{{#Wiki_filter:License Amendment Request
{{#Wiki_filter:License Amendment Request Rebaseline Watts Bar Technical Specifications Sections 3.1 and 3.2 September 27, 2023


Rebaseline Watts Bar Technical Specifications Sections 3.1 and 3.2
Agenda
 
* Background
Septem ber 27, 2023 Age nda
* B a c kgr o und
* Solution
* Solution
* TS Section 3.1 & 3.2 Rebaseline
* TS Section 3.1 & 3.2 Rebaseline
* L A R S c he dule
* LAR Schedule
* S u mma r y
* Summary
* Questions/Comments?
* Questions/Comments?
2


2 Ba c k gr ound
===
Background===
* Watts Bar Unit 1 received its Operating License on 2/7/1996.
* Watts Bar Unit 1 received its Operating License on 2/7/1996.
* Watts Bar Unit 2 received its Operating License on 10/22/2015
* Watts Bar Unit 2 received its Operating License on 10/22/2015
* Both unit Technical Specifications (TS) are based on NUREG-1 431 Revision 0, issued on 9/28/1992
* Both unit Technical Specifications (TS) are based on NUREG-1431 Revision 0, issued on 9/28/1992
* Few TSTF travelers were adopted for Unit 1 to maintain TS consistency with eventual licensing of Unit 2.
* Few TSTF travelers were adopted for Unit 1 to maintain TS consistency with eventual licensing of Unit 2.
* Current backlog of unadopted TSTF travelers is approximately 90.
* Current backlog of unadopted TSTF travelers is approximately 90.
3


3 Solution To r educe t he backlog of unadopt ed TSTF t r aveler s, TVA pr oposes a st r at egy t o r ebaseline discr et e sect ions of t he TS:
Solution To reduce the backlog of unadopted TSTF travelers, TVA proposes a strategy to rebaseline discrete sections of the TS:
* M ult iple t r aveler s af f ect ing common sect ions of t he TS w ill be included in a bundled License Amendment Request ( LAR).
Multiple travelers affecting common sections of the TS will be included in a bundled License Amendment Request (LAR).
* Each t r aveler w ill have it s ow n sect ion in t he LAR w it h ident ical subsect ions.
Each traveler will have its own section in the LAR with identical subsections.
* TS mar kups w ill be color coded f or t he ef f ect s of each t r aveler.
TS markups will be color coded for the effects of each traveler.
* TVA w ill assess t he success of t his appr oach w it h t he pilot LAR and make adjust ment s as needed f or f ut ur e r ebaseline LARs.
TVA will assess the success of this approach with the pilot LAR and make adjustments as needed for future rebaseline LARs.
 
4
4 TS Se c tion The pilot LAR f or t his appr oach w ill be t he r ebaseline of TS 3.1 & 3.2 Sect ions 3. 1 and 3. 2, and w ill adopt t w elve t r aveler s:
Rebaseline
* TSTF-5-A, Revision 1, Delet e Saf et y Limit Violat ion Not if icat ion Requirement s
* TSTF-9- A, Revision 1, Relocat e value f or shut dow n mar gin t o CO L R
* TSTF-12-A, Revision 1, Delet e LCO 3. 1. 9 and 3. 1. 11
( Physics Test s Except ions)
* TSTF-13-A, Revision 1, M ove SR f or 300 ppm M TC measur ement t o Fr equency Not e of SR 3. 1. 4. 3
* TSTF-14-A, Revision 4, Add an LCO it em and SR t o M ode 2 Physics Test s Except ions t o ver if y t hat Ther mal Pow er < =
5 % R T P.
 
