ML24059A220: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:. .....                                                                                                                                                                                                                                                                                                                                                                                               Page    1 of 6 2012   Current                 FY   Report:                   Review         of Federal               Advisory               Committee                                                                                                                                                                                                                                     Committee       Menu
{{#Wiki_filter:......
2012 Current FY Report: Review of Federal Advisory Committee 11 /14/2012 2: 16:08 PM Page 1 of 6 Committee Menu I Department or Agency
: 2. Fiscal Year 2012 Nuclear Regulatory Commission
: 3. Committee or SubCommittee Advisory Committee on Reactor Safeguards 3b. GSA Committee No.
207
: 4. Is this New During Fiscal Year?
: 5. Current Charter
: 6. Expected Renewal Date
: 7. Expected Term Date No 12/10/2010 12/10/2012 8a. Was Terminated During FY?
8b. Specific Termination Authority Sc.Actual Termination Date No CJ. Agency Recommendation for Next FY Continue I Oa.Legislation Req to Terminate?
1 Ob.Legislation Pending?
No 11. Establishment Authority
: 12. Specific Establishment Authority Statutory (Congress Created)
I 3. Effective Date
: 14. Committee Type Continuing 14c. Presidential?
42 U.S.C. Sect. 2039 & 2232 1/1/1957
: 15. Description of Committee 16a. Total Number of Reports 40 16b. Report Titles and Dates Scientific Technical Program Advisory Board Initial ACRS Review of 1) The NRC Near Term Task Force Report on Fukushima and 2) Staffs Recommended Actions to be Taken Without Delay Draft Final Regulatory Guide (RG) 1.82, "Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident," Revision 4 No 10/13/2011 10/17/2011 Enhancing the Fuel Cycle Oversight Process 10/17/2011 ACRS Review of Starrs Prioritization of Recommended Actions to be Taken in Response to Fukushima 111812011 Lessons Learned (SECY-I 1-0137)
Nine Mile Point Nuclear Station, Unit 2, Extended Power Uprate Application 11/10/2011 Draft Fin Rev 6 of Standard Rev Plan Br Tech Position 7-19,Guidance for Eval of Div & Defense-in-Depth in Digital Computer-Based lnstru & Ctrl System Report on the Safety Aspects of the Progress Energy Florida, Inc. Combined License Application for Levy Nuclear Plant, Units 1 and 2 Proposed Requirements for ITAAC Maintenance and Draft Final Regulatory Guide 1.215, "Guidance for ITAAC Closure Under JO CFR Part 62" 11/14/2011 12/7/2011 I 2/8/2011 Res to 10/28/1, EDO Letter ACRS Recommendations Topical Rpt NEDC-33173P, Supplement 2, Parts 1211212011 I, 2, &3, "Analysis of Gamma Scan Data & Removal ofSLMCPR Margin" Revised Branch Technical Position on Concentration Averaging and Encapsulation of Low-Level Radioactive Waste Proposed Draft Rule for JO CFR 50.46c, "Emergency Core Cooling System Performance During Loss-of-Coolant Accidents" Draft JO CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Daiichi Event Draft Final Revision I to Regulatory Guide 1.93, "Availability of Electric Power Sources" Response to 2/27/12 Letter Regarding Final Disposition of Fukushima-Related ACRS Recommendations in Letters dated October 13, 2011 and November 8,2011 ACRS Review of Proposed Orders in Response to Fukushima Lessons Learned (SECY-12-0025)
Chapters 6, 7, 11, 13, 15, 16, & 18 Safety Evaluation Report with Open Items Associated with U.S.
Evolutionary Power Reactor Design Certification Application Fin SER Associated with the Florida Power and Light Turkey Point Nuclear Plant, Units 3 and 4, License Amendment Request for an Extended Power Uprate Extremely Low Probability of Rupture Project I 2/13/2011 1/26/2012 2/15/2012 2/16/2012 3/13/2012 3/14/2012 3/15/2012 3/20/2012 4/23/2012 Report on the Safety Aspects of the License Renewal Application for the Columbia Generating Station 4/24/2012 Response to the January 24, 2012, EDO Letter Regarding the Progress Energy Florida Combined h ttps :/ /www. fido. gov /facadata base/rptann ualreport. asp 4/25/2012 11/14/2012


11      /14/2012 2: 16:08      PM I           Department      or    Agency                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    2. Fisca l Year Nuclear         Regulatory                 Commission                                                                                                                                                                                                                                                                                                                  2012 3 . Committee     o      r SubComm                                    ittee                                                                                                                                                                                                                                                  3b        . GSA    Committee No        .
License Application for Levy Nuclear Plant, Units I and 2 Chapters 6, 7, 15, & 18 of the SER with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application Spent Fuel Pool Scoping Study Draft Commission Paper, "Risk-Informed Regulatory Framework for New Reactors" Review and Evaluation of the NRC Safety Research Program, NUREG-1635, Volume IO 4/25/2012 4/25/2012 4/26/2012 4/30/2012 State-of-the-Art Reactor Consequence Analysis (SOARCA) Project 5/15/2012 Draft Final NUREG-1921, (EPRI Report 1023001), "EPRI/NRC-RES Fire Human Reliability Analysis 511712012 Guidelines Chapters 3, 9, 14, and 19 of the Safety Evaluation Report with Open Items Associated with the U.S.
Advisory              Committee                    on    Reactor          Safeguards                                                                                                                                                                                                                                                                                        207
Evolutionary Power Reactor Design Certification Application 5/18/2012 Grand Gulf Nuclear Station, Unit I, Extended Power Uprate License Amendment Request 6/18/2012 Proposed Revision I to Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, 611812012 ASME OM Code" NRC Staffs Draft Plans and Status Summaries for Tier 3 Japan Lessons Learned Recommendations 6/19/2012 Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit I, License 612012012 Amendment Request for an Extended Power Uprate Draft Interim Staff Guidance Documents in Support of Tier I Orders Draft Final NUREG-1934 (EPRI 1023259), "Nuclear Power Plant Fire Modeling Analysis Guidelines (NPP FIRE MAG)"
SECY-12-0081, "Risk-Informed Regulatory Framework for New Reactors" 7/17/2012 7/17/2012 7/17/2012 Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 2, License 712312012 Amendment Request for an Extended Power Rate Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel 9/11/2012 Chapters 5, 8, IO, 11 and 12 of the SER with Open Items for the Comanche Peak Nuclear Power Plant, 911812012 Units 3 and 4, US-APWR Reference Combine License Application Interim Staff Guidance 8, Revision 3, "Burn up Credit in the Criticality Safety Analyses of PWR Spent Fuel in Transportation and Storage Casks" Chapter 9 of the Safety Evaluation Report with Open Items for the US-APWR Design Certification Application 9/18/2012 9/18/2012 Draft Regulatory Guide DG-1290 (Proposed Revision of Regulatory Guide 1.59), "Design-Basis Floods 912512012 for Nuclear Power Plants" 17a Open:
71 17b. Closed 4
Meeting Purposes and Dates Radiation Protection and Nuclear Materials ABWR Planning and Procedures Power Uprates Plant Operations and Fire Protection 587th Full Committee APIO00 Plant License Renewal US APWR ESBWR Future Plant Designs Planning and Procedures 588th Full Committee EPR Planning and Procedures (w/Commissioners)
Planning and Procedures APWR Thermal Hydraulic Phenomena https ://www.fido.gov/facadatabase/rptannualreport.asp 17c. Partially Closed:
10/4/2011 10/4/2011 10/4/20 II 10/4/20 II I 0/5/20 I I 10/5/2011 10/5/201 I 10/5/2011 10/5/201 I 10/5/2011 10/6/20 II I 0/8/2011 10/18/2011 10/19/2011 10/19/2011 10/19/2011 10/20/201 I 10/20/201 I 10/21/201 I 10/21/201 I 11 /2/20 II 11 /2/20 II 11/2/201 I 11/2/2011 11/3/2011 11/5/2011 11/14/201 I 11 /15/2011 11/29/2011 11/29/201 I 11/29/2011 11/29/2011 11/30/2011 11/30/2011 11/30/2011 11/30/201 I 3
17d. Total Meetings 78 Page 2 of 6 11/14/2012


