ML20245B266: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
                                      - --       --
- --
            a               >,.
--
              '
a
                                                          SAFEGUARDS INFORMATION
>,.
                                                                                                                    l
SAFEGUARDS INFORMATION
                    '
'
                                                                  JUU 14123
l
l                               Docket Nos. 50-338, 50-339
'
l                               License Nos. NPF-4, NPF-7
JUU 14123
l
Docket Nos. 50-338, 50-339
l
License Nos. NPF-4, NPF-7
l.
l.
                                                                                                                    1
1
                                Virginia Electric and Power Company
Virginia Electric and Power Company
                                ATTN: Mr. W. R. Cartwright, Vice President,
ATTN:
                                                              "                           A
Mr. W. R. Cartwright, Vice President,
                                5000 Domi           ou ar                                   ARDS MORWil0N REMOVED
"
                                Glen Allen, VA 23060
A
                                Gentlemen:
ARDS MORWil0N REMOVED
                                                                                                                    l
5000 Domi
                                                                                                                    '
ou
                                SUBJECT:       NRC INSPECTION REPORT NOS. 50-338/89-17 AND 50-339/89-17
ar
                                This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Glen Allen, VA 23060
                                Ms. Orysia M. Masnyk on May 1-5, 1989. The inspection included a review of
Gentlemen:
                                activities authorizod for your North Anna facility. At the conclusion of the
l
                                inspection, the findings were discussed with those members of your staff
SUBJECT:
                                identified in the enclosed Inspection Report.
NRC INSPECTION REPORT NOS. 50-338/89-17 AND 50-339/89-17
                                Areas examined during the inspection are identified in the report. Within
'
                                these areas, the inspection consisted of selective examinations of procedures
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
                                and representative records, interviews with personnel, and observation of
Ms. Orysia M. Masnyk on May 1-5,
                                activities in progress.
1989.
                                Within the scope of the inspection, no violations or deviations were identified.
The inspection included a review of
                                In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
activities authorizod for your North Anna facility. At the conclusion of the
                                security measures are exempt from public disclosure. Therefore, the enclosure
inspection, the findings were discussed with those members of your staff
                                to this letter with the exception of the report cover page, which presents a
identified in the enclosed Inspection Report.
                                nonexempt summary, will not be placed in the NRC Public Document Room.
Areas examined during the inspection are identified in the report. Within
                                The responses directed by this letter and its enclosure is not subject to the
these areas, the inspection consisted of selective examinations of procedures
                                clearance procedures of the Office of Management and Budget as required by the
and representative records, interviews with personnel, and observation of
                                Paperwork Reduction Act of 1980, Pub. L. No. 96-511.
activities in progress.
                                Should you have any questions concerning this letter, please contact us.
Within the scope of the inspection, no violations or deviations were identified.
                                                                          Sincerely,
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
                                              90 4                           ORIGINAL SIGNED BY
security measures are exempt from public disclosure. Therefore, the enclosure
                  g                            o    y                     y$ g g g) g y,N g3,f
to this letter with the exception of the report cover page, which presents a
                                                                          Nuclear Materials Safety and
nonexempt summary, will not be placed in the NRC Public Document Room.
                                                                                                                    '
The responses directed by this letter and its enclosure is not subject to the
                    G
clearance procedures of the Office of Management and Budget as required by the
                                                                              Safeguards Branch
Paperwork Reduction Act of 1980, Pub. L. No. 96-511.
                                                                          Division of Radiation Safety
Should you have any questions concerning this letter, please contact us.
                                                                              and Safeguards
Sincerely,
                                Enclosure:       (See page 2)
90 4
wment icemitted beewe                                                                                       b
ORIGINAL SIGNED BY
    "' " ' * * * "
y
            &n, When separated from                     SAFEGUARDS INFORMATION                            M>
y$ g g g) g y,N g3,f
                                                                                                        j g g
g
                W4 document ts decontrollatf.                                                               \
o
                                                                                                                    i
G
u_.___._m._       . _ . .
Nuclear Materials Safety and
'
Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosure:
(See page 2)
b
SAFEGUARDS INFORMATION
M>
wment icemitted beewe
"' " ' * * * "
&n, When separated from
j g g
W4 document ts decontrollatf.
\\
i
u_.___._m._
. _ . .


