ML20217D014: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 21: Line 21:
;4
;4
p
p
                      ,
,
                                                                March 20,1998
March 20,1998
L
L
                          Mr. Walter G. MacFarland IV .
Mr. Walter G. MacFarland IV .
                          Chief Nuclear Officer -
Chief Nuclear Officer -
L                 -
L
                          Clinton Power Station-
-
                          lilinois Power Company - '
Clinton Power Station-
l                         Mail Code V-275
lilinois Power Company -
P                         P. O.LBox 678'
l
                          Clinton,IL 61727..
Mail Code V-275
    '
'
                        , SUBJECT:         ' OPERATOR LICENSING EXAMINATION REPORT 5                   /97313(OL)
P
                        : Dear Mr. MacFarland:
P. O.LBox 678'
                          On February 5,1998, the NRC completed initial operator licensing examinations at your Clinton
Clinton,IL 61727..
                          Power Station (CPS). The license applicants' performance evaluations were finalized on
'
                        . March 4,1998.' The enclosed report presents the results of the examination.
, SUBJECT:
                          Operating and written examinations were administered to nine license applicants. Two
' OPERATOR LICENSING EXAMINATION REPORT 5
                          applicants were administered Reactor Operator (RO) examinations and seven applicants were
/97313(OL)
                          administered Senior Reactor Operator (SRO) examinations. Two SRO applicants failed
: Dear Mr. MacFarland:
                        iportions of their examination and were denied operator licenses. .Two SRO applicants passed
On February 5,1998, the NRC completed initial operator licensing examinations at your Clinton
                          all sections of their examinations and were issued Senior Reactor Operator licenses to operate
Power Station (CPS). The license applicants' performance evaluations were finalized on
                          your. CPS.' Five applicants passed all sections of their RO or SRO examinations but were not '
. March 4,1998.' The enclosed report presents the results of the examination.
                        . Issued operator licenses as they have not completed all requirements necessary to be issued a
Operating and written examinations were administered to nine license applicants. Two
                        ? license.' These applicants will be issued licenses when you certify, in writing, to the Nuclear           .,
applicants were administered Reactor Operator (RO) examinations and seven applicants were
                          Regulatory Commission that all CPS training program requirements and 10.CFR 55 required                     i
administered Senior Reactor Operator (SRO) examinations. Two SRO applicants failed
                        / reactivity manipulations'are completed.1 Your certification should also state that the applicants'         !
iportions of their examination and were denied operator licenses. .Two SRO applicants passed
                        -= were enrolled. in the continuing operator training program and their performance in that program           )
all sections of their examinations and were issued Senior Reactor Operator licenses to operate
  .
your. CPS.' Five applicants passed all sections of their RO or SRO examinations but were not '
                        ' is satisfactory..
. Issued operator licenses as they have not completed all requirements necessary to be issued a
L         ,            g This examination was your first opportunity to prepare an operator license examination under
? license.' These applicants will be issued licenses when you certify, in writing, to the Nuclear
                          the NRC's initial license examination process. This process allowed your training department               I
.,
                          personnel to prepare and administer the written examination and prepare the operating
Regulatory Commission that all CPS training program requirements and 10.CFR 55 required
                        i examination. NRC examiners administered the operating examination. Four occurrences of
i
      ,
/ reactivity manipulations'are completed.1 Your certification should also state that the applicants'
                        ; poor examination material control (examination security) were identified during the examination
!
                          preparation and administrationJ One occurrence resulted .in a non-cited violation for failure to -
-= were enrolled. in the continuing operator training program and their performance in that program
                          ensure adequate examination security. The remaining three examples did not represent a -
)
                          potential to compromise the examination and therefore are not considered violations. ' The
.
                        . examination was technically correct and examined at the proper complexity and depth for the
' is satisfactory..
                        ' license applicants. On-site NRC validation of the examination indicated a weakness in
L
                          examination validation in the area of Job Performance Measures.-                                   1
g This examination was your first opportunity to prepare an operator license examination under
                                                                                                                                I
,
!:                                                                                                                           l
the NRC's initial license examination process. This process allowed your training department
                                                                                                                                  l
I
            +f l                                                                                                               1
personnel to prepare and administer the written examination and prepare the operating
i examination. NRC examiners administered the operating examination. Four occurrences of
; poor examination material control (examination security) were identified during the examination
,
preparation and administrationJ One occurrence resulted .in a non-cited violation for failure to -
ensure adequate examination security. The remaining three examples did not represent a -
potential to compromise the examination and therefore are not considered violations. ' The
. examination was technically correct and examined at the proper complexity and depth for the
' license applicants. On-site NRC validation of the examination indicated a weakness in
I
examination validation in the area of Job Performance Measures.-
1
!:
l
+f l
l
1
i
i
I                 '9803270274 980324
I
l'-             !PDR         ADOCK 05000346
'9803270274 980324
\'                 V                         PDR
l'-
                                                                        d
!PDR
                                                                                                                        "
ADOCK 05000346
                                                                                                                          fSQ
fSQ
\\'
V
PDR
"
d


