{{#Wiki_filter:October 29, 2020 | {{#Wiki_filter:October 29, 2020 | ||
Mr. Peter Dietrich | |||
Senior VP and Chief Nuclear Officer | Mr. Peter Dietrich | ||
DTE Electric Company | Senior VP and Chief Nuclear Officer | ||
Fermi 2 - 260 TAC | DTE Electric Company | ||
6400 North Dixie Highway | Fermi 2 - 260 TAC | ||
Newport, MI 48166 | 6400 North Dixie Highway | ||
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES | Newport, MI 48166 | ||
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES | |||
Dear Mr. Dietrich: | ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR | ||
On January 11, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline | INFORMATION: INSPECTION REPORT 05000341/2021012 | ||
Design Bases Assurance Inspection (Programs) at Fermi Power Plant, Unit 2. This inspection | |||
will be performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design | Dear Mr. Dietrich: | ||
On January 11, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline | |||
Design Bases Assurance Inspection (Programs) at Fermi Power Plant, Unit 2. This inspection | |||
will be performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design | |||
Bases Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power- | Bases Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power- | ||
Operated Valves Under 10 CFR 50.55a Requirements. | Operated Valves Under 10 CFR 50.55a Requirements. | ||
This inspection will evaluate the reliability, functional capability, and design basis of risk- | This inspection will evaluate the reliability, functional capability, and design basis of risk- | ||
important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable | important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable | ||
10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the | 10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the | ||
team will select risk-important POVs used to prevent and mitigate the consequences of a design | team will select risk-important POVs used to prevent and mitigate the consequences of a design | ||
basis accident. | basis accident. | ||
The inspection will include two weeks of onsite inspection. The inspection team will consist of | |||
three NRC inspectors. The current inspection schedule is as follows: | The inspection will include two weeks of onsite inspection. The inspection team will consist of | ||
three NRC inspectors. The current inspection schedule is as follows: | |||
Experience with previous baseline engineering inspections of similar depth and length has | * | ||
shown this type of inspection is extremely resource intensive, both for the NRC inspectors and | Preparation week: January 4 - 8, 2021 | ||
the licensee staff. In order to minimize the inspection impact on the site and to ensure a | |||
productive inspection for both parties, we have enclosed a request for information needed for | * | ||
the inspection. It is important that all of these documents are up-to-date and complete in order | Onsite weeks: January 11 - 15, 2021, and January 25 - 29, 2021 | ||
to minimize the number of additional documents requested during the preparation and/or the | |||
onsite portions of the inspection. Insofar as possible, this information should be provided | Experience with previous baseline engineering inspections of similar depth and length has | ||
electronically to the lead inspector. The information request has been divided into three groups: | shown this type of inspection is extremely resource intensive, both for the NRC inspectors and | ||
the licensee staff. In order to minimize the inspection impact on the site and to ensure a | |||
productive inspection for both parties, we have enclosed a request for information needed for | |||
the inspection. It is important that all of these documents are up-to-date and complete in order | |||
to minimize the number of additional documents requested during the preparation and/or the | |||
onsite portions of the inspection. Insofar as possible, this information should be provided | |||
electronically to the lead inspector. The information request has been divided into three groups: | |||
* | |||
The first group lists information necessary for our initial inspection scoping activities. | |||
This information should be provided to the lead inspector no later than November 27, | |||
2020. By December 4, 2020, the lead inspector will communicate the initial selected | |||
P. Dietrich | P. Dietrich | ||
-2- | |||
samples and any additional information needed to support the in-office preparation | |||
activities. | |||
* | |||
The second group of documents requested is those items needed to support our | |||
in-office preparation activities. This set of documents should be provided to the lead | |||
inspector no later than December 28, 2020. During the preparation activities, the team | |||
may identify additional information needed to support the inspection. | |||
In addition, the enclosure includes information and requests addressing inspection logistics. | * | ||
The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our | The last group includes the additional information above as well as plant-specific | ||
