{{#Wiki_filter:October 29, 2020
{{#Wiki_filter:October 29, 2020  
Mr. Peter Dietrich
Senior VP and Chief Nuclear Officer
Mr. Peter Dietrich  
DTE Electric Company
Senior VP and Chief Nuclear Officer  
Fermi 2 - 260 TAC
DTE Electric Company  
6400 North Dixie Highway
Fermi 2 - 260 TAC  
Newport, MI 48166
6400 North Dixie Highway  
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES
Newport, MI 48166  
            ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR
            INFORMATION: INSPECTION REPORT 05000341/2021012
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES  
Dear Mr. Dietrich:
ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR  
On January 11, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
INFORMATION: INSPECTION REPORT 05000341/2021012  
Design Bases Assurance Inspection (Programs) at Fermi Power Plant, Unit 2. This inspection
will be performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design
Dear Mr. Dietrich:  
On January 11, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline  
Design Bases Assurance Inspection (Programs) at Fermi Power Plant, Unit 2. This inspection  
will be performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design  
Bases Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power-
Bases Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power-
Operated Valves Under 10 CFR 50.55a Requirements.
Operated Valves Under 10 CFR 50.55a Requirements.  
This inspection will evaluate the reliability, functional capability, and design basis of risk-
This inspection will evaluate the reliability, functional capability, and design basis of risk-
important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable
important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable  
10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the
10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the  
team will select risk-important POVs used to prevent and mitigate the consequences of a design
team will select risk-important POVs used to prevent and mitigate the consequences of a design  
basis accident.
basis accident.  
The inspection will include two weeks of onsite inspection. The inspection team will consist of
three NRC inspectors. The current inspection schedule is as follows:
The inspection will include two weeks of onsite inspection. The inspection team will consist of  
    * Preparation week: January 4 - 8, 2021
three NRC inspectors. The current inspection schedule is as follows:  
    * Onsite weeks: January 11 - 15, 2021, and January 25 - 29, 2021
Experience with previous baseline engineering inspections of similar depth and length has
*  
shown this type of inspection is extremely resource intensive, both for the NRC inspectors and
Preparation week: January 4 - 8, 2021  
the licensee staff. In order to minimize the inspection impact on the site and to ensure a
productive inspection for both parties, we have enclosed a request for information needed for
*  
the inspection. It is important that all of these documents are up-to-date and complete in order
Onsite weeks: January 11 - 15, 2021, and January 25 - 29, 2021  
to minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection. Insofar as possible, this information should be provided
Experience with previous baseline engineering inspections of similar depth and length has  
electronically to the lead inspector. The information request has been divided into three groups:
shown this type of inspection is extremely resource intensive, both for the NRC inspectors and  
    * The first group lists information necessary for our initial inspection scoping activities.
the licensee staff. In order to minimize the inspection impact on the site and to ensure a  
        This information should be provided to the lead inspector no later than November 27,
productive inspection for both parties, we have enclosed a request for information needed for  
        2020. By December 4, 2020, the lead inspector will communicate the initial selected
the inspection. It is important that all of these documents are up-to-date and complete in order  
to minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the inspection. Insofar as possible, this information should be provided  
electronically to the lead inspector. The information request has been divided into three groups:  
*  
The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than November 27,  
2020. By December 4, 2020, the lead inspector will communicate the initial selected  


P. Dietrich                                   -2-
P. Dietrich  
        samples and any additional information needed to support the in-office preparation
-2-  
        activities.
    *   The second group of documents requested is those items needed to support our
samples and any additional information needed to support the in-office preparation  
        in-office preparation activities. This set of documents should be provided to the lead
activities.  
        inspector no later than December 28, 2020. During the preparation activities, the team
        may identify additional information needed to support the inspection.
*  
    *   The last group includes the additional information above as well as plant-specific
The second group of documents requested is those items needed to support our  
        reference material. This information should be available to the team onsite on
in-office preparation activities. This set of documents should be provided to the lead  
        January 11, 2021. It is also requested that corrective action documents and answers to
inspector no later than December 28, 2020. During the preparation activities, the team  
        questions developed during the inspection be provided to the lead inspector as the
may identify additional information needed to support the inspection.  
        documents are generated.
In addition, the enclosure includes information and requests addressing inspection logistics.
*  
The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our
The last group includes the additional information above as well as plant-specific  
licensing contact for this inspection is Shane Gatter of your organization. If there are any
reference material. This information should be available to the team onsite on  
questions about the inspection or the material requested in the enclosure, contact the lead
January 11, 2021. It is also requested that corrective action documents and answers to  
inspector at 630-829-9520 or via e-mail at Elba.SanchezSantiago@nrc.gov.
questions developed during the inspection be provided to the lead inspector as the  
This letter does not contain new or amended information collection requirements subject to
documents are generated.  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
In addition, the enclosure includes information and requests addressing inspection logistics.  
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our  
document displays a currently valid Office of Management and Budget Control Number.
licensing contact for this inspection is Shane Gatter of your organization. If there are any  
This letter and its enclosure will be made available for public inspection and copying at
questions about the inspection or the material requested in the enclosure, contact the lead  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
inspector at 630-829-9520 or via e-mail at Elba.SanchezSantiago@nrc.gov.  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
                                                Sincerely,
This letter does not contain new or amended information collection requirements subject to  
                                                /RA/
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
                                                Elba Sanchez Santiago
requirements were approved by the Office of Management and Budget, Control Number  
                                                Senior Reactor Inspector
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,  
                                                Engineering Branch 2
a request for information or an information collection requirement unless the requesting  
                                                Division of Reactor Safety
document displays a currently valid Office of Management and Budget Control Number.  
Docket No. 50-341
License No. NPF-43
This letter and its enclosure will be made available for public inspection and copying at  
Enclosure:
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
Design Bases Assurance Inspection (Programs)
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  
   Document Request
cc: Distribution via LISTSERV
Sincerely,  
/RA/  
Elba Sanchez Santiago  
Senior Reactor Inspector  
Engineering Branch 2  
Division of Reactor Safety  
Docket No. 50-341  
License No. NPF-43  
Enclosure:  
Design Bases Assurance Inspection (Programs)  
   Document Request  
cc: Distribution via LISTSERV  


