{{#Wiki_filter:UFFLORIDA Herbert Wertheim College of Engineering                                   PO Box 116134 UF Training Reactor Facility                                             Gainesville, FL 32611 352-294-2104 bshea@uf l.edu June 21, 2023 ATTN: Documen t Control Desk                                           Technical Specifications 6.7 .1 U.S. Nuclear Regulatory Commiss ion                                      License R-56, Docket 50-83 Washington, DC 20555-0001
{{#Wiki_filter:UFFLORIDA Herbert Wertheim College of Engineering UF Training Reactor Facility June 21, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  


==Subject:==
==Subject:==
CY2022 Annual Report for the UFTR Please find enclosed the UFTR annual report for calendar year 2022. This report is being submitted as required by our Technical Specifications, Section 6.7 .1.
CY2022 Annual Report for the UFTR PO Box 116134 Gainesville, FL 32611 352-294-2104 bshea@ufl.edu Technical Specifications 6.7.1 License R-56, Docket 50-83 Please find enclosed the UFTR annual report for calendar year 2022. This report is being submitted as required by our Technical Specifications, Section 6.7.1.
I declare under penalty of perjury that the foregoing and attached are true and correct to my knowledge.
I declare under penalty of perjury that the foregoing and attached are true and correct to my knowledge.
Executed on June 21, 2023.
Executed on June 21, 2023.
Brian Shea Reactor Manager, University of Florida Training Reactor cc:         Duane Hardesty, Project Manager, NRC The Founda tion for The Gator Nation An Equal Opportunity Institution
Brian Shea Reactor Manager, University of Florida Training Reactor cc:
Duane Hardesty, Project Manager, NRC The Foundation for The Gator Nation An Equal Opportunity Institution  


University of Florida Training Reactor Annual Report for Calendar Year 2022 The following annual report is submitted in accordance with Section 6. 7.1 of the UFTR Technical Specifications.
University of Florida Training Reactor Annual Report for Calendar Year 2022 The following annual report is submitted in accordance with Section 6. 7.1 of the UFTR Technical Specifications.
Summary of Reactor Operations:
Summary of Reactor Operations:
Total Energy Output for CY2022:                                                     21,501 kW-hrs Cumulative Energy Output Since Conversion to LEU:                                   88,702 kW-hrs Routine operations were conducted throughout the year with brief outages for maintenance and surveillances with an extended outage for scheduled in-core fuel inventory and a fresh fuel addition to the core.
Total Energy Output for CY2022:
Cumulative Energy Output Since Conversion to LEU:
21,501 kW-hrs 88,702 kW-hrs Routine operations were conducted throughout the year with brief outages for maintenance and surveillances with an extended outage for scheduled in-core fuel inventory and a fresh fuel addition to the core.
Unscheduled Shutdowns:
Unscheduled Shutdowns:
There were no unscheduled shutdowns during CY2022.
There were no unscheduled shutdowns during CY2022.
Major Maintenance:
Major Maintenance:
A listing of all major maintenance is presented in Table I. The Date Opened entry is when the Maintena nce Log Page (MLP) was opened; in a few cases, this date may be one or more days after the original problem was noted. The Date Closed entry is the day the MLP was closed which can also be one or more days after work completion. Update of CY2021 Report, MLP 21-8 was closed on 5/18/22.
A listing of all major maintenance is presented in Table I. The Date Opened entry is when the Maintenance Log Page (MLP) was opened; in a few cases, this date may be one or more days after the original problem was noted. The Date Closed entry is the day the MLP was closed which can also be one or more days after work completion. Update of CY2021 Report, MLP 21-8 was closed on 5/18/22.
Table I MLP#       Date Opened       Date Closed                             Summary 22-1         1/10/2022         1/10/2022 Routine addition of makeup water to the PC Tank.
MLP# Date Opened Date Closed 22-1 1/10/2022 1/10/2022 22-2 1/10/2022 1/10/2022 22-3 1/13/2022 1/13/2022 22-4 2/8/2022 2/8/2022 22-5 3/14/2022 3/14/2022 22-6 4/28/2022 5/6/2022 22-7 8/1/2022 8/1/2022 22-8 8/3/2022 8/9/2022 22-9 9/21/2022 OPEN 22-10 10/3/2022 10/3/2022 22-11 11/14/2022 11/14/2022 22-12 11/14/2022 11/14/2022 CY2022 Annual Report University of Florida Training Reactor Table I Summary Routine addition of makeup water to the PC Tank.
22-2         1/10/2022         1/10/2022 Cleaned the reactor console key switch due to carbon buildup.
Cleaned the reactor console key switch due to carbon buildup.
22-3         1/13/2022         1/13/2022 Replaced Stack Fan motor belt.
Replaced Stack Fan motor belt.
22-4         2/8/2022         2/8/2022 Replaced rupture disk and added makeup water to the PC Tank.
Replaced rupture disk and added makeup water to the PC Tank.
22-5         3/14/2022         3/14/2022 Routine addition of makeup water to the PC Tank.
Routine addition of makeup water to the PC Tank.
22-6         4/28/2022         5/6/2022 Factory calibration adjustments to Nuclear Instrumentation.
Factory calibration adjustments to Nuclear Instrumentation.
22-7           8/1/2022         8/1/2022 Routine addition of makeup water to the PC Tank.
Routine addition of makeup water to the PC Tank.
22-8           8/3/2022         8/9/2022 Adjusted spacer combs on fuel and dummy bundles to be added to the core.
Adjusted spacer combs on fuel and dummy bundles to be added to the core.
22-9         9/21/2022           OPEN     Replaced the piping and controls for the Rabbit System 22-10         10/3/2022         10/3/2022 Routine addition of makeup water to the PC Tank.
Replaced the piping and controls for the Rabbit System Routine addition of makeup water to the PC Tank.
22-11       11/14/2022       11/14/2022 Changed DI Water System Filter and Resin.
Changed DI Water System Filter and Resin.
22-12       11/14/2022       11/14/2022 Routine addition of makeup water to the PC Tank.
Routine addition of makeup water to the PC Tank.
CY2022 Annual Report                                                                      Page 1 of 3 University of Florida Training Reactor                                                  June 21, 2023
Page 1 of 3 June 21, 2023  