5 TS Se c tion
* TSTF-11 0-A, Revision 2, Delet e SR Fr equencies Based on 3.1 & 3.2 I noper able Alar ms Rebaseline
* TSTF-135-A, Revision 3, RPS and ESFAS I ns t r um e nt a t i o n (c ontinue d)
* TSTF-136-A, Combine LCO 3. 1. 1 and 3. 1. 2
* TSTF-142-A, I ncr ease t he Complet ion Time When t he Cor e Reac t ivit y Balanc e is Not W it hin Limit
* TSTF-241-A, Revision 4, Allow Time f or St abilizat ion Af t er Reducing Pow er Due t o Q PTR O ut-of -Limit
* TSTF-256-A, M odif y M O DE 2 STE Applic abilit y
* TSTF-339-A, Revision 2, Relocat e TS Par amet er s t o CO LR
 
6 PHYSICS TESTS EXCEPTIONS - MODE 2
: 3. 1. 10
 
3.1 REACTIVITY CONTROL SYSTEMS


3.1.10 PHYSICS TESTS Exceptions-MODE 2
TS Section 3.1 & 3.2 Rebaseline The pilot LAR for this approach will be the rebaseline of TS Sections 3.1 and 3.2, and will adopt twelve travelers:
TSTF-5-A, Revision 1, Delete Safety Limit Violation Notification Requirements TSTF-9-A, Revision 1, Relocate value for shutdown margin to COLR TSTF-12-A, Revision 1, Delete LCO 3.1.9 and 3.1.11 (Physics Tests Exceptions)
TSTF-13-A, Revision 1, Move SR for 300 ppm MTC measurement to Frequency Note of SR 3.1.4.3 TSTF-14-A, Revision 4, Add an LCO item and SR to Mode 2 Physics Tests Exceptions to verify that Thermal Power <=
5% RTP.
5


LCO 3.1.10 During the performance of PHYSICS TESTS, the requirements of
TS Section 3.1 & 3.2 Rebaseline (continued)
TSTF-110-A, Revision 2, Delete SR Frequencies Based on Inoperable Alarms TSTF-135-A, Revision 3, RPS and ESFAS Instrumentation TSTF-136-A, Combine LCO 3.1.1 and 3.1.2 TSTF-142-A, Increase the Completion Time When the Core Reactivity Balance is Not Within Limit TSTF-241-A, Revision 4, Allow Time for Stabilization After Reducing Power Due to QPTR Out-of-Limit TSTF-256-A, Modify MODE 2 STE Applicability TSTF-339-A, Revision 2, Relocate TS Parameters to COLR 6


LCO 3.1.4, "Moderator Temperature Coefficient (MTC)";
PHYSICS TESTS EXCEPTIONS -
MODE 2
: 3. 1. 10 3.1 REACTIVITY CONTROL SYSTEMS 3.1.10 PHYSICS TESTS Exceptions-MODE 2 LCO 3.1.10 APPLICABILITY:
ACTIONS During the performance of PHYSICS TESTS, the requirements of LCO 3.1.4, "Moderator Temperature Coefficient (MTC)";
LCO 3.1.5, "Rod Group Alignment Limits";
LCO 3.1.5, "Rod Group Alignment Limits";
LCO 3. 1. 6, "Shutdown Bank Insertion Limits";
LCO 3. 1. 6, "Shutdown Bank Insertion Limits";
LCO 3.1.7, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality"
LCO 3.1.7, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended, and the number of required channels for LCO 3.3.1, "RTS Instrumentation," Functions 2, 3, 6, and 16.e, may be reduced to "3" required channels provided:
 
: a.
may be suspended, and the number of required channels for LCO 3.3.1, "RTS Instrumentation," Functions 2, 3, 6, and 16.e, may be reduced to "3" required channels provided:
RCS lowest loop average temperature is~ 541&deg;F; and
: a. RCS lowest loop average temperature is~ 541&deg;F; and
: b.
: b. SDM is~ 1.6% 6k/k.
SDM is~ 1.6% 6k/k.
 
MODE 2 during PHYSICS TESTS.
APPLICABILITY: MODE 2 during PHYSICS TESTS.
CONDITION REQUIRED ACTION COMPLETION TIME A.
 
SOM not within A.1 Initiate boration to 15 minutes limit.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
restore SOM to within limit.
 