P. Dietrich                               -3-
P. Dietrich  
Letter to Peter Dietrich from Elba Sanchez Santiago dated October 29, 2020.
-3-  
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES
            ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR
Letter to Peter Dietrich from Elba Sanchez Santiago dated October 29, 2020.  
            INFORMATION: INSPECTION REPORT 05000341/2021012
DISTRIBUTION:
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES  
Jessie Quichocho
ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR  
Richard Skokowski
INFORMATION: INSPECTION REPORT 05000341/2021012  
RidsNrrDorlLpl3
RidsNrrPMFermi2 Resource
DISTRIBUTION:  
RidsNrrDroIrib Resource
Jessie Quichocho  
John Giessner
Richard Skokowski  
Kenneth OBrien
RidsNrrDorlLpl3  
Jamnes Cameron
RidsNrrPMFermi2 Resource  
Allan Barker
RidsNrrDroIrib Resource  
DRPIII
John Giessner  
DRSIII
Kenneth OBrien  
ADAMS Accession Number: ML20303A287
Jamnes Cameron  
    Publicly Available       Non-Publicly Available       Sensitive       Non-Sensitive
Allan Barker  
OFFICE       RIII
DRPIII  
  NAME         ESanchez
DRSIII  
              Santiago:mb via
              e-mail
  DATE         10/29/2020
                                  OFFICIAL RECORD COPY
ADAMS Accession Number: ML20303A287  
Publicly Available  
Non-Publicly Available
Sensitive  
Non-Sensitive  
OFFICE  
RIII  
   
NAME  
ESanchez  
Santiago:mb via  
e-mail  
   
DATE  
10/29/2020  
OFFICIAL RECORD COPY  


                DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM
                                REQUEST FOR INFORMATION
I. ADMINISTRATIVE INSPECTION INFORMATION
  Inspection Report Number:     05000341/2021012
Enclosure
  Onsite Inspection Dates:       January 11-15, 2021, and January 25-29, 2021
DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM  
                                IP 71111.21N, Design Bases Assurance Inspection
REQUEST FOR INFORMATION  
  Inspection Procedure:          (Programs), Attachment 2, Design-Basis Capability of
                                Power-Operated Valves Under 10 CFR 50.55a Requirements
                                Elba Sanchez Santiago, Senior Reactor Engineer, RIII/DRS
I. ADMINISTRATIVE INSPECTION INFORMATION  
  Lead Inspector:                630-829-9520
                                Elba.SanchezSantiago@nrc.gov
Inspection Report Number:  
                                Benny Jose, Senior Reactor Inspector, RIII/DRS
05000341/2021012  
  Teammate Inspectors:
Onsite Inspection Dates:  
                                Michael Jones, Reactor Inspector, RIII/DRS
January 11-15, 2021, and January 25-29, 2021  
II. LOGISTICS
Inspection Procedure:
Email the following inspection logistics to the lead inspector by December 28, 2020, or sooner:
IP 71111.21N, Design Bases Assurance Inspection  
1. Inspection room name/number, directions from the main access facility, and phone number;
(Programs), Attachment 2, Design-Basis Capability of  
2. Interview room name/number;
Power-Operated Valves Under 10 CFR 50.55a Requirements  
3. Response team contact information (names and phone numbers) and team roles (e.g.,
Lead Inspector:
    management sponsor, lead, inspector counterpart);
Elba Sanchez Santiago, Senior Reactor Engineer, RIII/DRS  
4. Any site access/badging actions needed for each inspector;
630-829-9520  
5. Any dosimetry actions needed for each inspector;
Elba.SanchezSantiago@nrc.gov  
6. Entrance meeting time and location;
Teammate Inspectors:
7. Confirmation that the team will have access to a licensee computer with a nearby printer;
Benny Jose, Senior Reactor Inspector, RIII/DRS  
8. Confirmation that the team will have Wi-Fi access;
Michael Jones, Reactor Inspector, RIII/DRS  
9. Cafeteria location and hours;
10. Inspection response team normal working hours; and
11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff
II. LOGISTICS  
    meetings).
                                                                                Enclosure
Email the following inspection logistics to the lead inspector by December 28, 2020, or sooner:  
1. Inspection room name/number, directions from the main access facility, and phone number;  
2. Interview room name/number;  
3. Response team contact information (names and phone numbers) and team roles (e.g.,  
management sponsor, lead, inspector counterpart);  
4. Any site access/badging actions needed for each inspector;  
5. Any dosimetry actions needed for each inspector;  
6. Entrance meeting time and location;  
7. Confirmation that the team will have access to a licensee computer with a nearby printer;  
8. Confirmation that the team will have Wi-Fi access;  
9. Cafeteria location and hours;  
10. Inspection response team normal working hours; and  
11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff  
meetings).


III. INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this
information request. Provide the information electronically in searchable formats, if possible.
2
The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of
III. INFORMATION REQUEST  
use. Information in lists should contain enough information to be easily understood by
someone who has knowledge of light water reactor technology.
Contact the lead inspector as soon as possible if you have any questions regarding this  
Important Note: For the purpose of this inspection, POVs are valves with power actuators.
information request. Provide the information electronically in searchable formats, if possible.
Examples include motor-operated valves (MOVs), air-operated valves (AOVs),
The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of  
hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated
use. Information in lists should contain enough information to be easily understood by  
valves (e.g., squib valves).
someone who has knowledge of light water reactor technology.  
1. Information Requested for Initial Inspection Scoping Activities
    The following information is requested by November 27, 2020, or sooner, to facilitate the
Important Note: For the purpose of this inspection, POVs are valves with power actuators.
    initial sample selection.
Examples include motor-operated valves (MOVs), air-operated valves (AOVs),  
    1.1. List of systems, system numbers/designators, and corresponding system names.
hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated  
    1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary
valves (e.g., squib valves).  
            document. Also, identify the top ten risk significant functions per the PSA.
    1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth (RAW).
1. Information Requested for Initial Inspection Scoping Activities  
            Include values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley
            (as applicable). The list should include (a) component identification number;
The following information is requested by November 27, 2020, or sooner, to facilitate the  
            (b) applicable plant system; (c) ASME Boiler and Pressure Vessel Code (BPV Code)
initial sample selection.  
            Class; (d) safety-related or nonsafety-related classification; (e) valve type, size, and
            manufacturer; and (f) actuator type, size, and manufacturer. If the NRC has granted a
1.1. List of systems, system numbers/designators, and corresponding system names.  
            license amendment to categorize structures, systems, and component in accordance
            with 10 CFR 50.69, please provide the Risk Informed Safety Category of the
1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary  
            component.
document. Also, identify the top ten risk significant functions per the PSA.  
    1.4. All corrective action documents, evaluations, and NRC correspondence, including any
            associated NRC requests for additional information (RAIs) and Safety Evaluation
1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth (RAW).
            Report(s), generated in response to the NRC communications listed below. Also, any
Include values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley  
            NRC inspection reports that were conducted to close out the sites associated
(as applicable). The list should include (a) component identification number;  
            responses.
(b) applicable plant system; (c) ASME Boiler and Pressure Vessel Code (BPV Code)  
            1.4.1. Generic Letter (GL) 89-10;
Class; (d) safety-related or nonsafety-related classification; (e) valve type, size, and  
            1.4.2. GL 96-05;
manufacturer; and (f) actuator type, size, and manufacturer. If the NRC has granted a  
            1.4.3. GL 95-07;
license amendment to categorize structures, systems, and component in accordance  
            1.4.4. Bulletin 85-03;
with 10 CFR 50.69, please provide the Risk Informed Safety Category of the  
            1.4.5. Regulatory Issue Summary (RIS) 2000-03; and
component.  
            1.4.6. GL 88-14.
                                                2
1.4. All corrective action documents, evaluations, and NRC correspondence, including any  
associated NRC requests for additional information (RAIs) and Safety Evaluation  
Report(s), generated in response to the NRC communications listed below. Also, any  
NRC inspection reports that were conducted to close out the sites associated  
responses.  
1.4.1. Generic Letter (GL) 89-10;  
1.4.2. GL 96-05;  
1.4.3. GL 95-07;  
1.4.4. Bulletin 85-03;  
1.4.5. Regulatory Issue Summary (RIS) 2000-03; and  
1.4.6. GL 88-14.  