Changes, Tests, and Experiments Implemented under 10 CFR 50.59:
Changes, Tests, and Experiments Implemented under 10 CFR 50.59:
A listing of changes, tests, and experiments implemented under 10 CFR 50.59 is presented in Table II.
A listing of changes, tests, and experiments implemented under 10 CFR 50.59 is presented in Table II. All changes, tests, and experiments implemented during CY2022 screened-out from full evaluation.
All changes, tests, and experiments implemented during CY2022 screened-out from full evaluation.
Table II Number Date Summary Approved 22-1 5/23/2022 Procedure Change: SOP-A.1 Pre-Operational Checks, change sequence for cycling console power.
Table II Number             Date                                           Summary Approved 22-1           5/23/2022       Procedure Change: SOP-A.1 Pre-Operational Checks, change sequence for cycling console power.
22-2 5/24/2022 Procedure Change: SOP-E.2 Calibration of Rx Measuring Channels, change connection point for measuring compensating voltage.
22-2           5/24/2022     Procedure Change: SOP-E.2 Calibration of Rx Measuring Channels, change connection point for measuring compensating voltage.
22-3 6/07/2022 Procedure Change: SOP-A.9 Startup using Inverse Multiplication, change units of reactivity.
22-3           6/07/2022     Procedure Change: SOP-A.9 Startup using Inverse Multiplication, change units of reactivity.
22-4 7/06/2022 Modification: Use of MCNP6.2 for fuel addition calculations, newer version than that used for license renewal FSAR information.
22-4           7/06/2022     Modification: Use of MCNP6.2 for fuel addition calculations, newer version than that used for license renewal FSAR information.
22-5 7/06/2022 Modification: Load a fresh partial fuel bundle into the core.
22-5           7/06/2022     Modification: Load a fresh partial fuel bundle into the core.
22-6 9/21/2022 Modification: Confinement hole created for rabbit system conduit installation.
22-6           9/21/2022       Modification: Confinement hole created for rabbit system conduit installation.
22-7 10/31/2022 Procedure Change: SOP-A.2 Reactor Startup, changes needed based on adding new fuel to the core.
22-7           10/31/2022     Procedure Change: SOP-A.2 Reactor Startup, changes needed based on adding new fuel to the core.
22-8 10/31/2022 Procedure Change: SOP-A.3 Operation at Power, editorial changes to be consistent with SOP-A.2 revision.
22-8           10/31/2022     Procedure Change: SOP-A.3 Operation at Power, editorial changes to be consistent with SOP-A.2 revision.
22-9 10/31/2022 Procedure Change: SOP-B.1 Radiological Emergency, editorial changes and changes due to new power supply references.
22-9           10/31/2022       Procedure Change: SOP-B.1 Radiological Emergency, editorial changes and changes due to new power supply references.
22-10 10/31/2022 Procedure Change: SOP-B-2 Emergency Procedure - Fire, similar changes made from SOP-B.l revision.
22-10         10/31/2022       Procedure Change: SOP-B-2 Emergency Procedure - Fire, similar changes made from SOP-B.l revision.
Radioactive Effluents:
Radioactive Effluents:
Liquid Waste No wastewater releases were made during CY2022.
Liquid Waste No wastewater releases were made during CY2022.
Gaseous Waste The total activity of Argon-41 released during CY2022 was 95. 75 curies. Using the calculation method described in the UFSAR, the maximum potential dose to a member of the public from UFTR Ar-41 emissions during CY2022 was 0.4 mrem/year. This is significantly less than 25% of the ALARA constrain t
Gaseous Waste The total activity of Argon-41 released during CY2022 was 95. 75 curies. Using the calculation method described in the UFSAR, the maximum potential dose to a member of the public from UFTR Ar-41 emissions during CY2022 was 0.4 mrem/year. This is significantly less than 25% of the ALARA constraint of 10 mrem/yr.
of 10 mrem/yr.
CY2022 Annual Report University of Florida Training Reactor Page 2 of 3 June 21, 2023  
CY2022 Annual Report                                                                         Page 2 of 3 University of Florida Training Reactor                                                     June 21, 2023