licensing contact for this inspection is Shane Gatter of your organization. If there are any | reference material. This information should be available to the team onsite on | ||
questions about the inspection or the material requested in the enclosure, contact the lead | January 11, 2021. It is also requested that corrective action documents and answers to | ||
inspector at 630-829-9520 or via e-mail at Elba.SanchezSantiago@nrc.gov. | questions developed during the inspection be provided to the lead inspector as the | ||
This letter does not contain new or amended information collection requirements subject to | documents are generated. | ||
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, Control Number | In addition, the enclosure includes information and requests addressing inspection logistics. | ||
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, | |||
a request for information or an information collection requirement unless the requesting | The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our | ||
document displays a currently valid Office of Management and Budget Control Number. | licensing contact for this inspection is Shane Gatter of your organization. If there are any | ||
This letter and its enclosure will be made available for public inspection and copying at | questions about the inspection or the material requested in the enclosure, contact the lead | ||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | inspector at 630-829-9520 or via e-mail at Elba.SanchezSantiago@nrc.gov. | ||
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
This letter does not contain new or amended information collection requirements subject to | |||
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, Control Number | |||
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, | |||
a request for information or an information collection requirement unless the requesting | |||
document displays a currently valid Office of Management and Budget Control Number. | |||
Docket No. 50-341 | |||
License No. NPF-43 | This letter and its enclosure will be made available for public inspection and copying at | ||
Enclosure: | http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | ||
Design Bases Assurance Inspection (Programs) | accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Document Request | |||
cc: Distribution via LISTSERV | Sincerely, | ||
/RA/ | |||
Elba Sanchez Santiago | |||
Senior Reactor Inspector | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket No. 50-341 | |||
License No. NPF-43 | |||
Enclosure: | |||
Design Bases Assurance Inspection (Programs) | |||
Document Request | |||
cc: Distribution via LISTSERV | |||
P. Dietrich | P. Dietrich | ||
Letter to Peter Dietrich from Elba Sanchez Santiago dated October 29, 2020. | -3- | ||
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES | |||
Letter to Peter Dietrich from Elba Sanchez Santiago dated October 29, 2020. | |||
DISTRIBUTION: | SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES | ||
Jessie Quichocho | ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR | ||
Richard Skokowski | INFORMATION: INSPECTION REPORT 05000341/2021012 | ||
RidsNrrDorlLpl3 | |||
RidsNrrPMFermi2 Resource | DISTRIBUTION: | ||
RidsNrrDroIrib Resource | Jessie Quichocho | ||
John Giessner | Richard Skokowski | ||
Kenneth OBrien | RidsNrrDorlLpl3 | ||
Jamnes Cameron | RidsNrrPMFermi2 Resource | ||
Allan Barker | RidsNrrDroIrib Resource | ||
DRPIII | John Giessner | ||
DRSIII | Kenneth OBrien | ||
ADAMS Accession Number: ML20303A287 | Jamnes Cameron | ||
Allan Barker | |||
DRPIII | |||
NAME | DRSIII | ||
DATE | |||
ADAMS Accession Number: ML20303A287 | |||
Publicly Available | |||
Non-Publicly Available | |||
Sensitive | |||
Non-Sensitive | |||
OFFICE | |||
RIII | |||
NAME | |||
ESanchez | |||
Santiago:mb via | |||
e-mail | |||
DATE | |||
10/29/2020 | |||
OFFICIAL RECORD COPY | |||
I. ADMINISTRATIVE INSPECTION INFORMATION | |||
Enclosure | |||
DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM | |||
REQUEST FOR INFORMATION | |||
I. ADMINISTRATIVE INSPECTION INFORMATION | |||
Inspection Report Number: | |||
05000341/2021012 | |||
Onsite Inspection Dates: | |||
January 11-15, 2021, and January 25-29, 2021 | |||
II. LOGISTICS | Inspection Procedure: | ||
Email the following inspection logistics to the lead inspector by December 28, 2020, or sooner: | IP 71111.21N, Design Bases Assurance Inspection | ||
1. Inspection room name/number, directions from the main access facility, and phone number; | (Programs), Attachment 2, Design-Basis Capability of | ||
2. Interview room name/number; | Power-Operated Valves Under 10 CFR 50.55a Requirements | ||
3. Response team contact information (names and phone numbers) and team roles (e.g., | Lead Inspector: | ||
Elba Sanchez Santiago, Senior Reactor Engineer, RIII/DRS | |||
4. Any site access/badging actions needed for each inspector; | 630-829-9520 | ||
5. Any dosimetry actions needed for each inspector; | Elba.SanchezSantiago@nrc.gov | ||
6. Entrance meeting time and location; | Teammate Inspectors: | ||
7. Confirmation that the team will have access to a licensee computer with a nearby printer; | Benny Jose, Senior Reactor Inspector, RIII/DRS | ||
8. Confirmation that the team will have Wi-Fi access; | Michael Jones, Reactor Inspector, RIII/DRS | ||