AND A.2 Suspend PHYSICS TESTS 1 hour exceptions.
A. SOM not within A.1 Initiate boration to 15 minutes limit. restore SOM to within limit.
B.
 
THERMAL POWER not 8.1 Open reactor trip Immediately within limit.
AND
breakers.
 
A.2 Suspend PHYSICS TESTS 1 hour exceptions.
 
B. THERMAL POWER not 8.1 Open reactor trip Immediately within limit. breakers.
 
(continued)
(continued)
Watts Bar-Unit 1 3.1-23 Amendment No. 28 SEP 1 3 2000 DRAFT within the limits specified in the COLR; and
: c. THERMAL POWER is 5% RTP.
D initiated in MODE 2 Red - TSTF-9 Green = TSTF-12 Orange = TSTF-14 Black = TSTF-256 21


Watts Bar-Unit 1 3.1-23 Amendment No. 28 SEP 1 3 2000 PHYSICS TESTS EXCEPTIONS - MODE 2 3.1.10
PHYSICS TESTS EXCEPTIONS - MODE 2 3.1.10 Watts Bar-Unit 1 3.1-21 Amendment 28, 3.1 REACTIVITY CONTROL SYSTEMS 3.1.10 PHYSICS TESTS ExceptionsMODE 2 LCO 3.1.10 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.4, "Moderator Temperature Coefficient (MTC)";
 
3.1 REACTIVITY CONTROL SYSTEMS
 
3.1.10 PHYSICS TESTS ExceptionsMODE 2
 
LCO 3.1.10 During the performance of PHYSICS TESTS, the requirements of
 
LCO 3.1.4, "Moderator Temperature Coefficient (MTC)";
LCO 3.1.5, "Rod Group Alignment Limits";
LCO 3.1.5, "Rod Group Alignment Limits";
LCO 3.1.6, "Shutdown Bank Insertion Limits";
LCO 3.1.6, "Shutdown Bank Insertion Limits";
LCO 3.1.7, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality"
LCO 3.1.7, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended, and the number of required channels for LCO 3.3.1, RTS Instrumentation, Functions 2, 3, 6, and 16.e, may be reduced to 3 required channels provided:
 
a.
may be suspended, and the number of required channels for LCO 3.3.1, RTS Instrumentation, Functions 2, 3, 6, and 16.e, may be reduced to 3 required channels provided:
RCS lowest loop average temperature is 541F; b.
: a. RCS lowest loop average temperature is 541F;
SDM is within the limits specified in the COLR; and
: b. SDM is within the limits specified in the COLR; and
: c.
: c. THERMAL POWER is 5% RTP.
THERMAL POWER is 5% RTP.
 
APPLICABILITY:
APPLICABILITY: During PHYSICS TESTS initiated in MODE 2.
During PHYSICS TESTS initiated in MODE 2.
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME
SDM not within limit.
 
A.1 Initiate boration to restore SDM to within limit.
A. SDM not within limit. A.1 Initiate boration to restore SDM 15 minutes to within limit.
AND A.2 Suspend PHYSICS TESTS exceptions.
 
15 minutes 1 hour B.
AND
THERMAL POWER not within limit.
 
B.1 Open reactor trip breakers.
A.2 Suspend PHYSICS TESTS 1 hour exceptions.
Immediately (continued)
 
DRAFT
B. THERMAL POWER notB.1 Open reactor trip breakers. Immediately within limit.
 
