Line 2: Line 2:
| number = ML20217K823
| number = ML20217K823
| issue date = 08/13/1997
| issue date = 08/13/1997
| title = Responds to 970730 Ltr to Chairman Jackson Re Cable Separation Issues at Myaps.Ltr Being Forwarded to NRC Ofc of Inspector General for Whatever Action Appropriate
| title = Responds to to Chairman Jackson Re Cable Separation Issues at Myaps.Ltr Being Forwarded to NRC Ofc of Inspector General for Whatever Action Appropriate
| author name = Dorman D
| author name = Dorman D
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9708180176
| document report number = NUDOCS 9708180176
| title reference date = 07-30-1997
| package number = ML20217K828
| package number = ML20217K828
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:l f*euqI*t p                                            UNITED STATES 4             NUCLEAR REGULATORY COMMISSION                               8#"80 o                                        WASHINGTON. D.C. 30086 4 001
{{#Wiki_filter:l f*euqI*t UNITED STATES p
  \       ,/j                                 August 13, 1997 Ms. Kris L. Christine P.O. Box 12 Alna. ME 04535
4 NUCLEAR REGULATORY COMMISSION 8#"80 WASHINGTON. D.C. 30086 4 001
\\
,/j o
August 13, 1997 Ms. Kris L. Christine P.O. Box 12 Alna. ME 04535


==Dear Ms. Christine:==
==Dear Ms. Christine:==
I am respondin to your letter of July 30, 1997, to Chairman Jackson of the U.S. Nuclear R ulatory Comission (NRC) regarding cable separation issues at the Maine Yankee Atomic Power Station (MYAPS).
I am respondin to your letter of July 30, 1997, to Chairman Jackson of the U.S. Nuclear R ulatory Comission (NRC) regarding cable separation issues at the Maine Yankee Atomic Power Station (MYAPS).
You requested assurw.e that the IMC will not allow MYAPS to operate without complying with NRC replations, ospecially regarding cable separation. The NRC staff's actions over Uis last eight months clearly indicate that the staff intended to ensure resolution of the cable separation and other compliance problems at MYAPS before it would have considered allowing restart of the facility.
You requested assurw.e that the IMC will not allow MYAPS to operate without complying with NRC replations, ospecially regarding cable separation. The NRC staff's actions over Uis last eight months clearly indicate that the staff intended to ensure resolution of the cable separation and other compliance problems at MYAPS before it would have considered allowing restart of the facility.
When the cable separation issues were identified in December 1996, the staff issued a confirmatory action letter (CAL). CAL No. 1-96 015. dated December 18. 1996, to ensure that those issues would be fully resolved before plant startup,     Subsequently, the scope of the CAL was expanded to address additional areas of non compliance (CAL No. 1 96-015. Sup)lement 1. dated January 30, 1997.) In January 1997, the staff laced MYA)S on the NRC watch list. In addition to the cable separation and ther compliance issues identified in the CAL and CAL Sup lement. NRC Inspection Report 50 309/96-16.
When the cable separation issues were identified in December 1996, the staff issued a confirmatory action letter (CAL). CAL No. 1-96 015. dated December 18. 1996, to ensure that those issues would be fully resolved before plant startup, Subsequently, the scope of the CAL was expanded to address additional areas of non compliance (CAL No. 1 96-015. Sup)lement 1. dated January 30, 1997.)
dated February 11, 1997. identifi d 16 potential violations of NRC requirements. These potential violations were the subject of an o>en predecisional enforcement conference held in Wiscasset. Maine, on iarch 11 1997.
In January 1997, the staff laced MYA)S on the NRC watch list.
In February 1997, the staff initiated its restart review process consistent with NRC Inspection Manual Chapter 0350 to ensure that safety / compliance issues would be thorough reviewed and a>propriately addressed before plant restart. B letter date May 23. 1997, tie staff issued its Restart Action Plan (RAP) or Maine Yankee. The RAP contained a list of issues that the NRC planned to inspect "to assess the licensee's compliance with applicable regulator bases." yIncluded requirements in the RAP and conformance list were cablewith      the facility separation   and design  and licensing open NRC violations. This plan was designed to provide assurance that restart and operation of the MYAPS would only occur with assurance of compliance with applicable regulatory requirements. These activities have been rendered moot by the licensee's August 7,1997, certification under 10 CFR 50,82(a)(1)(1) of permanent cessation of power operation of MYAPS.
In addition to the cable separation and ther compliance issues identified in the CAL and CAL Sup lement. NRC Inspection Report 50 309/96-16.
dated February 11, 1997. identifi d 16 potential violations of NRC requirements.
These potential violations were the subject of an o>en predecisional enforcement conference held in Wiscasset. Maine, on iarch 11 1997.
In February 1997, the staff initiated its restart review process consistent with NRC Inspection Manual Chapter 0350 to ensure that safety / compliance issues would be thorough reviewed and a>propriately addressed before plant restart.
B letter date May 23. 1997, tie staff issued its Restart Action Plan (RAP) or Maine Yankee. The RAP contained a list of issues that the NRC planned to inspect "to assess the licensee's compliance with applicable regulator bases." y requirements and conformance with the facility design and licensing Included in the RAP list were cable separation and open NRC violations.
This plan was designed to provide assurance that restart and operation of the MYAPS would only occur with assurance of compliance with applicable regulatory requirements.
These activities have been rendered moot by the licensee's August 7,1997, certification under 10 CFR 50,82(a)(1)(1) of permanent cessation of power operation of MYAPS.
D
D
        $[S* l0$N So$oSo9 H                   PDR ll 1,1,lill,il,I llll N
$[S* l0$N So$oSo9 H
PDR N
ll 1,1,lill,il,I llll