4 . I s this New        During        Fiscal Year?                                                                                                                                                                                                        5. Current  C harter                                                                                                                                                                                                                                                                                    6.      Expected      Renewal              Date                                                                                                                                                                        7. Expec            ted  Te  rm      Date No                                                                                                                                                                                                                                                                                                                                                                                                                                                  12 /10/2010                                                                                                                                                                                                                                                                                                                                                                                                                                          12 /10/2012 8a      . Was              Terminated        During      FY    ?                                                                                                                                                                                                                                                                                                                                                                                                        8b        . Specific Termination            Authority                                                                                                                                                                                                                                                                                                                                                                                    Sc    .Actual      Termination              Date No
ESBWR 589th Full Committee Reliability and PRA Power Uprates Materials, Metallurgy & Reactor Fuels Plant Operations and Fire Protection Radiation Protection and Nuclear Materials Planning and Procedures 590th Full Committee Regulatory Policies and Practices Planning and Procedures 591st Full Committee EPR Power Uprates Reliability and PRA Regulatory Policies and Practices Materials, Metallurgy & Reactor Fuels Reliability and PRA Planning and Procedures 592nd Full Committee Reliablity and PRA US APWR Planning and Procedures Planning and Procedures (ACRS Retreat) 593rd Full Committee Regulatory Policies and Practices Power Uprates Radiation Protection and Nuclear Materials Reliability and PRA Thermal Hydraulic Phenomena Planning and Procedures 594th Full Committee 11/30/2011 11/30/2011 12/1/2011 12/3/2011 12/14/2011 12/14/2011 12/14/2011 12/14/2011 12/15/2011 12/15/2011 12/15/2011 12/15/2011 1/18/2012 1/18/2012 1/18/2012 1/18/2012 1/19/2012 1/20/2012 2/8/2012 2/8/2012 2/8/2012 2/8/2012 2/9/2012 2/11/2012 2/21/2012 2/23/2012 2/24/2012 2/24/2012 3/6/2012 3/6/2012 3/6/2012 3/6/2012 3/6/2012 3/6/2012 3/7/2012 3/7/2012 3/7/2012 3/7/2012 3/8/2012 3/10/2012 3/21/2012 3/21 /2012 3/22/2012 3/23/2012 4/11/2012 4/11/20 I 2 4/11/2012 4/11/2012 4/12/2012 4/13/2012 4/25/2012 4/25/2012 4/26/2012 4/26/2012 4/27/2012 4/27/2012 5/8/2012 5/8/2012 5/8/2012 5/9/2012 5/9/2012 5/9/2012 5/10/2012 5/12/2012 Fukushima (Lessons Learned Task Force) 5/22/2012 5/22/2012 Fukushima (Disposition of NTTF Tier 3 Recommendations) 5/22/2012 5/23/2012 Power Uprates Radiation Protection and Nuclear Materials Planning and Procedures 595th Full Committee Reliability and PRA Fukushima Power Uprates US APWR Radiation Protection and Nuclear Materials Plant License Renewal Planning and Procedures Regulatory Policies and Practices 596th Full Commitee 596th Full Commitee Reliability and PRA Fukushima (Seismic Hazards)
Fukushima (NTTF Recommendation 1) 5/24/2012 5/24/2012 6/5/2012 6/5/2012 6/5/2012 6/5/2012 6/6/2012 6/8/2012 6/19/2012 6/19/2012 6/20/2012 6/20/2012 6/22/2012 6/22/2012 7/9/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7 /10/2012 7/11/2012 7/13/2012 7/11/2012 7/13/2012 7/26/2012 7/27/2012 8/15/2012 8/15/2012 8/15/2012 8/15/2012 https://www.fido.gov/facadatabase/rptannualreport.asp Page 3 of 6 11/14/2012


CJ  . Age  nc          y          Recommendation                                        for Next    FY                                                 I Oa      .Legislation R eq to Terminate    ?                                                                                                                                                                                                                                                          1 Ob.Leg      isla    tion    Pending?
Plant License Renewal Fukushima Planning and Procedures 597th Full Commitee Regulatory Policies and Practices Radiation Protection and Nuclear Materials (Spent Fuel Transportation Risk Assessment)
Continue                                                                                                                                  No
Plant License Renewal US APWR I 8a( I ) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff I 8a(4) Personnel Pmts to Non-member Consultants I 8b( I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members I 8b(3) Travel and Per Diem 10 Federal Staff I 8b(4) Travel and Per Diem to Non-Member Consultants I 8c.Other(rents,user charges,graphics,printing,mai I etc.)
18d Total
: 19. Federal Staff Support Years 20a. How does the Committee accompl ish its purpose?
8/16/2012 8/16/2012 9/5/2012 9/5/2012 9/5/2012 9/5/2012 9/5/2012 9/5/2012 9/6/2012 9/8/2012 9/18/2012 9/18/2012 9/18/2012 9/18/2012 9/19/2012 9/19/2012 9/20/2012 9/20/2012 Current Fiscal Year
$964,077
$0
$3,357,486
$184,135
$429,003
$0
$27,875
$33,318
$266,691
$5,262,585 37.0 Next Fiscal Year
$970,000
$0
$3,675,440
$184,135
$450,453
$0
$29,269
$33,318
$251,000
$5,593,615 37.0 The Advisory Committee on Reactor Safeguards (ACRS) reports to the Nuclear Regulatory Commission (NRC) and provides the Commission with independent reviews of, and advice on, the safety of proposed or existing NRC-licensed reactor facilities and the adequacy of applicable safety standards. The ACRS was established as a statutory committee by a 1957 amendment to the Atomic Energy Act of 1954. With the enactment of the Energy Reorganization Act of 1974, the licensing functions of the Atomic Energy Commission (AEC) were transferred intact from the AEC to the NRC. The ACRS has continued in the same advisory role to the NRC with its responsibilities changing with the needs of the Commission. Some ACRS tasks are mandated by statute or regulation; some are in response to direction by the Commission, or requests from the NRC staff, or other stakeholders; and some are self initiated in response to ACRS concerns on important regulatory and safety-related matters. The ACRS, upon request from the Department of Energy (DOE), provides advice on the safety of U.S.
naval reactor designs. Upon request, the ACRS also provides technical advice to the Defense Nuclear Facilities Safety Board. The ACRS and its Subcommittees meet regularly in public, Federal Advisory Committee Act (FACA)-regulated meetings to review matters within the scope of its responsibilities. ACRS meeting agendas, meeting transcripts, and letter reports are available for downloading or viewing on the Internet at http://www.nrc.gov/reading-rm/doc-collections/#acrs. The ACRS and its Subcommittees held 78 meetings during FY 2012, including 11 Full Committee meetings that were attended by all ACRS members of which 3 were partially closed meetings. The ACRS members are chosen for their technical expertise relevant to the safety issues important to the Commission. Consultants are used on occasion to augment the expertise of the ACRS members.
The Committee has a full-time staff that provides technical support and administrative services in compliance with FACA requirements. ACRS Subcommittees normally consist of three to six ACRS members with the expertise needed to review in detail the regulatory and safety issues and to formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Stakeholders' participation in ACRS meetings is encouraged and routinely occurs. The Committee's advice, in the form of written reports, is only produced by the Full Committee, and reports on significant regulatory matters are discussed with the Commission in public meetings.
The ACRS conducts an ongoing review of its priorities and schedules to ensure that regulatory matters within its scope of responsibilities are being properly addressed and within its resources, and timely advice is provided to the Commission. Input from the Commission, the NRC staff, and affected stakeholders is used in this process. A Memorandum of Understanding with the NRC Executive Director for Operations (EDO) provides a framework for NRC staff interaction with the ACRS. The ACRS conducts self-assessments to improve its effectiveness and efficiency. The focus of the ACRS work during FY 2012 includes review of: license renewal applications; power uprate applications; design certification applications for the US Advanced Pressurized Water Reactor (US-APWR) and the Evolutionary Power Reactor (EPR); amendments to the certified designs for the Advanced Boiling Water Reactor (ABWR), digital instrumentation and control matters, pressurized water reactor sump performance issues, fuel cycle oversight processes; license applications for New Reactors; Probabilistic Risk Assessment, Fire Protection, and events at the Fukushima Dai-ichi site.
https://www.fido.gov/facadatabase/rptannualreport.asp Page 4 of 6 11/14/2012


