ML23200A256: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:IP 21 Operator Licensing Exam Schedule From 10/01/2022 to 09/30/2023 Phase Code: 2 - Construction, 5 - Operational Region: 3 By Date                                                                   # Candidates Exam Staart Exam End           Site           Docket # Insp Rpt Cac # RO LSRO   SROI SROU Type         Exam   Chief   Examiner
{{#Wiki_filter:IP 21 Operator Licensing Exam Schedule From 10/01/2022 to 09/30/2023 Phase Code: 2 - Construction, 5 - Operational Region: 3 By Date
                                                        #                                                  Author Examiner 6/18/2023     6/24/2023 Fermi             05000341, 2023301 000500 2   0     2     0 FB-OR-INITIAL NFF   Bergeon, Rodriguez, 05000016                                      LICENSE EXAM        Bryan    Lionel; Roach, ADMINISTRATI                  Gregory; ON (EXAD)                    Bergeon, Bryan 6/25/2023       7/1/2023 Fermi             05000341, 2023301 000500                     FB-OR-INITIAL NFF   Bergeon, Rodriguez, 05000016                                      LICENSE EXAM        Bryan    Lionel; Roach, ADMINISTRATI                  Gregory; ON (EXAD)                    Bergeon, Bryan Sites: FERM Orgs: ALL Exam Author: ALL Activity Codes: EXAD Prepared on 6/12/2023 1:44:37 PM
# Candidates Exam Staart Exam End Site Docket #
Insp Rpt Cac #
RO LSRO SROI SROU Type Exam Author Chief Examiner Examiner 6/18/2023 6/24/2023 Fermi
: 05000341, 05000016 2023301 000500 2
0 2
0 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD)
NFF
: Bergeon, Bryan Rodriguez, Lionel; Roach, Gregory; Bergeon, Bryan 6/25/2023 7/1/2023 Fermi
: 05000341, 05000016 2023301 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD)
NFF
: Bergeon, Bryan Rodriguez, Lionel; Roach, Gregory; Bergeon, Bryan Prepared on 6/12/2023 1:44:37 PM Activity Codes: EXAD Exam Author: ALL Orgs: ALL Sites: FERM


IP 21 Operator Licensing Exam Schedule Region/Site Summary     RO   SROI SROU LSRO Total 3                           2   2   0     0       4 Exam Date/Site Summary   RO   SROI SROU LSRO Total 6/18/2023                  2   2   0     0       4 Region/Docket Summary   RO   SROI SROU LSRO Total 3                          2   2   0     0       4 Exam Date/Docket Summary RO   SROI SROU LSRO Total 6/18/2023                   2   2   0     0       4 Sites: FERM Orgs: ALL Exam Author: ALL Activity Codes: EXAD Prepared on 6/12/2023 1:44:37 PM}}
IP 21 Operator Licensing Exam Schedule Region/Site Summary RO SROI SROU LSRO Total 3
2 2
0 0
4 Region/Docket Summary RO SROI SROU LSRO Total 3
2 2
0 0
4 Exam Date/Site Summary RO SROI SROU LSRO Total 6/18/2023 2
2 0
0 4
Exam Date/Docket Summary RO SROI SROU LSRO Total 6/18/2023 2
2 0
0 4
Prepared on 6/12/2023 1:44:37 PM Activity Codes: EXAD Exam Author: ALL Orgs: ALL Sites: FERM}}

Latest revision as of 02:38, 27 November 2024

IP 21 Operator Licensing Exam Schedule
ML23200A256
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/19/2023
From:
NRC/RGN-III/DORS/OB
To:
Bryan Bergeon
Shared Package
ML22007A060 List:
References
Download: ML23200A256 (1)


Text

IP 21 Operator Licensing Exam Schedule From 10/01/2022 to 09/30/2023 Phase Code: 2 - Construction, 5 - Operational Region: 3 By Date

  1. Candidates Exam Staart Exam End Site Docket #

Insp Rpt Cac #

RO LSRO SROI SROU Type Exam Author Chief Examiner Examiner 6/18/2023 6/24/2023 Fermi

05000341, 05000016 2023301 000500 2

0 2

0 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD)

NFF

Bergeon, Bryan Rodriguez, Lionel; Roach, Gregory; Bergeon, Bryan 6/25/2023 7/1/2023 Fermi
05000341, 05000016 2023301 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD)

NFF

Bergeon, Bryan Rodriguez, Lionel; Roach, Gregory; Bergeon, Bryan Prepared on 6/12/2023 1:44:37 PM Activity Codes: EXAD Exam Author: ALL Orgs: ALL Sites: FERM

IP 21 Operator Licensing Exam Schedule Region/Site Summary RO SROI SROU LSRO Total 3

2 2

0 0

4 Region/Docket Summary RO SROI SROU LSRO Total 3

2 2

0 0

4 Exam Date/Site Summary RO SROI SROU LSRO Total 6/18/2023 2

2 0

0 4

Exam Date/Docket Summary RO SROI SROU LSRO Total 6/18/2023 2

2 0

0 4

Prepared on 6/12/2023 1:44:37 PM Activity Codes: EXAD Exam Author: ALL Orgs: ALL Sites: FERM