ML24053A247: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:          
{{#Wiki_filter:Orano TN 7160 Riverwood Drive Suite 200 Columbia, MD 21046 USA Tel: 410-910-6900 Fax: 434-260-8480 September 28, 2023 E-62818 Mr. Rick Boyle Chief, Radioactive Materials Transport U.S. Department of Transportation 1200 New Jersey Avenue SE, Washington, DC, 20590  
      
 
September 28, 2023 E-62818
 
Orano TN 7160 Riverwood Drive          Mr. Rick Boyle Suite 200                      Chief, Radioactive Materials Transport Columbia, MD 21046            U.S. Department of Transportation USA Tel: 410-910-6900              1200 New Jersey Avenue SE, Fax: 434-260-8480              Washington, DC, 20590


==Subject:==
==Subject:==
Request         for         issuance         of         Provisional         Renewal         of         Compete nt          Authority Certification J/2009/AF, GP-01
Request for issuance of Provisional Renewal of Competent Authority Certification J/2009/AF, GP-01  


==References:==
==References:==
(1)                                     TN Americas Letter E-62007 dated January 24, 20 23, Application for Revalidation of Competent Authority Certificat  ion J/2009/AF, GP-01.
(1)
 
TN Americas Letter E-62007 dated January 24, 2023, Application for Revalidation of Competent Authority Certification J/2009/AF, GP-01.
(2)                                     TN Americas Letter E-62515 dated July 25, 2023, Additional Information for Review of the Application for Revalidation of Competent Authority Certification J/2009/AF, GP-01.
(2)
TN Americas Letter E-62515 dated July 25, 2023, Additional Information for Review of the Application for Revalidation of Competent Authority Certification J/2009/AF, GP-01.  


==Dear Mr. Boyle:==
==Dear Mr. Boyle:==
The Nuclear Fuel Industries, Ltd. (NFI) Is the certificate holder for the GP-01, Type A Fissile package used for shipment of Uranium oxide (UO2, UO3 and U3O8) or Uranium oxides mixed with gadolinia. NFI is working with suppliers in Europe to continue to fulfill commitments to transport Uranium oxides for use in commercial fuel production in Japan. NFI plans to ship uranium oxide for use in commercial nuclear reactor fuel from Westinghouse Springfields Fuels Ltd. in the United Kingdom or Westinghouse Electric Sweden to a European port by vehicle, from a European port to a Canadian east coast port by vessel, transit from a Canadian east coast port to a USA west coast port by vehicle, from the west coast of the USA to Tokyo by vessel, and from Tokyo to NFI Kumatori Works by land.
NFI, through their contractors Orano Nuclear Packaging and Services (NPS) and Orano TN Americas, are working closely with the U.S. Department of Transportation (DOT) and U.S. Nuclear Regulatory Commission (NRC) to revalidate for transit through the United States the material transport package needed for this important shipment: GP-01 [1]. An administrative issue regarding the Aging Management Analysis of the transportation package has delayed completion of the revalidation [2]
 

   


The Nuclear Fuel Industries, Ltd. (NFI) Is the certificate hold er for the GP-01, Type A Fissile package used for shipment of Uranium oxide (UO 2, UO3 and U3O8) or Uranium oxides  mixed  with  gadolinia. NFI  is  working  with  suppliers  in    Europe  to  continue  to fulfill commitments to transport Uranium oxides for use in comm ercial fuel production in Japan. NFI plans to ship uranium oxide for use in commercia l nuclear reactor fuel from  Westinghouse  Springfields  Fuels  Ltd. in  the  United Kingdom    or  Westinghouse Electric Sweden to a European port by vehicle, from  a European  port to a Canadian east coast port by vessel, transit from a Canadian east coast port to a USA west coast port  by  vehicle,  from  the  west  coast of  the  USA  to  Tokyo  by vessel,  and from  Tokyo to NFI Kumatori Works by land.
E-62818 U.S. DOT Page 2 of 2 It is imperative that NFI complete the shipment on schedule to meet the commitments described above. TN Americas, therefore, requests that the DOT issue the Competent Authority Certificate for the GP-01 package without the Aging Management Analysis for two shipments to take place in April 2024 and August 2024. NFI, in cooperation with their contractors, are committed to resolving the outstanding administrative issue and submit the Aging Management Analysis to the NRC.
 