1.5. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program
      and relief and alternative requests submitted in accordance with 10 CFR 50.55a for
      POVs. Identify the edition of the ASME Operation and Maintenance of Nuclear Power
3
      Plants (OM Code) that is the Code of record for the current 10-year IST Program
1.5. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program  
      interval, as well as any self-imposed standards related to the IST Program elements
and relief and alternative requests submitted in accordance with 10 CFR 50.55a for  
      applicable to POVs.
POVs. Identify the edition of the ASME Operation and Maintenance of Nuclear Power  
1.6. IST Program documents, including implementing procedures, IST plan, and the
Plants (OM Code) that is the Code of record for the current 10-year IST Program  
      document that identifies the in-scope valves and the associated IST Program
interval, as well as any self-imposed standards related to the IST Program elements  
      requirements for each valve (e.g., IST valve table identifying category, active/passive
applicable to POVs.  
      function).
1.7. Any NRC correspondence regarding the stations POV programs other than the IST
1.6. IST Program documents, including implementing procedures, IST plan, and the  
      Program, including any associated NRC RAIs and any NRC Safety Evaluation
document that identifies the in-scope valves and the associated IST Program  
      Report(s). Identify any self-imposed standards related to these programs.
requirements for each valve (e.g., IST valve table identifying category, active/passive  
1.8. Site (and corporate if applicable) procedures associated with implementation of the
function).  
      POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory
      Appendix III.
1.7. Any NRC correspondence regarding the stations POV programs other than the IST  
1.9. List of any valve removed from a POV program and basis for removal.
Program, including any associated NRC RAIs and any NRC Safety Evaluation  
1.10. List of corrective action documents related to the POV programs for the last 5 years,
Report(s). Identify any self-imposed standards related to these programs.  
      including the document identifier and brief description. Provide a separate list for each
      POV program.
1.8. Site (and corporate if applicable) procedures associated with implementation of the  
1.11. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list
POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory  
      should include a brief description of the surrounding circumstances.
Appendix III.  
1.12. Current list of operator workarounds.
1.13. List of open operability evaluations related to POVs.
1.9. List of any valve removed from a POV program and basis for removal.  
1.14. List of permanent plant modifications to POVs completed in the last 5 years. For the
      purpose of this inspection, permanent plant modifications include permanent: plant
1.10. List of corrective action documents related to the POV programs for the last 5 years,  
      changes, design changes, set point changes, equivalency evaluations, suitability
including the document identifier and brief description. Provide a separate list for each  
      analyses, and commercial grade dedications. The list should contain the modification
POV program.  
      identifier, title, revision/date, the affected system, completion date, and a brief
      modification description.
1.11. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list  
1.15. Any self-assessment and/or audit of POV programs completed in the last 5 years.
should include a brief description of the surrounding circumstances.  
1.16. Updated Final Safety Analysis Report, Technical Specifications, Technical
      Specifications Bases, and Technical Requirements Manual.
1.12. Current list of operator workarounds.  
1.17. The lead inspector will deliver forms to the licensee point of contact identified in the
      letter for approximately 30 valves. Fill out the valve characteristics in the form fields. It
1.13. List of open operability evaluations related to POVs.  
      is possible that not all fields can be completed. For those fields that cannot be filled,
      leave the fields blank.
1.14. List of permanent plant modifications to POVs completed in the last 5 years. For the  
purpose of this inspection, permanent plant modifications include permanent: plant  
changes, design changes, set point changes, equivalency evaluations, suitability  
analyses, and commercial grade dedications. The list should contain the modification  
identifier, title, revision/date, the affected system, completion date, and a brief  
modification description.  
1.15. Any self-assessment and/or audit of POV programs completed in the last 5 years.  
1.16. Updated Final Safety Analysis Report, Technical Specifications, Technical  
Specifications Bases, and Technical Requirements Manual.  
1.17. The lead inspector will deliver forms to the licensee point of contact identified in the  
letter for approximately 30 valves. Fill out the valve characteristics in the form fields. It  
is possible that not all fields can be completed. For those fields that cannot be filled,  
leave the fields blank.  
1.18. All emergency and abnormal operating procedures.
1.18. All emergency and abnormal operating procedures.
                                              3