k
k
....   ...
...
  -
. . . .
                                      SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
            . Virginia Electric and Power Company     2           14 gg
-
            Enclosure:
. Virginia Electric and Power Company
            NRC. Inspection Report
2
            cc w/ encl:
14 gg
            G. E. Kane, Station Manager
Enclosure:
            R. F. Saunders, Manager - Nuclear                           i
NRC. Inspection Report
                Programs and Licensing
cc w/ encl:
            cc w/ Inspection Summary:
G. E. Kane, Station Manager
            Commonwealth of Virginia
R. F. Saunders, Manager - Nuclear
            bec w/ encl:
i
            NRR/DRIS/SB                                                 4
Programs and Licensing
                                                                        ,
cc w/ Inspection Summary:
            bec.w/ Inspection Summary:
Commonwealth of Virginia
            Document Control Desk (RIDS IE04), 016
bec w/ encl:
            NRC Resident Inspector
NRR/DRIS/SB
                                                                        <
4
                                                                        !
,
              RII                           RII
bec.w/ Inspection Summary:
                      g        R                        II             l
Document Control Desk (RIDS IE04), 016
                      k:tj     DMcGuire     PFredrickson    g
NRC Resident Inspector
              OMa)89
<
              05/0              06/6 /89     05/[/89       >/   89
!
      _           ....
RII
        ';g,j''l j              ;3;u.EGUARDS INFORMATION
R
RII
II
l
g
PFredrickson
k:tj
DMcGuire
g
OMa)89
06/6 /89
05/[/89
>/
89
05/0
_
. . . .
';g,j''l
;3;u.EGUARDS INFORMATION
j
}}
}}

Latest revision as of 03:23, 2 December 2024

Forwards Insp Repts 50-338/89-17 & 50-339/89-17 on 890501-05.No Violations or Deviations Noted
ML20245B266
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/14/1989
From: Cline W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20245B269 List:
References
NUDOCS 8906230106
Download: ML20245B266 (2)


See also: IR 05000338/1989017

Text

-

- --

--

a

>,.

SAFEGUARDS INFORMATION

'

l

'

JUU 14123

l

Docket Nos. 50-338, 50-339

l

License Nos. NPF-4, NPF-7

l.

1

Virginia Electric and Power Company

ATTN:

Mr. W. R. Cartwright, Vice President,

"

A

ARDS MORWil0N REMOVED

5000 Domi

ou

ar

Glen Allen, VA 23060

Gentlemen:

l

SUBJECT:

NRC INSPECTION REPORT NOS. 50-338/89-17 AND 50-339/89-17

'

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Ms. Orysia M. Masnyk on May 1-5,

1989.

The inspection included a review of

activities authorizod for your North Anna facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure. Therefore, the enclosure

to this letter with the exception of the report cover page, which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosure is not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

90 4

ORIGINAL SIGNED BY

y

y$ g g g) g y,N g3,f

g

o

G

Nuclear Materials Safety and

'

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure:

(See page 2)

b

SAFEGUARDS INFORMATION

M>

wment icemitted beewe

"' " ' * * * "

&n, When separated from

j g g

W4 document ts decontrollatf.

\\

i

u_.___._m._

. _ . .

k

...

. . . .

SAFEGUARDS INFORMATION

-

. Virginia Electric and Power Company

2

14 gg

Enclosure:

NRC. Inspection Report

cc w/ encl:

G. E. Kane, Station Manager

R. F. Saunders, Manager - Nuclear

i

Programs and Licensing

cc w/ Inspection Summary:

Commonwealth of Virginia

bec w/ encl:

NRR/DRIS/SB

4

,

bec.w/ Inspection Summary:

Document Control Desk (RIDS IE04), 016

NRC Resident Inspector

<

!

RII

R

RII

II

l

g

PFredrickson

k:tj

DMcGuire

g

OMa)89

06/6 /89

05/[/89

>/

89

05/0

_

. . . .

';g,jl

3;u.EGUARDS INFORMATION

j