9. Cafeteria location and hours; | |||
10. Inspection response team normal working hours; and | |||
11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff | II. LOGISTICS | ||
Email the following inspection logistics to the lead inspector by December 28, 2020, or sooner: | |||
1. Inspection room name/number, directions from the main access facility, and phone number; | |||
2. Interview room name/number; | |||
3. Response team contact information (names and phone numbers) and team roles (e.g., | |||
management sponsor, lead, inspector counterpart); | |||
4. Any site access/badging actions needed for each inspector; | |||
5. Any dosimetry actions needed for each inspector; | |||
6. Entrance meeting time and location; | |||
7. Confirmation that the team will have access to a licensee computer with a nearby printer; | |||
8. Confirmation that the team will have Wi-Fi access; | |||
9. Cafeteria location and hours; | |||
10. Inspection response team normal working hours; and | |||
11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff | |||
meetings). | |||
III. INFORMATION REQUEST | |||
Contact the lead inspector as soon as possible if you have any questions regarding this | |||
information request. Provide the information electronically in searchable formats, if possible. | 2 | ||
The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of | III. INFORMATION REQUEST | ||
use. Information in lists should contain enough information to be easily understood by | |||
someone who has knowledge of light water reactor technology. | Contact the lead inspector as soon as possible if you have any questions regarding this | ||
Important Note: For the purpose of this inspection, POVs are valves with power actuators. | information request. Provide the information electronically in searchable formats, if possible. | ||
Examples include motor-operated valves (MOVs), air-operated valves (AOVs), | The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of | ||
hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated | use. Information in lists should contain enough information to be easily understood by | ||
valves (e.g., squib valves). | someone who has knowledge of light water reactor technology. | ||
1. Information Requested for Initial Inspection Scoping Activities | |||
Important Note: For the purpose of this inspection, POVs are valves with power actuators. | |||
Examples include motor-operated valves (MOVs), air-operated valves (AOVs), | |||
hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated | |||
valves (e.g., squib valves). | |||
1. Information Requested for Initial Inspection Scoping Activities | |||
The following information is requested by November 27, 2020, or sooner, to facilitate the | |||
initial sample selection. | |||
1.1. List of systems, system numbers/designators, and corresponding system names. | |||
1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary | |||
document. Also, identify the top ten risk significant functions per the PSA. | |||
1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth (RAW). | |||
Include values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley | |||
(as applicable). The list should include (a) component identification number; | |||
(b) applicable plant system; (c) ASME Boiler and Pressure Vessel Code (BPV Code) | |||
Class; (d) safety-related or nonsafety-related classification; (e) valve type, size, and | |||
manufacturer; and (f) actuator type, size, and manufacturer. If the NRC has granted a | |||
license amendment to categorize structures, systems, and component in accordance | |||
with 10 CFR 50.69, please provide the Risk Informed Safety Category of the | |||
component. | |||
1.4. All corrective action documents, evaluations, and NRC correspondence, including any | |||
associated NRC requests for additional information (RAIs) and Safety Evaluation | |||
Report(s), generated in response to the NRC communications listed below. Also, any | |||
NRC inspection reports that were conducted to close out the sites associated | |||
responses. | |||
1.4.1. Generic Letter (GL) 89-10; | |||
1.4.2. GL 96-05; | |||
1.4.3. GL 95-07; | |||
1.4.4. Bulletin 85-03; | |||
1.4.5. Regulatory Issue Summary (RIS) 2000-03; and | |||
1.4.6. GL 88-14. | |||
1.5. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program | |||
3 | |||
1.5. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program | |||
and relief and alternative requests submitted in accordance with 10 CFR 50.55a for | |||
POVs. Identify the edition of the ASME Operation and Maintenance of Nuclear Power | |||
1.6. IST Program documents, including implementing procedures, IST plan, and the | Plants (OM Code) that is the Code of record for the current 10-year IST Program | ||
interval, as well as any self-imposed standards related to the IST Program elements | |||
applicable to POVs. | |||
1.7. Any NRC correspondence regarding the stations POV programs other than the IST | 1.6. IST Program documents, including implementing procedures, IST plan, and the | ||
document that identifies the in-scope valves and the associated IST Program | |||
requirements for each valve (e.g., IST valve table identifying category, active/passive | |||
1.8. Site (and corporate if applicable) procedures associated with implementation of the | function). | ||
