ML20247M848: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ - _     _ _ _ _ _ _ _ _ - _ _ _ _ _ -
{{#Wiki_filter:_ - _
May 19,:1998 4
May 19,:1998 4
Mr. Garrett D. Edwards Director-Licensing. MC 62A-1 PECO Energy Company Nuclear Group Headquarters P.O. Box No.195 Wayne, PA 19087
Mr. Garrett D. Edwards Director-Licensing. MC 62A-1 PECO Energy Company Nuclear Group Headquarters P.O. Box No.195 Wayne, PA 19087
Line 25: Line 25:


==Dear Mr. Edwards:==
==Dear Mr. Edwards:==
 
The Commission has issued the enclosed Confirmatory Order Modifying Licenses (Order) for the PECO Energy Company's (licensee's) Peach Bottom Atomic Power Station, Units 2 and 3. This Order confirms the licensee's commitment, as stated in the hcensee's {{letter dated|date=August 2, 1995|text=letter dated August 2, 1995}}, to complete implementation of ThermcH.ag 3301 fire bamers corrective actions at both units prior to restart from 3R12 refuehng outa0s of Peach Bottom Atomic Power Station, Unit 3, scheduled for October 1999. This commitment was set out in your letter of consent dated April 27,1998.
The Commission has issued the enclosed Confirmatory Order Modifying Licenses (Order) for the PECO Energy Company's (licensee's) Peach Bottom Atomic Power Station, Units 2 and 3. This Order confirms the licensee's commitment, as stated in the hcensee's letter dated August 2, 1995, to complete implementation of ThermcH.ag 3301 fire bamers corrective actions at both units prior to restart from 3R12 refuehng outa0s of Peach Bottom Atomic Power Station, Unit 3, scheduled for October 1999. This commitment was set out in your letter of consent dated April 27,1998.
l l
l l         You should proceed with implementation of these corrective actions in accordance with your proposed schedule.
You should proceed with implementation of these corrective actions in accordance with your proposed schedule.
A copy of this Order is being filed with the Office of the Federal Register for publication.
A copy of this Order is being filed with the Office of the Federal Register for publication.
;                                                        Smcorely, l                                                           /S/
: Smcorely, l
l                                                         Mohan C. Thadani, Senior Project Ms.,4ger Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278                   DISTRIBUTION.
/S/
Docket                                                     OGC
l Mohan C. Thadani, Senior Project Ms.,4ger Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 DISTRIBUTION.
Docket OGC


==Enclosure:==
==Enclosure:==
Order                               PUBLIC                                                     GHill(2/ docket)
Order PUBLIC GHill(2/ docket)
PDl-2 Reading                                               ACRS cc w/ encl: See next page                       SColhns/FMirgalia                                           SECY BBoger                                                     BMcCabe r                                                        JZwolinski                                                 CAnderson l                                                         RCapra                                                     MThadani l                                                         MO'Brien                                                   SWest i
PDl-2 Reading ACRS cc w/ encl: See next page SColhns/FMirgalia SECY BBoger BMcCabe JZwolinski CAnderson r
AKugler                                                    JLieberman MTschiltz (Thermo-Lag)
l RCapra MThadani l
Document NarDe:         BTHLAG.ORD       __f_, *Spe previous concurrence OFC      kb-2             LA:PN             PD:PDl-2               (A)D:Dl W                                 OGC*
MO'Brien SWest AKugler JLieberman i
NAME      MThadani:mw      MOhrh             RCapra "               JZwolink                                   RHoefling DATE      I /l Y 198       5/ fk/98         5 / I 4 /98           i / 6 /98                                 05/14/98 2 '/
MTschiltz (Thermo-Lag)
OFC       ADPR(A) ?       @4RR                                                                                           !\ l NAME     BBoger h\         dCollins                       W n ~" r.                                                     9 DATE     I / /3 /98       h / N /98
Document NarDe:
                                                                                                                          *      !    kN 3      OFFICIAL RECORD COPY 9905260395 980519 PDR     ADOCK 05000277 P                       PDR
BTHLAG.ORD
*Spe previous concurrence
: __f_,
kb-2 LA:PN PD:PDl-2 (A)D:Dl W OGC*
OFC MOhrh RCapra "
JZwolink RHoefling NAME MThadani:mw I / Y 198 5/ fk/98 5 / I 4 /98 i / 6 /98 05/14/98 DATE l
2 '/
! \\
l OFC ADPR(A) ?
@4RR NAME BBoger h\\
dCollins W n ~" r.
9 kN DATE I / /3 /98 h / N /98 OFFICIAL RECORD COPY 3
9905260395 980519 PDR ADOCK 05000277 P
PDR