Environmental Surveys:
Environmental Surveys:
In addition to periodic radiation surveys using hand-held instruments, environmental monitoring is accomplished using radiation dosimeter badges. Areas monitored are located around the exterior of the Reactor Building (RB) and nearby buildings, including the Nuclear Sciences Building (NSB), the Rhines Hall (RH), Weil Hall (WH), Weimer Hall (WmH), and Wertheim Engineering Lab (WEL). The environmental dosimeter reports are tabulated and presented in Table III. Dose equivalents below the minimum measurable quantity are reported as "M".
In addition to periodic radiation surveys using hand-held instruments, environmental monitoring is accomplished using radiation dosimeter badges. Areas monitored are located around the exterior of the Reactor Building (RB) and nearby buildings, including the Nuclear Sciences Building (NSB), the Rhines Hall (RH), Weil Hall (WH), Weimer Hall (WmH), and Wertheim Engineering Lab (WEL). The environmental dosimeter reports are tabulated and presented in Table III. Dose equivalents below the minimum measurable quantity are reported as "M".
Table III Quarterly TEDE                   Annual TEDE Area                                                             (mrem)                           (mrem)
Table III Quarterly TEDE Annual TEDE Area (mrem)
Oct-Jan-Mar Apr-Jun     Jul-Sep     Dec
(mrem)
: 1. NSB Rm. 316 window - inside                       3         8         1         34             46
Oct-Jan-Mar Apr-Jun Jul-Sep Dec
: 2. NSB, NW corner of Van de graff roof               6         14         6         35               61
: 1. NSB Rm. 316 window - inside 3
: 3. UFTR West Lot, fence post                         7         15         5         46               73
8 1
: 4. RH roof, SE roof corner near access               3         9         2         29               43
34 46
: 5. RH roof, above N entrance to bldg                 4         13         1           5               23
: 2. NSB, NW corner of Van de graff roof 6
: 6. WH roof, SE corner of main roof                   4         8         3         32               47
14 6
: 7. WH roof, near roof access door                   5         9         4         24               42
35 61
: 8. WH roof, due N of bldg 25                         7         15         4         28               54
: 3. UFTR West Lot, fence post 7
: 9. WH roof, SE corner of SW roof section             3         11         3         27               44
15 5
: 10. WmH, 3rd floor roof, SW corner                   2         8         2         28               40
46 73
: 11. WmH Extension roof, SW corner                   4         11         2         28               45
: 4. RH roof, SE roof corner near access 3
: 12. WmH Extension roof, NW corner                   5         10       19         30               64
9 2
: 13. WEL roof, N side of Level 7                     3         8         3         26               40
29 43
: 14. Control Badge - Building 683 west wall           3         5       M           43               51 Radiation Exposures:
: 5. RH roof, above N entrance to bldg 4
13 1
5 23
: 6. WH roof, SE corner of main roof 4
8 3
32 47
: 7. WH roof, near roof access door 5
9 4
24 42
: 8. WH roof, due N of bldg 25 7
15 4
28 54
: 9. WH roof, SE corner of SW roof section 3
11 3
27 44
: 10. WmH, 3rd floor roof, SW corner 2
8 2
28 40
: 11. WmH Extension roof, SW corner 4
11 2
28 45
: 12. WmH Extension roof, NW corner 5
10 19 30 64
: 13. WEL roof, N side of Level 7 3
8 3
26 40
: 14. Control Badge - Building 683 west wall 3
5 M
43 51 Radiation Exposures:
There were no exposures received by facility personnel or visitors that were greater than 25% of that allowed in 10 CFR Part 20. Eight individuals received measurable occupational exposures during CY2022.
There were no exposures received by facility personnel or visitors that were greater than 25% of that allowed in 10 CFR Part 20. Eight individuals received measurable occupational exposures during CY2022.
The maximum Total Effective Dose Equivalent (TEDE) received by any individual in CY2022 was 308 mrem. The maximum extremity dose (SDE, ME) received by any individual in CY2022 was 625 mrem.
The maximum Total Effective Dose Equivalent (TEDE) received by any individual in CY2022 was 308 mrem. The maximum extremity dose (SDE, ME) received by any individual in CY2022 was 625 mrem.
CY2022 Annual Report                                                                     Page 3 of 3 University of Florida Training Reactor                                                 June 21, 2023}}
CY2022 Annual Report University of Florida Training Reactor Page 3 of 3 June 21, 2023}}