(continued)
 
Watts Bar-Unit 1 3.1-21 Amendment 28, TS Se c tion Subsect ions f or each t r aveler :
3.1 & 3.2
* Descr ipt ion of Pr oposed Change Rebaseline
* Dif f er ences Bet w een t he Pr oposed Change and t he (c ontinue d) Appr oved Tr aveler
* Summar y of t he Appr oved Tr aveler Just if icat ion
* Dif f er ences Bet w een t he Plant-Specif ic Just if icat ion and t he Appr oved Tr aveler Just if icat ion
* NRC Appr oval
* List of Af f ect ed Pages
* Regulat or y Analysis


7 TS Se c tion LAR w ill af f ec t t he f ollow ing TS:
TS Section 3.1 & 3.2 Rebaseline (continued)
3.1 & 3.2
Subsections for each traveler:
* TS 2. 1 Saf et y Limit s Rebaseline
Description of Proposed Change Differences Between the Proposed Change and the Approved Traveler Summary of the Approved Traveler Justification Differences Between the Plant-Specific Justification and the Approved Traveler Justification NRC Approval List of Affected Pages Regulatory Analysis 7
* TS 2. 2 Saf et y Limit Violat ions (c ontinue d)
* LCO 3. 0. 7
* TS 3. 1. 1 Shut dow n M ar gin - Ta v g > 200&deg;F
* TS 3. 1. 2 Shut dow n M ar gin - Ta v g 200&deg;F
* TS 3. 1. 3 Cor e React ivit y
* TS 3. 1. 4 M oder at or Temper at ur e Coef f icient
* TS 3. 1. 5 G r oup Rod Alignment Limit s
* TS 3. 1. 7 Cont r ol Bank I nser t ion Limit s


8 TS Se c tion 3.1 & 3.2
TS Section 3.1 & 3.2 Rebaseline (continued)
* TS 3. 1. 9 Physics Test s Except ions - M O DE 1 Rebaseline
LAR will affect the following TS:
* TS 3. 1. 10 Physics Test s Except ions - M ode 2 (c ontinue d)
TS 2.1 Safety Limits TS 2.2 Safety Limit Violations LCO 3.0.7 TS 3.1.1 Shutdown Margin - Tavg >200&deg;F TS 3.1.2 Shutdown Margin - Tavg 200&deg;F TS 3.1.3 Core Reactivity TS 3.1.4 Moderator Temperature Coefficient TS 3.1.5 Group Rod Alignment Limits TS 3.1.7 Control Bank Insertion Limits 8
* TS 3. 2. 3 Axial Flux Dif f erence
* TS 3. 2. 4 Q uadr ant Pow er Tilt Rat io
* TS 3. 3. 1 React or Tr ip Syst em I nst r ument at ion
* TS 3. 3. 2 ESFAS I nst r ument at ion
* TS 3. 4. 1 RCS Pr essur e, Temper at ur e, and Flow Depar t ur e f rom Nucleat e Boiling Limit s
* TS 5. 9. 5 Cor e O per at ing Limit s Repor t


9 LAR
TS Section 3.1 & 3.2 Rebaseline (continued)
* P roj ec ted s ubm i ttal by m i ddl e of Novem ber 2023 w i th a reques ted approval w i thi n one year Sc he dule
TS 3.1.9 Physics Tests Exceptions - MODE 1 TS 3.1.10 Physics Tests Exceptions - Mode 2 TS 3.2.3 Axial Flux Difference TS 3.2.4 Quadrant Power Tilt Ratio TS 3.3.1 Reactor Trip System Instrumentation TS 3.3.2 ESFAS Instrumentation TS 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits TS 5.9.5 Core Operating Limits Report 9
* A 180- day i m pl em entati on peri od i s propos ed


10 S umma r y
LAR Schedule
* TVA plans t o submit bundled TSTF t r aveler LARs t hat f ocus on specif ic TS sect ions t o r educe t he backlog of unadopt ed t r aveler s f or Wat t s Bar
* Projected submittal by middle of November 2023 with a requested approval within one year
* T he pilot LAR Rebaselines TS Sect ions 3. 1 & 3. 2 w it h adopt ion of t w elve t r aveler s
* A 180-day implementation period is proposed 10
* Submit t al planned f or t he middle of November 2023, w it h o ne-year NRC r eview, and 180- day implement at ion per iod
* TVA w ill assess t he success of t he pilot f or f ut ur e bundled t r aveler submit t als of t his t ype


11 Que s tions /
Summary TVA plans to submit bundled TSTF traveler LARs that focus on specific TS sections to reduce the backlog of unadopted travelers for Watts Bar The pilot LAR Rebaselines TS Sections 3.1 & 3.2 with adoption of twelve travelers Submittal planned for the middle of November 2023, with one-year NRC review, and 180-day implementation period TVA will assess the success of the pilot for future bundled traveler submittals of this type 11
C omme nt s ???