                                                      , , p5? "'%
,, p5? "'%
p                      k                               UNITED STATES g                           j             NUCLEAR REGULATORY COMMISSION o                                                WASHINGTON, D.C. 20066 4001 May 19, 1998 g * * * * * /g Mr. Garrett D. Edwards Director-Ucensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters P.O. Box No.195 Wayne, PA 19087
k UNITED STATES p
g j
NUCLEAR REGULATORY COMMISSION g * * * * * /g WASHINGTON, D.C. 20066 4001 o
May 19, 1998 Mr. Garrett D. Edwards Director-Ucensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters P.O. Box No.195 Wayne, PA 19087


==SUBJECT:==
==SUBJECT:==
Line 49: Line 66:


==Dear Mr. Edwards:==
==Dear Mr. Edwards:==
 
The Commission has issued the enclosed Confirmatory Order Modifying Ucenses (Order) for the PECO Energy Company's (licensee's) Peach Bottom Atomic Power Station, Units 2 and 3. This Order confirms the licensee's commitment, as stated in the licensee's {{letter dated|date=August 2, 1995|text=letter dated August 2, 1995}}, to complete implementation of Thermo-Lag 330-1 fire barriers corrective actions at both units prior to restart from 3R12 refueling outage of Peach Bottom Atomic Power Station, Unit 3, scheduled for October 1999. This commitment was set out in your letter of consent dated April 27,1998.
The Commission has issued the enclosed Confirmatory Order Modifying Ucenses (Order) for the PECO Energy Company's (licensee's) Peach Bottom Atomic Power Station, Units 2 and 3. This Order confirms the licensee's commitment, as stated in the licensee's letter dated August 2, 1995, to complete implementation of Thermo-Lag 330-1 fire barriers corrective actions at both units prior to restart from 3R12 refueling outage of Peach Bottom Atomic Power Station, Unit 3, scheduled for October 1999. This commitment was set out in your letter of consent dated April 27,1998.
You should proceed with implementation of these corrective actions in accordance with your proposed schedule.
You should proceed with implementation of these corrective actions in accordance with your proposed schedule.
A copy of this Order is being filed with the Office of the Federal Register for publication.
A copy of this Order is being filed with the Office of the Federal Register for publication.
Line 58: Line 74:
Order cc w/ encl: See next page I
Order cc w/ encl: See next page I


Mr. Garrett D. Edwards                                             Peach Bottom Atomic Power Station, PECO Energy Company                                                 Units 2 and 3 cc:
Mr. Garrett D. Edwards Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 cc:
J. W. Durham, Sr., Esquire                                           Chief-Division of Nuclear Safety Sr. V.P. & General Counsel                                           PA Dept. of PECO Energy Company                                                   Environmental Resources 2301 Market Street, S261                                             P.O. Box 8469 Philadelphia, PA 19101                                               Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President                             Board of Supervisors Peach Bottom Atomic Power Station                                   Peach Bottom Township 1848 Lay Road                                                       R. D. #1 Delta, PA 17314                                                     Delta, PA 17314 PECO Energy Company                                                 Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-SS                                     Engineering Division Peach Bottom Atomic Power Station                                   Chief Engineer 1848 Lay Road                                                       6 St. Paul Centre Delta, PA 17314                                                     Baltimore, MD 21202-6806 Resident inspector                                                   Mr. Richard McLean U.S. Nuclear Regulatory Commission                                   Power Plant and Environmental Peach Bottom Atomic Power Station                                     Review Division P.O. Box 399                                                         Department of Natural Resources Delta, PA 17314                                                     B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission                                   Dr. Judith Johnsrud 475 Allendale Road                                                   National Energy Committee King of Prussia, PA 19406                                           Sierra Club 433 Orlando Avenue Mr. Roland Fletcher                                                 State College, PA 16803 Department of Environment 201 West Preston Street                                             Manager-Financial Control & Co-Owner Baltimore, MD 21201                                                   Affairs Public Service Electric and Gas A. F. Kirby,111                                                       Company Extemal Operations - Nuclear                                         P.O. Box 236 Delmarva Power & Light Company                                       Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899                                               Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company                                                 Nuclear Group Headquarters Plant Manager                                                       Correspondence Control Desk Peach Bottom Atomic Power Station                                   P.O. Box No.195 1848 Lay Road                                                       Wayne, PA 19087-0195 Delta, PA 17314}}
J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S261 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Financial Control & Co-Owner Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirby,111 Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314}}

