ML20247D435: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML20247D435
| number = ML20247D435
| issue date = 03/15/1989
| issue date = 03/15/1989
| title = Forwards Corrected Notice of Violation from Insp Repts 50-424/89-03 & 50-425/89-03.Notice Inadvertently Dtd 890202. Correct Date Is 890302
| title = Forwards Corrected Notice of Violation from Insp Repts 50-424/89-03 & 50-425/89-03.Notice Inadvertently . Correct Date Is 890302
| author name = Julian C
| author name = Julian C
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:- _ - -                                           ._
{{#Wiki_filter:- _ - -
                          _4 , .. i.       .
._
                          .         ..
_4 , .. i.
                              *                                                                                                9:
.
                                                                                                                              9
9:
                                                                                            g g ggg                           06
.
..
9
*
g g ggg
06
l
l
l
l
                                        ' Docket Nos. 50-424, 50-425
' Docket Nos. 50-424, 50-425
                                        -License:Nos. NPF-68, CPPR-109 .
-License:Nos. NPF-68, CPPR-109
.
'
'
                                          Georgia Power Company
Georgia Power Company
                                          ATTN: Mr. W. G. Hairston, III
ATTN: Mr. W. G. Hairston, III
-
Senior Vice President -
'
'
    -
,
                                        ,
.
                                                    Senior Vice President -
. Nuclear Operations
                                              .
P. O. Box 1295-
                                                    . Nuclear Operations
Birmingham,;AL 35201
                                          P. O. Box 1295-
'
                                          Birmingham,;AL 35201
Gentlemen:
                                                                                                                                    '
. SUBJECT:
                                            Gentlemen:
ERRATA LETTER : FOR ' NRC INSPECTION REPORT N05. 50-424/89-03 AND
                                          . SUBJECT:       ERRATA LETTER : FOR ' NRC INSPECTION REPORT N05. 50-424/89-03 AND
50-425/89-03
                                                          50-425/89-03
l
                                                                                                                            '
Thel above subject: inspection report was transmitted to you by letter, dated
l                                          Thel above subject: inspection report was transmitted to you by letter, dated
'
                                          March 2, 1989. It has come to our attention that the Notice of Violation was-
March 2, 1989.
                                            inadvertently dated February 2,1989. _ A corrected Notice of Violation is
It has come to our attention that the Notice of Violation was-
                                            enclosed. Please delete the superseded Notice of Violation. and insert the
inadvertently dated February 2,1989. _ A corrected Notice of Violation is
                                            corrected Notice with your copy of the report.
enclosed.
                                            If you have 'any-questions concerning this matter, please contact us.
Please delete the superseded Notice of Violation. and insert the
                                                                                                  Sincerely,
corrected Notice with your copy of the report.
                                                                                                    ORIGINAL SIGNED BY
If you have 'any-questions concerning this matter, please contact us.
                                                                                                    CAUDLE A.JULIAN
Sincerely,
                                                                                                  Caudie A. Julian, Chief
ORIGINAL SIGNED BY
                                                                                                  Engineering Branch
CAUDLE A.JULIAN
                                                                                                  Division of Reactor Safety
Caudie A. Julian, Chief
                                            Enclosure:
Engineering Branch
                                            As Stated
Division of Reactor Safety
                                            cc w/ encl:
Enclosure:
                                            R. P. Mcdonald, Executive Vice
As Stated
                                                President, Nuclear Operations
cc w/ encl:
                                            P.   D.. Rice, Vice President, Project
R. P. Mcdonald, Executive Vice
                                                Director
President, Nuclear Operations
                                            C. W. Hayes, Vogtle Quality
P. D.. Rice, Vice President, Project
                                                Assurance Manager
Director
                                            G. Bockhold,'Jr., General Manager,
C. W. Hayes, Vogtle Quality
                                                Nuclear Operations
Assurance Manager
                                            J. P. Kane, Manager Licensing
G. Bockhold,'Jr., General Manager,
                                                and Engineering
Nuclear Operations
                                            J. A. Bailey, Project Licensing
J. P. Kane, Manager Licensing
                                                Manager
and Engineering
                                            B. W. Churchill, Esq., Shaw,
J. A. Bailey, Project Licensing
                                              - Pittman, Potts and Trowbridge
Manager
                                            cc w/ encl:                   (see page 2)
B. W. Churchill, Esq., Shaw,
                                                                        G
- Pittman, Potts and Trowbridge
                                                                        g3h          890325 F
cc w/ encl:
                                                                                      0500o424
(see page 2)
                                                                                                                                \
g 3 h
                                                                                                                                  o;
890325
  _ _ _ _ _ _ _ __ _ _ _ _                             _ _ _ _ _ _ _ _   _       __._____ ___ PNV II
F
\\
0500o424
o;
__._____ ___ PNV II
G
_ _ _ _ _ _ _ __ _ _ _ _
_ _ _ _ _ _ _ _
_