11     . Estab    lishment      Au        thority                                                        Statutory                (Congress           Created)
20b. How does the Committee balance its membership?
The Commission appoints ACRS members with the scientific and engineering expertise needed to address the safety issues of importance to the Commission. Members are sought who can provide an independent perspective on nuclear safety issues, outstanding scientific and technical ability, balanced and mature judgment, and a willingness to devote the time required to the demanding work involved. Members do not have fixed terms.
However, absent unusual circumstances, they do not serve more than three, four year terms. Members are reappointed in excess of this period only if there is a compelling continuing need for their expertise. Vacancies in the ACRS membership are filled from the pool of applicants which exists after solicitations of interest are published in the Federal Register, trade and professional society publications, and in the press. Recommendations to the Commission as to the selection of qualified candidates from this pool are made by the ACRS Member Candidate Screening Panel. The ACRS provides input to this Panel. During FY 2012, the membership was comprised of individuals with diverse employment backgrounds and included those with expertise in the areas of nuclear power plant operations; probabilistic risk assessment; analysis of severe reactor accident phenomena; design of nuclear power plant structures, systems, and components; chemical engineering; digital instrumentation and control; materials and metallurgy; health physics; and thermal-hydraulics and computational fluid dynamics.
The diversity of viewpoints represented by current members is based on special fields of interest, employment experience, and technical expertise. These member attributes provide the Committee with the balance of highly qualified technical expertise and diverse safety perspectives necessary to carry out the Committee's statutory responsibilities effectively.
20c How frequent and relevant are the Committee meetings?
The ACRS and its Subcommittees held 78 meetings during FY 2012, of which 11 were Full Committee meetings.
The number of meetings held in a reporting period is directly related to the number of nuclear safety matters to be reviewed as required by statute; the number of rules and regulatory guidance referred to the Committee for review and comment; the number of special reviews requested by the Commission, EDO, or other Federal Government organizations; and other safety issues of particular concern to the Committee and its stakeholders.
The Full Committee normally meets IO times a year for 3 days to consider important safety-related nuclear issues, license applications, generic issues, significant regulatory matters, rules, and regulatory guidance. The ACRS Subcommittees, which are normally comprised of three to six members with the relevant expertise, meet as necessary with stakeholders to conduct in-depth reviews of particular matters for later consideration by the full membership during Full Committee meetings. Although not required by the revised FACA, Subcommittee meetings are conducted under the same FACA procedures as the Full Committee meetings to facilitate public participation and to provide a forum for stakeholders to express their views on regulatory matters being considered by the ACRS. Reviews are conducted during each Full Committee meeting to assess the relevance of proposed review topics, resource needs, and the priority of each activity. These assessments have the benefit of input from the Commission, EDO, and other stakeholders. All ACRS meetings for this reporting period addressed either matters for which ACRS review was required by statute or regulation, specific requests from either the Commission or the EDO, or other important regulatory and safety-related matters self-initiated in response to ACRS concerns.
20d. W hy can't the advice or in formation this committee provides be obtained elsewhere?
The ACRS is an independent body of recognized experts in the field of nuclear reactor safety whose Congressional mandate is to provide the Commission with independent advice. Particular duties of the ACRS (e.g., review of operating reactor license renewal applications, extended power uprate amendments, new reactor designs, and rules and regulatory guidance) are dictated by statute or regulation. In addition, functional arrangements exist wherein, upon request, the ACRS provides advice to the Department of Energy and the Defense Nuclear Facilities Safety Board. The Commission has its own expert staff on whom it relies in the day-to-day regulation of nuclear power facilities. The ACRS provides the Commission and the NRC staff with an independent, critical review of high level regulatory issues under consideration by the NRC and independent technical insights as to important matters needing Commission attention. The ACRS members are part-time special government employees with other full-time interests and activities in related fields, and provide a breadth of experience, an independent perspective on issues, and technical knowledge that is not duplicated by the NRC's full-time government employees. A standing Committee such as the ACRS remains current with respect to nuclear safety issues of importance to the NRC, including those related to reactor operating experience, regulatory reform, and NRC's needs for safety research, and provides an independent, collegial judgment regarding these issues that other part-time consultants could not provide. The ACRS meetings provide an important forum for stakeholders to express freely their concerns on safety issues and the regulatory process. A number of important safety initiatives have had their origins in ACRS deliberations. Through the ACRS, the public and the Congress are ensured of an independent technical review and evaluation of the safety of NRC-licensed facilities, proposed reactor designs, significant regulatory and safety issues, and of providing an opportunity for stakeholder input.
20e. Why is it necessary to close and/or partially close committee meetings?
According to 5 U.S.C. 552b (c), ACRS meetings can only be closed for the following reasons:
* Protect information classified as national security information* Discuss information relating solely to internal personnel rules and/or practices* Protect unclassified safeguards information* Protect proprietary information* Protect information provided in confidence by a foreign source* Prevent invasion of personal privacy* Prevent disclosure of https://Vvww.fido.gov/facadatabase/rptannualreport.asp Page 5 of 6 11/14/2012


12  . Specific Establishment Autho          rity                                                                                                                I 3 . Effective Date                                                                                                                                                    14  . Commi                ttee  Type 14c  . Presidential?
information the premature disclosure of which would be likely to significantly frustrate implementation of a proposed Agency action 21. Remarks None Designated Federal Official: Jamila Perry DFO Committee Members Start End Occupation Abdel-Khalik, 9/7/2010 5/31/2012 Southern Nuclear Distinguished Professor, George W.
42      U.S.C. Sect.     2039  &    2232                                                                                                                                                                                                                                                1/1/1957 Continuing  No
Dr. Said I.
: 15. D esc  ription of Committee                                                                        Scientific          Technical            Program Advisory                Board
Woodruff School of Mechanical Engineering, Georgia Institute of Technology, Atlanta, GA Armijo, Dr.
Joseph S.
Banerjee, Dr.
Sanjoy Bley, Dr.
Dennis C.
Brown Jr.,
Mr. Charles H.
Corradini, Dr. Michael L.
Powers, Dr.
Dana A.
Ray, Mr.
Harold B Rempe, Ms.
Joy Ryan, Dr.
Michael T Schultz, Dr.
Steven Shack, Dr.
William J.
Sieber, Mr.
John D.
3/9/2010 3/8/2014 Adjunct Professor of Materials Science and Engineering, University of Nevada, Reno, NV 7/26/2010 7/25/2014 Distinguished Professor of Chemical Engineering and Director of the Institute for Sustainable Energy Technologies, The Grove School of Engineering at the City College of New York, NY 8/30/2011 8/29/2015 President of Buttonwood Consulting,lnc., Oakton, VA 4/28/2012 4/27/2016 Senior Advisor for Electrical Systems, BMT Syntek Technologies, Inc., Arlington, VA 9/7/2010 9/6/2014 Professor and Chairman of Department of Engineering Physics, University of Wisconsin, Madison, WI 6/6/2010 6/5/2014 Senior Scientist, Sandia National Laboratories, Alburquerque, NM 6/23/2012 6/22/2016 Retired Chief Executive Vice President, Southern California Edison Company, Rosemead, CA 10/7/2010 10/6/2014 Directorate Fellow, Idaho National Laboratory, Idaho Falls, ID 7/6/2012 7/5/2016 Principal, Michael T. Ryan and Associates, LLC, Lexington, SC 1/9/2012 1/8/2016 Consultant, International Atomic Energy Agency; Retired Engineering Manager, Nuclear Design Duke Energy Corporation, Charlotte, NC 8/1/2009 7/31/2013 Retired Associate Director, Energy Technology Division, Argonne National Laboratory, Argonne, IL 7/12/2011 7/11/2015 Retired Senior Vice-President, Nuclear Power Division, Duquesne Light Company, Pittsburgh, PA Skillman, Mr. 8/21 /2011 8/20/2015 President and Principal, Skillman Technical Resources, Gordon Hershey, PA Stetkar, Mr.
9/5/2011 9/4/2015 Principal, Stetkar & Associates, Lake Forest, CA John W.
Total Count of Committee Members 15 https ://www.fido.gov/facadatabase/rptannualreport.asp Member Designation Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Special Government Employee (SGE)
Page 6 of 6 11/14/2012


