ML20214E299: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:. -
{{#Wiki_filter:Ybh
                                                                            Ybh
.
                                        March 4, 1986
-
                                                              .
March 4, 1986
                                                                3
.
    Docket No. 50-461
3
                                                                          .
Docket No. 50-461
                                                                                ,\
,\\
    Illinois Power Company
.
    ATTN: Mr. W. C. Gerstner                             i
Illinois Power Company
            Executive Vice President
ATTN: Mr. W. C. Gerstner
    500 South 27th Street
i
    Decatur, IL 62525
Executive Vice President
    Gentlemen:                                                     ,
500 South 27th Street
                                                                      s
Decatur, IL 62525
    This refers to the routine safety inspection conducted by Mr: _ C. H. Scheibelhut
Gentlemen:
    of this office on January 27-31 and February 3-7, 1986, of activities at Clinton
,
    Power Station authorized by NRC Construction Permit No. CPPR-137, and to the
s
    discussion of our findings with Mr. D. P. Hall and others of your staff at the
This refers to the routine safety inspection conducted by Mr: _ C. H. Scheibelhut
    conclusion of the inspection.                                       '
of this office on January 27-31 and February 3-7, 1986, of activities at Clinton
    The enclosed copy of our inspection report identifies areas examined during
Power Station authorized by NRC Construction Permit No. CPPR-137, and to the
    the inspection. Within these areas, the inspection consisted of a selective
discussion of our findings with Mr. D. P. Hall and others of your staff at the
    examination of procedures and representative records, observations, and
conclusion of the inspection.
    interviews with personnel.
'
    No violations of NRC requirements were identified during the course of this
The enclosed copy of our inspection report identifies areas examined during
    inspection.
the inspection. Within these areas, the inspection consisted of a selective
    In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
examination of procedures and representative records, observations, and
    this letter and the enclosures will be placed in the NRC Public Document Room.
interviews with personnel.
    We will gladly discuss any questions you have concerning this inspection.
No violations of NRC requirements were identified during the course of this
                                              Sincerely,
inspection.
                                              R. F. Warnick, Chief
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
                                              Projects Branch 1
this letter and the enclosures will be placed in the NRC Public Document Room.
    Enclosure: Inspection Report
We will gladly discuss any questions you have concerning this inspection.
        No. 50-461/86010(DRP)
Sincerely,
    See Attached Distribution
R. F. Warnick, Chief
    RIII                     B603070248 B60304
Projects Branch 1
      RFd                    PDR
Enclosure:
                              G
Inspection Report
                                    ADOCK 050 g 1
No. 50-461/86010(DRP)
    Warnick/mj
See Attached Distribution
                                                                                      ;
RIII
                                                                                  Lea /
B603070248 B60304
ADOCK 050 g 1
RFd
PDR
Warnick/mj
G
;
Lea /


  . .
.
!     Illinois Power Company             2 March 4, 1986
.
      Distribution
!
      cc w/ enclosure:
Illinois Power Company
      DCS/RSB (RIDS)
2
      Licensing Fee Management Branch
March 4, 1986
      Resident Inspector, RIII
Distribution
      Richard Hubbard
cc w/ enclosure:
      Gary N. Wright, Manager
DCS/RSB (RIDS)
          Nuclear Facility Safety
Licensing Fee Management Branch
      Jean Foy, Prairie Alliance
Resident Inspector, RIII
      Mark Jason, Assistant
Richard Hubbard
          Attorney General,
Gary N. Wright, Manager
l         Environmental Control Division
Nuclear Facility Safety
[     H. S. Taylor, Quality Assurance
Jean Foy, Prairie Alliance
          Division
Mark Jason, Assistant
Attorney General,
l
Environmental Control Division
[
H. S. Taylor, Quality Assurance
Division
.
.
,
,
t
t
\
\\
l
l
l
l
Line 87: Line 100:
1
1
'
'
                                                        i
i
l
l
.
-
-
- -
}}
}}

Latest revision as of 02:21, 4 December 2024

Forwards Safety Insp Rept 50-461/86-10 on 860127-31 & 0203-07.No Violation Noted
ML20214E299
Person / Time
Site: Clinton 
Issue date: 03/04/1986
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20214E301 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8603070248
Download: ML20214E299 (2)


See also: IR 05000461/1986010

Text

Ybh

.

-

March 4, 1986

.

3

Docket No. 50-461

,\\

.

Illinois Power Company

ATTN: Mr. W. C. Gerstner

i

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

,

s

This refers to the routine safety inspection conducted by Mr: _ C. H. Scheibelhut

of this office on January 27-31 and February 3-7, 1986, of activities at Clinton

Power Station authorized by NRC Construction Permit No. CPPR-137, and to the

discussion of our findings with Mr. D. P. Hall and others of your staff at the

conclusion of the inspection.

'

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. F. Warnick, Chief

Projects Branch 1

Enclosure:

Inspection Report

No. 50-461/86010(DRP)

See Attached Distribution

RIII

B603070248 B60304

ADOCK 050 g 1

RFd

PDR

Warnick/mj

G

Lea /

.

.

!

Illinois Power Company

2

March 4, 1986

Distribution

cc w/ enclosure:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

Gary N. Wright, Manager

Nuclear Facility Safety

Jean Foy, Prairie Alliance

Mark Jason, Assistant

Attorney General,

l

Environmental Control Division

[

H. S. Taylor, Quality Assurance

Division

.

,

t

\\

l

l

i

1

'

i

l

.

-

-

- -