Latest revision as of 03:05, 27 November 2024

University of Florida, CY2022 Annual Report for the Uftr
ML23172A067
Person / Time
Site: 05000083
Issue date: 06/21/2023
From: Shea B
Univ of Florida
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML23172A067 (1)


Text

UFFLORIDA Herbert Wertheim College of Engineering UF Training Reactor Facility June 21, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

CY2022 Annual Report for the UFTR PO Box 116134 Gainesville, FL 32611 352-294-2104 bshea@ufl.edu Technical Specifications 6.7.1 License R-56, Docket 50-83 Please find enclosed the UFTR annual report for calendar year 2022. This report is being submitted as required by our Technical Specifications, Section 6.7.1.

I declare under penalty of perjury that the foregoing and attached are true and correct to my knowledge.

Executed on June 21, 2023.

Brian Shea Reactor Manager, University of Florida Training Reactor cc:

Duane Hardesty, Project Manager, NRC The Foundation for The Gator Nation An Equal Opportunity Institution

University of Florida Training Reactor Annual Report for Calendar Year 2022 The following annual report is submitted in accordance with Section 6. 7.1 of the UFTR Technical Specifications.

Summary of Reactor Operations:

Total Energy Output for CY2022:

Cumulative Energy Output Since Conversion to LEU:

21,501 kW-hrs 88,702 kW-hrs Routine operations were conducted throughout the year with brief outages for maintenance and surveillances with an extended outage for scheduled in-core fuel inventory and a fresh fuel addition to the core.

Unscheduled Shutdowns:

There were no unscheduled shutdowns during CY2022.

Major Maintenance:

A listing of all major maintenance is presented in Table I. The Date Opened entry is when the Maintenance Log Page (MLP) was opened; in a few cases, this date may be one or more days after the original problem was noted. The Date Closed entry is the day the MLP was closed which can also be one or more days after work completion. Update of CY2021 Report, MLP 21-8 was closed on 5/18/22.

MLP# Date Opened Date Closed 22-1 1/10/2022 1/10/2022 22-2 1/10/2022 1/10/2022 22-3 1/13/2022 1/13/2022 22-4 2/8/2022 2/8/2022 22-5 3/14/2022 3/14/2022 22-6 4/28/2022 5/6/2022 22-7 8/1/2022 8/1/2022 22-8 8/3/2022 8/9/2022 22-9 9/21/2022 OPEN 22-10 10/3/2022 10/3/2022 22-11 11/14/2022 11/14/2022 22-12 11/14/2022 11/14/2022 CY2022 Annual Report University of Florida Training Reactor Table I Summary Routine addition of makeup water to the PC Tank.

Cleaned the reactor console key switch due to carbon buildup.

Replaced Stack Fan motor belt.

Replaced rupture disk and added makeup water to the PC Tank.

Routine addition of makeup water to the PC Tank.

Factory calibration adjustments to Nuclear Instrumentation.

Routine addition of makeup water to the PC Tank.