16a        . Tota        l Number                of Reports 40 16b        . Report Titles and                  Dates Initial          ACRS        Review       of 1)  The    NRC      Near      Term          Task        Force      Report          on      Fukushima                and      2)  Staffs                                                                                                                                                            10/13 /2011 Recommended                          Actions        to    be  Taken        Without              Delay Draft        Final      Regulatory                 Guide      (RG)      1.82,  "Water        Sources          for      Long-Term                Recirculation                  Cooling                                                                                                                                                          10/17/2011 Following          a    Loss-of-Coolant                  Accident,"              Revision          4 Enhancing                the        Fuel    Cycle      Oversight                Process                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    10/17 /2011 ACRS        Review        of Starrs          Prioritization                      of Recommended                      Actions          to     be  Taken            in    Response          to    Fukushima                            11    1812011 Lessons        Learned            (SECY-I        1-0137)
2012 Current FY Report: Review of Federal Advisory Committee 11 /6/2012 3:19:28 PM Page 1 of 2 Committee Menu I Department or Agency Nuclear Regulatory Commission 3 Committee or SubCommittee Licensing Support System Advisory Review Panel
Nine      Mile    Point        Nuclear        Station,            Unit      2,    Extended              Power        Uprate          Application                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          11/10/2011 Draft          Fin      Rev      6  of Standard                  Rev      Plan        Br  Tech        Position        7-19,Guidance                for      Eval      of Div    &    Defense-in                                                                                                                                          11/14/2011 Depth          in      Digital      Computer-Based                          lnstru            &    Ctrl      System Report          on      the    Safety          Aspects      of the    Progress              Energy            Florida,            Inc.     Combined                  License      Application              for                                                                                                                                 12/7/2011 Levy          Nuclear          Plant,          Units        1 and      2 Proposed              Requirements                        for     ITAAC        Maintenance                and       Draft        Final      Regulatory                Guide          1.215,  "Guidance                                                                                                                                            I 2/8/2011 for      ITAAC        Closure            Under            JO    CFR    Part    62" Res    to       10/28 /1,    EDO      Letter        ACRS      Recommendations                            Topical          Rpt      NEDC-33173P,          Supplement                      2,   Parts                                        1211212011 I,   2,   &3,   "Analysis              of Gamma            Scan      Data      &    Removal            ofSLMCPR            Margin" Revised          Branch          Technical              Position        on    Concentration                      Averaging            and        Encapsulation                  of Low-Level                                                                                                                                                    I 2/13/2011 Radioactive                Waste Proposed              Draft        Rule    for          JO    CFR    50.46c,  "Emergency                  Core      Cooling      System            Performance                  During            Loss                                                                                                                                      1/26/2012 of-Coolant                Accidents" Draft              JO      CFR    50.54(f)     Letter          on     Implementation                          of the     Near-Term                Task      Force        Recommendations                              from                                                                                                                    2/15/2012 the      Fukushima                    Daiichi        Event Draft        Final        Revision              I    to    Regulatory                Guide          1.93,  "Availability                    of Electric          Power      Sources"                                                                                                                                                          2/16/2012 Response          to    2/27  /12    Letter        Regarding                Final        Disposition          of Fukushima-Related                              ACRS                                                                                                                                                                              3 /13/2012 Recommendations                                        in       Letters        dated        October                13, 2011    and       November              8,2011 ACRS        Review      of Proposed          Orders              in    Response            to    Fukushima                    Lessons        Learned            (SECY-12-0025)                                                                                                                                                                  3/14/2012 Chapters                6,   7,       11,   13,     15,    16, &        18  Safety          Evaluation                Report          with    Open        Items        Associated          with        U.S.                                                                                                                               3 /15/2012 Evolutionary                        Power        Reactor              Design    Certification                    Application Fin    SER      Associated              with      the     Florida            Power      and       Light      Turkey            Point        Nuclear          Plant,          Units    3  and       4,                                                                                                                                      3/20/2012 License      Amendment                    Request          for   an      Extended              Power        Uprate Extremely                  Low    Probability                  of Rupture            Project                                                                                                                                                                                                                                                      4/23/2012 Report          on    the     Safety        Aspects      of the     License        Renewal          Application                for     the     Columbia              Generating              Station                                    4/24/2012 Response            to    the   January              24,   2012 ,   EDO    Letter        Regarding              the      Progress            Energy            Florida          Combined                                                                                                                                                        4/25 /2012
: 4. Is th is New During Fiscal Year0 No
: 5. Current Charter 12/3/2010
: 6. Expected Renewal Date 12/3/2012 8a. Was Terminated During FY?
8b. Specific Termination A uthority No 9 Agency Recommendation for Next FY Continue 11 Establishment Authority
: 12. Specific Establ ishment Authority 42 u.s.c. 2201
: 15. Description of Committee 42 u.s.c. 2201 I 0a Legislation Req to Terminate?
No Agency Authority
: 13. Effective Date 1/19/1975 Non Scientific Program Advisory Board
: 14. Committee Type Continuing
: 2. Fiscal Year 2012 3b. GSA Committee No.
1104
: 7. Expected Term Date Sc.Actual Termination Date I Ob Legislation Pending?
14c. Presidential?
No I6a. Total Number of Reports I 7d. Total Meetings No Reports for this Fiscal Year.
I Sa( I ) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff No Meetings for this Fiscal Year.
I 8a(4) Personnel Pmts to Non-member Consultants J 8b( I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members I 8b(3) Travel and Per Diem to Federal Staff J 8b(4) Travel and Per Diem to Non-Member Consultants 18c Other(rents,user chargcs,graphics,printing,mai l etc)
I8d Total I 9. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?
Current Fiscal Year Next Fi scal Year
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 0.0 0.0 The Nuclear Regulatory Commission relied on the Licensing Support Network Advisory Review Panel (LSNARP) for advice and recommendations on the design and operation of the searchable electronic database (Licensing Support Network (LSN)) for documents that were relevant to the licensing of a geologic repository for the storage of high level nuclear waste as defined in 10 CFR 2. 1003. The document collection contained electronic copies of all of the material that was used by parties in the NRC's licensing proceeding for a high level radioactive waste repository. The LSN was loaded with more than 3 million documents begining in FY-2004 and continuing through FY-201 I. Document addition continued during FY-2011, however, no committee meetings were held since December 2003. DOE had planned on submitting an application to build a high level waste disposal facility at Yucca Mountain, Nevada in December 2004, however delays occured and in the spring of2006 DOE issued a revised schedule. DOE certified their LSN document collection in late 2007 and submitted a License application to the NRC in June 2008. The delay in DO E's program negated any need for LSN meetings during this period.
During FY 2010 DOE asked to withdraw the Yucca Mountain License Application pending before the NRC. In FY-2011 and FY-2012, Congress did not appropisate any funds for DOE or NRC for the Licenseing of the Yucca Mountain Application. NRC shut down the licensing review in FY-2011 and preserved the record of the proceeding. The Atomic Safety and Licensing Board that presided over the application hearing ordered the parties to submit their LSN document collections to the NRC Secretary for preservation. The LSN system was decom issioned at the close of FY-2011. Litigation continued before the DC Circuit Court in FY-2012.
20b. How does the Committee balance its membership?
The membership of the LSN ARP was balanced by being drawn from among the full spectrum of parties to NRC's licensing proceeding for the burial of high level radioactive waste. Since the burial site under review is in Nevada, the membership includes the State of Nevada, local county governments of both Nevada and California, Indian https://www.fido.gov/facadatabase/rptannualreport.asp 11 /06/2012  


h ttps :/ /www. fido. gov /facadata base  /rptann ualreport        . asp                                                                                                                                                                                                                                                                                                                                       11/14/2012 Page  2  of 6
tribes (represented by the National Congress of American Indians), and an environmental group (the Nevada Nuclear Waste Task Force). It also included the nuclear industry, the potential licensee (DOE) and the licensing agency (NRC). Input by these representatives was essential to the success of the LSN project.
20c. How frequent and relevant are the Committee meetings?
The LSNARP did not meet in FY-2012. The need for additional meetings of the LSNARP will be determined based upon the outcome of Court action and Congressional appropiations.
20d. Why can't the advice or in formation this committee provides be obtained elsewhere?
The Committee was formed as part ofa negotiated rulemaking to oversee the operation of the LSN. The advice provided by the state, county and tribal governmental units, together with other potential users of the LSN and EHD, was unique to this particular computer application. It was not available from other existing committees or within the NRC itself. NRC considered it essential that advice on the design of the software and hardware should come from representatives of the future hands-on users of the LSN.
20e. Why is,t necessary to close and/or partially close committee meetings?
The LSNARP did not hold any closed meetings in FY 2012.
21. Remarks In FY-2012, Congress did not appropisate any funds for DOE or NRC for the Licenseing of the Yucca Mountain Application. At the close of the FY-2012 year, Litigation continued before the DC Circuit Court and the future need for the Committee remained uncertain.
Designated Federal Official Dr. Andrew L Bates DFO Committee Members Bates, Andrew L Brandt, Joy Clark, Ray Frishman, Steve Holden, Robert Johnson, Abby Kall, Alan Kraft, Steven Leake, Harry Mathias, Linda McCorkell, George Murphy, Malachy Pitts, Jason Remus, Andrew Simom, Mike Swanson, David Treichel, Judy von Tresenhausen,
Engelbrech Total Count of Committee Members Start End Occupation 6/15/2000 9/30/2012 US Nuclear Regulatory Commission 10/1/2000 9/30/2012 Lander County, Nevada 7/1/1999 9/30/2012 US EPA M ember Designation Regular Government Employee (RGE)
Representative Ex Officio 7/1/1999 9/30/2012 State Of Nevada Representative 7/1/1999 9/30/2012 National Congress of American Representative Indians 10/15/2003 9/30/2012 Eureka County, Nevada Representative 7/1/1999 9/30/2012 Churchill County, Nevada Representative 1/1/1998 9/30/2012 Nuclear Energy Institute - Energy Representative Coalition 6/1/2002 9/30/2012 US Departmant of Energy Regular Government Employee (RGE) 10/1/2001 9/30/2012 Mineral County, Nevada 10/1/2000 9/30/2012 Esmeralda County, Nevada 12/18/1989 9/30/2012 Nye County, Nevada 10/1/2001 9/30/2012 Lincoln County, Nevada 10/1/2001 9/30/2012 Inyo County, Nevada 10/15/2003 9/30/2012 White Pine County Nevada 10/1/2009 9/30/2012 Nye County, Nevada 1/1/1998 9/30/2012 Nevada Nuclear Waste Task Force 7/1/2001 9/30/2012 Clark County, Nevada 18 Representative Representative Representative Representative Representative Representative Representative Representative Representative h ttps :/ /www. fido. gov /facadatabase/rptann ual report. asp Page 2 of 2 11/06/2012  


