ML20236X008: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-     . _ _ _
{{#Wiki_filter:-
i
i
()\%h O DA/RYLAND 3
()\\%h O DA/RYLAND hh[M[ COOPERATIVE
hh[M[ COOPERATIVE
* P O BOX 817 2615 EAST AVE SO
* P O BOX 817 2615 EAST AVE SO                                                                                       *
* LACR 3
* LACR (608) 788 4000   !
(608) 788 4000 JAMES W. TAYLOR General Manager November 18, 1987 In reply, please hk -U f
JAMES W. TAYLOR General Manager                                                                                                   November 18, 1987 In reply, please refer to LAC-12439 hk -U                f c_7. .__1. . : " r_-
refer to LAC-12439 c_7..__1.. : " r_-
i DOCKET No. 50-409  pp/ y } f[-g ,j' _   --
pp/ y } f[-g,j' _
zy
i DOCKET No. 50-409 zy
                                                                                                                                                          .-            -l
-l
                                                                                                                                                    ,7 UW31   ~ ~
,7 UW31
~ ~
Mr. A. Bert Davis, Regional Administrator U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III
Mr. A. Bert Davis, Regional Administrator U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III
                  /99 Roosevelt Road                                                                                                                                               i Glen Ellyn, IL 60137                                                                                                                                           ;
/99 Roosevelt Road Glen Ellyn, IL 60137


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
==SUBJECT:==
==SUBJECT:==
Dairyland Power Cooperative                                                                                                           )
Dairyland Power Cooperative
La Crosse Boiling Water Reactor (LACBWR)                                                                                             ;
)
  '                                          Provisional Operating License No. DPR-45 Special Report l
La Crosse Boiling Water Reactor (LACBWR)
l
Provisional Operating License No. DPR-45 Special Report l


==REFERENCES:==
==REFERENCES:==
(1) LACBWR Technical Specifications, Section 4.2.18.1 (2) LACBWR Technical Specifications, Section 6.9.2 In accordance with References (1) and (2) this letter serves as the notification by the Special Report required when the fire suppression water system is inoperable.
(1) LACBWR Technical Specifications, Section 4.2.18.1 (2) LACBWR Technical Specifications, Section 6.9.2 In accordance with References (1) and (2) this letter serves as the notification by the Special Report required when the fire suppression water system is inoperable.
The internal portion of the fire suppression water system was removed from service at 0630 on November 18, 1987 in order to replace a section of piping. The two diesel driven High Pressure Service Water Pumps control switches were turned off. The procedure controlling the internal fire suppression system removal from service states the pumps should be started if a fire occurs. Hoses were laid from the yard hydrants to areas inside the plant to provide backup fire suppression capability prior to removing the internal portion of the system from service.                                                                                                                   )1 The plant has been permanently shut down and the reactor defueled.                                                                     gb 8712080367 871128                                                                                                               b PDR             ADOCK 05000409 S                                  eda                                                                                        NOV 2 01987; PCI-39 j
The internal portion of the fire suppression water system was removed from service at 0630 on November 18, 1987 in order to replace a section of piping. The two diesel driven High Pressure Service Water Pumps control switches were turned off. The procedure controlling the internal fire suppression system removal from service states the pumps should be started if a fire occurs. Hoses were laid from the yard hydrants to areas inside the plant to provide backup fire suppression capability prior to removing the internal portion of the system from service.
)
The plant has been permanently shut down and the reactor defueled.
gb b
8712080367 871128 PDR ADOCK 05000409 NOV 2 01987; S
eda PCI-39 j