Adjusted spacer combs on fuel and dummy bundles to be added to the core.

Replaced the piping and controls for the Rabbit System Routine addition of makeup water to the PC Tank.

Changed DI Water System Filter and Resin.

Routine addition of makeup water to the PC Tank.

Page 1 of 3 June 21, 2023

Changes, Tests, and Experiments Implemented under 10 CFR 50.59:

A listing of changes, tests, and experiments implemented under 10 CFR 50.59 is presented in Table II. All changes, tests, and experiments implemented during CY2022 screened-out from full evaluation.

Table II Number Date Summary Approved 22-1 5/23/2022 Procedure Change: SOP-A.1 Pre-Operational Checks, change sequence for cycling console power.

22-2 5/24/2022 Procedure Change: SOP-E.2 Calibration of Rx Measuring Channels, change connection point for measuring compensating voltage.

22-3 6/07/2022 Procedure Change: SOP-A.9 Startup using Inverse Multiplication, change units of reactivity.

22-4 7/06/2022 Modification: Use of MCNP6.2 for fuel addition calculations, newer version than that used for license renewal FSAR information.

22-5 7/06/2022 Modification: Load a fresh partial fuel bundle into the core.

22-6 9/21/2022 Modification: Confinement hole created for rabbit system conduit installation.

22-7 10/31/2022 Procedure Change: SOP-A.2 Reactor Startup, changes needed based on adding new fuel to the core.

22-8 10/31/2022 Procedure Change: SOP-A.3 Operation at Power, editorial changes to be consistent with SOP-A.2 revision.

22-9 10/31/2022 Procedure Change: SOP-B.1 Radiological Emergency, editorial changes and changes due to new power supply references.

22-10 10/31/2022 Procedure Change: SOP-B-2 Emergency Procedure - Fire, similar changes made from SOP-B.l revision.

Radioactive Effluents:

Liquid Waste No wastewater releases were made during CY2022.

Gaseous Waste The total activity of Argon-41 released during CY2022 was 95. 75 curies. Using the calculation method described in the UFSAR, the maximum potential dose to a member of the public from UFTR Ar-41 emissions during CY2022 was 0.4 mrem/year. This is significantly less than 25% of the ALARA constraint of 10 mrem/yr.

CY2022 Annual Report University of Florida Training Reactor Page 2 of 3 June 21, 2023

Environmental Surveys:

In addition to periodic radiation surveys using hand-held instruments, environmental monitoring is accomplished using radiation dosimeter badges. Areas monitored are located around the exterior of the Reactor Building (RB) and nearby buildings, including the Nuclear Sciences Building (NSB), the Rhines Hall (RH), Weil Hall (WH), Weimer Hall (WmH), and Wertheim Engineering Lab (WEL). The environmental dosimeter reports are tabulated and presented in Table III. Dose equivalents below the minimum measurable quantity are reported as "M".

Table III Quarterly TEDE Annual TEDE Area (mrem)

(mrem)

Oct-Jan-Mar Apr-Jun Jul-Sep Dec

1. NSB Rm. 316 window - inside 3

8 1

34 46

2. NSB, NW corner of Van de graff roof 6

14 6

35 61

3. UFTR West Lot, fence post 7

15 5

46 73

4. RH roof, SE roof corner near access 3

9 2

29 43

5. RH roof, above N entrance to bldg 4

13 1

5 23

6. WH roof, SE corner of main roof 4

8 3

32 47

7. WH roof, near roof access door 5

9 4

24 42

8. WH roof, due N of bldg 25 7

15 4

28 54

9. WH roof, SE corner of SW roof section 3

11 3

27 44

10. WmH, 3rd floor roof, SW corner 2

8 2

28 40

11. WmH Extension roof, SW corner 4

11 2

28 45

12. WmH Extension roof, NW corner 5

10 19 30 64

13. WEL roof, N side of Level 7 3

8 3

26 40

14. Control Badge - Building 683 west wall 3

5 M

43 51 Radiation Exposures:

There were no exposures received by facility personnel or visitors that were greater than 25% of that allowed in 10 CFR Part 20. Eight individuals received measurable occupational exposures during CY2022.

The maximum Total Effective Dose Equivalent (TEDE) received by any individual in CY2022 was 308 mrem. The maximum extremity dose (SDE, ME) received by any individual in CY2022 was 625 mrem.

CY2022 Annual Report University of Florida Training Reactor Page 3 of 3 June 21, 2023