                ~                                   .
~
Ms. Kris L. Christine                                                     -
Ms. Kris L. Christine 2-In your letter, you also assert that since MYAPS began operating, the NRC staff has repeatedly failed to effectively oversee regulatory compliance at MYAPS. Therefore, your letter is being forwarded to the NRC Of fice of the inspector General for whatever action that office deems appropriate.
2-In your letter, you also assert that since MYAPS began operating, the NRC staff has repeatedly failed to effectively oversee regulatory compliance at MYAPS. Therefore, your letter is being forwarded to the NRC Of fice of the inspector General for whatever action that office deems appropriate.
Thank you for sharing your concerns regarding compliance at Maine Yankee.
Thank you for sharing your concerns regarding compliance at Maine Yankee.                                                             I trust that you will find this letter responsive to them.
I trust that you will find this letter responsive to them.
Sincerely.
Sincerely.
Original signed by Daniel H. Dorman, Project Manager Project Directorate 1-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation DISTRIBUTLON Docket F1' e (50-309) w/ orig, inc.
Original signed by Daniel H. Dorman, Project Manager Project Directorate 1-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation DISTRIBUTLON Docket F1' e (50-309) w/ orig, inc.
Line 40: Line 51:
M. Thadani OGC OPA OCA SECY # CRC 97-0801 NRR Mailroom (EDO#G970801 w/inc.)
M. Thadani OGC OPA OCA SECY # CRC 97-0801 NRR Mailroom (EDO#G970801 w/inc.)
N. Olson C. Norsworthy D. Dorman (w/inc.)
N. Olson C. Norsworthy D. Dorman (w/inc.)
E. Peyton C. Hehl, Region 1 DOCUMENT NAME: G:\DORMAN\GT970801 To receive e copy of this document. Indecete in the bos: *C' = Ccow without ottachment.' enclosure                           *t*
E. Peyton C. Hehl, Region 1 DOCUMENT NAME: G:\\DORMAN\\GT970801 To receive e copy of this document. Indecete in the bos:
H y with stiscnn ei.ttenclosure *N' = No copy 0FilCE                                      PDI 3/PM t ,    l l PDiv 2/LA                                       l l (A)DtPghk'                   l l                         l_ l NAME                                       DDorman ,M@         EPeyton M M                                         REatoni I
*C' = Ccow without ottachment.' enclosure
DATE                                       08/f3 /9F           08/ W 97                                             08// 3 97                                                     I 0FilCIAL RfCORD CDPf
*t* H y with stiscnn ei.ttenclosure
*N' = No copy t
l l PDiv 2/LA l l (A)DtPghk' l l l_ l 0FilCE PDI 3/PM NAME DDorman,M@
EPeyton M M REatoni I
DATE 08/f3 /9F 08/ W 97 08// 3 97 I
0FilCIAL RfCORD CDPf