Latest revision as of 19:35, 1 December 2024

Forwards Confirmatory Order Modifying Licenses for Util Units 2 & 3.Order Confirms Licensee Commitment,As Stated in Licensee Ltr Dtd 950802,to Complete Implementation of Thermo-Lag 330-1 Fire Barriers Corrective Actions
ML20247M848
Person / Time
Site: Peach Bottom  
Issue date: 05/19/1998
From: Thadani M
NRC (Affiliation Not Assigned)
To: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20247M853 List:
References
NUDOCS 9805260395
Download: ML20247M848 (3)


Text

_ - _

May 19,:1998 4

Mr. Garrett D. Edwards Director-Licensing. MC 62A-1 PECO Energy Company Nuclear Group Headquarters P.O. Box No.195 Wayne, PA 19087

SUBJECT:

CONFIRMATORY ORDER MODIFYING LICENSES

Dear Mr. Edwards:

The Commission has issued the enclosed Confirmatory Order Modifying Licenses (Order) for the PECO Energy Company's (licensee's) Peach Bottom Atomic Power Station, Units 2 and 3. This Order confirms the licensee's commitment, as stated in the hcensee's letter dated August 2, 1995, to complete implementation of ThermcH.ag 3301 fire bamers corrective actions at both units prior to restart from 3R12 refuehng outa0s of Peach Bottom Atomic Power Station, Unit 3, scheduled for October 1999. This commitment was set out in your letter of consent dated April 27,1998.

l l

You should proceed with implementation of these corrective actions in accordance with your proposed schedule.

A copy of this Order is being filed with the Office of the Federal Register for publication.

Smcorely, l

/S/

l Mohan C. Thadani, Senior Project Ms.,4ger Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 DISTRIBUTION.

Docket OGC

Enclosure:

Order PUBLIC GHill(2/ docket)

PDl-2 Reading ACRS cc w/ encl: See next page SColhns/FMirgalia SECY BBoger BMcCabe JZwolinski CAnderson r

l RCapra MThadani l

MO'Brien SWest AKugler JLieberman i

MTschiltz (Thermo-Lag)

Document NarDe:

BTHLAG.ORD

  • Spe previous concurrence
__f_,

kb-2 LA:PN PD:PDl-2 (A)D:Dl W OGC*

OFC MOhrh RCapra "

JZwolink RHoefling NAME MThadani:mw I / Y 198 5/ fk/98 5 / I 4 /98 i / 6 /98 05/14/98 DATE l

2 '/

! \\

l OFC ADPR(A) ?

@4RR NAME BBoger h\\

dCollins W n ~" r.

9 kN DATE I / /3 /98 h / N /98 OFFICIAL RECORD COPY 3

9905260395 980519 PDR ADOCK 05000277 P

PDR

,, p5? "'%

k UNITED STATES p

g j

NUCLEAR REGULATORY COMMISSION g * * * * * /g WASHINGTON, D.C. 20066 4001 o

May 19, 1998 Mr. Garrett D. Edwards Director-Ucensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters P.O. Box No.195 Wayne, PA 19087

SUBJECT:

CONFIRMATORY ORDER MODIFYING UCENSES

Dear Mr. Edwards:

The Commission has issued the enclosed Confirmatory Order Modifying Ucenses (Order) for the PECO Energy Company's (licensee's) Peach Bottom Atomic Power Station, Units 2 and 3. This Order confirms the licensee's commitment, as stated in the licensee's letter dated August 2, 1995, to complete implementation of Thermo-Lag 330-1 fire barriers corrective actions at both units prior to restart from 3R12 refueling outage of Peach Bottom Atomic Power Station, Unit 3, scheduled for October 1999. This commitment was set out in your letter of consent dated April 27,1998.

You should proceed with implementation of these corrective actions in accordance with your proposed schedule.

A copy of this Order is being filed with the Office of the Federal Register for publication.

Sincerely, Mohan C. Thadani, enior Project Manager Project Directorate 1-2 Division of Reactor Projects - t/il Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosure:

Order cc w/ encl: See next page I

Mr. Garrett D. Edwards Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S261 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Financial Control & Co-Owner Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirby,111 Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314