We greatly appreciate the DOTs support to these important commercial nuclear fuel supply projects and your consideration of this request. If you have any questions or concerns, please do not hesitate to contact me at Peter.Vescovi@orano.group or (336) 420-8325.
NFI,      through      their      contractors      Orano      Nuclear      Packaging      and      Serv ices (NPS) and Orano TN Americas, are working closely with the U.S. Department  of Transportation (DOT)          and          U.S.          Nuclear          Regulatory          Commission          (NRC)          to          revalidat e          for          transit through  the  United  States  the  material  transport  package  needed  for this important shipment:        GP-01        [1].                  An        administrative        issue        regarding        the        Agi ng        Management Analysis of the transportation package has delayed completion o  f the revalidation [2]
Sincerely, Peter Vescovi TN-Americas Cc:
 
Laurence Labbe, Project Manager, TN Americas Laurent Klein, Project Manager, Orano NPS  
                  
 
      

 
   }}
E-62818 U.S. DOT                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Page 2 of 2
 
It is imperative that NFI complete the shipment on schedule to meet the commitments described above. TN Americas, therefore, requests that the DOT issue the   Competent Authority Certificate for the GP-01 package without the Aging Management Analysis for two shipments to take place in       April       2024       and       August       2024.             NFI,       in       cooperation       with       their         contractors,       are       committed       to resolving the outstanding administrative issue and submit the A  ging Management Analysis to the NRC.
 
We       greatly       appreciate       the       DOTs       support       to       these       important       commercial       nuclear       fuel       supply projects and your consideration of this request. If you have a ny questions or concerns, please do not hesitate to contact me at Peter.Vescovi@orano.group or (336 ) 420-8325.
 
Sincerely,
 
Peter Vescovi TN-Americas
 
Cc:                                                           Laurence Labbe, Project Manager, TN Americas Laurent Klein, Project Manager, Orano NPS}}

Latest revision as of 20:07, 24 November 2024

Letter Dated 9-28-23 from Pvescovi (Orano Tn) to Rboyle (Dot), Request to for a Short-Term Approval of a Shipment Using the Model No. GP-01 Japanese Package Taking Place in April 2024
ML24053A247
Person / Time
Site: 07103098
Issue date: 09/28/2023
From: Vescovi P
Orano TN Americas
To: Boyle R
Office of Nuclear Material Safety and Safeguards, US Dept of Transportation (DOT), Office of Hazardous Materials Safety
Shared Package
ML24053A246 List:
References
A33010, E-62818
Download: ML24053A247 (2)


Text

Orano TN 7160 Riverwood Drive Suite 200 Columbia, MD 21046 USA Tel: 410-910-6900 Fax: 434-260-8480 September 28, 2023 E-62818 Mr. Rick Boyle Chief, Radioactive Materials Transport U.S. Department of Transportation 1200 New Jersey Avenue SE, Washington, DC, 20590

Subject:

Request for issuance of Provisional Renewal of Competent Authority Certification J/2009/AF, GP-01

References:

(1)

TN Americas Letter E-62007 dated January 24, 2023, Application for Revalidation of Competent Authority Certification J/2009/AF, GP-01.

(2)

TN Americas Letter E-62515 dated July 25, 2023, Additional Information for Review of the Application for Revalidation of Competent Authority Certification J/2009/AF, GP-01.

Dear Mr. Boyle:

The Nuclear Fuel Industries, Ltd. (NFI) Is the certificate holder for the GP-01, Type A Fissile package used for shipment of Uranium oxide (UO2, UO3 and U3O8) or Uranium oxides mixed with gadolinia. NFI is working with suppliers in Europe to continue to fulfill commitments to transport Uranium oxides for use in commercial fuel production in Japan. NFI plans to ship uranium oxide for use in commercial nuclear reactor fuel from Westinghouse Springfields Fuels Ltd. in the United Kingdom or Westinghouse Electric Sweden to a European port by vehicle, from a European port to a Canadian east coast port by vessel, transit from a Canadian east coast port to a USA west coast port by vehicle, from the west coast of the USA to Tokyo by vessel, and from Tokyo to NFI Kumatori Works by land.

NFI, through their contractors Orano Nuclear Packaging and Services (NPS) and Orano TN Americas, are working closely with the U.S. Department of Transportation (DOT) and U.S. Nuclear Regulatory Commission (NRC) to revalidate for transit through the United States the material transport package needed for this important shipment: GP-01 [1]. An administrative issue regarding the Aging Management Analysis of the transportation package has delayed completion of the revalidation [2]

 



   

E-62818 U.S. DOT Page 2 of 2 It is imperative that NFI complete the shipment on schedule to meet the commitments described above. TN Americas, therefore, requests that the DOT issue the Competent Authority Certificate for the GP-01 package without the Aging Management Analysis for two shipments to take place in April 2024 and August 2024. NFI, in cooperation with their contractors, are committed to resolving the outstanding administrative issue and submit the Aging Management Analysis to the NRC.

We greatly appreciate the DOTs support to these important commercial nuclear fuel supply projects and your consideration of this request. If you have any questions or concerns, please do not hesitate to contact me at Peter.Vescovi@orano.group or (336) 420-8325.

Sincerely, Peter Vescovi TN-Americas Cc:

Laurence Labbe, Project Manager, TN Americas Laurent Klein, Project Manager, Orano NPS