in the allegation are Auxiliary System Operators (circulating water system, service water system, makeup demineralizer system and the like) not Reactor Operators.
There are no technical specification requirements for Auxiliary System Operators.                                                                   -
There are no technical specification requirements for Auxiliary System Operators.
On two occasions, Operator Helpers who were qualified on the ASO watch station but not promoted to ASO stood the watch.
On two occasions, Operator Helpers who were qualified on the ASO watch station but not promoted to ASO stood the watch.
Due to the lack of safety significance, and the fact that qualified personnel filled in on both occasions, this allegation has been closed.
Due to the lack of safety significance, and the fact that qualified personnel filled in on both occasions, this allegation has been closed.
Originni Signed By Jack Strosnider, Chief Reactor Projects Section IB cc:
Originni Signed By Jack Strosnider, Chief Reactor Projects Section IB cc:
Docket 50-387/388 Public Document Room Local Public Document Room Allegation File
Docket 50-387/388 Public Document Room Local Public Document Room Allegation File ()
()
RI:DRP [
RI:DRP [           f3RI:DRP Fuhrmeister         y Strosnider 9/2'l/86               9/25/86 0FFICIAL RECORD COPY       370FUHRMEISTER9/24/86 - 0001.0.0 09/24/86 .'I E 6 l 8610080216 860925 PDR P
f3RI:DRP Fuhrmeister y
ADOCK 05000387                                                   )
Strosnider 9/2'l/86 9/25/86 0FFICIAL RECORD COPY 370FUHRMEISTER9/24/86 - 0001.0.0 09/24/86.'I E 6 l 8610080216 860925 PDR ADOCK 05000387
PDR                                               i'   O i}}
)
P PDR i ' O i}}

Latest revision as of 01:15, 6 December 2024

Advises That Allegation RI-86-A-28 Re Auxiliary Operators Leaving Site Prior to Relief,Causing Shortage of Reactor Qualified Operators Closed Due to Lack of Safety Significance
ML20210S742
Person / Time
Site: Susquehanna  
Issue date: 09/25/1986
From: Strosnider J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8610080216
Download: ML20210S742 (1)


Text

r SEP 2 51986 MEMORANDUM FOR:

Harry B. Kister, Chief Reactor Projects Branch No. 1, DRP FROM:

Jack R. Strosnider, Chief Reactor Projects Section IB, DRP

SUBJECT:

ALLEGATION RI-86-A-28:

" Auxiliary Operators leaving Site Prio* to Relief, Causing Shortage of Reactor Qualified Operators."

Our investigation into the subject matter has been completed with the following results:

The personnel referred to in the allegation are Auxiliary System Operators (circulating water system, service water system, makeup demineralizer system and the like) not Reactor Operators.

There are no technical specification requirements for Auxiliary System Operators.

On two occasions, Operator Helpers who were qualified on the ASO watch station but not promoted to ASO stood the watch.

Due to the lack of safety significance, and the fact that qualified personnel filled in on both occasions, this allegation has been closed.

Originni Signed By Jack Strosnider, Chief Reactor Projects Section IB cc:

Docket 50-387/388 Public Document Room Local Public Document Room Allegation File ()

RI:DRP [

f3RI:DRP Fuhrmeister y

Strosnider 9/2'l/86 9/25/86 0FFICIAL RECORD COPY 370FUHRMEISTER9/24/86 - 0001.0.0 09/24/86.'I E 6 l 8610080216 860925 PDR ADOCK 05000387

)

P PDR i ' O i