ML20236E145: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,                                                                                                              __- ___ -
{{#Wiki_filter:__- ___ -
                                                            .. F6btuary 27,.1989 i     .
.. F6btuary 27,.1989 i
                  ~ Docket No. 50-346
~ Docket No. 50-346
                            ~
~
Mr. Donald C. Shelton Vice President - Nuclear.
Mr. Donald C. Shelton Vice President - Nuclear.
Toledo Edison Company 300 Madison Avenue Toledo, Ohio -43652
Toledo Edison Company 300 Madison Avenue Toledo, Ohio -43652


==Dear Mr. Shelton:==
==Dear Mr. Shelton:==
==SUBJECT:==
==SUBJECT:==
EMBRITTLEMENT OF REACTOR ~ VESSEL' SUPPORTS Since April 1988, the NRC staff.has been investigating the potential significance of the effects of low-temperature, low-flux embrittlement on the structural-integrity of reactor vessel supports. The reviews to date have concluded-that.
EMBRITTLEMENT OF REACTOR ~ VESSEL' SUPPORTS Since April 1988, the NRC staff.has been investigating the potential significance of the effects of low-temperature, low-flux embrittlement on the structural-integrity of reactor vessel supports. The reviews to date have concluded-that.
this issue does not pose an immediate concern to public safety, but.it challenges the margins provided by the defense-in-depth concept. Accordingly, we would like to meet with your representatives (as well as the Combustion -
this issue does not pose an immediate concern to public safety, but.it challenges the margins provided by the defense-in-depth concept. Accordingly, we would like to meet with your representatives (as well as the Combustion -
Engineering and Westinghouse Owners Group) in mid-March 1989 to discuss embrittlenient of reactor vessel supports.
Engineering and Westinghouse Owners Group) in mid-March 1989 to discuss embrittlenient of reactor vessel supports.
l                       To assist you in your preparation for-the meeting; I have enclosed two documents for your review. One is the Oak Ridge National Laboratory Final Draft Report on this issue, and the other is the staff's evaluation. We will be in touch.with you-in the near fu'ture to establish'a meeting date.
l To assist you in your preparation for-the meeting; I have enclosed two documents for your review. One is the Oak Ridge National Laboratory Final Draft Report on this issue, and the other is the staff's evaluation. We will be in touch.with you-in the near fu'ture to establish'a meeting date.
Sincerely,
Sincerely,
                                                                ' original signed by l                                                 .
' original signed by l
Gary M. Holahan, Acting Director Division of Reactor. Projects III, l
Gary M. Holahan, Acting Director Division of Reactor. Projects III, l
IV, V, and Special Projects Office.of Nuclear Reactor Regulation
IV, V, and Special Projects Office.of Nuclear Reactor Regulation


==Enclosures:==
==Enclosures:==
: 1.     " Impact of Radiation Embrittlement'on Integrity of Pressure Vessel Supports for Two PWR Plants," 0RNL/TM-10966, Final Draft, 12/7/88
1.
: 2. Staff Evaluation of Embrittlement of Reactor Vessel Supports,.1/89 cc: w/ enclosures
" Impact of Radiation Embrittlement'on Integrity of Pressure Vessel Supports for Two PWR Plants," 0RNL/TM-10966, Final Draft, 12/7/88 2.
          $            See next page sed
Staff Evaluation of Embrittlement of Reactor Vessel Supports,.1/89 cc: w/ enclosures See next page sed
    .N8'               DISTRIBUTION (w/o enclosures)
.N8' DISTRIBUTION (w/o enclosures)
    .@@ {'DoctetF11eJ(w/ enclosures)q                           0GC (info. only) mo                 NRCTiocal'PDRs"h r LP
.@@ {'DoctetF11eJ(w/ enclosures)q 0GC (info. only) mo NRCTiocal'PDRs"h r LP l
                                                        ^       E. Jordan                                   i l
.a PD5 Reading
    .a                  PD5 Reading                              B. Grimes                               66I
^
    $8               -G. Holahan ACRS(10) op                 M. Virgilio                             T. Wambach                               gh
E. Jordan i
    -@"                J. Lee                                   J.'Hannon                 g L
B. Grimes 66I
T. Chan                                 J. Richardson           /
$8
                                                        -                             bp ora
-G. Holahan ACRS(10) op M. Virgilio T. Wambach gh J. Lee J.'Hannon g
    *''                                                efy/W             .
L T. Chan J. Richardson
1        l   PN      A? i QRp/PD5                                       D   P   905   (A)AD:DRSP35 (A]D:DRSP Jtt            Dd(DRSP/PD5 fChan DRSP/PD33 TWambach           1 hton     MVir ilio     GHolahan
/bp N
                      .02>1/89         P 02/n/89. 02R//89                           02/6g/89 2/pk/89                   02/3 /89
A? i
-efy/W 1
l P
ora QRp/PD5 Dd(DRSP/PD5 DRSP/PD33 D
P 905 (A)AD:DRSP35 (A]D:DRSP fChan TWambach 1 hton MVir ilio GHolahan Jtt
.02>1/89 P 02/n/89. 02R//89 2/pk/89 02/6g/89 02/3 /89