  *
*
a
a
    .
.
*                                                                                                              March 20, 1998
W. MacFarand IV
        W. MacFarand IV                                              2
2
      ' Administration of the examination revealed two operator performance issues needing additional
March 20, 1998
        attention by the CPS Training Department. License applicants failed to correctly use the motor
*
                                                                  .
' Administration of the examination revealed two operator performance issues needing additional
        operated valve test preparation switches provided for Emergency Core Cooling System                                       !
attention by the CPS Training Department. License applicants failed to correctly use the motor
        containment isolation valves. Of greater significance, some applicants failed to correctly
.
      - execute steps of the Clinton Power Station Emergency Operating Procedures, such as initiating
operated valve test preparation switches provided for Emergency Core Cooling System
        Suppression Pool Cooling when required and using alternate injection sources to maintain
containment isolation valves. Of greater significance, some applicants failed to correctly
                                                                                                                                  !
- execute steps of the Clinton Power Station Emergency Operating Procedures, such as initiating
        reactor pressure vessel water level when preferred injection sources were available.
Suppression Pool Cooling when required and using alternate injection sources to maintain
        Compliance with these procedures is necessary to ensure the health and safety of the general
reactor pressure vessel water level when preferred injection sources were available.
        public. Your actions to ensure correct EOP implementation will be monitored as part of our MC                             ;
Compliance with these procedures is necessary to ensure the health and safety of the general
      . 0350 oversight panel activities.                                                                                         ;
public. Your actions to ensure correct EOP implementation will be monitored as part of our MC
        Operator performance for one operating crew was observed in the control room by the                                       j
;
        examiners. During the observed period operators were found to be monitoring their control
. 0350 oversight panel activities.
        panels on a regular basis and executing their responsibilities in a business like manner.
;
                                                                                                                                  !
Operator performance for one operating crew was observed in the control room by the
        In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the
j
        enclosures to this letter will be placed in the NRC Public Document Room.                                                 l
examiners. During the observed period operators were found to be monitoring their control
                                                                                                                                  1
panels on a regular basis and executing their responsibilities in a business like manner.
        We will gladly discuss any questions you have concerning this examination.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the
                                                            Sincerely
enclosures to this letter will be placed in the NRC Public Document Room.
                                                                                                                                  4
1
                                                Original Signed by John A. Grobe                                                 ;
We will gladly discuss any questions you have concerning this examination.
                                                            John A. Grobe, Director
Sincerely
                                                            Division of Reactor Safety .
4
                                                                                                                                  !
Original Signed by John A. Grobe
        Docket No. 50-461
John A. Grobe, Director
        Enclosures:       1. Inspection Report 50-461/97313(OL)
Division of Reactor Safety .
                          2. Simulator Fidelity Report
Docket No. 50-461
                          3. Written Examination & Answer Key (SRO)
Enclosures:
        See Attached Distribution:
1. Inspection Report 50-461/97313(OL)
;       DOCUMENT NAME: G:DRS\CLl97313.0L (SEE PREVIOUS CONCURRENCE)
2. Simulator Fidelity Report
l       To receive a copy of this document. Indicate in the box *C's Copy w/o attach /end 'E" a Co)y w/ attach /end "N" = No copy
3. Written Examination & Answer Key (SRO)
          OFFICE         Rlll:DRS                   Rlli:DRS                   Rill:DRP                     Rill:DRS , O
See Attached Distribution:
          NAME           DMcNeil: llc /jp/sd * MLeach                     *   TKozak                   *   JGrobCW
;
          DATE-         3/ /98                     3/ /98                     3/ /98                       3/k/98 i
DOCUMENT NAME: G:DRS\\CLl97313.0L (SEE PREVIOUS CONCURRENCE)
                                                      OFFICIAL RECORD COPY
l
To receive a copy of this document. Indicate in the box *C's Copy w/o attach /end 'E" a Co)y w/ attach /end "N" = No copy
OFFICE
Rlll:DRS
Rlli:DRS
Rill:DRP
Rill:DRS , O
NAME
DMcNeil: llc /jp/sd *
MLeach
*
TKozak
* JGrobCW
DATE-
3/ /98
3/ /98
3/ /98
3/k/98 i
OFFICIAL RECORD COPY
l
l
[,
[,


