{{#Wiki_filter:I
{{#Wiki_filter:I
                                                                                                  '
'
a
a
t
t
                                            September 19, 1997
September 19, 1997
  Mr. John K. Wood
Mr. John K. Wood
  Vice President Nuclear
Vice President Nuclear
  Davls Besse Nuclear Power Station
Davls Besse Nuclear Power Station
  Centerior Service Company
Centerior Service Company
  5501 North State Route 2
5501 North State Route 2
  Oak Harbor, OH 43449
Oak Harbor, OH 43449
  SUBJECT:       OPERATOR LICENSING EXAMINATION REPORT 50 346/97308(OL)
SUBJECT:
  Dear Mr. Wood:
OPERATOR LICENSING EXAMINATION REPORT 50 346/97308(OL)
  On July 10,1997, the NRC completed initial operator licensing examinations at your Davis
Dear Mr. Wood:
  Besse Nuclear Power Station (DBNPS). The license applicants' performance evaluations
On July 10,1997, the NRC completed initial operator licensing examinations at your Davis
  were finalized on July 28,1997. The enclosed report presents the results of the
Besse Nuclear Power Station (DBNPS). The license applicants' performance evaluations
  examination, in addition to an exit meeting held at DBNPS on July 10,1997, a re exit
were finalized on July 28,1997. The enclosed report presents the results of the
  was conducted by telephone on August 18,1997.
examination, in addition to an exit meeting held at DBNPS on July 10,1997, a re exit
  Operating and written examinations were administered to three license applicants. All
was conducted by telephone on August 18,1997.
  license applicants passed all sections of their respective examinations and were issued
Operating and written examinations were administered to three license applicants. All
  Senior Reactor Operator licenses to operate your DBNPS.
license applicants passed all sections of their respective examinations and were issued
  The license applicants were all previously licensed Reactor Operators at the DBNPS. They
Senior Reactor Operator licenses to operate your DBNPS.
  performed wellin all areas of the examination with only minor individual weaknesses.
The license applicants were all previously licensed Reactor Operators at the DBNPS. They
  When compared with previous examinations, significant improvement was noted in
performed wellin all areas of the examination with only minor individual weaknesses.
  applicant execution of administrative Job Performance Measures.
When compared with previous examinations, significant improvement was noted in
  This examination was your first opportunity to prepare an operator license examination
applicant execution of administrative Job Performance Measures.
  under the NRC's initiallicense examination pilot process. The pilot process allowed your
This examination was your first opportunity to prepare an operator license examination
  training personnel to prepare and administer the written examination and prepare the
under the NRC's initiallicense examination pilot process. The pilot process allowed your
  operating examination. NRC examiners administered the operating examination. The
training personnel to prepare and administer the written examination and prepare the
  Davis Besse training department is to be commended for the examination produced for this
operating examination. NRC examiners administered the operating examination. The
  initiallicense examination. The examination submitted to Region lll was acceptable for use
Davis Besse training department is to be commended for the examination produced for this
  after minor changes. The examination was technically correct and examined at the proper
initiallicense examination. The examination submitted to Region lll was acceptable for use
  complexity and depth for a Senior Reactor Operator license applicant. Although the
after minor changes. The examination was technically correct and examined at the proper
  submitted examination was commendable, instructor attention to detail during facility
complexity and depth for a Senior Reactor Operator license applicant. Although the
  validation of the administrative job performance measures portion of the examination was
submitted examination was commendable, instructor attention to detail during facility
  weak.
validation of the administrative job performance measures portion of the examination was
  Operator performance for two operating crews was observed in the control room by the
weak.
  examiners. During each observed period operators were found to be professionalin
Operator performance for two operating crews was observed in the control room by the
  executing their control room responsibilities,
examiners. During each observed period operators were found to be professionalin
  in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
executing their control room responsibilities,
  and the enclosures to this letter will be placed in the NRC Public Document Room.
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
                                                                                              i\
and the enclosures to this letter will be placed in the NRC Public Document Room.
  9709260237 970923
i\\
  PDR     ADOCK 0500       6                                                     gg
9709260237 970923
                                                                                                j
PDR
ADOCK 0500
6
gg
j