m e         o                                                                   ..
m e
                                                    ,i ,
o
n
,i,
        ,f e tsa(3,,                           UNITED STATES y                g              NUCLEAR REGULATORY COMMISSION                               ,
e tsa(3,,
WASHINGTON, D. C. 20656                             ]
n UNITED STATES
n                j February 27, 1989 Docket No. 50-346                                                                         l l
,f NUCLEAR REGULATORY COMMISSION y
Mr. Donald C. Shelton                                                               1 Vice President - Nuclear                                                           i Toledo Edison Company                                                               1 i
g n
300 Madison Avenue Toledo, Ohio 43652
j WASHINGTON, D. C. 20656
]
February 27, 1989 Docket No. 50-346 Mr. Donald C. Shelton 1
Vice President - Nuclear i
Toledo Edison Company 1
300 Madison Avenue i
Toledo, Ohio 43652


==Dear Mr. Shelton:==
==Dear Mr. Shelton:==
 
SUBJECTi EMBRITTLEMENT OF REACTOR VESSEL SUPPORTS Since April 1988, the NRC staff has been investigating the potential significance of the effects of low-temperature, low-flux embrittlement on the structural integrity of reactor vessel suppcrts. The reviews to date have concluded that this issue does not pose an innediate concern to public safety, but it challenges the margins provided by the defense-in-depth concept. Accordingly, we would like to meet with your representatives (as well as the Combustion EngineeringandWestinghouseOwnersGroup)inmid-March 1989todiscuss embrittlement of reactor vessel supports.
SUBJECTi EMBRITTLEMENT OF REACTOR VESSEL SUPPORTS Since April 1988, the NRC staff has been investigating the potential significance of the effects of low-temperature, low-flux embrittlement on the structural integrity of reactor vessel suppcrts. The reviews to date have concluded that this issue does not pose an innediate concern to public safety, but it challenges the margins provided by the defense-in-depth concept. Accordingly,
    .            we would like to meet with your representatives (as well as the Combustion EngineeringandWestinghouseOwnersGroup)inmid-March 1989todiscuss embrittlement of reactor vessel supports.
To assist you in your preparation for the meeting, I have enclosed two documents for your review. One is the Oak Ridge National Laboratory Final Draft Report on this issue, and the other is the staff's evaluation. We will be in touch with you in the near future to establish a meeting date.
To assist you in your preparation for the meeting, I have enclosed two documents for your review. One is the Oak Ridge National Laboratory Final Draft Report on this issue, and the other is the staff's evaluation. We will be in touch with you in the near future to establish a meeting date.
Sincerely, h             Y       "
Sincerely, h
Gary M. Holahan, Acting Director           ,
Y Gary M. Holahan, Acting Director Division of Reactor Projects III,
Division of Reactor Projects III,           )
)
IV, V, and Special Projects Office of Nuclear Reactor Regulation 1
IV, V, and Special Projects Office of Nuclear Reactor Regulation 1


==Enclosures:==
==Enclosures:==
1
1.
: 1. " Impact of Radiation Embrittlement on                                         )
" Impact of Radiation Embrittlement on Integrity of Pressure Vessel Supports for Two PWR Plants," ORNL/TM-10966, Final Draft, 12/7/88 2.
Integrity of Pressure Vessel Supports for Two PWR Plants," ORNL/TM-10966, Final Draft, 12/7/88                                                         ;
Staff Evaluation of Embrittlement of Reactor Vessel Supports, 1/89 cc: w/ enclosures See next page q
: 2. Staff Evaluation of Embrittlement of Reactor Vessel Supports, 1/89 l
cc: w/ enclosures See next page q
i
i