1.7. Any NRC correspondence regarding the stations POV programs other than the IST | |||
1.9. List of any valve removed from a POV program and basis for removal. | Program, including any associated NRC RAIs and any NRC Safety Evaluation | ||
1.10. List of corrective action documents related to the POV programs for the last 5 years, | Report(s). Identify any self-imposed standards related to these programs. | ||
1.8. Site (and corporate if applicable) procedures associated with implementation of the | |||
1.11. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list | POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory | ||
Appendix III. | |||
1.12. Current list of operator workarounds. | |||
1.13. List of open operability evaluations related to POVs. | 1.9. List of any valve removed from a POV program and basis for removal. | ||
1.14. List of permanent plant modifications to POVs completed in the last 5 years. For the | |||
1.10. List of corrective action documents related to the POV programs for the last 5 years, | |||
including the document identifier and brief description. Provide a separate list for each | |||
POV program. | |||
1.11. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list | |||
1.15. Any self-assessment and/or audit of POV programs completed in the last 5 years. | should include a brief description of the surrounding circumstances. | ||
1.16. Updated Final Safety Analysis Report, Technical Specifications, Technical | |||
1.12. Current list of operator workarounds. | |||
1.17. The lead inspector will deliver forms to the licensee point of contact identified in the | |||
1.13. List of open operability evaluations related to POVs. | |||
1.14. List of permanent plant modifications to POVs completed in the last 5 years. For the | |||
purpose of this inspection, permanent plant modifications include permanent: plant | |||
changes, design changes, set point changes, equivalency evaluations, suitability | |||
analyses, and commercial grade dedications. The list should contain the modification | |||
identifier, title, revision/date, the affected system, completion date, and a brief | |||
modification description. | |||
1.15. Any self-assessment and/or audit of POV programs completed in the last 5 years. | |||
1.16. Updated Final Safety Analysis Report, Technical Specifications, Technical | |||
Specifications Bases, and Technical Requirements Manual. | |||
1.17. The lead inspector will deliver forms to the licensee point of contact identified in the | |||
letter for approximately 30 valves. Fill out the valve characteristics in the form fields. It | |||
is possible that not all fields can be completed. For those fields that cannot be filled, | |||
leave the fields blank. | |||
1.18. All emergency and abnormal operating procedures. | 1.18. All emergency and abnormal operating procedures. | ||
2. Information Requested to Support Inspection Preparation Activities | |||
4 | |||
1.19. Current management and engineering organizational chart. | |||
2. Information Requested to Support Inspection Preparation Activities | |||
The following information is requested by December 28, 2020, or sooner, to facilitate the | |||
final inspection preparation. | |||
2.1. Preventive Maintenance (PM) Program document, implementing procedures, and PM | |||
templates applicable to POVs. | |||
2.2. Title 10 CFR 50, Appendix J Program document and implementing procedures. | |||
2.3. Corrective Action Program procedures, including the operability/functionality | |||
determination procedure. | |||
2.4. Quality Assurance Program document. | |||
2.5. Procedure for addressing issues captured in 10 CFR 21 notifications. | |||
2.6. Joint Owners Group (JOG) MOV program classification evaluation. | |||
2.7. For each selected POV, including its actuator (the response should be separated by | |||
POV such as by creating a folder for each valve that includes the associated | |||
documents): | |||
2.7.1. | |||
Procurement and design specifications, and Certificate of Conformance. | |||
2.7.2. | |||
Vendor documents addressing installation, operation, and maintenance. | |||
2.7.3. | |||
Piping and instrumentation drawings (PI&Ds) for the associated system. | |||
2.7.4. | |||
Electrical diagrams, including control logic diagrams. | |||
2.7.5. | |||
Valve and actuator component drawings. | |||
2.7.6. | |||
System description and/or training documents associated with the POV. | |||
2.7.7. | |||
Operations procedures that direct operators to control the valve, including | |||
alarm response procedures. | |||
2.7.8. | |||
Applicable Maintenance Rule scoping document and the Maintenance Rule | |||
performance criteria which would cause the system or component to be | |||
moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective | |||
action and work orders) associated with any instance the POV was placed in | |||
(a)(1) status during the last 5 years. | |||
2.7.9. | |||
List of tests, including technical specification surveillances. The list should | |||
identify the test periodicity and test procedure identifier. | |||
2.7.10. Completed tests and surveillances performed during the last 5 years. For | |||
5 | |||