Questions/
Comments
???
12}}
12}}

Latest revision as of 08:41, 25 November 2024

NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides
ML23264A041
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/27/2023
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Green K
References
Download: ML23264A041 (15)


Text

License Amendment Request Rebaseline Watts Bar Technical Specifications Sections 3.1 and 3.2 September 27, 2023

Agenda

  • Background
  • Solution
  • Summary
  • Questions/Comments?

2

=

Background===

  • Watts Bar Unit 1 received its Operating License on 2/7/1996.
  • Watts Bar Unit 2 received its Operating License on 10/22/2015
  • Both unit Technical Specifications (TS) are based on NUREG-1431 Revision 0, issued on 9/28/1992
  • Few TSTF travelers were adopted for Unit 1 to maintain TS consistency with eventual licensing of Unit 2.
  • Current backlog of unadopted TSTF travelers is approximately 90.

3

Solution To reduce the backlog of unadopted TSTF travelers, TVA proposes a strategy to rebaseline discrete sections of the TS:

Multiple travelers affecting common sections of the TS will be included in a bundled License Amendment Request (LAR).

Each traveler will have its own section in the LAR with identical subsections.

TS markups will be color coded for the effects of each traveler.

TVA will assess the success of this approach with the pilot LAR and make adjustments as needed for future rebaseline LARs.

4

TS Section 3.1 & 3.2 Rebaseline The pilot LAR for this approach will be the rebaseline of TS Sections 3.1 and 3.2, and will adopt twelve travelers:

TSTF-5-A, Revision 1, Delete Safety Limit Violation Notification Requirements TSTF-9-A, Revision 1, Relocate value for shutdown margin to COLR TSTF-12-A, Revision 1, Delete LCO 3.1.9 and 3.1.11 (Physics Tests Exceptions)

TSTF-13-A, Revision 1, Move SR for 300 ppm MTC measurement to Frequency Note of SR 3.1.4.3 TSTF-14-A, Revision 4, Add an LCO item and SR to Mode 2 Physics Tests Exceptions to verify that Thermal Power <=

5% RTP.

5

TS Section 3.1 & 3.2 Rebaseline (continued)

TSTF-110-A, Revision 2, Delete SR Frequencies Based on Inoperable Alarms TSTF-135-A, Revision 3, RPS and ESFAS Instrumentation TSTF-136-A, Combine LCO 3.1.1 and 3.1.2 TSTF-142-A, Increase the Completion Time When the Core Reactivity Balance is Not Within Limit TSTF-241-A, Revision 4, Allow Time for Stabilization After Reducing Power Due to QPTR Out-of-Limit TSTF-256-A, Modify MODE 2 STE Applicability TSTF-339-A, Revision 2, Relocate TS Parameters to COLR 6

PHYSICS TESTS EXCEPTIONS -

MODE 2

3. 1. 10 3.1 REACTIVITY CONTROL SYSTEMS 3.1.10 PHYSICS TESTS Exceptions-MODE 2 LCO 3.1.10 APPLICABILITY:

ACTIONS During the performance of PHYSICS TESTS, the requirements of LCO 3.1.4, "Moderator Temperature Coefficient (MTC)";

LCO 3.1.5, "Rod Group Alignment Limits";

LCO 3. 1. 6, "Shutdown Bank Insertion Limits";

LCO 3.1.7, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended, and the number of required channels for LCO 3.3.1, "RTS Instrumentation," Functions 2, 3, 6, and 16.e, may be reduced to "3" required channels provided:

a.

