ML23200A256: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:IP 21 Operator Licensing Exam Schedule From 10/01/2022 to 09/30/2023 Phase Code: 2 - Construction, 5 - Operational Region: 3 By Date | {{#Wiki_filter:IP 21 Operator Licensing Exam Schedule From 10/01/2022 to 09/30/2023 Phase Code: 2 - Construction, 5 - Operational Region: 3 By Date | ||
# Candidates Exam Staart Exam End Site Docket # | |||
Insp Rpt Cac # | |||
RO LSRO SROI SROU Type Exam Author Chief Examiner Examiner 6/18/2023 6/24/2023 Fermi | |||
: 05000341, 05000016 2023301 000500 2 | |||
0 2 | |||
0 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD) | |||
NFF | |||
: Bergeon, Bryan Rodriguez, Lionel; Roach, Gregory; Bergeon, Bryan 6/25/2023 7/1/2023 Fermi | |||
: 05000341, 05000016 2023301 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD) | |||
NFF | |||
: Bergeon, Bryan Rodriguez, Lionel; Roach, Gregory; Bergeon, Bryan Prepared on 6/12/2023 1:44:37 PM Activity Codes: EXAD Exam Author: ALL Orgs: ALL Sites: FERM | |||
IP 21 Operator Licensing Exam Schedule Region/Site Summary | IP 21 Operator Licensing Exam Schedule Region/Site Summary RO SROI SROU LSRO Total 3 | ||
2 2 | |||
0 0 | |||
4 Region/Docket Summary RO SROI SROU LSRO Total 3 | |||
2 2 | |||
0 0 | |||
4 Exam Date/Site Summary RO SROI SROU LSRO Total 6/18/2023 2 | |||
2 0 | |||
0 4 | |||
Exam Date/Docket Summary RO SROI SROU LSRO Total 6/18/2023 2 | |||
2 0 | |||
0 4 | |||
Prepared on 6/12/2023 1:44:37 PM Activity Codes: EXAD Exam Author: ALL Orgs: ALL Sites: FERM}} | |||
Latest revision as of 02:38, 27 November 2024
| ML23200A256 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/19/2023 |
| From: | NRC/RGN-III/DORS/OB |
| To: | |
| Bryan Bergeon | |
| Shared Package | |
| ML22007A060 | List: |
| References | |
| Download: ML23200A256 (1) | |
Text
IP 21 Operator Licensing Exam Schedule From 10/01/2022 to 09/30/2023 Phase Code: 2 - Construction, 5 - Operational Region: 3 By Date
- Candidates Exam Staart Exam End Site Docket #
Insp Rpt Cac #
RO LSRO SROI SROU Type Exam Author Chief Examiner Examiner 6/18/2023 6/24/2023 Fermi
- 05000341, 05000016 2023301 000500 2
0 2
0 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD)
NFF
- Bergeon, Bryan Rodriguez, Lionel; Roach, Gregory; Bergeon, Bryan 6/25/2023 7/1/2023 Fermi
- 05000341, 05000016 2023301 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD)
NFF
- Bergeon, Bryan Rodriguez, Lionel; Roach, Gregory; Bergeon, Bryan Prepared on 6/12/2023 1:44:37 PM Activity Codes: EXAD Exam Author: ALL Orgs: ALL Sites: FERM
IP 21 Operator Licensing Exam Schedule Region/Site Summary RO SROI SROU LSRO Total 3
2 2
0 0
4 Region/Docket Summary RO SROI SROU LSRO Total 3
2 2
0 0
4 Exam Date/Site Summary RO SROI SROU LSRO Total 6/18/2023 2
2 0
0 4
Exam Date/Docket Summary RO SROI SROU LSRO Total 6/18/2023 2
2 0
0 4
Prepared on 6/12/2023 1:44:37 PM Activity Codes: EXAD Exam Author: ALL Orgs: ALL Sites: FERM