ML20210V030: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
                                    b
b
            K e tt,                             UNITED STATES
K e tt,
        /     '
UNITED STATES
                      'o               NUCLEAR REGULATORY COMMISSION
/
                    "
'o
    ]'                 n                          REGloN li
NUCLEAR REGULATORY COMMISSION
      g,
'
      *
"
                        j                  101 MARIETTA STREET.N.W.                         -l
]'
                        *                   ATLANTA, GEORGI A 30323
REGloN li
        i
n
                      nY
g,
          *****
j
.                          ~
101 MARIETTA STREET.N.W.
                                                  JAN 0 51987
-l
    Docket No. 50-424
*
    License No. CPPR-108
*
    Georgia Power _ Company
ATLANTA, GEORGI A 30323
    ATTN: Mr. J. H. Miller, Jr.
Y
            President
i
    P. O. Box 4545
n
    Atlanta, GA 30302
.
    Gentlemen:
*****
    SUBJECT: NRC INSPECTION REPORT NO. 50-424/86-137
JAN 0 51987
    This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
~
    P. G. Stoddart on December 8-11, 1986. The inspection included a review of
Docket No. 50-424
    activities authorized for your Vogtle facility.                 At the conclusion of the
License No. CPPR-108
    inspection, the findings were discussed with those members of your staff
Georgia Power _ Company
    identified in the enclosed inspection report.
ATTN: Mr. J. H. Miller, Jr.
    Areas examined during the inspection are identified in the report. Within these
President
    areas, the inspection consisted of selective examinations of procedures and
P. O. Box 4545
    representative records, interviews with personnel, and observation of activities
Atlanta, GA 30302
    in progress.
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-424/86-137
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. G. Stoddart on December 8-11, 1986.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
2
2
    Within the scope of the inspection, no violations or deviations were identified.
Within the scope of the inspection, no violations or deviations were identified.
    In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
I
I
    Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
    will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, ylease contact us.
    Should you have any questions concerning this letter, ylease contact us.
Sincerely,
                                                    Sincerely,
b
                                                                      b
Virgi
'                                                  Virgi     L. Brownlee, Chief
L. Brownlee, Chief
                                                    Reactor Projects Branch 3
'
                                                    Division of Reactor Projects
Reactor Projects Branch 3
    Enclosure:
Division of Reactor Projects
i   NRC Inspection Report
Enclosure:
j   cc w/ encl:         (See page 2)
i
NRC Inspection Report
j
cc w/ encl:
(See page 2)
,
,
I
I
    0702180660 870203
0702180660 870203
    PDR   ADOCK 05000424
PDR
                              PDR
ADOCK 05000424
PDR


        _ _ _ _ .
_ _ _ _ .
                    . _ - _ _ . . - _ _
. _ - _ _ . . - _ _
f
f
                  .
.
  Georgia Power Company                 2
Georgia Power Company
  cc w/ encl:
2
  J. P. O'Reilly, Senior Vice President
cc w/ encl:
    Nuclear. Operations
J. P. O'Reilly, Senior Vice President
  R. E. Conway, Senior Vice President &
Nuclear. Operations
    Project Director
R. E. Conway, Senior Vice President &
  D. O. Foster, Vice President, Project
Project Director
    Support
D. O. Foster, Vice President, Project
  P. D. Rice, Vice President, Project
Support
    Engineering
P. D. Rice, Vice President, Project
  R. H. Pinson, Vice President, Project
Engineering
    Construction
R. H. Pinson, Vice President, Project
  J. T. Beckham, Vice President,
Construction
    Plant Hatch
J. T. Beckham, Vice President,
  R. A. Thomas, Vice President,
Plant Hatch
    Licensing
R. A. Thomas, Vice President,
  D. S. Read, General Manager,
Licensing
    Quality Assurance
D. S. Read, General Manager,
  C. W. Hayes, Vogtle Quality
Quality Assurance
    Assurance Manager
C. W. Hayes, Vogtle Quality
  W. C. Ramsey, Manager -
Assurance Manager
    Readiness Review
W. C. Ramsey, Manager -
  G. B. Bockhold, General Manager,
Readiness Review
    Nuclear Operations
G. B. Bockhold, General Manager,
  L. Gucwa, Manager, Nuclear Safety
Nuclear Operations
    and Licensing
L. Gucwa, Manager, Nuclear Safety
  M. H. Googe, Project
and Licensing
    Construction Manager
M. H. Googe, Project
  E. D. Groover, Quality
Construction Manager
    Assurance Site Manager -
E. D. Groover, Quality
    Construction
Assurance Site Manager -
  J. A. Bailey, Project Licensing
Construction
    Manager
J. A. Bailey, Project Licensing
  G. F. Trowbridge, Esq. , Shaw,
Manager
    Pittman, Potts and Trowbridge
G. F. Trowbridge, Esq. , Shaw,
  B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
    Pittman, Potts and Trowbridge
B. W. Churchill, Esq., Shaw,
  E. L. Blake, Jr. , Esq. , Shaw,
Pittman, Potts and Trowbridge
    Pittman, Potts and Trowbridge
E. L. Blake, Jr. , Esq. , Shaw,
  J. E. Joiner, Troutman, Sanders,
Pittman, Potts and Trowbridge
    Lockerman and Ashmore
J. E. Joiner, Troutman, Sanders,
  J. G. Ledbetter, Commissioner,
Lockerman and Ashmore
    Department of Human Resources
J. G. Ledbetter, Commissioner,
  C. H. Badger, Office of Planning
Department of Human Resources
    and Budget
C. H. Badger, Office of Planning
  D. Kirkland, III, Counsel,
and Budget
    Office of the Consumer's Utility     C1
D. Kirkland, III, Counsel,
    Council
Office of the Consumer's Utility
  D. Feig, Georgians Against
C1
    Nuclear Energy
Council
  (cc w/enci cont'd - see page 3)
D. Feig, Georgians Against
Nuclear Energy
(cc w/enci cont'd - see page 3)