License      Application                for      Levy        Nuclear        Plant,          Units        I   and      2 Chapters                6,  7,    15, &        18  of the   SER    with    Open          Items        Associated          with      the    Calvert              Cliffs    Nuclear Power                                                                                                4/25/2012 Plant,        Unit    3,  Combined                License      Application Spent        Fuel      Pool    Scoping      Study                                                                                                                                                                                                                                        4/25/2012 Draft      Commission                  Paper,        "Risk-Informed                        Regulatory                Framework                  for      New  Reactors"                                                                                                                4/26/2012 Review      and        Evaluation                of the    NRC  Safety        Research            Program,                NUREG-1635,          Volume              IO                                                                                                              4/30/2012 State-of-the-Art                      Reactor          Consequence                Analysis        (SOARCA)           Project                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  5/15/2012 Draft        Final        NUREG-1921,          (EPRI        Report            1023001), "EPRI/NRC-RES            Fire      Human          Reliability              Analysis                                    511712012 Guidelines Chapters              3,   9,       14, and            19  of the   Safety          Evaluation                Report          with    Open        Items        Associated          with      the      U.S.                                                                               18/2012 Evolutionary                      Power      Reactor              Design  Certification                    Application                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          5/
2012 Current FY Report: Review of Federal Advisory Committee I 1/6/2012 2:59:44 PM Page 1 of 2 Committee Menu I. Department or Agency Nuclear Regulatory Commission 3 Committee or SubCommittee Advisory Committee on the Medical Uses of Isotopes 4 Is this New During Fiscal Year?
Grand        Gulf    Nuclear        Station,              Unit        I,    Extended            Power        Uprate            License      Amendment                  Request                                                                                                                                                                                                                                                  6/18/2012 Proposed              Revision              I    to    Regulatory                Guide            1.192, "Operation                  and      Maintenance                Code    Case      Acceptability,                      611812012 ASME      OM  Code" NRC Staffs                        Draft        Plans      and    Status        Summaries                  for    Tier    3 Japan            Lessons      Learned            Recommendations                                                                              6/19/2012 Final      Safety          Evaluation                Report          Associated          with    the      Florida            Power      and      Light      St.      Lucie,      Unit        I,    License                                      612012012 Amendment                    Request          for    an      Extended            Power      Uprate Draft        Interim              Staff  Guidance              Documents                  in    Support          of Tier        I    Orders                                                                                                                                            7/17/2012 Draft        Final        NUREG-1934          (EPRI            1023259) , "Nuclear            Power        Plant        Fire      Modeling        Analysis        Guidelines                                                                                                        7/17/2012 (NPP        FIRE        MAG)"
No 8a. Was Terminated During FY?
SECY-12-0081,           "Risk-Informed                          Regulatory                Framework                for      New  Reactors"                                                                                                                                            7/17/2012 Final      Safety Evaluation                                                                                                                    Report          Associated          with      the      Florida          Power      and        Light      St. Lucie,     Unit      2,     License                                712312012 Amendment                  Request            for    an      Extended          Power        Rate Technical              Information                        Needs    Affecting        Potential            Regulation            of Extended          Storage        and      Transportation of Spent        Nuclear            Fuel                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                9/11/2012 Chapters                  5,   8,       IO,     11        and          12    of the   SER    with    Open        Items        for      the    Comanche              Peak      Nuclear          Power        Plant,                                   911812012 Units      3 and       4,     US-APWR          Reference        Combine              License      Application Interim              Staff   Guidance              8,   Revision        3,  "Burn up  Credit            in    the   Criticality                Safety        Analyses        of PWR    Spent                                                                                      9/18/2012 Fuel        in    Transportation                      and     Storage        Casks" Chapter            9  of the   Safety          Evaluation              Report          with    Open          Items        for    the     US-APWR            Design  Certification                                                                                                  9/18/2012 Application Draft        Regulatory                Guide          DG-1290    (Proposed              Revision        of Regulatory                Guide          1.59),  "Design-Basis              Floods                              912512012 for      Nuclear            Power      Plants" 17a  Open :                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             71 17b . C losed                                                                  4 17c . Partially Closed : 3                                                                                                                                                                                      17d  . Total Meetings        78 Mee  tin g  Purposes and    Dates
No
: 9. Agency Recommendation for Next FY Continue 11 Establishment Authority
: 5. Current Charter
: 6. Expected Renewal Date 3/14/2012 3/14/2014 8b. Specific Termination Authority 42 u.s.c. 2201 I 0a. Legislation Req to Terminate?
No Agency Authority
: 12. Specific Establishment Authority I 3. Effective Date
: 14. Committee Type Continuing 42 u.s.c. 2201 7/1/1958
: 15. Description of Committee Scientific Technical Program Advisory Board I 6a. Total Number of Reports 3
16b. Report Titl es and Dates Permanent Implant Brachytherapy Final Report Permanent Implant Brachytherapy Revised Final Report Electronic Signatures Report 17a Open:
M eeting Purposes and Dates ACMUI Teleconference ACMUI Teleconference ACMUI Teleconference ACMUI Meeting ACMUI Teleconference ACMUI Meeting I Sa( I ) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff 4
I 8a(4) Personnel Pmts to Non-member Consultants I 8b( I) Travel and Per Diem to Non-Federal Members i 8b(2) Travel and Per Diem to Federal Members I 8b(3) Travel and Per Diem to Federal Staff I 8b(4) Travel and Per Diem to Non-Member Consultants I 8c.Other(rents,user charges,graphics,printing,mail etc) 18d Total I 9. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?
17b. Closed 0
17c. Partially Closed*
10/18/2011 10/18/2011 12/15/2011 12/15/2011 2/7/2012 2/7/2012 4/16/2012 4/ 17/2012 7/9/2012 7/9/2012 9/20/2012 9/21 /2012 Current Fiscal Year
$102,824
$0
$249,061
$0
$31,506
$0
$4,442
$0
$0
$387,833 1.6 2
: 2. Fiscal Year 2012 3b. GSA Committee No.
1102
: 7. Expected Term Date Sc.Actual Termination Date I Ob. Legislation Pending?
14c. Pres idential?
No 10/18/2011 2/7/2012 4/16/2012 17d. Total Meetings 6 Next Fiscal Year
$103,000
$0
$250,000
$0
$32,000
$0
$4,500
$0
$0
$389,500 1.6 The NRC staff believes that licensees, the general public, and medical professionals benefit when recognized ex perts provide advice to the staff. This advice enables staff to develop rules that will maintain public safety, while not inappropriately intruding upon the practice of medicine. The Staff provides a summary of issues to be addressed during meetings, and the ACMUI discusses the issues and gives advice and makes recommendations to the Staff. Furthermore, the ACMUI keeps staff abreast of new developments. This ongoing communication helps https://www.fido.gov/facadatabase/rptannualreport.asp 11/06/2012


Radiation                Protection            and       Nuclear          Materials                                                                              10/4/2011 10/4/2011 ABWR                                                                                                                                                                  10/4/20 II          10/4/20 II Planning            and      Procedures                                                                                                                              I 0/5/20 I I        10/5/2011 Power        Uprates                                                                                                                                                10/5/201 I        10/5/2011 Plant        Operations                and       Fire      Protection                                                                                              10/5/201 I      10/5/2011 587th        Full    Committee                                                                                                                                      10/6/20 II          I 0/8/2011 APIO00                                                                                                                                                                10/18/2011      10/19/2011 Plant          License      Renewal                                                                                                                                  10/19/2011 10/19/2011 US    APWR                                                                                                                                                          10/20 /201 I        10/20/201 I ESBWR                                                                                                                                                                10/21/201 I        10/21/201 I Future        Plant          Designs                                                                                                                                11 /2/20 II          11 /2/20 II Planning          and       Procedures                                                                                                                              11    /2/201 I      11/2/2011 588th        Full    Committee                                                                                                                                     11/3/2011        11/5/2011 EPR                                                                                                                                                                  11/14/201 I        11      /15 /2011 Planning            and      Procedures                    (w /Commissioners)                                                                                        11    /29 /2011        11/29/201 I Planning            and      Procedures                                                                                                                              11    /29 /2011      11/29/2011 APWR                                                                                                                                                                  11/30/2011      11/30/2011 Thermal              Hydraulic                  Phenomena                                                                                                            11    /30/2011        11    /30/201 I
ensure that staff is aware of important issues during critical stages of rule development. When issues that need special emphasis arise, working groups and subcommittees are formed.
 
20b. How does the Committee balance its membership?
https ://www.fido.gov                /facadatabase          /rptannualreport.asp                                                                                                                                                                                                                                                        11/14/2012 Page  3  of 6
Membership is balanced by placing individuals of diverse specialty on the committee. For instance, there are members who represent both diagnostic and therapeutic applications of medicine. There are members who have a regulatory function within their specialties. There is a member who represents medicine from an administrative standpoint, and there is a patient advocate member, who represents patients' interests. ACMUI members also perform regular self-evaluations, in which they give feedback on the appropriateness of the committee's com position.
 
20c. How frequent and relevant are the Committee meetings?
ESBWR                                                                                        11/30/2011        11    /30/2011 589th      Full    Committee                                                                12/1/2011 12/3/2011 Reliability            and       PRA                                                        12 /14/2011 12/14/2011 Power      Uprates                                                                          12/14/2011 12/14 /2011 Materials,             Metallurgy                  &  Reactor              Fuels          12/15/2011 12 /15/2011 Plant      Operations                and        Fire      Protection                      12 /15/2011        12 /15/2011 Radiation                Protection            and       Nuclear          Materials      1/18/2012 1/18/2012 Planning          and       Procedures                                                      1/18/2012 1/18/2012 590th        Full    Committee                                                                1/19/2012 1/20/2012 Regulatory                  Policies    and         Practices                              2/8/2012  2/8/2012 Planning          and       Procedures                                                      2/8/2012  2/8/2012 591st      Full    Committee                                                                 2/9/2012  2/11/2012 EPR                                                                                          2 /21/2012 2/23/2012 Power      Uprates                                                                            2/24/2012  2/24/2012 Reliability            and       PRA                                                        3 /6/2012 3/6/2012 Regulatory                    Policies    and       Practices                              3 /6/2012 3/6/2012 Materials,             Metallurgy                  &  Reactor              Fuels        3 /6/2012   3/6/2012 Reliability            and        PRA                                                      3/7/2012  3/7/2012 Planning          and        Procedures                                                    3 /7/2012  3 /7/2012 592nd        Full    Committee                                                              3 /8/2012 3/10/2012 Reliablity          and        PRA                                                          3/21/2012 3 /21      /2012 US      APWR                                                                                3 /22  /2012  3 /23 /2012 Planning          and      Procedures                                                      4/11/2012 4/11/20 I 2 Planning          and      Procedures                (ACRS        Retreat)                  4/11/2012 4/11/2012 593rd          Full    Committee                                                            4/12 /2012  4/13/2012 Regulatory                    Policies    and        Practices                            4/25 /2012    4/25/2012 Power        Uprates                                                                        4/26 /2012  4/26/2012 Radiation   Protection                        and      Nuclear          Materials        4/27 /2012    4/27  /2012 Reliability            and       PRA                                                        5/8/2012    5/8/2012 Thermal              Hydraulic                Phenomena                                      5/8/2012  5/9/2012 Planning          and      Procedures                                                      5/9/2012 5/9/2012 594th        Full    Committee                                                              5/10/2012  5/12 /2012 Fukushima                  (Lessons        Learned            Task        Force)                                                                                                                                                                                                                                                                                                                            5/22  /2012  5/22  /2012 Fukushima                  (Disposition          of NTTF    Tier    3 Recommendations)                                      5/22  /2012  5/23 /2012 Power      Uprates                                                                          5/24 /2012  5/24 /2012 Radiation                Protection            and        Nuclear          Materials      6/5/2012  6/5/2012 Planning          and      Procedures                                                      6/5/2012  6/5/2012 595th        Full    Committee                                                              6/6/2012  6/8/2012 Reliability            and        PRA                                                      6/19/2012  6/19/2012 Fukushima                                                                                    6/20/2012 6/20/2012 Power        Uprates                                                                        6/22  /2012    6/22 /2012 US      APWR                                                                                7/9/2012  7/10/2012 Radiation              Protection              and      Nuclear          Materials        7/10/2012 7/10/2012 Plant          License      Renewal                                                          7/10/2012  7/10/2012 Planning          and      Procedures                                                      7/10/2012 7/10/2012 Regulatory                    Policies    and        Practices                              7/10/2012 7 /10/2012 596th        Full    Commitee                                                              7/11/2012 7/13 /2012 596th        Full    Commitee                                                              7/11    /2012  7/13/2012 Reliability          and        PRA                                                        7/26/2012 7/27/2012 Fukushima                  (Seismic        Hazards)                                        8/15/2012  8/15/2012 Fukushima                (NTTF        Recommendation                                  1)    8/15/2012 8/15/2012
Committee meetings are generally held semi-annually. The committee will hold more frequent meetings when important issues emerge or when issues need timely resolution.
 
