ML20212H569: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:bmA NRC-86-104 WPSC (414] 433-1234 | {{#Wiki_filter:bmA NRC-86-104 WPSC (414] 433-1234 TELEX 5101012698 WPSC GRB TELECOPIER [414]433-1297 EASYUNK 62891993 WBCONWN PUBUC SEmACE CORPORADON 600 North Adams | ||
* P.O. Box 19002 | * P.O. Box 19002 | ||
* Green Bay, WI 54307-9002 July 28, 1986 Mr. J. G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 | * Green Bay, WI 54307-9002 July 28, 1986 Mr. J. G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 | ||
==Dear Mr. Keppler:== | ==Dear Mr. Keppler:== | ||
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant I.E. Bulletin 86 Static "0" Ring Differential Pressure Switches The subject bulletin requested that we determine whether series 102 or 103 differential pressure switches supplied by SOR Incorporated, are installed as electrical equipment important to safety at the Kewaunee Nuclear Power Plant. | |||
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant I.E. Bulletin 86 Static | |||
Following a review of our environmentally qualified electrical equipment impor-tant to safety (10 CFR 50.49(b)), we have concluded that S0R series 102 or 103 differential pressure switches have not been installed in EQ applications. | Following a review of our environmentally qualified electrical equipment impor-tant to safety (10 CFR 50.49(b)), we have concluded that S0R series 102 or 103 differential pressure switches have not been installed in EQ applications. | ||
Furthermore, we do not plan to install these switches in future applications. | Furthermore, we do not plan to install these switches in future applications. | ||
Very truly yours, | Very truly yours, | ||
/ | |||
Director, Office of I&E, US NRC | Subscribed and Swor to D. C. Hintz BeforeMeJhis. | ||
Day Manager - Nuclear Power of G eefy 1986 KMS/jms Af-u 6M b | |||
cc - Mr. G. E. Lear, US NRC Mr. Robert Nelson, US NRC My Commission Expires: | |||
Director, Office of I&E, US NRC June 28, 1987 8608140106 860728 PDR ADOCK 0500 5 | |||
g 3 Q gj | |||
[ | |||
Nk}} | Nk}} | ||
Latest revision as of 06:00, 4 December 2024
| ML20212H569 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 07/28/1986 |
| From: | Hintz D WISCONSIN PUBLIC SERVICE CORP. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| CON-NRC-86-104 IEB-86-002, IEB-86-2, NUDOCS 8608140106 | |
| Download: ML20212H569 (1) | |
Text
bmA NRC-86-104 WPSC (414] 433-1234 TELEX 5101012698 WPSC GRB TELECOPIER [414]433-1297 EASYUNK 62891993 WBCONWN PUBUC SEmACE CORPORADON 600 North Adams
- P.O. Box 19002
- Green Bay, WI 54307-9002 July 28, 1986 Mr. J. G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant I.E. Bulletin 86 Static "0" Ring Differential Pressure Switches The subject bulletin requested that we determine whether series 102 or 103 differential pressure switches supplied by SOR Incorporated, are installed as electrical equipment important to safety at the Kewaunee Nuclear Power Plant.
Following a review of our environmentally qualified electrical equipment impor-tant to safety (10 CFR 50.49(b)), we have concluded that S0R series 102 or 103 differential pressure switches have not been installed in EQ applications.
Furthermore, we do not plan to install these switches in future applications.
Very truly yours,
/
Subscribed and Swor to D. C. Hintz BeforeMeJhis.
Day Manager - Nuclear Power of G eefy 1986 KMS/jms Af-u 6M b
cc - Mr. G. E. Lear, US NRC Mr. Robert Nelson, US NRC My Commission Expires:
Director, Office of I&E, US NRC June 28, 1987 8608140106 860728 PDR ADOCK 0500 5