    .:w. .n h{                                                                                                                                         's Q M e-                                                                                                                                     d h1           -
.:w..n h{
4 j
's d
: Mr. A. Bert Davis
Q M e-h1 4
                    -LAC-124392                                                                                                               j
: Mr. A. Bert Davis j
                                                                                                                            '              t' F Page 2                                                                         >
-LAC-124392 j
November 18, 1987 f
t' F Page 2 November 18, 1987 f
                                          . Telephone notification was.made'to Nick'Jackiw, U. S. Nuclear Regulatory Commission, Region III,.at 0820 on November 18, 1987 by L. Goodman.
. Telephone notification was.made'to Nick'Jackiw, U. S. Nuclear Regulatory Commission, Region III,.at 0820 on November 18, 1987 by L. Goodman.
l
l
: If.you' have any question;, please contact us. -                                       *
: If.you' have any question;, please contact us. -
                                                                                                      ' Sincerely, DAIRYLAND-POWER COOPERATIVE Es f7
' Sincerely, DAIRYLAND-POWER COOPERATIVE Es f7 James W. Taylor.
;                                                                                                      James W. Taylor.                .
General Manager.
General Manager.             ,
JWT:LSG:sks Mr. Peter B. Erickson, LACBWR Project' Manager cc:
JWT:LSG:sks cc:                        Mr. Peter B. Erickson, LACBWR Project' Manager Division of' Nuclear Reactor Regulation-U. S. Nuclear Regulatory Commission Document ' Control.' Desk U..S. Nuclear Regulatory. Commission                                   <
Division of' Nuclear Reactor Regulation-U. S. Nuclear Regulatory Commission Document ' Control.' Desk U..S. Nuclear Regulatory. Commission Washington, DC. 20555-
Washington, DC. 20555-
~
                                                                                                            ~
Mr.. Ken Ridgway, NRC Resident Inspector T
Mr.. Ken Ridgway, NRC Resident Inspector T
k Ik PCl-39                                                               -
k Ik PCl-39
                                                          .1-                 ,
.1-Ah
Ah    $  ______a__._             _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _        .}}
______a__._
.}}

Latest revision as of 19:45, 2 December 2024

Special Rept Re Inoperability of Fire Suppression Water Sys. Internal Portion of Sys Removed from Svc on 871118 to Replace Section of Piping.Initially Reported on 871118.Plant Permanently Shut Down & Reactor Defueled
ML20236X008
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/18/1987
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
LAC-12439, NUDOCS 8712080367
Download: ML20236X008 (2)


Text

-

i

()\\%h O DA/RYLAND hh[M[ COOPERATIVE

  • P O BOX 817 2615 EAST AVE SO
  • LACR 3

(608) 788 4000 JAMES W. TAYLOR General Manager November 18, 1987 In reply, please hk -U f

refer to LAC-12439 c_7..__1.. : " r_-

pp/ y } f[-g,j' _

i DOCKET No. 50-409 zy

-l

,7 UW31

~ ~

Mr. A. Bert Davis, Regional Administrator U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III

/99 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

SUBJECT:

Dairyland Power Cooperative

)

La Crosse Boiling Water Reactor (LACBWR)

Provisional Operating License No. DPR-45 Special Report l

REFERENCES:

(1) LACBWR Technical Specifications, Section 4.2.18.1 (2) LACBWR Technical Specifications, Section 6.9.2 In accordance with References (1) and (2) this letter serves as the notification by the Special Report required when the fire suppression water system is inoperable.

The internal portion of the fire suppression water system was removed from service at 0630 on November 18, 1987 in order to replace a section of piping. The two diesel driven High Pressure Service Water Pumps control switches were turned off. The procedure controlling the internal fire suppression system removal from service states the pumps should be started if a fire occurs. Hoses were laid from the yard hydrants to areas inside the plant to provide backup fire suppression capability prior to removing the internal portion of the system from service.

)

The plant has been permanently shut down and the reactor defueled.

gb b

8712080367 871128 PDR ADOCK 05000409 NOV 2 01987; S

eda PCI-39 j

.:w..n h{

's d

Q M e-h1 4

Mr. A. Bert Davis j

-LAC-124392 j

t' F Page 2 November 18, 1987 f

. Telephone notification was.made'to Nick'Jackiw, U. S. Nuclear Regulatory Commission, Region III,.at 0820 on November 18, 1987 by L. Goodman.

l

If.you' have any question;, please contact us. -

' Sincerely, DAIRYLAND-POWER COOPERATIVE Es f7 James W. Taylor.

General Manager.

JWT:LSG:sks Mr. Peter B. Erickson, LACBWR Project' Manager cc:

Division of' Nuclear Reactor Regulation-U. S. Nuclear Regulatory Commission Document ' Control.' Desk U..S. Nuclear Regulatory. Commission Washington, DC. 20555-

~

Mr.. Ken Ridgway, NRC Resident Inspector T

k Ik PCl-39

.1-Ah

______a__._

.