RCS lowest loop average temperature is~ 541°F; and

b.

SDM is~ 1.6% 6k/k.

MODE 2 during PHYSICS TESTS.

CONDITION REQUIRED ACTION COMPLETION TIME A.

SOM not within A.1 Initiate boration to 15 minutes limit.

restore SOM to within limit.

AND A.2 Suspend PHYSICS TESTS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> exceptions.

B.

THERMAL POWER not 8.1 Open reactor trip Immediately within limit.

breakers.

(continued)

Watts Bar-Unit 1 3.1-23 Amendment No. 28 SEP 1 3 2000 DRAFT within the limits specified in the COLR; and

c. THERMAL POWER is 5% RTP.

D initiated in MODE 2 Red - TSTF-9 Green = TSTF-12 Orange = TSTF-14 Black = TSTF-256 21

PHYSICS TESTS EXCEPTIONS - MODE 2 3.1.10 Watts Bar-Unit 1 3.1-21 Amendment 28, 3.1 REACTIVITY CONTROL SYSTEMS 3.1.10 PHYSICS TESTS ExceptionsMODE 2 LCO 3.1.10 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.4, "Moderator Temperature Coefficient (MTC)";

LCO 3.1.5, "Rod Group Alignment Limits";

LCO 3.1.6, "Shutdown Bank Insertion Limits";

LCO 3.1.7, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended, and the number of required channels for LCO 3.3.1, RTS Instrumentation, Functions 2, 3, 6, and 16.e, may be reduced to 3 required channels provided:

a.

RCS lowest loop average temperature is 541F; b.

SDM is within the limits specified in the COLR; and

c.

THERMAL POWER is 5% RTP.

APPLICABILITY:

During PHYSICS TESTS initiated in MODE 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

SDM not within limit.

A.1 Initiate boration to restore SDM to within limit.

AND A.2 Suspend PHYSICS TESTS exceptions.

15 minutes 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.

THERMAL POWER not within limit.

B.1 Open reactor trip breakers.

Immediately (continued)

DRAFT

TS Section 3.1 & 3.2 Rebaseline (continued)

Subsections for each traveler:

Description of Proposed Change Differences Between the Proposed Change and the Approved Traveler Summary of the Approved Traveler Justification Differences Between the Plant-Specific Justification and the Approved Traveler Justification NRC Approval List of Affected Pages Regulatory Analysis 7

TS Section 3.1 & 3.2 Rebaseline (continued)

LAR will affect the following TS:

TS 2.1 Safety Limits TS 2.2 Safety Limit Violations LCO 3.0.7 TS 3.1.1 Shutdown Margin - Tavg >200°F TS 3.1.2 Shutdown Margin - Tavg 200°F TS 3.1.3 Core Reactivity TS 3.1.4 Moderator Temperature Coefficient TS 3.1.5 Group Rod Alignment Limits TS 3.1.7 Control Bank Insertion Limits 8

TS Section 3.1 & 3.2 Rebaseline (continued)

TS 3.1.9 Physics Tests Exceptions - MODE 1 TS 3.1.10 Physics Tests Exceptions - Mode 2 TS 3.2.3 Axial Flux Difference TS 3.2.4 Quadrant Power Tilt Ratio TS 3.3.1 Reactor Trip System Instrumentation TS 3.3.2 ESFAS Instrumentation TS 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits TS 5.9.5 Core Operating Limits Report 9

LAR Schedule

  • Projected submittal by middle of November 2023 with a requested approval within one year
  • A 180-day implementation period is proposed 10

Summary TVA plans to submit bundled TSTF traveler LARs that focus on specific TS sections to reduce the backlog of unadopted travelers for Watts Bar The pilot LAR Rebaselines TS Sections 3.1 & 3.2 with adoption of twelve travelers Submittal planned for the middle of November 2023, with one-year NRC review, and 180-day implementation period TVA will assess the success of the pilot for future bundled traveler submittals of this type 11

Questions/

Comments

???

12