a e *,     .
a e *,
7-                                                                                     ACTION EDO Principal Correspondence Control FROM                                           DUE:       / /                 EDO CONTROL: G970801 DOC DT: 07/30/97 FINAL REPLY:
7-ACTION EDO Principal Correspondence Control FROM DUE:
Kris L. Christine                                                                       .
/
Alna, Maine TOs
/
\
EDO CONTROL: G970801 DOC DT: 07/30/97 FINAL REPLY:
  ,.        -,:hairtaan Jacksoi.
Kris L. Christine Alna, Maine TOs
FCh SIGNATURE OF :                                           ** GRN       **
\\
CRC NO: 97-0801 DESC:
-,:hairtaan Jacksoi.
FCh SIGNATURE OF :
** GRN CRC NO: 97-0801 DESC:
ROUTING:
ROUTING:
MAINE YANKEE CABLE SEPARATION                                                     Callan 1
MAINE YANKEE CABLE SEPARATION Callan 1
Thadani Thompson Norry Blaha Burns DATS: 08/05/97                                                                       Miller, RI ASSIGNED TO:                                       CONTACT:
Thadani Thompson Norry Blaha Burns DATS: 08/05/97 Miller, RI ASSIGNED TO:
_NRR                                       Collins SPECIAL INSTRUCTIONS OR REMARKS:
CONTACT:
_NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:
For Appropriate Action.
For Appropriate Action.


s 1
s 1
OFFICE OF THE SECRETARY
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:
      ,                                                                          CORRESPONDENCE CONTROL TICKET PAPER NUMBER:                                         CRC-97-0801                     LOGGING DATE: Aug   4 97 ACTION OFFICE:                                         EDO                                                       ,
CRC-97-0801 LOGGING DATE: Aug 4 97 ACTION OFFICE:
AUTHOR:                                               KRIS CHRISTINE AFFILIATION:                                         MAINE ADDRESSEE:                                           CHAIRMAN JACKSON LETTER DATE:                                          Jul 30 97          FILE CODE: IDR 5 MAINE YANKEE
EDO AUTHOR:
KRIS CHRISTINE AFFILIATION:
MAINE ADDRESSEE:
CHAIRMAN JACKSON
}
}
LETTER DATE:
Jul 30 97 FILE CODE: IDR 5 MAINE YANKEE


==SUBJECT:==
==SUBJECT:==
MAINE YANKEE CABLE SEPARATION ACTION:                                               Appropriate
MAINE YANKEE CABLE SEPARATION ACTION:
}                     DISTRIBUTION:                                       CHAIRMAN, OIG SPECIAL HANDLING: NONE CONSTITUENT:
Appropriate
}
DISTRIBUTION:
CHAIRMAN, OIG SPECIAL HANDLING: NONE CONSTITUENT:
s NOTES:
s NOTES:
                      '' ATE DUE:
'' ATE DUE:
?                         ,IGNA'IJRE:                                                 *
?
                                                                              .                            DATE SIGNED:
,IGNA'IJRE:
y,.9                   AFFILIATION:
DATE SIGNED:
y,.9 AFFILIATION:
1 EDO -- G970581
1 EDO -- G970581
_ . . . - . . .                  - _ _ _ _ _ _ _ _ _ - _ _ _ _}}
- _ _ _ _ _ _ _ _ _ - _ _ _ _}}

Latest revision as of 08:13, 3 December 2024

Responds to to Chairman Jackson Re Cable Separation Issues at Myaps.Ltr Being Forwarded to NRC Ofc of Inspector General for Whatever Action Appropriate
ML20217K823
Person / Time
Site: Maine Yankee
Issue date: 08/13/1997
From: Dan Dorman
NRC (Affiliation Not Assigned)
To: Christine K
AFFILIATION NOT ASSIGNED
Shared Package
ML20217K828 List:
References
NUDOCS 9708180176
Download: ML20217K823 (4)


Text

l f*euqI*t UNITED STATES p

4 NUCLEAR REGULATORY COMMISSION 8#"80 WASHINGTON. D.C. 30086 4 001

\\

,/j o

August 13, 1997 Ms. Kris L. Christine P.O. Box 12 Alna. ME 04535

Dear Ms. Christine:

I am respondin to your letter of July 30, 1997, to Chairman Jackson of the U.S. Nuclear R ulatory Comission (NRC) regarding cable separation issues at the Maine Yankee Atomic Power Station (MYAPS).

You requested assurw.e that the IMC will not allow MYAPS to operate without complying with NRC replations, ospecially regarding cable separation. The NRC staff's actions over Uis last eight months clearly indicate that the staff intended to ensure resolution of the cable separation and other compliance problems at MYAPS before it would have considered allowing restart of the facility.

When the cable separation issues were identified in December 1996, the staff issued a confirmatory action letter (CAL). CAL No. 1-96 015. dated December 18. 1996, to ensure that those issues would be fully resolved before plant startup, Subsequently, the scope of the CAL was expanded to address additional areas of non compliance (CAL No. 1 96-015. Sup)lement 1. dated January 30, 1997.)