20d. Why can't the advice or information this committee provides be obtained elsewhere?
https      ://www.fido.gov              /facadatabase          /rptannualreport.asp                                                                                                    11/14/2012 Page  4  of 6
NRC continues to strive to achieve its goal of creating risk-informed, performance-based regulations that provide for the health and safety of the public while imposing no unnecessary burden on licensees. Furthermore, the medical profession continues to see regular advances that create unique regulatory challenges. The advice and recommendations from medical professionals who are exposed to these advances is crucial to the NRC staffs ability to continue to regulate effectively.
 
20e. Why is it necessary to close and/or partially close committee meetings?
8/16/2012 8/16/2012 Plant        License        Renewal                                                                                            9/5/2012 9/5/2012 Fukushima                                                                                                                      9/5/2012  9/5/2012 Planning          and      Procedures                                                                                        9/5/2012 9/5/2012 597th        Full    Commitee                                                                                                  9/6/2012  9/8/2012 Regulatory                  Policies      and        Practices                                                                9/18/2012  9/18/2012 Radiation                Protection              and        Nuclear          Materials              (Spent            Fuel  9/18/2012 9/18/2012 Transportation                          Risk      Assessment)
Meetings are closed to conduct annual ethics briefings, conduct reviews of paperwork of a personal and confidential nature, and to discuss administrative matters that are purely internal to Committee business. It would be inappropriate to conduct these types of meetings openly. They must be conducted privately to allow Committee members the freedom to ask and answer personal questions and to protect individuals' privacy.
Plant        License        Renewal                                                                                          9/19/2012  9/19/2012 US    APWR                                                                                                                    9/20 /2012  9/20 /2012
21 Remarks Designated Federal Official: Mr. Christian E Einberg DFO Commi ttee Members Start End Occupation Member Designation Bailey, Ms. Darice G.
 
3/26/2012 3/26/2016 State Government Representative Special Government Guiberteau, Dr.
Current    Fiscal Y    ea      r                              Next  Fiscal Year I 8a(    I    )  Personn              el Pmts to      No      n-F      edera    l M  emb              ers                                            $964,077                                                          $970,000
Milton J.
 
Langhorst, Dr. Susan M.
I 8a(2)        Personnel          Pm        ts to        Fe deral Members                                                                                            $0                                                                $0
Malmud, Dr. Leon S.
 
Mattmuller, Mr.
I 8a(3)        Personnel          Pm        ts to        Federal Staff                                                                              $3,357,486                                                        $3,675,440
Steven R.
 
Palestro, Dr.
I 8a(4)          Personnel      Pmts to      No        n    -member                    Consu                  ltan        ts                          $184,135                                                          $184,135
Christopher J.
 
Suh, Dr. Jon H.
I 8b(    I) Travel and                Per Diem  to  No        n-Federa                l Members                                                          $429,003                                                          $450,453
1/10/2011 1/10/2015 Diagnostic Radiologist 9/28/2009 9/28/2013 Radiation Safety Officer 5/20/2002 5/20/2013 Health Care Administrator 3/30/2008 3/30/2016 Nuclear Pharmacist 9/22/2011 9/22/2015 Nuclear Medicine Physician 10/18/2010 10/17/2014 Radiation Oncologist Suleiman, Dr. Orhan 1/1/2004 1/1/2014 Food and Drug Administration H.
 
Representative Thomadsen, Dr. Bruce 10/15/2007 10/15/20 I 5 Medical Physicist - Therapy R.
I 8b(2)        Travel a      n    d  Per Diem    to    Federal M  em        bers                                                                                      $0                                                                $0
Yan Decker, Dr.
 
10/3/2005 10/3/2013 Nuclear Cardiologist William A.
I 8b(3)        Travel a      nd              Per Diem        10    Federa      l Staff                                                                  $27,875                                                          $29,269
Weil, Ms. Laura M.
 
8/29/2011 8/29/2015 Patients' Rights Advocate Welsh, Dr. James S.
I 8b(4)        Trave      l and                  Per Diem        to  Non-Member                              Cons              u      ltants              $33,318                                                          $33,318
2/25/2007 2/25/2015 Radiation Oncologist Zanzonico, Dr. Pat B. 3/8/2010 3/8/2014 Nuclear Medicine Medical Physicist Total Count of Committee Members 13 https://www.fido.gov/facadatabase/rptannualreport.asp Employee (SGE)
 
Special Government Employee (SGE)
I 8c      .Other(rent  s, u      ser charges    ,grap  hics    , printing,mai  I etc.)                                                                  $266,691                                                          $251,000
Special Government Employee (SGE)
 
Special Government Employee (SGE)
18d                                                                                                Total                                              $5,262,585                                                        $5,593,615
Special Government Employee (SGE)
: 19. Federal Staff Sup        port Years                                                                                                                              37.0                                                              37.0
Special Government Employee (SGE)
 
Special Government Employee (SGE)
20a        . How                does      the Committee    accompl                        ish its purpose?
Regular Government Employee (RGE)
The    Advisory              Committee                    on      Reactor          Safeguards                (ACRS)        reports              to    the      Nuclear Regulatory                                                                                                                                                  Commission                (NRC) and        provides            the    Commission                  with      independent                    reviews          of,  and      advice        on,    the    safety          of proposed            or  existing        NRC licensed        reactor            facilities        and      the    adequacy              of applicable              safety        standards.                The    ACRS      was    established                as  a statutory                committee                      by      a      1957  amendment                      to    the      Atomic          Energy            Act  of  1954. With      the    enactment              of the    Energy Reorganization                            Act    of  1974,  the      licensing          functions          of the    Atomic          Energy        Commission                  (AEC)      were      transferred intact          from          the      AEC      to    the      NRC. The    ACRS        has    continued                    in    the    same      advisory                  role    to    the    NRC    with      its responsibilities                  changing            with      the      needs    of the    Commission.                  Some      ACRS      tasks      are    mandated                    by    statute          or regulation;                some      are      in      response          to  direction                by    the    Commission,                or  requests            from        the    NRC    staff,      or other stakeholders;                      and    some      are    self  initiated                  in    response          to    ACRS    concerns              on    important                regulatory                  and      safety-related matters.              The    ACRS,        upon        request            from          the      Department                of Energy          (DOE),        provides            advice          on    the    safety        of U.S.
Special Government Employee (SGE)
naval          reactor          designs.        Upon        request,          the    ACRS      also      provides            technical            advice        to    the      Defense      Nuclear            Facilities Safety          Board.          The    ACRS    and        its  Subcommittees                        meet        regularly                    in    public,        Federal          Advisory            Committee                    Act (FACA)-regulated                            meetings            to    review        matters              within        the    scope    of its    responsibilities.                  ACRS      meeting          agendas, meeting          transcripts,                  and      letter        reports            are    available              for    downloading              or  viewing        on    the      Internet            at http:        //www.nrc.gov                /reading-rm                    /doc-collections              /#acrs.        The      ACRS    and        its  Subcommittees                            held      78    meetings        during FY      2012,    including                  11          Full    Committee                  meetings          that      were      attended                by    all    ACRS      members              of which      3  were partially                closed        meetings.          The    ACRS      members                are    chosen        for    their      technical            expertise              relevant                to    the  safety          issues important                  to    the    Commission.                Consultants                  are      used      on    occasion        to  augment              the    expertise            of the    ACRS      members.
Special Government Employee (SGE)
The    Committee                    has    a    full-time          staff    that        provides            technical          support          and      administrative                          services              in    compliance              with FACA      requirements.                          ACRS    Subcommittees                      normally                  consist      of three        to    six    ACRS      members                  with      the    expertise needed        to      review            in    detail        the      regulatory                  and      safety          issues    and      to  formulate                proposed                positions        and      actions,          as appropriate,                    for    deliberation                        by    the      Full    Committee.                  Stakeholders'                      participation                              in    ACRS      meetings              is    encouraged and        routinely              occurs.        The    Committee's                      advice,              in    the    form          of written            reports,                  is    only        produced                  by    the      Full Committee,                  and        reports              on    significant              regulatory                  matters            are    discussed          with      the    Commission                        in    public        meetings.
Special Government Employee (SGE)
The      ACRS      conducts            an    ongoing        review        of its    priorities              and      schedules            to  ensure          that        regulatory                  matters              within          its scope    of  responsibilities                are    being      properly              addressed              and      within            its    resources,            and      timely          advice              is    provided              to  the Commission.                  Input        from          the    Commission,                  the    NRC    staff,      and    affected        stakeholders                          is    used        in    this      process.        A Memorandum                    of Understanding                    with      the    NRC      Executive            Director            for    Operations                (EDO)        provides              a  framework for      NRC    staff    interaction                  with      the    ACRS.      The    ACRS      conducts          self-assessments                    to    improve                its    effectiveness          and efficiency.          The    focus    of the    ACRS      work      during          FY    2012    includes          review        of:      license      renewal          applications;  power uprate          applications;                      design      certification                applications                  for    the        US    Advanced            Pressurized                    Water      Reactor          (US-APWR) and      the      Evolutionary                        Power        Reactor          (EPR);          amendments                          to    the    certified          designs        for    the    Advanced                Boiling    Water Reactor          (ABWR),              digital        instrumentation                          and      control            matters,              pressurized                water        reactor          sump        performance issues,      fuel    cycle    oversight              processes;              license    applications                  for      New  Reactors;              Probabilistic                    Risk      Assessment,            Fire Protection,                and      events        at  the    Fukushima                    Dai-ichi      site.
Special Government Employee (SGE)
https    ://www.fi      do      .g  ov  /facadatabase        /rptannualreport.asp                                                                                                                                                                            11/14/  2012 Page    5  of 6
Special Government Employee (SGE)
 