  1.19. Current management and engineering organizational chart.
2. Information Requested to Support Inspection Preparation Activities
  The following information is requested by December 28, 2020, or sooner, to facilitate the
4
  final inspection preparation.
1.19. Current management and engineering organizational chart.  
  2.1. Preventive Maintenance (PM) Program document, implementing procedures, and PM
          templates applicable to POVs.
2. Information Requested to Support Inspection Preparation Activities  
  2.2. Title 10 CFR 50, Appendix J Program document and implementing procedures.
  2.3. Corrective Action Program procedures, including the operability/functionality
The following information is requested by December 28, 2020, or sooner, to facilitate the  
          determination procedure.
final inspection preparation.  
  2.4. Quality Assurance Program document.
  2.5. Procedure for addressing issues captured in 10 CFR 21 notifications.
2.1. Preventive Maintenance (PM) Program document, implementing procedures, and PM  
  2.6. Joint Owners Group (JOG) MOV program classification evaluation.
templates applicable to POVs.  
  2.7. For each selected POV, including its actuator (the response should be separated by
          POV such as by creating a folder for each valve that includes the associated
2.2. Title 10 CFR 50, Appendix J Program document and implementing procedures.  
          documents):
          2.7.1.   Procurement and design specifications, and Certificate of Conformance.
2.3. Corrective Action Program procedures, including the operability/functionality  
          2.7.2.   Vendor documents addressing installation, operation, and maintenance.
determination procedure.  
          2.7.3.   Piping and instrumentation drawings (PI&Ds) for the associated system.
          2.7.4.   Electrical diagrams, including control logic diagrams.
2.4. Quality Assurance Program document.  
          2.7.5.   Valve and actuator component drawings.
          2.7.6.   System description and/or training documents associated with the POV.
2.5. Procedure for addressing issues captured in 10 CFR 21 notifications.  
          2.7.7.   Operations procedures that direct operators to control the valve, including
                  alarm response procedures.
2.6. Joint Owners Group (JOG) MOV program classification evaluation.  
          2.7.8.   Applicable Maintenance Rule scoping document and the Maintenance Rule
                  performance criteria which would cause the system or component to be
2.7. For each selected POV, including its actuator (the response should be separated by  
                  moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective
POV such as by creating a folder for each valve that includes the associated  
                  action and work orders) associated with any instance the POV was placed in
documents):  
                  (a)(1) status during the last 5 years.
          2.7.9.   List of tests, including technical specification surveillances. The list should
2.7.1.  
                  identify the test periodicity and test procedure identifier.
Procurement and design specifications, and Certificate of Conformance.  
                                              4
2.7.2.  
Vendor documents addressing installation, operation, and maintenance.  
2.7.3.  
Piping and instrumentation drawings (PI&Ds) for the associated system.  
2.7.4.  
Electrical diagrams, including control logic diagrams.  
2.7.5.  
Valve and actuator component drawings.  
2.7.6.  
System description and/or training documents associated with the POV.  
2.7.7.  
Operations procedures that direct operators to control the valve, including  
alarm response procedures.  
2.7.8.  
Applicable Maintenance Rule scoping document and the Maintenance Rule  
performance criteria which would cause the system or component to be  
moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective  
action and work orders) associated with any instance the POV was placed in  
(a)(1) status during the last 5 years.  
2.7.9.  
List of tests, including technical specification surveillances. The list should  
identify the test periodicity and test procedure identifier.  


2.7.10. Completed tests and surveillances performed during the last 5 years. For
        those tests and surveillances performed at a periodicity of less than 1 year or
        greater than 5 years, provide the latest three performed. Include the
5
        associated acceptance criteria basis calculations.
2.7.10. Completed tests and surveillances performed during the last 5 years. For  
2.7.11. Completed preservice testing (PST).
those tests and surveillances performed at a periodicity of less than 1 year or  
2.7.12. List of applicable PMs. The list should identify the PM periodicity and last
greater than 5 years, provide the latest three performed. Include the  
        completion date, and briefly describe the PM.
associated acceptance criteria basis calculations.  
2.7.13. Completed PMs performed during the last 5 years, including any post
        maintenance testing. For those PMs performed at a periodicity of less than
2.7.11. Completed preservice testing (PST).  
        1 year or greater than 5 years, provide the latest three performed.
2.7.14. Corrective maintenance work orders performed on the POV during the last
2.7.12. List of applicable PMs. The list should identify the PM periodicity and last  
        5 years, including any post maintenance testing.
completion date, and briefly describe the PM.  
2.7.15. An all-inclusive list of calculation revisions in effect associated with the POV.
        The list should include the document identifier, title, and revision number.
2.7.13. Completed PMs performed during the last 5 years, including any post  
2.7.16. Calculations associated with the POV. Data files may be excluded.
maintenance testing. For those PMs performed at a periodicity of less than  
        Calculation examples include (as applicable):
1 year or greater than 5 years, provide the latest three performed.  
        *   Minimum available and required voltage at transient and steady state;
        *   Thermal overload sizing evaluation;
2.7.14. Corrective maintenance work orders performed on the POV during the last  
        *   Critical setpoint calculations (e.g., limit switch settings);
5 years, including any post maintenance testing.  
        *   Required thrust/torque;
        *   Maximum allowed leakage;
2.7.15. An all-inclusive list of calculation revisions in effect associated with the POV.
        *   Maximum differential pressure;
The list should include the document identifier, title, and revision number.  
        *   Ambient room temperature under normal and accident conditions;
        *   Environmental qualification (EQ) file;
2.7.16. Calculations associated with the POV. Data files may be excluded.
        *   (For AOVs) Pneumatic supply sizing and setpoint calculations;
Calculation examples include (as applicable):  
        *   System hydraulic calculations;
        *   Pressure locking/thermal binding evaluations; and
*  
        *   Valve weak link/seismic weak link analysis.
Minimum available and required voltage at transient and steady state;  
2.7.17. History of permanent modifications performed on the POV since installation.
*  
        Include modification identifier and brief modification description.
Thermal overload sizing evaluation;  
2.7.18. List of corrective action documents associated with the POV for the last
*  
        5 years. The list should include the document identifier, brief description, and
Critical setpoint calculations (e.g., limit switch settings);  
        status (e.g., open or completed).
*  
2.7.19. Open and closed operability evaluations originated during the last 5 years.
Required thrust/torque;  
                                    5
*  
Maximum allowed leakage;  
*  
Maximum differential pressure;  
*  
Ambient room temperature under normal and accident conditions;  
*  
Environmental qualification (EQ) file;  
*  
(For AOVs) Pneumatic supply sizing and setpoint calculations;  
*  
System hydraulic calculations;  
*  
Pressure locking/thermal binding evaluations; and  
*  
Valve weak link/seismic weak link analysis.  
2.7.17. History of permanent modifications performed on the POV since installation.
Include modification identifier and brief modification description.  
2.7.18. List of corrective action documents associated with the POV for the last  
5 years. The list should include the document identifier, brief description, and  
status (e.g., open or completed).  
2.7.19. Open and closed operability evaluations originated during the last 5 years.  


