ML20212C130: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:[~~                                                                               pw o
{{#Wiki_filter:[~~
*   .
o
pw
*
.
.
                                            DEC 2 21986
.
      Docket No. 50-409
DEC 2 21986
      Dairyland Power Cooperative
Docket No. 50-409
      ATTN: Mr. J. W. Taylor
Dairyland Power Cooperative
              General Manager
ATTN: Mr. J. W. Taylor
      2615 East Avenue - South
General Manager
      La Crosse, WI 54601
2615 East Avenue - South
      Gentlemen:
La Crosse, WI 54601
      This refers to the routine safety inspections conducted by I. Villalva and
Gentlemen:
      J. Wiebe and of this office from September 27 through December 5,1986, of
This refers to the routine safety inspections conducted by I. Villalva and
      activities at the La Crosse Boiling Water Reactor authorized by NRC Operating
J. Wiebe and of this office from September 27 through December 5,1986, of
      License No. DPR-45 and to the discussion of our findings with J. Parkyn and
activities at the La Crosse Boiling Water Reactor authorized by NRC Operating
      G. Boyd and other members of your staff during the course of the inspections.
License No. DPR-45 and to the discussion of our findings with J. Parkyn and
      The enclosed copy of our inspection report identifies areas examined during
G. Boyd and other members of your staff during the course of the inspections.
      the inspections. Within these areas, the inspections consisted of a selective
The enclosed copy of our inspection report identifies areas examined during
      examination of procedures and representative records, observations, and
the inspections. Within these areas, the inspections consisted of a selective
      interviews with personnel.
examination of procedures and representative records, observations, and
      No violations of NRC requirerrents were identified during the course of this
interviews with personnel.
      inspection.
No violations of NRC requirerrents were identified during the course of this
      In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
inspection.
      this letter and the enclosed inspection report will be placed in the NRC
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
      Public Document Room.
this letter and the enclosed inspection report will be placed in the NRC
      We will gladly discuss any question you have concerning this inspection.
Public Document Room.
                                              Sincerely,
We will gladly discuss any question you have concerning this inspection.
                                              W. G. Guldemond, Chief
Sincerely,
                                              Reactor Projects Branch 2
W. G. Guldemond, Chief
      Enclosure:   Inspection Report
Reactor Projects Branch 2
        No. 50-409/86013(DRP)
Enclosure:
      See Attached Distribution
Inspection Report
      8612290397 861222 9
No. 50-409/86013(DRP)
        DR ADOCK 0500
See Attached Distribution
8612290397 861222
DR
ADOCK 0500
9


      .k
.k
    .
.
. - -   .
. - -
    '
.
          Dairyland Power Cooperative      2 DEC 2"I'9Ob
'
                                                    4
DEC 2"I'9Ob
          Distribution-
Dairyland Power Cooperative
          cc w/ enclosure:
2
          J. Parkyn, Plant Superintendent
4
          DCS/RSB (RIDS)
Distribution-
          Licensing Fee Management Branch
cc w/ enclosure:
          Resident Inspector, RIII
J. Parkyn, Plant Superintendent
          John Stang, NRR
DCS/RSB (RIDS)
          John J. Duffy, Chief
Licensing Fee Management Branch
            Boiler Section
Resident Inspector, RIII
          Mary Lou Munts, Chairperson
John Stang, NRR
            Wisconsin Public Service
John J. Duffy, Chief
            Commission
Boiler Section
          Spark Burmaster, Coulee
Mary Lou Munts, Chairperson
            Region Energy Coalition
Wisconsin Public Service
          Collette Blum-Meister (SLO),
Commission
            WI Div. of Emergency Government
Spark Burmaster, Coulee
Region Energy Coalition
Collette Blum-Meister (SLO),
WI Div. of Emergency Government
}}
}}

Latest revision as of 06:48, 4 December 2024

Forwards Safety Insp Rept 50-409/86-13 on 860927-1205.No Violations Noted
ML20212C130
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/22/1986
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20212C134 List:
References
REF-GTECI-B-19, REF-GTECI-TH, RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8612290397
Download: ML20212C130 (2)


See also: IR 05000409/1986013

Text

[~~

o

pw

.

.

DEC 2 21986

Docket No. 50-409

Dairyland Power Cooperative

ATTN: Mr. J. W. Taylor

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspections conducted by I. Villalva and

J. Wiebe and of this office from September 27 through December 5,1986, of

activities at the La Crosse Boiling Water Reactor authorized by NRC Operating

License No. DPR-45 and to the discussion of our findings with J. Parkyn and

G. Boyd and other members of your staff during the course of the inspections.

The enclosed copy of our inspection report identifies areas examined during

the inspections. Within these areas, the inspections consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirerrents were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any question you have concerning this inspection.

Sincerely,

W. G. Guldemond, Chief

Reactor Projects Branch 2

Enclosure:

Inspection Report

No. 50-409/86013(DRP)

See Attached Distribution

8612290397 861222

DR

ADOCK 0500

9

.k

.

. - -

.

'

DEC 2"I'9Ob

Dairyland Power Cooperative

2

4

Distribution-

cc w/ enclosure:

J. Parkyn, Plant Superintendent

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

John Stang, NRR

John J. Duffy, Chief

Boiler Section

Mary Lou Munts, Chairperson

Wisconsin Public Service

Commission

Spark Burmaster, Coulee

Region Energy Coalition

Collette Blum-Meister (SLO),

WI Div. of Emergency Government