          y
y
                                                                                                                                            l
.
            .
,
      ,
!
..W. MacFarand IV
-2
Administration of the examination revealed two operator performance issues needing additional
attention by the CPS Training Department.~ License applicants failed to correctly use the motor
. operated valve test preparation switches provided for Emergency Core Cooling System
containment isolation valves. Of greater significance, some applicants failed to correctly ~
execute steps of the Clinton Power Station Emergency Operating Procedures, such as initiating
'
Suppression Pool Cooling when required and using altamate injection sources to maintain
reactor pressure vessel water level when preferred injection sources were available.
.F
, Compliance with these procedures is necessary to ensure the health and safety of the general
j
'public. Your actions to ensure correct EOP implementation will be monitored as~ part of our MC
'
0350 oversight panel activities.
Operator performance for one operating crew was observed in the control room by the
g
examiners. During the observed period operators were found to be monitoring their control'
panels on a regular basis and executing their responsibilities in a business like manner,
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the
enclosures to this letter will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have conceming this examination.
Sincerely
l
l.
' John A. Grobe, Director
i
Division of Reactor Safety
!
!
              ..W. MacFarand IV                                            -2
. Docket No. 50-461
                Administration of the examination revealed two operator performance issues needing additional
5nclosures:
                attention by the CPS Training Department.~ License applicants failed to correctly use the motor
1. Inspection Report 50-461/97313(OL)
              . operated valve test preparation switches provided for Emergency Core Cooling System
,
                containment isolation valves. Of greater significance, some applicants failed to correctly ~
2. Simulator Fidelity Report
    '
3. Written Examination & Answer Key (SRO)
                execute steps of the Clinton Power Station Emergency Operating Procedures, such as initiating
i
                Suppression Pool Cooling when required and using altamate injection sources to maintain
                reactor pressure vessel water level when preferred injection sources were available.
      .F
              , Compliance with these procedures is necessary to ensure the health and safety of the general                              j
              'public. Your actions to ensure correct EOP implementation will be monitored as~ part of our MC                              '
                0350 oversight panel activities.
        g      Operator performance for one operating crew was observed in the control room by the
                examiners. During the observed period operators were found to be monitoring their control'
                panels on a regular basis and executing their responsibilities in a business like manner,
                in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the
                enclosures to this letter will be placed in the NRC Public Document Room.
                We will gladly discuss any questions you have conceming this examination.
                                                                      Sincerely                                                            !
                                                                                                                                            l
                                                                                                                                            !
                                                                                                                                          l.
                                                                    ' John A. Grobe, Director                                              i
                                                                      Division of Reactor Safety                                            !
                                                                                                                                            !
              . Docket No. 50-461
                5nclosures:       1. Inspection Report 50-461/97313(OL)                                                                   ,
                                    2. Simulator Fidelity Report                                                                           ;
                                    3. Written Examination & Answer Key (SRO)                                                               i
I
I
See Attached Distribution:
'
'
                See Attached Distribution:
i
i
                DOCUMENT NAME: G:DRS\CLl97308.OL -
DOCUMENT NAME: G:DRS\\CLl97308.OL -
              ' To receive a co py of thee document, Indicate in the box *C" = Copy w/o attach /end T = Ccpy w/ attach /end "N" = No copy
' To receive a co py of thee document, Indicate in the box *C" = Copy w/o attach /end T = Ccpy w/ attach /end "N" = No copy
                  OFFICE         Rill:DRS             v     Rill:DRS           v     Rill:DRP             E.,   Rill:DRS
OFFICE
                  NAME-         DMcNeil:llefjpff MLeach #w4                           TKozak C                     JGrobe               ,
Rill:DRS
                  DATE:         3//798                     3//7/98                   3/l?98                       3! /98
v
  ,
Rill:DRS
                                                              OFFICIAL RECORD COPY
v
p                                                                                                                                           ;
Rill:DRP
E.,
Rill:DRS
NAME-
DMcNeil:llefjpff MLeach #w4
TKozak C
JGrobe
,
DATE:
3//798
3//7/98
3/l?98
3! /98
OFFICIAL RECORD COPY
,
p
;