In January 1997, the staff laced MYA)S on the NRC watch list.

In addition to the cable separation and ther compliance issues identified in the CAL and CAL Sup lement. NRC Inspection Report 50 309/96-16.

dated February 11, 1997. identifi d 16 potential violations of NRC requirements.

These potential violations were the subject of an o>en predecisional enforcement conference held in Wiscasset. Maine, on iarch 11 1997.

In February 1997, the staff initiated its restart review process consistent with NRC Inspection Manual Chapter 0350 to ensure that safety / compliance issues would be thorough reviewed and a>propriately addressed before plant restart.

B letter date May 23. 1997, tie staff issued its Restart Action Plan (RAP) or Maine Yankee. The RAP contained a list of issues that the NRC planned to inspect "to assess the licensee's compliance with applicable regulator bases." y requirements and conformance with the facility design and licensing Included in the RAP list were cable separation and open NRC violations.

This plan was designed to provide assurance that restart and operation of the MYAPS would only occur with assurance of compliance with applicable regulatory requirements.

These activities have been rendered moot by the licensee's August 7,1997, certification under 10 CFR 50,82(a)(1)(1) of permanent cessation of power operation of MYAPS.

D

$[S* l0$N So$oSo9 H

PDR N

ll 1,1,lill,il,I llll

~

Ms. Kris L. Christine 2-In your letter, you also assert that since MYAPS began operating, the NRC staff has repeatedly failed to effectively oversee regulatory compliance at MYAPS. Therefore, your letter is being forwarded to the NRC Of fice of the inspector General for whatever action that office deems appropriate.

Thank you for sharing your concerns regarding compliance at Maine Yankee.

I trust that you will find this letter responsive to them.

Sincerely.

Original signed by Daniel H. Dorman, Project Manager Project Directorate 1-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation DISTRIBUTLON Docket F1' e (50-309) w/ orig, inc.

PUBLIC (w/inc.)

EDO #G970801 L. Callan H. Thompson A. Thadani P. Norry J. Blaha S. Burns OGC H. Miller, RI S. Collins /F. Miraglia R. Zinnerman PDI-3 RF B. Boger J. Zwolinski M. Boyle (MLB4)

M. Thadani OGC OPA OCA SECY # CRC 97-0801 NRR Mailroom (EDO#G970801 w/inc.)

N. Olson C. Norsworthy D. Dorman (w/inc.)

E. Peyton C. Hehl, Region 1 DOCUMENT NAME: G:\\DORMAN\\GT970801 To receive e copy of this document. Indecete in the bos:

  • C' = Ccow without ottachment.' enclosure
  • t* H y with stiscnn ei.ttenclosure
  • N' = No copy t

l l PDiv 2/LA l l (A)DtPghk' l l l_ l 0FilCE PDI 3/PM NAME DDorman,M@

EPeyton M M REatoni I

DATE 08/f3 /9F 08/ W 97 08// 3 97 I

0FilCIAL RfCORD CDPf

a e *,

7-ACTION EDO Principal Correspondence Control FROM DUE:

/

/

EDO CONTROL: G970801 DOC DT: 07/30/97 FINAL REPLY:

Kris L. Christine Alna, Maine TOs

\\

-,:hairtaan Jacksoi.

FCh SIGNATURE OF :

    • GRN CRC NO: 97-0801 DESC:

ROUTING:

MAINE YANKEE CABLE SEPARATION Callan 1

Thadani Thompson Norry Blaha Burns DATS: 08/05/97 Miller, RI ASSIGNED TO:

CONTACT:

_NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:

For Appropriate Action.

s 1

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:

CRC-97-0801 LOGGING DATE: Aug 4 97 ACTION OFFICE:

EDO AUTHOR:

KRIS CHRISTINE AFFILIATION:

MAINE ADDRESSEE:

CHAIRMAN JACKSON

}

LETTER DATE:

Jul 30 97 FILE CODE: IDR 5 MAINE YANKEE

SUBJECT:

MAINE YANKEE CABLE SEPARATION ACTION:

Appropriate

}

DISTRIBUTION:

CHAIRMAN, OIG SPECIAL HANDLING: NONE CONSTITUENT:

s NOTES:

ATE DUE:

?

,IGNA'IJRE:

DATE SIGNED:

y,.9 AFFILIATION:

1 EDO -- G970581

- _ _ _ _ _ _ _ _ _ - _ _ _ _