l f*euqI*t UNITED STATES p
4 NUCLEAR REGULATORY COMMISSION 8#"80 WASHINGTON. D.C. 30086 4 001
\\
,/j o
August 13, 1997 Ms. Kris L. Christine P.O. Box 12 Alna. ME 04535
Dear Ms. Christine:
I am respondin to your letter of July 30, 1997, to Chairman Jackson of the U.S. Nuclear R ulatory Comission (NRC) regarding cable separation issues at the Maine Yankee Atomic Power Station (MYAPS).
You requested assurw.e that the IMC will not allow MYAPS to operate without complying with NRC replations, ospecially regarding cable separation. The NRC staff's actions over Uis last eight months clearly indicate that the staff intended to ensure resolution of the cable separation and other compliance problems at MYAPS before it would have considered allowing restart of the facility.
When the cable separation issues were identified in December 1996, the staff issued a confirmatory action letter (CAL). CAL No. 1-96 015. dated December 18. 1996, to ensure that those issues would be fully resolved before plant startup, Subsequently, the scope of the CAL was expanded to address additional areas of non compliance (CAL No. 1 96-015. Sup)lement 1. dated January 30, 1997.)
In January 1997, the staff laced MYA)S on the NRC watch list.
In addition to the cable separation and ther compliance issues identified in the CAL and CAL Sup lement. NRC Inspection Report 50 309/96-16.
dated February 11, 1997. identifi d 16 potential violations of NRC requirements.
These potential violations were the subject of an o>en predecisional enforcement conference held in Wiscasset. Maine, on iarch 11 1997.
In February 1997, the staff initiated its restart review process consistent with NRC Inspection Manual Chapter 0350 to ensure that safety / compliance issues would be thorough reviewed and a>propriately addressed before plant restart.
B letter date May 23. 1997, tie staff issued its Restart Action Plan (RAP) or Maine Yankee. The RAP contained a list of issues that the NRC planned to inspect "to assess the licensee's compliance with applicable regulator bases." y requirements and conformance with the facility design and licensing Included in the RAP list were cable separation and open NRC violations.
This plan was designed to provide assurance that restart and operation of the MYAPS would only occur with assurance of compliance with applicable regulatory requirements.
These activities have been rendered moot by the licensee's August 7,1997, certification under 10 CFR 50,82(a)(1)(1) of permanent cessation of power operation of MYAPS.
D
$[S* l0$N So$oSo9 H
PDR N
ll 1,1,lill,il,I llll
~
Ms. Kris L. Christine 2-In your letter, you also assert that since MYAPS began operating, the NRC staff has repeatedly failed to effectively oversee regulatory compliance at MYAPS. Therefore, your letter is being forwarded to the NRC Of fice of the inspector General for whatever action that office deems appropriate.
Thank you for sharing your concerns regarding compliance at Maine Yankee.
I trust that you will find this letter responsive to them.
Sincerely.
Original signed by Daniel H. Dorman, Project Manager Project Directorate 1-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation DISTRIBUTLON Docket F1' e (50-309) w/ orig, inc.
PUBLIC (w/inc.)
EDO #G970801 L. Callan H. Thompson A. Thadani P. Norry J. Blaha S. Burns OGC H. Miller, RI S. Collins /F. Miraglia R. Zinnerman PDI-3 RF B. Boger J. Zwolinski M. Boyle (MLB4)
M. Thadani OGC OPA OCA SECY # CRC 97-0801 NRR Mailroom (EDO#G970801 w/inc.)
N. Olson C. Norsworthy D. Dorman (w/inc.)
E. Peyton C. Hehl, Region 1 DOCUMENT NAME: G:\\DORMAN\\GT970801 To receive e copy of this document. Indecete in the bos:
- C' = Ccow without ottachment.' enclosure
- t* H y with stiscnn ei.ttenclosure
- N' = No copy t
l l PDiv 2/LA l l (A)DtPghk' l l l_ l 0FilCE PDI 3/PM NAME DDorman,M@
EPeyton M M REatoni I
DATE 08/f3 /9F 08/ W 97 08// 3 97 I
0FilCIAL RfCORD CDPf
a e *,
7-ACTION EDO Principal Correspondence Control FROM DUE:
/
/
EDO CONTROL: G970801 DOC DT: 07/30/97 FINAL REPLY:
Kris L. Christine Alna, Maine TOs
\\
-,:hairtaan Jacksoi.
FCh SIGNATURE OF :
- GRN CRC NO: 97-0801 DESC:
ROUTING:
MAINE YANKEE CABLE SEPARATION Callan 1
Thadani Thompson Norry Blaha Burns DATS: 08/05/97 Miller, RI ASSIGNED TO:
CONTACT:
_NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:
For Appropriate Action.
s 1
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:
CRC-97-0801 LOGGING DATE: Aug 4 97 ACTION OFFICE:
EDO AUTHOR:
KRIS CHRISTINE AFFILIATION:
MAINE ADDRESSEE:
CHAIRMAN JACKSON
}
LETTER DATE:
Jul 30 97 FILE CODE: IDR 5 MAINE YANKEE
SUBJECT:
MAINE YANKEE CABLE SEPARATION ACTION:
Appropriate
}
DISTRIBUTION:
CHAIRMAN, OIG SPECIAL HANDLING: NONE CONSTITUENT:
s NOTES:
ATE DUE:
?
,IGNA'IJRE:
DATE SIGNED:
y,.9 AFFILIATION:
1 EDO -- G970581
- _ _ _ _ _ _ _ _ _ - _ _ _ _