3. Additional Information to Be Provided Onsite
  3.1. During the in-office preparation activities, the team may identify additional information
        needed to support the inspection. The lead inspector will provide a list of the
6
        additional information needed during the week of January 4, 2021.
3. Additional Information to Be Provided Onsite  
  3.2. Information requested to be provided throughout the inspection:
        3.2.1.   Any corrective action documents generated as a result of the teams
3.1. During the in-office preparation activities, the team may identify additional information  
                questions during this inspection as the documents are generated.
needed to support the inspection. The lead inspector will provide a list of the  
        3.2.2.   List of questions and/or document requests submitted by the team and their
additional information needed during the week of January 4, 2021.  
                status (e.g., open, closed) sorted by inspector. Provide to each inspector
                daily 1.5 hours prior to the daily debrief. It is recommended to provide the
3.2. Information requested to be provided throughout the inspection:  
                team leader with a master list sorted by inspector and each inspector with a
                list containing only the items originated by that inspector.
3.2.1.  
        3.2.3.   If available in hardcopy form, one complete set of P&IDs and simplified
Any corrective action documents generated as a result of the teams  
                drawings (e.g., training schematics). If any of these documents is not
questions during this inspection as the documents are generated.  
                available in hardcopy form, contact the lead inspector.
                                            6
3.2.2.  
List of questions and/or document requests submitted by the team and their  
status (e.g., open, closed) sorted by inspector. Provide to each inspector  
daily 1.5 hours prior to the daily debrief. It is recommended to provide the  
team leader with a master list sorted by inspector and each inspector with a  
list containing only the items originated by that inspector.  
3.2.3.  
If available in hardcopy form, one complete set of P&IDs and simplified  
drawings (e.g., training schematics). If any of these documents is not  
available in hardcopy form, contact the lead inspector.
}}
}}

Revision as of 14:32, 29 November 2024

Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000341/2021012
ML20303A287
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/29/2020
From: Santiago E
NRC/RGN-III/DRS/EB2
To: Peter Dietrich
DTE Electric Company
References
IR 2021012
Download: ML20303A287 (9)


See also: IR 05000341/2021012

Text

October 29, 2020

Mr. Peter Dietrich

Senior VP and Chief Nuclear Officer

DTE Electric Company

Fermi 2 - 260 TAC

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES

ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR

INFORMATION: INSPECTION REPORT 05000341/2021012

Dear Mr. Dietrich:

On January 11, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

Design Bases Assurance Inspection (Programs) at Fermi Power Plant, Unit 2. This inspection

will be performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design

Bases Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power-

Operated Valves Under 10 CFR 50.55a Requirements.

This inspection will evaluate the reliability, functional capability, and design basis of risk-

important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable

10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the

team will select risk-important POVs used to prevent and mitigate the consequences of a design

basis accident.

The inspection will include two weeks of onsite inspection. The inspection team will consist of

three NRC inspectors. The current inspection schedule is as follows:

Preparation week: January 4 - 8, 2021

Onsite weeks: January 11 - 15, 2021, and January 25 - 29, 2021

Experience with previous baseline engineering inspections of similar depth and length has

shown this type of inspection is extremely resource intensive, both for the NRC inspectors and

the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection. It is important that all of these documents are up-to-date and complete in order

to minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection. Insofar as possible, this information should be provided

electronically to the lead inspector. The information request has been divided into three groups:

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than November 27,

2020. By December 4, 2020, the lead inspector will communicate the initial selected

P. Dietrich

-2-

samples and any additional information needed to support the in-office preparation

activities.

The second group of documents requested is those items needed to support our

in-office preparation activities. This set of documents should be provided to the lead

inspector no later than December 28, 2020. During the preparation activities, the team

may identify additional information needed to support the inspection.