  . o-                                                                               \
o-
1 Mr. Donald C. Shelton             Davis-Besse Nuclear Power Station Toledo Edison Company                                                       l Unit No. 1                               l
\\
        .CC:                                                                         4 David E. Burke, Esq.
1 Mr. Donald C. Shelton Davis-Besse Nuclear Power Station l
The Cleveland Electric             Radiological Health Program 111uminating Company             Ohio Department of Health P. O. Box 5000                     1224 Kinnear Road Cleveland, Ohio 44101             Columbus, Ohio 43212 Mr. Robert W. Schrauder           Attorney General                         !
Toledo Edison Company Unit No. 1 l
Manager, Nuclear Licensing         Department of Attorney Toledo Edison Company               General                               i Edison Plaza                       30 East Broad Street                     !
.CC:
300 Madison Avenue                 Columbus, Ohio 43215 Toledo, Ohio 43652 l                                           Mr. James W. Harris, Director
4 David E. Burke, Esq.
;        Gerald Charnoff, Esq.             (Addressee Only)                           l Shaw, Pittman, Potts               Division of Power Generation and Trowbridge                   Ohio Department of Industrial Relations ]
The Cleveland Electric Radiological Health Program 111uminating Company Ohio Department of Health P. O. Box 5000 1224 Kinnear Road Cleveland, Ohio 44101 Columbus, Ohio 43212 Mr. Robert W. Schrauder Attorney General Manager, Nuclear Licensing Department of Attorney Toledo Edison Company General i
4 2300 N Street N.W.                 2323 West 5th Avenue                     :
Edison Plaza 30 East Broad Street 300 Madison Avenue Columbus, Ohio 43215 Toledo, Ohio 43652 l
Washington, D.C. 20037             P. O. Box 825                           >
Mr. James W. Harris, Director Gerald Charnoff, Esq.
>                                            Columbus, Ohio 43216                     i Regional Administrator, Region III                                         j U.S. Nuclear Regulatory Comission Ohio Environmental Protection Agency l         799 Roosevelt Road                 361 East Broad Street                     j l
(Addressee Only) l Shaw, Pittman, Potts Division of Power Generation
Glen Ellyn, Illinois               Columbus, Ohio 43266-0558               i l
]
Fresident, Beard of Mr. Robert B. Borsum                 County Commissioners of Babcock & Wilcox                     Ottawa County Nuclear Power Generation Division Port Clinton, Ohio 43452 Suite 525, 1700 Rockville Pike Rockville, Maryland 20852         State of Ohio Public Utilities Comission               i Resident Inspector                 180 East Broad Street                   a U.S. Nuclear Regulatory Commission Columbus, Ohio 43266-0573               l 5503 N. State Route 2                                                       ;
and Trowbridge Ohio Department of Industrial Relations 4
Oak Harbor, Ohio 43449                                                     1 I
2300 N Street N.W.
i l
2323 West 5th Avenue Washington, D.C. 20037 P. O. Box 825 Columbus, Ohio 43216 i
l
Regional Administrator, Region III j
U.S. Nuclear Regulatory Comission Ohio Environmental Protection Agency l
799 Roosevelt Road 361 East Broad Street j
l Glen Ellyn, Illinois Columbus, Ohio 43266-0558 i
l Fresident, Beard of Mr. Robert B. Borsum County Commissioners of Babcock & Wilcox Ottawa County Nuclear Power Generation Division Port Clinton, Ohio 43452 Suite 525, 1700 Rockville Pike Rockville, Maryland 20852 State of Ohio Public Utilities Comission i
Resident Inspector 180 East Broad Street a
U.S. Nuclear Regulatory Commission Columbus, Ohio 43266-0573 l
5503 N. State Route 2 Oak Harbor, Ohio 43449 1
I i
l l
_ _ _ _ _ - - -}}
_ _ _ _ _ - - -}}

Latest revision as of 02:25, 3 December 2024

Forwards Final Draft Rept, Impact of Radiation Embrittlement on Integrity of Pressure Vessel Supports for Two PWR Plants. Meeting w/util,C-E & Westinghouse Owners Group Will Be Scheduled in mid-Mar 1989 Re Embrittlement
ML20236E145
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/27/1989
From: Holahan G
Office of Nuclear Reactor Regulation
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20235B069 List:
References
NUDOCS 8903230464
Download: ML20236E145 (3)


Text

__- ___ -

.. F6btuary 27,.1989 i

~ Docket No. 50-346

~

Mr. Donald C. Shelton Vice President - Nuclear.

Toledo Edison Company 300 Madison Avenue Toledo, Ohio -43652

Dear Mr. Shelton:

SUBJECT:

EMBRITTLEMENT OF REACTOR ~ VESSEL' SUPPORTS Since April 1988, the NRC staff.has been investigating the potential significance of the effects of low-temperature, low-flux embrittlement on the structural-integrity of reactor vessel supports. The reviews to date have concluded-that.

this issue does not pose an immediate concern to public safety, but.it challenges the margins provided by the defense-in-depth concept. Accordingly, we would like to meet with your representatives (as well as the Combustion -

Engineering and Westinghouse Owners Group) in mid-March 1989 to discuss embrittlenient of reactor vessel supports.

l To assist you in your preparation for-the meeting; I have enclosed two documents for your review. One is the Oak Ridge National Laboratory Final Draft Report on this issue, and the other is the staff's evaluation. We will be in touch.with you-in the near fu'ture to establish'a meeting date.

