ML20247K385: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:i | {{#Wiki_filter:i | ||
^ | |||
I i | I i | ||
l 1 | l 1 | ||
DOCKET: 50-369 UNIT: McGuire i Date: | DOCKET: 50-369 UNIT: McGuire i Date: | ||
05/15/98-NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
') | |||
i MONTil: April,1998 M Juire Unit i began the month of April operating at 100% full power. The unit operated at or near 100% | i MONTil: April,1998 M Juire Unit i began the month of April operating at 100% full power. The unit operated at or near 100% | ||
full power for the entire month. | full power for the entire month. | ||
| Line 30: | Line 31: | ||
l l | l l | ||
Prepared by: R. A. Williams Telephone:(704)- 382-5346 | Prepared by: R. A. Williams Telephone:(704)- 382-5346 | ||
~ | |||
9805220000 980515 PDR | 9805220000 980515 PDR ADOCK 05000369 R | ||
PDR l | |||
u DOCKET: 50-370 | u DOCKET: 50-370 i | ||
UNIT: McGuire 2 Date: | |||
05/15/98 | |||
) | |||
NARRATIVE | NARRATIVE | ||
==SUMMARY== | ==SUMMARY== | ||
MONTH: April,1998 McGuire Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100% | MONTH: April,1998 McGuire Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100% | ||
full power for the entire month. | full power for the entire month. | ||
l Prepared by: R. A. Williams | l Prepared by: R. A. Williams | ||
) | |||
Telephone: (704)- 382-5346 | Telephone: (704)- 382-5346 l | ||
h | i h | ||
- _ - - _ - _ _ _ _ . - - .}} | - _ - - _ - _ _ _ _. - -.}} | ||
Latest revision as of 20:07, 1 December 2024
| ML20247K385 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 04/30/1998 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20247K356 | List: |
| References | |
| NUDOCS 9805220080 | |
| Download: ML20247K385 (2) | |
Text
i
^
I i
l 1
DOCKET: 50-369 UNIT: McGuire i Date:
05/15/98-NARRATIVE
SUMMARY
')
i MONTil: April,1998 M Juire Unit i began the month of April operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
1 l
l l
Prepared by: R. A. Williams Telephone:(704)- 382-5346
~
9805220000 980515 PDR ADOCK 05000369 R
PDR l
u DOCKET: 50-370 i
UNIT: McGuire 2 Date:
05/15/98
)
NARRATIVE
SUMMARY
MONTH: April,1998 McGuire Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
l Prepared by: R. A. Williams
)
Telephone: (704)- 382-5346 l
i h
- _ - - _ - _ _ _ _. - -.