  .         .   - _ - - - ._.                   -           --     -           ~-.- - ~_.-- - - - -                                                   . - _-
.
    4
.
- _ - - - ._.
-
--
-
~-.- - ~_.-- - - - -
. - _-
4
:
:
      J. K. Wood                                                         2
J. K. Wood
                                                                                                                    September 19, 1997
2
                                                                                                                                                                  l
September 19, 1997
      We will gladly discuss any questions you have concerning this examination.
We will gladly discuss any questions you have concerning this examination.
                                                            Sincerely
Sincerely
;                                                   Original Signed by John A. Grobe
;
Original Signed by John A. Grobe
:
:
,                                                          John A. Grobe, Acting Director
John A. Grobe, Acting Director
                                                            Division of Reactor Safety
,
:     Docket No. 50 346
Division of Reactor Safety
{     Enclosures:             1. Inspection Report 50 346/97308(OL)
:
l                               2. Simulator Fidelity Report
Docket No. 50 346
                                3. Written Examination & Answer Key (SRO)
{
l     cc w/encls 1 & 2:               J. P. Stetz, Senior Vice President Nuclear
Enclosures:
j                                       J. H. Lash, Plant Manager
1. Inspection Report 50 346/97308(OL)
l
2. Simulator Fidelity Report
3. Written Examination & Answer Key (SRO)
l
cc w/encls 1 & 2:
J. P. Stetz, Senior Vice President Nuclear
j
J. H. Lash, Plant Manager
J. L. Freels, Manager, Regulatory Affairs
;
;
                                        J. L. Freels, Manager, Regulatory Affairs
j
j                                      State Liaison Officer, State of Ohio
State Liaison Officer, State of Ohio
                                        Robert E. Owen, Ohio Department of Health
Robert E. Owen, Ohio Department of Health
                                        C. A. Glazer, State of Ohio
C. A. Glazer, State of Ohio
Public Utilities Commission
'
'
                                          Public Utilities Commission
j
j      cc w/encls 1,2 & 3:                       R. A. Simpkins, Plant Training Manager
cc w/encls 1,2 & 3:
i     Qinidbution:
R. A. Simpkins, Plant Training Manager
      Docket File w/encle 1 & 2                         Rlli PRR w/encls 1 & 2
i
i
Qinidbution:
      PUBLIC IE 42 w/encls 1 & 2d                       Rill Enf. Coordinator w/encls 1 & 2
Docket File w/encle 1 & 2
      SRI, Davis Besse w/encls 1 & 2                     TSS w/encls 1 & 2
Rlli PRR w/encls 1 & 2
i
i
      OC/LFDCB w/encls 1 & 2                             LPM, NRR w/encls 1 & 2
PUBLIC IE 42 w/encls 1 & 2d
      DRP w/encls 1 & 2                                 A. B. Beach, Alli w/encls 1 & 2
Rill Enf. Coordinator w/encls 1 & 2
4      DRS w/encls 1 & 2                                 J. L. Caldwell, Rlli w/encls 1 & 2
SRI, Davis Besse w/encls 1 & 2
TSS w/encls 1 & 2
i
OC/LFDCB w/encls 1 & 2
LPM, NRR w/encls 1 & 2
DRP w/encls 1 & 2
A. B. Beach, Alli w/encls 1 & 2
DRS w/encls 1 & 2
J. L. Caldwell, Rlli w/encls 1 & 2
4
CAA1 w/encls 1 & 2
DOCDESK w/encls 1 & 2
4
4
      CAA1 w/encls 1 & 2                                DOCDESK w/encls 1 & 2
1
1
l
l
      DOCUMENT NAME: G:DRS\DAV97308.0L
DOCUMENT NAME: G:DRS\\DAV97308.0L
      To reconve a copy of thle document, indicate in the box *C" = Copy w/o attach / encl 'E" = Copy w/attacWenct             *N" = No copy
To reconve a copy of thle document, indicate in the box *C" = Copy w/o attach / encl
        OFFICE               Rlli             A/   Rlli           l#       Rlli         (7 _                   Rlli j t_%                   l
'E" = Copy w/attacWenct
        NAME~               DMcNeil:jpM8%           MLeach gra"             GWrightcIQ/                           JGMIE d
*N" = No copy
        DATE                 09/ J /97
OFFICE
                                              '
Rlli
                                                      09 W/97                 09//5/97                             09/ y fl97
A/
                                                      OFFICIAL RECOR D COPY
Rlli
                                                                                                        - - - - .--         - . - . . - . . . - . . _ . -
l#
Rlli
(7 _
Rlli j t_%
l
NAME~
DMcNeil:jpM8%
MLeach gra"
GWrightcIQ/
JGMIE d
DATE
09/ J /97
09 W/97
09//5/97
09/ y fl97
'
OFFICIAL RECOR D COPY
- - - - .--
- . - . . - . . . - . .
. -
}}
}}