p
p
    '
'
      . ,
. ,
p.
p.
t
t
L             - W. MacFarland IV                               3-                 March 20,1998
L
                cc w/encis 1 & 2:     G. Hunger, Station Manager
- W. MacFarland IV
                                      R. Phares, Manager, Nuclear Safety
3-
March 20,1998
cc w/encis 1 & 2:
G. Hunger, Station Manager
R. Phares, Manager, Nuclear Safety
and Performance improvement
,
,
'
'
                                        and Performance improvement
J. Sipek,' Director- Licensing
                                      J. Sipek,' Director- Licensing
- Nathan Schloss, Economist
            ,                        - Nathan Schloss, Economist
,
                                        Office of the Attomey General
Office of the Attomey General
                                      G. Stramback, Regulatory Licensing
G. Stramback, Regulatory Licensing
                                        Services Project Manager
Services Project Manager
                                        General Electric Company
General Electric Company
          '
'
                                      Chairman, DeWitt County Board
Chairman, DeWitt County Board
                                      State Liaison Officer-
State Liaison Officer-
                                      Chairman, Illinois Commerce Commission
Chairman, Illinois Commerce Commission
              - cc w/encls 1,2 & 3:   J. F. Paichak, Plant Training Manager
- cc w/encls 1,2 & 3:
J. F. Paichak, Plant Training Manager
,4
,4
                Distnbution-
Distnbution-
                Docket File w/encis                           DRP w/encls
Docket File w/encis
                SRI Clinton w/encls                           PUBLIC IE-42 w/encis
DRP w/encls
                                                                            .
SRI Clinton w/encls
              . Project Manager, NRR w/encls                   Rill PRR w/encls
PUBLIC IE-42 w/encis
                Rlli Enf. Coordinator w/encls                 IEO w/encls (E-mail)
.
              TSS w/encls                                     A. B. Beach w/encls
. Project Manager, NRR w/encls
              - DOCDESK (E-mail)                               Deputy RA w/encls                   1
Rill PRR w/encls
              : DRS (2)w/encls '                               GREENS
Rlli Enf. Coordinator w/encls
IEO w/encls (E-mail)
TSS w/encls
A. B. Beach w/encls
- DOCDESK (E-mail)
Deputy RA w/encls
1
: DRS (2)w/encls '
GREENS
.- .
.- .
                                                                                                  .)
.)
                                                                                                    i
i
  ,
,
                                                                                                    !
l
                                                                                                    l
,
                                                                                                    l
I
                                                    ,
                                                                                                    I
}}
}}