                                                          _.             .. -                 . _ -                                                     .
_.
.. -
. _ -
.
!
!
                                                                                                                                                                              l
.
                                .
Ge'orgia Power Company
                Ge'orgia Power Company                                             3                                                                                     .
3
                                                                                                                                                                              1
.
                  (cc w/enci cont'd)                                                                                                                                       ,
(cc w/enci cont'd)
                M. B. Margulies, Esq., Chairman,
,
_'
M. B. Margulies, Esq., Chairman,
                          Atomic Safety and Licensing Board
_'
                          Panel
Atomic Safety and Licensing Board
                  Dr. O. H. Paris, Administrative Judge
Panel
                          Atomic Safety and Licensing Board
Dr. O. H. Paris, Administrative Judge
                          Panel
Atomic Safety and Licensing Board
                G. A. Linenberger, Jr., Administrative Judge
Panel
                          Atomic Safety and Licensing Board
G. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
<
<
                          Panel
:
:
a
a
a
a
Line 154: Line 178:
!
!
<
<
    . _ . . , - _ _ . . _ _ . . .__.r_._.._ - _ , , , _ .   . _ . . . _ _ . . _ .-   . , - - _ _ , , , _ , _ . _ _ . _ _ _ _ _ . _ _ _ _ , , , , , _ _ . _ . _ , . - , _
.
_ . . , - _ _ . . _ _ . .
.__.r_._.._
- _ , , , _ .
.
. . .
. .
.-
. , - - _ _ , , , _ , _ . _ _ . _ _ _ _ _ .
_ _ _ _ , , , , , _ _ . _ . _ , . - , _
}}
}}

Latest revision as of 00:48, 6 December 2024

Corrected Ltr Forwarding Insp Rept 50-424/86-137 on 861208-11.Rept Incorrectly Ref as 50-424/86-128
ML20210V030
Person / Time
Site: Vogtle 
Issue date: 01/05/1987
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20210U967 List:
References
NUDOCS 8702180668
Download: ML20210V030 (3)


See also: IR 05000424/1986137

Text

_

b

K e tt,

UNITED STATES

/

'o

NUCLEAR REGULATORY COMMISSION

'

"

]'

REGloN li

n

g,

j

101 MARIETTA STREET.N.W.

-l

ATLANTA, GEORGI A 30323

Y

i

n

.

JAN 0 51987

~

Docket No. 50-424

License No. CPPR-108

Georgia Power _ Company

ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-424/86-137

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. G. Stoddart on December 8-11, 1986.

The inspection included a review of

activities authorized for your Vogtle facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

2

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

I

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, ylease contact us.

Sincerely,

b

Virgi

L. Brownlee, Chief

'

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

i

NRC Inspection Report

j

cc w/ encl:

(See page 2)

,

I

0702180660 870203

PDR

ADOCK 05000424

PDR

_ _ _ _ .

. _ - _ _ . . - _ _

f

.

Georgia Power Company

2

cc w/ encl:

J. P. O'Reilly, Senior Vice President

Nuclear. Operations

R. E. Conway, Senior Vice President &

Project Director

D. O. Foster, Vice President, Project

Support

P. D. Rice, Vice President, Project

Engineering

R. H. Pinson, Vice President, Project

Construction

J. T. Beckham, Vice President,

Plant Hatch

R. A. Thomas, Vice President,

Licensing

D. S. Read, General Manager,

Quality Assurance

C. W. Hayes, Vogtle Quality

Assurance Manager

W. C. Ramsey, Manager -

Readiness Review

G. B. Bockhold, General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

M. H. Googe, Project

Construction Manager

E. D. Groover, Quality

Assurance Site Manager -

Construction

J. A. Bailey, Project Licensing

Manager

G. F. Trowbridge, Esq. , Shaw,

Pittman, Potts and Trowbridge

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

E. L. Blake, Jr. , Esq. , Shaw,

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

J. G. Ledbetter, Commissioner,

Department of Human Resources

C. H. Badger, Office of Planning

and Budget

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

C1

Council

D. Feig, Georgians Against

Nuclear Energy

(cc w/enci cont'd - see page 3)

_.

.. -

. _ -

.

!

.

Ge'orgia Power Company

3

.

(cc w/enci cont'd)

,

M. B. Margulies, Esq., Chairman,

_'

Atomic Safety and Licensing Board

Panel

Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

G. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

<

a

a

4

!

<

.

_ . . , - _ _ . . _ _ . .

.__.r_._.._

- _ , , , _ .

.

. . .

. .

.-

. , - - _ _ , , , _ , _ . _ _ . _ _ _ _ _ .

_ _ _ _ , , , , , _ _ . _ . _ , . - , _