The last group includes the additional information above as well as plant-specific

reference material. This information should be available to the team onsite on

January 11, 2021. It is also requested that corrective action documents and answers to

questions developed during the inspection be provided to the lead inspector as the

documents are generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our

licensing contact for this inspection is Shane Gatter of your organization. If there are any

questions about the inspection or the material requested in the enclosure, contact the lead

inspector at 630-829-9520 or via e-mail at Elba.SanchezSantiago@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Elba Sanchez Santiago

Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-341

License No. NPF-43

Enclosure:

Design Bases Assurance Inspection (Programs)

Document Request

cc: Distribution via LISTSERV

P. Dietrich

-3-

Letter to Peter Dietrich from Elba Sanchez Santiago dated October 29, 2020.

SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES

ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR

INFORMATION: INSPECTION REPORT 05000341/2021012

DISTRIBUTION:

Jessie Quichocho

Richard Skokowski

RidsNrrDorlLpl3

RidsNrrPMFermi2 Resource

RidsNrrDroIrib Resource

John Giessner

Kenneth OBrien

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML20303A287

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

ESanchez

Santiago:mb via

e-mail

DATE

10/29/2020

OFFICIAL RECORD COPY

Enclosure

DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM

REQUEST FOR INFORMATION

I. ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number:

05000341/2021012

Onsite Inspection Dates:

January 11-15, 2021, and January 25-29, 2021

Inspection Procedure:

IP 71111.21N, Design Bases Assurance Inspection

(Programs), Attachment 2, Design-Basis Capability of

Power-Operated Valves Under 10 CFR 50.55a Requirements

Lead Inspector:

Elba Sanchez Santiago, Senior Reactor Engineer, RIII/DRS

630-829-9520

Elba.SanchezSantiago@nrc.gov

Teammate Inspectors:

Benny Jose, Senior Reactor Inspector, RIII/DRS

Michael Jones, Reactor Inspector, RIII/DRS

II. LOGISTICS

Email the following inspection logistics to the lead inspector by December 28, 2020, or sooner:

1. Inspection room name/number, directions from the main access facility, and phone number;

2. Interview room name/number;

3. Response team contact information (names and phone numbers) and team roles (e.g.,

management sponsor, lead, inspector counterpart);

4. Any site access/badging actions needed for each inspector;

5. Any dosimetry actions needed for each inspector;

6. Entrance meeting time and location;

7. Confirmation that the team will have access to a licensee computer with a nearby printer;

8. Confirmation that the team will have Wi-Fi access;

9. Cafeteria location and hours;

10. Inspection response team normal working hours; and

11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff

meetings).

2

III. INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding this

information request. Provide the information electronically in searchable formats, if possible.

The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.

Important Note: For the purpose of this inspection, POVs are valves with power actuators.

Examples include motor-operated valves (MOVs), air-operated valves (AOVs),

hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated

valves (e.g., squib valves).

1. Information Requested for Initial Inspection Scoping Activities

The following information is requested by November 27, 2020, or sooner, to facilitate the

initial sample selection.

1.1. List of systems, system numbers/designators, and corresponding system names.

1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary

document. Also, identify the top ten risk significant functions per the PSA.

1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth (RAW).

Include values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley

(as applicable). The list should include (a) component identification number;

(b) applicable plant system; (c) ASME Boiler and Pressure Vessel Code (BPV Code)

Class; (d) safety-related or nonsafety-related classification; (e) valve type, size, and

manufacturer; and (f) actuator type, size, and manufacturer. If the NRC has granted a

license amendment to categorize structures, systems, and component in accordance

with 10 CFR 50.69, please provide the Risk Informed Safety Category of the

component.

1.4. All corrective action documents, evaluations, and NRC correspondence, including any

associated NRC requests for additional information (RAIs) and Safety Evaluation

Report(s), generated in response to the NRC communications listed below. Also, any

NRC inspection reports that were conducted to close out the sites associated

responses.

1.4.1. Generic Letter (GL) 89-10;

1.4.2. GL 96-05;

1.4.3. GL 95-07;

1.4.4.Bulletin 85-03;

1.4.5. Regulatory Issue Summary (RIS) 2000-03; and

1.4.6. GL 88-14.

3

1.5. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program

and relief and alternative requests submitted in accordance with 10 CFR 50.55a for

POVs. Identify the edition of the ASME Operation and Maintenance of Nuclear Power

Plants (OM Code) that is the Code of record for the current 10-year IST Program

interval, as well as any self-imposed standards related to the IST Program elements

applicable to POVs.

1.6. IST Program documents, including implementing procedures, IST plan, and the

document that identifies the in-scope valves and the associated IST Program

requirements for each valve (e.g., IST valve table identifying category, active/passive

function).

1.7. Any NRC correspondence regarding the stations POV programs other than the IST

Program, including any associated NRC RAIs and any NRC Safety Evaluation

Report(s). Identify any self-imposed standards related to these programs.

1.8. Site (and corporate if applicable) procedures associated with implementation of the

POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory

Appendix III.

1.9. List of any valve removed from a POV program and basis for removal.

1.10. List of corrective action documents related to the POV programs for the last 5 years,

including the document identifier and brief description. Provide a separate list for each

POV program.

1.11. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list

should include a brief description of the surrounding circumstances.