Latest revision as of 09:15, 3 December 2024

Forwards Operator Licensing Exam Rept 50-461/97-313OL Conducted on 980126-0205
ML20217D014
Person / Time
Site: Clinton 
Issue date: 03/20/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Walter MacFarland
ILLINOIS POWER CO.
Shared Package
ML20217C980 List:
References
50-461-97-313OL, NUDOCS 9803270274
Download: ML20217D014 (4)


See also: IR 05000461/1997313

Text

-

4

p

,

March 20,1998

L

Mr. Walter G. MacFarland IV .

Chief Nuclear Officer -

L

-

Clinton Power Station-

lilinois Power Company -

l

Mail Code V-275

'

P

P. O.LBox 678'

Clinton,IL 61727..

'

, SUBJECT:

' OPERATOR LICENSING EXAMINATION REPORT 5

/97313(OL)

Dear Mr. MacFarland:

On February 5,1998, the NRC completed initial operator licensing examinations at your Clinton

Power Station (CPS). The license applicants' performance evaluations were finalized on

. March 4,1998.' The enclosed report presents the results of the examination.

Operating and written examinations were administered to nine license applicants. Two

applicants were administered Reactor Operator (RO) examinations and seven applicants were

administered Senior Reactor Operator (SRO) examinations. Two SRO applicants failed

iportions of their examination and were denied operator licenses. .Two SRO applicants passed

all sections of their examinations and were issued Senior Reactor Operator licenses to operate

your. CPS.' Five applicants passed all sections of their RO or SRO examinations but were not '

. Issued operator licenses as they have not completed all requirements necessary to be issued a

? license.' These applicants will be issued licenses when you certify, in writing, to the Nuclear

.,

Regulatory Commission that all CPS training program requirements and 10.CFR 55 required

i

/ reactivity manipulations'are completed.1 Your certification should also state that the applicants'

!

-= were enrolled. in the continuing operator training program and their performance in that program

)

.

' is satisfactory..

L

g This examination was your first opportunity to prepare an operator license examination under

,

the NRC's initial license examination process. This process allowed your training department

I

personnel to prepare and administer the written examination and prepare the operating

i examination. NRC examiners administered the operating examination. Four occurrences of

poor examination material control (examination security) were identified during the examination

,

preparation and administrationJ One occurrence resulted .in a non-cited violation for failure to -

ensure adequate examination security. The remaining three examples did not represent a -

potential to compromise the examination and therefore are not considered violations. ' The

. examination was technically correct and examined at the proper complexity and depth for the

' license applicants. On-site NRC validation of the examination indicated a weakness in

I

examination validation in the area of Job Performance Measures.-

1

!:

l

+f l

l

1

i

I

'9803270274 980324

l'-

!PDR

ADOCK 05000346

fSQ

\\'

V

PDR

"

d

a

.

W. MacFarand IV

2

March 20, 1998

' Administration of the examination revealed two operator performance issues needing additional

attention by the CPS Training Department. License applicants failed to correctly use the motor

.

operated valve test preparation switches provided for Emergency Core Cooling System

containment isolation valves. Of greater significance, some applicants failed to correctly

- execute steps of the Clinton Power Station Emergency Operating Procedures, such as initiating

Suppression Pool Cooling when required and using alternate injection sources to maintain

reactor pressure vessel water level when preferred injection sources were available.

Compliance with these procedures is necessary to ensure the health and safety of the general

public. Your actions to ensure correct EOP implementation will be monitored as part of our MC

. 0350 oversight panel activities.

Operator performance for one operating crew was observed in the control room by the

j

examiners. During the observed period operators were found to be monitoring their control

panels on a regular basis and executing their responsibilities in a business like manner.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the

enclosures to this letter will be placed in the NRC Public Document Room.