Page 2 of 2 11/06/2012}}
20b        . H ow                does      the Com                m        ittee b      a      la    n      ce        its m      em        be      rship?
The    Commission                appoints              ACRS      members              with      the    scientific        and      engineering            expertise            needed          to  address          the safety        issues    of importance                    to  the    Commission                . Members            are    sought        who  can      provide            an      independent                  perspective on    nuclear          safety          issues,    outstanding                scientific        and      technical          ability          ,  balanced          and      mature          judgment,              and      a willingness        to  devote        the    time        required              to    the    demanding                work        involved.          Members            do    not    have        fixed    terms.
However,          absent          unusual            circumstances,                      they        do    not    serve        more        than        three,        four      year      terms          . Members            are reappointed                        in    excess    of this      period        only      if there          is    a  compelling            continuing                need    for    their        expertise.            Vacancies          in the    ACRS      membership                    are      filled    from          the    pool  of applicants                which      exists    after      solicitations            of interest          are published                in    the      Federal            Register,          trade        and        professional              society        publications,              and        in    the      press.        Recommendations to    the    Commission                    as    to    the    selection        of qualified          candidates                from        this        pool  are      made          by    the    ACRS      Member Candidate            Screening                Panel.      The    ACRS      provides          input          to    this      Panel.        During            FY  2012,  the    membership                      was comprised              of individuals                  with      diverse        employment                    backgrounds                and      included          those      with      expertise                in      the    areas      of nuclear          power      plant      operations;                  probabilistic                  risk    assessment;                analysis          of severe        reactor          accident          phenomena; design      of nuclear            power        plant      structures,                  systems,          and      components;                  chemical          engineering;                digital        instrumentation and      control;            materials                and      metallurgy;                      health          physics;          and      thermal-hydraulics                              and      computational                          fluid    dynamics.
The    diversity              of viewpoints              represented                        by    current            members                      is    based        on    special        fields    of interest, employment experience,            and      technical            expertise.          These      member            attributes                  provide            the    Committee                  with      the      balance        of highly qualified            technical            expertise          and    diverse          safety          perspectives                necessary              to  carry        out    the    Committee's                  statutory responsibilities                  effectively.
20c          Ho        w      frequ      ent  a      nd          releva      nt  ar  e the Co      mmittee    m      ee  tings?
The      ACRS    and        its  Subcommittees                          held      78    meetings        during              FY    2012,  of which          11      were      Full    Committee                    meetings.
The      number          of meetings              held        in    a    reporting                period            is    directly              related            to    the    number          of nuclear          safety        matters                to    be reviewed          as    required                    by    statute;              the    number          of rules    and        regulatory                guidance            referred              to    the    Committee                  for review      and      comment;                the      number          of special        reviews        requested                  by    the    Commission,              EDO,    or  other        Federal Government                  organizations;                      and      other      safety          issues  of particular                concern            to  the    Committee                and        its  stakeholders.
The      Full    Committee                  normally                  meets            IO    times        a  year        for    3  days          to  consider          important                safety-related                    nuclear            issues, license    applications,                generic          issues,    significant            regulatory                  matters,                rules,      and      regulatory                  guidance.          The    ACRS Subcommittees,                        which      are      normally              comprised              of three        to  six    members                with      the      relevant            expertise,            meet        as necessary              with    stakeholders                      to  conduct          in-depth            reviews      of particular                matters              for    later      consideration                      by    the    full membership                  during            Full    Committee                    meetings.          Although            not    required                    by    the    revised            FACA,    Subcommittee meetings          are    conducted              under        the  same        FACA      procedures                as    the      Full    Committee                  meetings            to    facilitate            public participation                    and      to    provide            a    forum            for    stakeholders                  to  express        their        views    on      regulatory                matters                being considered                  by      the    ACRS.      Reviews      are    conducted            during          each        Full    Committee                  meeting          to    assess      the      relevance          of proposed              review        topics,        resource              needs,    and      the      priority              of each      activity.            These      assessments                have      the      benefit      of input        from          the    Commission                  ,  EDO,    and      other      stakeholders.                          All    ACRS      meetings          for    this      reporting                period        addressed either        matters                for    which      ACRS        review        was    required                  by    statute          or  regulation,              specific      requests            from        either        the Commission                or  the      EDO,    or  other        important                  regulatory                and      safety-related                    matters            self-initiated                    in      response          to ACRS    concerns.
 
20d . W            hy        ca          n      't the advice      o      r in  fo  rm    a      tio      n      this com                  m        ittee  provides b    e o      bt a      ined elsew    here?
The    ACRS        is    an    independent                    body      of recognized            experts              in    the      field    of nuclear          reactor          safety        whose    Congressional mandate                  is      to    provide the                                                                                                                                  Commission                with      independent                advice.        Particular                duties      of the    ACRS      (e.g.,    review      of operating              reactor            license      renewal        applications,                extended          power        uprate          amendments,                        new    reactor            designs,      and        rules and        regulatory                  guidance)          are    dictated              by    statute          or    regulation.                    In    addition,            functional            arrangements                        exist    wherein, upon        request,          the    ACRS      provides            advice        to  the    Department                of Energy          and      the    Defense    Nuclear            Facilities        Safety Board.      The    Commission                  has      its  own    expert        staff    on    whom          it    relies      in    the    day-to-day                regulation              of nuclear          power facilities.      The    ACRS      provides              the    Commission              and      the    NRC    staff    with      an      independent,              critical            review      of high      level regulatory                    issues      under      consideration                      by    the    NRC    and      independent                technical            insights        as    to    important                matters needing        Commission                attention.              The    ACRS      members            are      part-time                special      government                  employees              with    other        full time        interests          and      activities                  in      related            fields,    and        provide a                                                                                                                        breadth            of experience,            an    independent                  perspective                on issues,    and      technical            knowledge        that          is    not    duplicated                  by    the      NRC's        full-time        government                    employees.              A standing Committee                  such      as    the    ACRS        remains          current            with        respect          to    nuclear          safety          issues  of importance                    to    the    NRC, including          those      related          to    reactor          operating              experience,              regulatory                  reform,          and      NRC's        needs      for    safety        research, and      provides            an      independent,                  collegial    judgment                regarding                these      issues    that      other        part-time                consultants                could      not provide.          The    ACRS      meetings            provide          an      important                forum            for    stakeholders                        to  express        freely        their        concerns              on safety          issues    and      the      regulatory                    process.        A  number          of important                safety          initiatives            have      had      their        origins          in    ACRS deliberations.                  Through            the    ACRS,      the      public      and      the    Congress          are    ensured          of an      independent                technical            review      and evaluation              of the    safety        of NRC-licensed              facilities,        proposed            reactor            designs,      significant            regulatory                and      safety issues,    and      of providing              an    opportunity                      for    stakeholder                input.
20e. Wh          y          is it n      ecessary        to    c    lose      a      nd/o                    r pa      rtia    lly          close  co          mmi        ttee  m      ee  tings?
 