Sincerely,

' original signed by l

Gary M. Holahan, Acting Director Division of Reactor. Projects III, l

IV, V, and Special Projects Office.of Nuclear Reactor Regulation

Enclosures:

1.

" Impact of Radiation Embrittlement'on Integrity of Pressure Vessel Supports for Two PWR Plants," 0RNL/TM-10966, Final Draft, 12/7/88 2.

Staff Evaluation of Embrittlement of Reactor Vessel Supports,.1/89 cc: w/ enclosures See next page sed

.N8' DISTRIBUTION (w/o enclosures)

.@@ {'DoctetF11eJ(w/ enclosures)q 0GC (info. only) mo NRCTiocal'PDRs"h r LP l

.a PD5 Reading

^

E. Jordan i

B. Grimes 66I

$8

-G. Holahan ACRS(10) op M. Virgilio T. Wambach gh J. Lee J.'Hannon g

L T. Chan J. Richardson

/bp N

A? i

-efy/W 1

l P

ora QRp/PD5 Dd(DRSP/PD5 DRSP/PD33 D

P 905 (A)AD:DRSP35 (A]D:DRSP fChan TWambach 1 hton MVir ilio GHolahan Jtt

.02>1/89 P 02/n/89. 02R//89 2/pk/89 02/6g/89 02/3 /89

m e

o

,i,

e tsa(3,,

n UNITED STATES

,f NUCLEAR REGULATORY COMMISSION y

g n

j WASHINGTON, D. C. 20656

]

February 27, 1989 Docket No. 50-346 Mr. Donald C. Shelton 1

Vice President - Nuclear i

Toledo Edison Company 1

300 Madison Avenue i

Toledo, Ohio 43652

Dear Mr. Shelton:

SUBJECTi EMBRITTLEMENT OF REACTOR VESSEL SUPPORTS Since April 1988, the NRC staff has been investigating the potential significance of the effects of low-temperature, low-flux embrittlement on the structural integrity of reactor vessel suppcrts. The reviews to date have concluded that this issue does not pose an innediate concern to public safety, but it challenges the margins provided by the defense-in-depth concept. Accordingly, we would like to meet with your representatives (as well as the Combustion EngineeringandWestinghouseOwnersGroup)inmid-March 1989todiscuss embrittlement of reactor vessel supports.

To assist you in your preparation for the meeting, I have enclosed two documents for your review. One is the Oak Ridge National Laboratory Final Draft Report on this issue, and the other is the staff's evaluation. We will be in touch with you in the near future to establish a meeting date.

Sincerely, h

Y Gary M. Holahan, Acting Director Division of Reactor Projects III,

)

IV, V, and Special Projects Office of Nuclear Reactor Regulation 1

Enclosures:

1.

" Impact of Radiation Embrittlement on Integrity of Pressure Vessel Supports for Two PWR Plants," ORNL/TM-10966, Final Draft, 12/7/88 2.

Staff Evaluation of Embrittlement of Reactor Vessel Supports, 1/89 cc: w/ enclosures See next page q

i

o-

\\

1 Mr. Donald C. Shelton Davis-Besse Nuclear Power Station l

Toledo Edison Company Unit No. 1 l

.CC:

4 David E. Burke, Esq.

The Cleveland Electric Radiological Health Program 111uminating Company Ohio Department of Health P. O. Box 5000 1224 Kinnear Road Cleveland, Ohio 44101 Columbus, Ohio 43212 Mr. Robert W. Schrauder Attorney General Manager, Nuclear Licensing Department of Attorney Toledo Edison Company General i

Edison Plaza 30 East Broad Street 300 Madison Avenue Columbus, Ohio 43215 Toledo, Ohio 43652 l

Mr. James W. Harris, Director Gerald Charnoff, Esq.

(Addressee Only) l Shaw, Pittman, Potts Division of Power Generation

]

and Trowbridge Ohio Department of Industrial Relations 4

2300 N Street N.W.

2323 West 5th Avenue Washington, D.C. 20037 P. O. Box 825 Columbus, Ohio 43216 i

Regional Administrator, Region III j

U.S. Nuclear Regulatory Comission Ohio Environmental Protection Agency l

799 Roosevelt Road 361 East Broad Street j

l Glen Ellyn, Illinois Columbus, Ohio 43266-0558 i

l Fresident, Beard of Mr. Robert B. Borsum County Commissioners of Babcock & Wilcox Ottawa County Nuclear Power Generation Division Port Clinton, Ohio 43452 Suite 525, 1700 Rockville Pike Rockville, Maryland 20852 State of Ohio Public Utilities Comission i

Resident Inspector 180 East Broad Street a

U.S. Nuclear Regulatory Commission Columbus, Ohio 43266-0573 l

5503 N. State Route 2 Oak Harbor, Ohio 43449 1

I i

l l

_ _ _ _ _ - - -