1

We will gladly discuss any questions you have concerning this examination.

Sincerely

4

Original Signed by John A. Grobe

John A. Grobe, Director

Division of Reactor Safety .

Docket No. 50-461

Enclosures:

1. Inspection Report 50-461/97313(OL)

2. Simulator Fidelity Report

3. Written Examination & Answer Key (SRO)

See Attached Distribution:

DOCUMENT NAME: G:DRS\\CLl97313.0L (SEE PREVIOUS CONCURRENCE)

l

To receive a copy of this document. Indicate in the box *C's Copy w/o attach /end 'E" a Co)y w/ attach /end "N" = No copy

OFFICE

Rlll:DRS

Rlli:DRS

Rill:DRP

Rill:DRS , O

NAME

DMcNeil: llc /jp/sd *

MLeach

TKozak

  • JGrobCW

DATE-

3/ /98

3/ /98

3/ /98

3/k/98 i

OFFICIAL RECORD COPY

l

[,

y

.

,

!

..W. MacFarand IV

-2

Administration of the examination revealed two operator performance issues needing additional

attention by the CPS Training Department.~ License applicants failed to correctly use the motor

. operated valve test preparation switches provided for Emergency Core Cooling System

containment isolation valves. Of greater significance, some applicants failed to correctly ~

execute steps of the Clinton Power Station Emergency Operating Procedures, such as initiating

'

Suppression Pool Cooling when required and using altamate injection sources to maintain

reactor pressure vessel water level when preferred injection sources were available.

.F

, Compliance with these procedures is necessary to ensure the health and safety of the general

j

'public. Your actions to ensure correct EOP implementation will be monitored as~ part of our MC

'

0350 oversight panel activities.

Operator performance for one operating crew was observed in the control room by the

g

examiners. During the observed period operators were found to be monitoring their control'

panels on a regular basis and executing their responsibilities in a business like manner,

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the

enclosures to this letter will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have conceming this examination.

Sincerely

l

l.

' John A. Grobe, Director

i

Division of Reactor Safety

!

. Docket No. 50-461

5nclosures:

1. Inspection Report 50-461/97313(OL)

,

2. Simulator Fidelity Report

3. Written Examination & Answer Key (SRO)

i

I

See Attached Distribution:

'

i

DOCUMENT NAME: G:DRS\\CLl97308.OL -

' To receive a co py of thee document, Indicate in the box *C" = Copy w/o attach /end T = Ccpy w/ attach /end "N" = No copy

OFFICE

Rill:DRS

v

Rill:DRS

v

Rill:DRP

E.,

Rill:DRS

NAME-

DMcNeil:llefjpff MLeach #w4

TKozak C

JGrobe

,

DATE:

3//798

3//7/98

3/l?98

3! /98

OFFICIAL RECORD COPY

,

p

p

'

. ,

p.

t

L

- W. MacFarland IV

3-

March 20,1998

cc w/encis 1 & 2:

G. Hunger, Station Manager

R. Phares, Manager, Nuclear Safety

and Performance improvement

,

'

J. Sipek,' Director- Licensing

- Nathan Schloss, Economist

,

Office of the Attomey General

G. Stramback, Regulatory Licensing

Services Project Manager

General Electric Company

'

Chairman, DeWitt County Board

State Liaison Officer-

Chairman, Illinois Commerce Commission

- cc w/encls 1,2 & 3:

J. F. Paichak, Plant Training Manager

,4

Distnbution-

Docket File w/encis

DRP w/encls

SRI Clinton w/encls

PUBLIC IE-42 w/encis

.

. Project Manager, NRR w/encls

Rill PRR w/encls

Rlli Enf. Coordinator w/encls

IEO w/encls (E-mail)

TSS w/encls

A. B. Beach w/encls

- DOCDESK (E-mail)

Deputy RA w/encls

1

DRS (2)w/encls '

GREENS

.- .

.)

i

,

l

,

I