2.7.10. Completed tests and surveillances performed during the last 5 years. For | |||
2.7.11. Completed preservice testing (PST). | those tests and surveillances performed at a periodicity of less than 1 year or | ||
2.7.12. List of applicable PMs. The list should identify the PM periodicity and last | greater than 5 years, provide the latest three performed. Include the | ||
associated acceptance criteria basis calculations. | |||
2.7.13. Completed PMs performed during the last 5 years, including any post | |||
2.7.11. Completed preservice testing (PST). | |||
2.7.14. Corrective maintenance work orders performed on the POV during the last | 2.7.12. List of applicable PMs. The list should identify the PM periodicity and last | ||
completion date, and briefly describe the PM. | |||
2.7.15. An all-inclusive list of calculation revisions in effect associated with the POV. | |||
2.7.13. Completed PMs performed during the last 5 years, including any post | |||
2.7.16. Calculations associated with the POV. Data files may be excluded. | maintenance testing. For those PMs performed at a periodicity of less than | ||
1 year or greater than 5 years, provide the latest three performed. | |||
2.7.14. Corrective maintenance work orders performed on the POV during the last | |||
5 years, including any post maintenance testing. | |||
2.7.15. An all-inclusive list of calculation revisions in effect associated with the POV. | |||
The list should include the document identifier, title, and revision number. | |||
2.7.16. Calculations associated with the POV. Data files may be excluded. | |||
Calculation examples include (as applicable): | |||
* | |||
Minimum available and required voltage at transient and steady state; | |||
2.7.17. History of permanent modifications performed on the POV since installation. | * | ||
Thermal overload sizing evaluation; | |||
2.7.18. List of corrective action documents associated with the POV for the last | * | ||
Critical setpoint calculations (e.g., limit switch settings); | |||
* | |||
2.7.19. Open and closed operability evaluations originated during the last 5 years. | Required thrust/torque; | ||
* | |||
Maximum allowed leakage; | |||
* | |||
Maximum differential pressure; | |||
* | |||
Ambient room temperature under normal and accident conditions; | |||
* | |||
Environmental qualification (EQ) file; | |||
* | |||
(For AOVs) Pneumatic supply sizing and setpoint calculations; | |||
* | |||
System hydraulic calculations; | |||
* | |||
Pressure locking/thermal binding evaluations; and | |||
* | |||
Valve weak link/seismic weak link analysis. | |||
2.7.17. History of permanent modifications performed on the POV since installation. | |||
Include modification identifier and brief modification description. | |||
2.7.18. List of corrective action documents associated with the POV for the last | |||
5 years. The list should include the document identifier, brief description, and | |||
status (e.g., open or completed). | |||
2.7.19. Open and closed operability evaluations originated during the last 5 years. | |||
3. Additional Information to Be Provided Onsite | |||
6 | |||
3. Additional Information to Be Provided Onsite | |||
3.1. During the in-office preparation activities, the team may identify additional information | |||
needed to support the inspection. The lead inspector will provide a list of the | |||
additional information needed during the week of January 4, 2021. | |||
3.2. Information requested to be provided throughout the inspection: | |||
3.2.1. | |||
Any corrective action documents generated as a result of the teams | |||
questions during this inspection as the documents are generated. | |||
3.2.2. | |||
List of questions and/or document requests submitted by the team and their | |||
status (e.g., open, closed) sorted by inspector. Provide to each inspector | |||
daily 1.5 hours prior to the daily debrief. It is recommended to provide the | |||
team leader with a master list sorted by inspector and each inspector with a | |||
list containing only the items originated by that inspector. | |||
3.2.3. | |||
If available in hardcopy form, one complete set of P&IDs and simplified | |||
drawings (e.g., training schematics). If any of these documents is not | |||
available in hardcopy form, contact the lead inspector. | |||
}} | }} | ||
Revision as of 14:32, 29 November 2024
| ML20303A287 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/29/2020 |
| From: | Santiago E NRC/RGN-III/DRS/EB2 |
| To: | Peter Dietrich DTE Electric Company |
| References | |
| IR 2021012 | |
| Download: ML20303A287 (9) | |
See also: IR 05000341/2021012
Text
October 29, 2020
Mr. Peter Dietrich
Senior VP and Chief Nuclear Officer
DTE Electric Company
Fermi 2 - 260 TAC
6400 North Dixie Highway
Newport, MI 48166
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES
ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR
INFORMATION: INSPECTION REPORT 05000341/2021012
Dear Mr. Dietrich:
On January 11, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
Design Bases Assurance Inspection (Programs) at Fermi Power Plant, Unit 2. This inspection
will be performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design
Bases Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power-
Operated Valves Under 10 CFR 50.55a Requirements.