1.12. Current list of operator workarounds.

1.13. List of open operability evaluations related to POVs.

1.14. List of permanent plant modifications to POVs completed in the last 5 years. For the

purpose of this inspection, permanent plant modifications include permanent: plant

changes, design changes, set point changes, equivalency evaluations, suitability

analyses, and commercial grade dedications. The list should contain the modification

identifier, title, revision/date, the affected system, completion date, and a brief

modification description.

1.15. Any self-assessment and/or audit of POV programs completed in the last 5 years.

1.16. Updated Final Safety Analysis Report, Technical Specifications, Technical

Specifications Bases, and Technical Requirements Manual.

1.17. The lead inspector will deliver forms to the licensee point of contact identified in the

letter for approximately 30 valves. Fill out the valve characteristics in the form fields. It

is possible that not all fields can be completed. For those fields that cannot be filled,

leave the fields blank.

1.18. All emergency and abnormal operating procedures.

4

1.19. Current management and engineering organizational chart.

2. Information Requested to Support Inspection Preparation Activities

The following information is requested by December 28, 2020, or sooner, to facilitate the

final inspection preparation.

2.1. Preventive Maintenance (PM) Program document, implementing procedures, and PM

templates applicable to POVs.

2.2. Title 10 CFR 50, Appendix J Program document and implementing procedures.

2.3. Corrective Action Program procedures, including the operability/functionality

determination procedure.

2.4. Quality Assurance Program document.

2.5. Procedure for addressing issues captured in 10 CFR 21 notifications.

2.6. Joint Owners Group (JOG) MOV program classification evaluation.

2.7. For each selected POV, including its actuator (the response should be separated by

POV such as by creating a folder for each valve that includes the associated

documents):

2.7.1.

Procurement and design specifications, and Certificate of Conformance.

2.7.2.

Vendor documents addressing installation, operation, and maintenance.

2.7.3.

Piping and instrumentation drawings (PI&Ds) for the associated system.

2.7.4.

Electrical diagrams, including control logic diagrams.

2.7.5.

Valve and actuator component drawings.

2.7.6.

System description and/or training documents associated with the POV.

2.7.7.

Operations procedures that direct operators to control the valve, including

alarm response procedures.

2.7.8.

Applicable Maintenance Rule scoping document and the Maintenance Rule

performance criteria which would cause the system or component to be

moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective

action and work orders) associated with any instance the POV was placed in

(a)(1) status during the last 5 years.

2.7.9.

List of tests, including technical specification surveillances. The list should

identify the test periodicity and test procedure identifier.

5

2.7.10. Completed tests and surveillances performed during the last 5 years. For

those tests and surveillances performed at a periodicity of less than 1 year or

greater than 5 years, provide the latest three performed. Include the

associated acceptance criteria basis calculations.

2.7.11. Completed preservice testing (PST).

2.7.12. List of applicable PMs. The list should identify the PM periodicity and last

completion date, and briefly describe the PM.

2.7.13. Completed PMs performed during the last 5 years, including any post

maintenance testing. For those PMs performed at a periodicity of less than

1 year or greater than 5 years, provide the latest three performed.

2.7.14. Corrective maintenance work orders performed on the POV during the last

5 years, including any post maintenance testing.

2.7.15. An all-inclusive list of calculation revisions in effect associated with the POV.

The list should include the document identifier, title, and revision number.

2.7.16. Calculations associated with the POV. Data files may be excluded.

Calculation examples include (as applicable):

Minimum available and required voltage at transient and steady state;

Thermal overload sizing evaluation;

Critical setpoint calculations (e.g., limit switch settings);

Required thrust/torque;

Maximum allowed leakage;

Maximum differential pressure;

Ambient room temperature under normal and accident conditions;

Environmental qualification (EQ) file;

(For AOVs) Pneumatic supply sizing and setpoint calculations;

System hydraulic calculations;

Pressure locking/thermal binding evaluations; and

Valve weak link/seismic weak link analysis.

2.7.17. History of permanent modifications performed on the POV since installation.

Include modification identifier and brief modification description.

2.7.18. List of corrective action documents associated with the POV for the last

5 years. The list should include the document identifier, brief description, and

status (e.g., open or completed).

2.7.19. Open and closed operability evaluations originated during the last 5 years.

6

3. Additional Information to Be Provided Onsite

3.1. During the in-office preparation activities, the team may identify additional information

needed to support the inspection. The lead inspector will provide a list of the

additional information needed during the week of January 4, 2021.

3.2. Information requested to be provided throughout the inspection:

3.2.1.

Any corrective action documents generated as a result of the teams

questions during this inspection as the documents are generated.

3.2.2.

List of questions and/or document requests submitted by the team and their

status (e.g., open, closed) sorted by inspector. Provide to each inspector

daily 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> prior to the daily debrief. It is recommended to provide the

team leader with a master list sorted by inspector and each inspector with a

list containing only the items originated by that inspector.

3.2.3.

If available in hardcopy form, one complete set of P&IDs and simplified

drawings (e.g., training schematics). If any of these documents is not

available in hardcopy form, contact the lead inspector.