Latest revision as of 00:13, 6 December 2024

Forwards Exam Rept 50-346/97-308OL Administered on 970707-10 to Three License Applicants.Simulator Fidelity Rept & Written Exam & Answer Key Also Encl
ML20211C543
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/19/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20211C515 List:
References
50-346-97-308OL, NUDOCS 9709260237
Download: ML20211C543 (2)


See also: IR 05000346/1997308

Text

I

'

a

t

September 19, 1997

Mr. John K. Wood

Vice President Nuclear

Davls Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

Oak Harbor, OH 43449

SUBJECT:

OPERATOR LICENSING EXAMINATION REPORT 50 346/97308(OL)

Dear Mr. Wood:

On July 10,1997, the NRC completed initial operator licensing examinations at your Davis

Besse Nuclear Power Station (DBNPS). The license applicants' performance evaluations

were finalized on July 28,1997. The enclosed report presents the results of the

examination, in addition to an exit meeting held at DBNPS on July 10,1997, a re exit

was conducted by telephone on August 18,1997.

Operating and written examinations were administered to three license applicants. All

license applicants passed all sections of their respective examinations and were issued

Senior Reactor Operator licenses to operate your DBNPS.

The license applicants were all previously licensed Reactor Operators at the DBNPS. They

performed wellin all areas of the examination with only minor individual weaknesses.

When compared with previous examinations, significant improvement was noted in

applicant execution of administrative Job Performance Measures.

This examination was your first opportunity to prepare an operator license examination

under the NRC's initiallicense examination pilot process. The pilot process allowed your

training personnel to prepare and administer the written examination and prepare the

operating examination. NRC examiners administered the operating examination. The

Davis Besse training department is to be commended for the examination produced for this

initiallicense examination. The examination submitted to Region lll was acceptable for use

after minor changes. The examination was technically correct and examined at the proper

complexity and depth for a Senior Reactor Operator license applicant. Although the

submitted examination was commendable, instructor attention to detail during facility

validation of the administrative job performance measures portion of the examination was

weak.

Operator performance for two operating crews was observed in the control room by the

examiners. During each observed period operators were found to be professionalin

executing their control room responsibilities,

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosures to this letter will be placed in the NRC Public Document Room.

i\\

9709260237 970923

PDR

ADOCK 0500

6

gg

j

.

.

- _ - - - ._.

-

--

-

~-.- - ~_.-- - - - -

. - _-

4

J. K. Wood

2

September 19, 1997

We will gladly discuss any questions you have concerning this examination.

Sincerely

Original Signed by John A. Grobe

John A. Grobe, Acting Director

,

Division of Reactor Safety

Docket No. 50 346

{

Enclosures:

1. Inspection Report 50 346/97308(OL)

l

2. Simulator Fidelity Report

3. Written Examination & Answer Key (SRO)

l

cc w/encls 1 & 2:

J. P. Stetz, Senior Vice President Nuclear

j

J. H. Lash, Plant Manager

J. L. Freels, Manager, Regulatory Affairs

j

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

'

j

cc w/encls 1,2 & 3:

R. A. Simpkins, Plant Training Manager

i

Qinidbution:

Docket File w/encle 1 & 2

Rlli PRR w/encls 1 & 2

i

PUBLIC IE 42 w/encls 1 & 2d

Rill Enf. Coordinator w/encls 1 & 2

SRI, Davis Besse w/encls 1 & 2

TSS w/encls 1 & 2

i

OC/LFDCB w/encls 1 & 2

LPM, NRR w/encls 1 & 2

DRP w/encls 1 & 2

A. B. Beach, Alli w/encls 1 & 2

DRS w/encls 1 & 2

J. L. Caldwell, Rlli w/encls 1 & 2

4

CAA1 w/encls 1 & 2

DOCDESK w/encls 1 & 2

4

1

l

DOCUMENT NAME: G:DRS\\DAV97308.0L

To reconve a copy of thle document, indicate in the box *C" = Copy w/o attach / encl

'E" = Copy w/attacWenct

  • N" = No copy

OFFICE

Rlli

A/

Rlli

l#

Rlli

(7 _

Rlli j t_%

l

NAME~

DMcNeil:jpM8%

MLeach gra"

GWrightcIQ/

JGMIE d

DATE

09/ J /97

09 W/97

09//5/97

09/ y fl97

'

OFFICIAL RECOR D COPY

- - - - .--

- . - . . - . . . - . .

. -