This inspection will evaluate the reliability, functional capability, and design basis of risk-
important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable
10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the
team will select risk-important POVs used to prevent and mitigate the consequences of a design
basis accident.
The inspection will include two weeks of onsite inspection. The inspection team will consist of
three NRC inspectors. The current inspection schedule is as follows:
Preparation week: January 4 - 8, 2021
Onsite weeks: January 11 - 15, 2021, and January 25 - 29, 2021
Experience with previous baseline engineering inspections of similar depth and length has
shown this type of inspection is extremely resource intensive, both for the NRC inspectors and
the licensee staff. In order to minimize the inspection impact on the site and to ensure a
productive inspection for both parties, we have enclosed a request for information needed for
the inspection. It is important that all of these documents are up-to-date and complete in order
to minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection. Insofar as possible, this information should be provided
electronically to the lead inspector. The information request has been divided into three groups:
The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than November 27,
2020. By December 4, 2020, the lead inspector will communicate the initial selected
P. Dietrich
-2-
samples and any additional information needed to support the in-office preparation
activities.
The second group of documents requested is those items needed to support our
in-office preparation activities. This set of documents should be provided to the lead
inspector no later than December 28, 2020. During the preparation activities, the team
may identify additional information needed to support the inspection.
The last group includes the additional information above as well as plant-specific
reference material. This information should be available to the team onsite on
January 11, 2021. It is also requested that corrective action documents and answers to
questions developed during the inspection be provided to the lead inspector as the
documents are generated.
In addition, the enclosure includes information and requests addressing inspection logistics.
The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our
licensing contact for this inspection is Shane Gatter of your organization. If there are any
questions about the inspection or the material requested in the enclosure, contact the lead
inspector at 630-829-9520 or via e-mail at Elba.SanchezSantiago@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Senior Reactor Inspector
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-341
License No. NPF-43
Enclosure:
Design Bases Assurance Inspection (Programs)
Document Request
cc: Distribution via LISTSERV
P. Dietrich
-3-
Letter to Peter Dietrich from Elba Sanchez Santiago dated October 29, 2020.
SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION OF NRC DESIGN BASES
ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR
INFORMATION: INSPECTION REPORT 05000341/2021012
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMFermi2 Resource
RidsNrrDroIrib Resource
Kenneth OBrien
DRPIII
DRSIII
ADAMS Accession Number: ML20303A287
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII
NAME
ESanchez
Santiago:mb via
DATE
10/29/2020
OFFICIAL RECORD COPY
Enclosure
DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM
REQUEST FOR INFORMATION
I. ADMINISTRATIVE INSPECTION INFORMATION
Inspection Report Number:
Onsite Inspection Dates:
January 11-15, 2021, and January 25-29, 2021
Inspection Procedure:
IP 71111.21N, Design Bases Assurance Inspection
(Programs), Attachment 2, Design-Basis Capability of
Power-Operated Valves Under 10 CFR 50.55a Requirements
Lead Inspector:
Elba Sanchez Santiago, Senior Reactor Engineer, RIII/DRS
630-829-9520
Elba.SanchezSantiago@nrc.gov
Teammate Inspectors:
Benny Jose, Senior Reactor Inspector, RIII/DRS
Michael Jones, Reactor Inspector, RIII/DRS
II. LOGISTICS
Email the following inspection logistics to the lead inspector by December 28, 2020, or sooner:
1. Inspection room name/number, directions from the main access facility, and phone number;
2. Interview room name/number;
3. Response team contact information (names and phone numbers) and team roles (e.g.,
management sponsor, lead, inspector counterpart);
4. Any site access/badging actions needed for each inspector;
5. Any dosimetry actions needed for each inspector;
6. Entrance meeting time and location;
7. Confirmation that the team will have access to a licensee computer with a nearby printer;
8. Confirmation that the team will have Wi-Fi access;
9. Cafeteria location and hours;
10. Inspection response team normal working hours; and
11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff
meetings).