-_.
-_.
          ,.     .
,.
      .     .
.
    .
.
        *
.
                Georgia Power Company               2 %$ ih
.
                cc w/ encl:   (cont'd)
%$ ih
                D. Kirkland, III, Counsel,
*
                  Office of the Consumer's Utility
Georgia Power Company
                  Council
2
                D. Feig, Georgians Against
cc w/ encl:
                  Nuclear Energy
(cont'd)
                State of Georgia
D. Kirkland, III, Counsel,
                bec w/ encl:
Office of the Consumer's Utility
                E. Reis, 0GC
Council
                J. Hopkins, NRR
D. Feig, Georgians Against
                M. Sinkule, RII
Nuclear Energy
                DRS Technical Assistant                     l
State of Georgia
                NRC Resident Inspector
bec w/ encl:
                                                            -
E. Reis, 0GC
                Document Control Desk
J. Hopkins, NRR
                  I                     .
M. Sinkule, RII
                    /
DRS Technical Assistant
                    oley:gb             p
l
              '
NRC Resident Inspector
                  3/ , c;'/89         / s /89
-
Document Control Desk
I
.
/
oley:gb
p
3/ , c;'/89
/ s /89
'
1
1
l
l
}}
}}

Latest revision as of 21:11, 1 December 2024

Forwards Corrected Notice of Violation from Insp Repts 50-424/89-03 & 50-425/89-03.Notice Inadvertently . Correct Date Is 890302
ML20247D435
Person / Time
Site: Vogtle  
Issue date: 03/15/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20247D440 List:
References
NUDOCS 8903310079
Download: ML20247D435 (2)


See also: IR 05000424/1989003

Text

- _ - -

._

_4 , .. i.

.

9:

.

..

9

g g ggg

06

l

l

' Docket Nos. 50-424, 50-425

-License:Nos. NPF-68, CPPR-109

.

'

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

-

Senior Vice President -

'

,

.

. Nuclear Operations

P. O. Box 1295-

Birmingham,;AL 35201

'

Gentlemen:

. SUBJECT:

ERRATA LETTER : FOR ' NRC INSPECTION REPORT N05. 50-424/89-03 AND

50-425/89-03

l

Thel above subject: inspection report was transmitted to you by letter, dated

'

March 2, 1989.

It has come to our attention that the Notice of Violation was-

inadvertently dated February 2,1989. _ A corrected Notice of Violation is

enclosed.

Please delete the superseded Notice of Violation. and insert the

corrected Notice with your copy of the report.

If you have 'any-questions concerning this matter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

CAUDLE A.JULIAN

Caudie A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

As Stated

cc w/ encl:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

P. D.. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold,'Jr., General Manager,

Nuclear Operations

J. P. Kane, Manager Licensing

and Engineering

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

- Pittman, Potts and Trowbridge

cc w/ encl:

(see page 2)

g 3 h

890325

F

\\

0500o424

o;

__._____ ___ PNV II

G

_ _ _ _ _ _ _ __ _ _ _ _

_ _ _ _ _ _ _ _

_

-_.

,.

.

.

.

.

%$ ih

Georgia Power Company

2

cc w/ encl:

(cont'd)

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

State of Georgia

bec w/ encl:

E. Reis, 0GC

J. Hopkins, NRR

M. Sinkule, RII

DRS Technical Assistant

l

NRC Resident Inspector

-

Document Control Desk

I

.

/

oley:gb

p

3/ , c;'/89

/ s /89

'

1

l