2
III. INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this
information request. Provide the information electronically in searchable formats, if possible.
The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of
use. Information in lists should contain enough information to be easily understood by
someone who has knowledge of light water reactor technology.
Important Note: For the purpose of this inspection, POVs are valves with power actuators.
Examples include motor-operated valves (MOVs), air-operated valves (AOVs),
hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated
valves (e.g., squib valves).
1. Information Requested for Initial Inspection Scoping Activities
The following information is requested by November 27, 2020, or sooner, to facilitate the
initial sample selection.
1.1. List of systems, system numbers/designators, and corresponding system names.
1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary
document. Also, identify the top ten risk significant functions per the PSA.
1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth (RAW).
Include values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley
(as applicable). The list should include (a) component identification number;
(b) applicable plant system; (c) ASME Boiler and Pressure Vessel Code (BPV Code)
Class; (d) safety-related or nonsafety-related classification; (e) valve type, size, and
manufacturer; and (f) actuator type, size, and manufacturer. If the NRC has granted a
license amendment to categorize structures, systems, and component in accordance
with 10 CFR 50.69, please provide the Risk Informed Safety Category of the
component.
1.4. All corrective action documents, evaluations, and NRC correspondence, including any
associated NRC requests for additional information (RAIs) and Safety Evaluation
Report(s), generated in response to the NRC communications listed below. Also, any
NRC inspection reports that were conducted to close out the sites associated
responses.
1.4.1. Generic Letter (GL) 89-10;
1.4.2. GL 96-05;
1.4.3. GL 95-07;
1.4.4.Bulletin 85-03;
1.4.5. Regulatory Issue Summary (RIS) 2000-03; and
1.4.6. GL 88-14.
3
1.5. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program
and relief and alternative requests submitted in accordance with 10 CFR 50.55a for
POVs. Identify the edition of the ASME Operation and Maintenance of Nuclear Power
Plants (OM Code) that is the Code of record for the current 10-year IST Program
interval, as well as any self-imposed standards related to the IST Program elements
applicable to POVs.
1.6. IST Program documents, including implementing procedures, IST plan, and the
document that identifies the in-scope valves and the associated IST Program
requirements for each valve (e.g., IST valve table identifying category, active/passive
function).
1.7. Any NRC correspondence regarding the stations POV programs other than the IST
Program, including any associated NRC RAIs and any NRC Safety Evaluation
Report(s). Identify any self-imposed standards related to these programs.
1.8. Site (and corporate if applicable) procedures associated with implementation of the
POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory
Appendix III.
1.9. List of any valve removed from a POV program and basis for removal.
1.10. List of corrective action documents related to the POV programs for the last 5 years,
including the document identifier and brief description. Provide a separate list for each
POV program.
1.11. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list
should include a brief description of the surrounding circumstances.
1.12. Current list of operator workarounds.
1.13. List of open operability evaluations related to POVs.
1.14. List of permanent plant modifications to POVs completed in the last 5 years. For the
purpose of this inspection, permanent plant modifications include permanent: plant
changes, design changes, set point changes, equivalency evaluations, suitability
analyses, and commercial grade dedications. The list should contain the modification
identifier, title, revision/date, the affected system, completion date, and a brief
modification description.
1.15. Any self-assessment and/or audit of POV programs completed in the last 5 years.
1.16. Updated Final Safety Analysis Report, Technical Specifications, Technical
Specifications Bases, and Technical Requirements Manual.
1.17. The lead inspector will deliver forms to the licensee point of contact identified in the
letter for approximately 30 valves. Fill out the valve characteristics in the form fields. It
is possible that not all fields can be completed. For those fields that cannot be filled,
leave the fields blank.
1.18. All emergency and abnormal operating procedures.
4
1.19. Current management and engineering organizational chart.
2. Information Requested to Support Inspection Preparation Activities
The following information is requested by December 28, 2020, or sooner, to facilitate the
final inspection preparation.
2.1. Preventive Maintenance (PM) Program document, implementing procedures, and PM
templates applicable to POVs.
2.2. Title 10 CFR 50, Appendix J Program document and implementing procedures.
2.3. Corrective Action Program procedures, including the operability/functionality
determination procedure.
2.4. Quality Assurance Program document.
2.5. Procedure for addressing issues captured in 10 CFR 21 notifications.
2.6. Joint Owners Group (JOG) MOV program classification evaluation.
2.7. For each selected POV, including its actuator (the response should be separated by
POV such as by creating a folder for each valve that includes the associated
documents):
2.7.1.
Procurement and design specifications, and Certificate of Conformance.
2.7.2.
Vendor documents addressing installation, operation, and maintenance.
2.7.3.
Piping and instrumentation drawings (PI&Ds) for the associated system.
2.7.4.
Electrical diagrams, including control logic diagrams.
2.7.5.
Valve and actuator component drawings.
2.7.6.
System description and/or training documents associated with the POV.
2.7.7.
Operations procedures that direct operators to control the valve, including
alarm response procedures.
2.7.8.
Applicable Maintenance Rule scoping document and the Maintenance Rule
performance criteria which would cause the system or component to be
moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective
action and work orders) associated with any instance the POV was placed in
(a)(1) status during the last 5 years.
2.7.9.
List of tests, including technical specification surveillances. The list should
identify the test periodicity and test procedure identifier.
5
2.7.10. Completed tests and surveillances performed during the last 5 years. For
those tests and surveillances performed at a periodicity of less than 1 year or
greater than 5 years, provide the latest three performed. Include the
associated acceptance criteria basis calculations.
2.7.11. Completed preservice testing (PST).
2.7.12. List of applicable PMs. The list should identify the PM periodicity and last
completion date, and briefly describe the PM.
2.7.13. Completed PMs performed during the last 5 years, including any post
maintenance testing. For those PMs performed at a periodicity of less than
1 year or greater than 5 years, provide the latest three performed.
2.7.14. Corrective maintenance work orders performed on the POV during the last
5 years, including any post maintenance testing.
2.7.15. An all-inclusive list of calculation revisions in effect associated with the POV.
The list should include the document identifier, title, and revision number.
2.7.16. Calculations associated with the POV. Data files may be excluded.
Calculation examples include (as applicable):
Minimum available and required voltage at transient and steady state;
Thermal overload sizing evaluation;
Critical setpoint calculations (e.g., limit switch settings);
Required thrust/torque;
Maximum allowed leakage;
Maximum differential pressure;
Ambient room temperature under normal and accident conditions;
Environmental qualification (EQ) file;
(For AOVs) Pneumatic supply sizing and setpoint calculations;
System hydraulic calculations;
Pressure locking/thermal binding evaluations; and
Valve weak link/seismic weak link analysis.
2.7.17. History of permanent modifications performed on the POV since installation.
Include modification identifier and brief modification description.
2.7.18. List of corrective action documents associated with the POV for the last
5 years. The list should include the document identifier, brief description, and
status (e.g., open or completed).
2.7.19. Open and closed operability evaluations originated during the last 5 years.
6
3. Additional Information to Be Provided Onsite
3.1. During the in-office preparation activities, the team may identify additional information
needed to support the inspection. The lead inspector will provide a list of the
additional information needed during the week of January 4, 2021.
3.2. Information requested to be provided throughout the inspection:
3.2.1.
Any corrective action documents generated as a result of the teams
questions during this inspection as the documents are generated.
3.2.2.
List of questions and/or document requests submitted by the team and their
status (e.g., open, closed) sorted by inspector. Provide to each inspector
daily 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> prior to the daily debrief. It is recommended to provide the
team leader with a master list sorted by inspector and each inspector with a
list containing only the items originated by that inspector.
3.2.3.
If available in hardcopy form, one complete set of P&IDs and simplified
drawings (e.g., training schematics). If any of these documents is not
available in hardcopy form, contact the lead inspector.