According            to    5  U.S.C. 552b    (c),    ACRS      meetings        can    only        be  closed      for    the    following      reasons:
* Protect          information classified        as    national            security            information*                    Discuss    information                  relating            solely    to  internal              personnel              rules    and/or practices*            Protect            unclassified          safeguards              information*                Protect          proprietary                    information*                Protect          information provided                  in    confidence            by      a    foreign      source*      Prevent              invasion          of personal            privacy*          Prevent            disclosure          of https      ://Vvww  .fido      .gov    /facadatabase            /rptannualreport.asp                                                                                                                                                                                  11/14/  2012 Page  6  of 6
 
information                    the      premature                disclosure          of which        would        be  likely      to  significantly              frustrate                implementation                    of a proposed              Agency      action
 
21      . Remarks None
 
De sig nated  Federal Official:                    Jamila            Perry          DFO Comm      ittee  Me mb  ers      Start                                                                                                              End                                                                                                                                  Occupati  on Memb  er Designation Abdel-Khalik,                                9/7/2010                        5/31/2012 Southern                Nuclear          Distinguished              Professor,            George          W.                              Special Dr. Said        I.                                                                                                                                                                                                                                                                                                                                                                          Woodruff          School    of Mechanical              Engineering,              Georgia Government Institute            of Technology,            Atlanta,            GA                                                                        Employee            (SGE)
Armijo,                Dr.          3 /9/2010                        3 /8/2014                      Adjunct            Professor          of Materials              Science    and      Engineering,                          Special Joseph              S.                                                                University              of Nevada,          Reno,        NV                                                                                  Government Employee            (SGE)
Banerjee,                  Dr.      7/26/2010 7/25 /2014      Distinguished              Professor          of Chemical                Engineering            and                                                                Special Sanjoy                                                                                Director          of the    Institute              for    Sustainable                Energy                                                Government Technologies,          The    Grove        School    of Engineering              at    the    City                                        Employee          (SGE)
College    of New  York,          NY Bley,            Dr.                8/30/2011 8/29/2015    President            of Buttonwood            Consulting,lnc.,                    Oakton,                VA                                                          Special Dennis      C.                                                                                                                                                                                                                      Government Employee (SGE)
Brown      Jr.      ,                4/28 /2012      4/27 /2016    Senior        Advisor          for      Electrical          Systems,              BMT      Syntek                                                          Special Mr. Charles                                                                      Technologies,              Inc.,    Arlington,                VA                                                                            Government H.                                                                                                                                                                                                                                  Employee          (SGE)
Corradini,                            9/7/2010                        9/6/2014                        Professor          and      Chairman                of Department                  of Engineering                          Special Dr.      Michael            L.                                                      Physics,          University            of Wisconsin,            Madison,          WI                                                      Government Employee (SGE)
Powers,            Dr.              6/6/2010                        6/5/2014                    Senior        Scientist,        Sandia          National          Laboratories,                                              Special Dana          A.                                                                      Alburquerque,                            NM                                                                                                Government Employee            (SGE)
Ray,          Mr.                    6/23/2012    6/22 /2016    Retired          Chief      Executive          Vice    President,            Southern                                                                          Special Harold              B                                                                California                  Edison    Company,                  Rosemead,            CA                                                    Government Employee (SGE)
Rempe,                Ms.            10 /7/2010        10/6/2014      Directorate                    Fellow,    Idaho        National            Laboratory,                    Idaho                                            Special Joy                                                                                    Falls,        ID                                                                                                                            Government Employee          (SGE)
Ryan,            Dr.                  7/6/2012                          7/5/2016                      Principal,                Michael        T. Ryan        and      Associates,          LLC,                              Special Michael        T                                                                      Lexington          , SC                                                                                                                      Government Employee (SGE)
Schultz,                Dr.          1/9/2012    1/8/2016                    Consultant, International                                                                                                                                                                                                                    Atomic        Energy            Agency;          Retired Special Steven                                                                                Engineering Manager,                                                                                                                                                                                                        Nuclear          Design      Duke    Energy Government Corporation,                  Charlotte,                  NC                                                                                Employee            (SGE)
Shack,          Dr.                  8/1/2009            7/31/2013 Retired            Associate      Director,            Energy          Technology              Division,                                                    Special William          J.                                                                  Argonne            National          Laboratory,                    Argonne,          IL                                                    Government Employee            (SGE)
Sieber,            Mr.              7/12 /2011      7/11    /2015      Retired          Senior        Vice-President,                Nuclear          Power        Division,                                                  Special John            D.                                                                    Duquesne          Light    Company,                Pittsburgh,                        PA                                                  Government Employee (SGE)
Skillman,                    Mr.                8/21      /2011      8/20 /2015      President            and        Principal,            Skillman            Technical            Resources,                                  Special Gordon                                                                                                                                                                                                                                                                                                                                                                                                                                                        Hershey,                PA Government Employee          (SGE)
Stetkar,            Mr.                                          9/5/2011                            9/4/2015                      Principal,            Stetkar            &    Associates,        Lake        Forest,        CA Special John          W.                                                                                                                                                                                                                    Government Employee            (SGE)
Total Count of Committee    Members                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              15
 
http  s ://www.fi      do.gov      /facadatabase            /rptannualreport                .as  p                                                                                                                                                                                              11      /14/2012 Pa ge        1 of 2 2012    Current                                  FY      Report:                        Review          of Federal                    Advisory                    Committee                                                                                                                                                                                                                                                                Committee      Menu
 
11      /6 /2012      3:19:28                PM I            Departmen            t o      r Agency                                                                                                                                                                                                                                                                                                                                                                  2.      Fiscal Yea        r Nuclear              Regulatory                            Commission                                                                                                                                                                                                                                                                                                                                                                    2012
 
3      Co        m      mittee  or    Su        b    Commi                ttee                                                                                                                                                                                                                                                                                                      3b      . GSA    Co      mmittee  No        .
Licensing                Support                      System                Advisory                    Review              Panel                                                                                                                                                                                                                                                                                                        1104
 
4 . I s this New          D ur  ing  Fisca  l Yea          r0                                                                              5. C  urrent  C ha    rter                                                                                    6 . Ex        pected  Ren      ew      al  D  a    te                                                              7. Ex      pected Te rm      D a    te No                                                                                                  12  /3/        2010                                                                                                        12 /3/2012 8a        . Was                T ermi n      a    ted  Dur    ing          FY    ?                                                                                            8b.        Spec    ific    T  ermin    a    tion        A  u      thor                ity                                                                                  Sc    .Ac      tu  a    l Te rmin    a    tio      n D      a    te No                                                                                                                                                    42    u.s.c.                    2201 9        Agency                        Recom                    m      endatio              n        for Nex        t FY                                                          I 0a          Leg  islatio n        Req    to        T ermin    a    te?                                                                                    I Ob        Leg  islatio      n P    end        ing      ?
Continue                                                                                                                                                          No
 
11      Establi shm        ent  Au          tho      rity                                                                      Agenc        y      Authority
 
12  . Specific Establ        ish m      ent  A  u      thority                                                                                                                            13. Effective Date                                                                      14. Co      mmittee  Type                                                                        14c.          Pres ident  ial?
42    u.s            .c.            2201                                                                                                  1/19 /1975                                                                              Continuing                                                                                                    No
 
15  . Description      of Committee                                                                                        Non      Scientific                  Program Advisory                      Board
 
I  6a        . Tota        l N  u      mbe              r of R eports                                                                                                                                                      No    Reports                    for        this          Fiscal          Year.
 
I    7d  . To        ta      l Meetings                                                                                                  No      Meetings                  for        this          Fiscal          Year.
 
C ur  ren      t  Fisca          l  Yea        r                                                                                                                                                                                    Next    Fiscal        Ye      a        r I Sa(      I    )  Perso      nne              l Pm          ts to    No        n        -Federa  l Members                                                                                                                                                                                                                  $0                                                                                                                                                                                                                                                                                                                                                                                                                                            $0
 
I 8a(2)          Perso      n        ne      l Pmts to    Federal Member          s                                                                                                                                                                                                                                        $0                                                                                                                                                                                                                                                                                                                                                                                                                                            $0
 
I 8a(3)          Personnel          Pm        ts to  Federa      l Staff                                                                                                                                                                                                                                                    $0                                                                                                                                                                                                                                                                                                                                                                                                                                            $0
 
I 8a(4)          Personn              el  Pmt s to  No        n-        memb                    er Consu                ltants                                                                                                                                                                                            $0                                                                                                                                                                                                                                                                                                                                                                                                                                            $0
 
J 8b(    I) Tra      ve  l a      nd          Per Diem      to  Non-Federa                  l Membe              rs                                                                                                                                                                                                      $0                                                                                                                                                                                                                                                                                                                                                                                                                                            $0
 
I 8b(2)        Trave    l and                Per D iem          to    Federa l  Mem        be      rs                                                                                                                                                                                                                    $0                                                                                                                                                                                                                                                                                                                                                                                                                                            $0
 
I 8b(3)        Trave      l and                  Per Diem    to    Federa    l Staff                                                                                                                                                                                                                                        $0                                                                                                                                                                                                                                                                                                                                                                                                      $0
 
J 8b(4)        Travel a      nd                Per Diem        to  Non-Member                              Consu                    ltants                                                                                                                                                                                  $0                                                                                                                                                                                                                                                                                                                                                                                                                                              $0
 
18c    Other(ren ts, u      ser chargcs        ,grap        hics    ,printing ,mai        l etc)                                                                                                                                                                                                                        $0                                                                                                                                                                                                                                                                                                                                                                                                                                            $0
 
I8d                                                                                          To        ta      l                                                                                                                                                                                                              $0                                                                                                                                                                                                                                                                                                                                                                                                                                            $0
 
I 9  . Federa  l Staff Su      pport Y    ea        rs                                                                                                                                                                                                                                                                    0.0                                                                                                                                                                                                                                                                                                                                                                                                                                                    0.0
 
20a        . How              does      the Committee      accomp                            lish its pur  po        se?
The          Nuclear                Regulatory                          Commission                            relied              on        the          Licensing            Support                    Network                Advisory                  Review              Panel          (LSNARP) for        advice                and            recommendations                                                    on        the        design            and          operation                    of the      searchable                        electronic                  database                      (Licensing Support                      Network                  (LSN))            for      documents                        that            were          relevant                      to    the        licensing            of a    geologic          repository                              for        the      storage of high          level        nuclear                  waste            as      defined                  in              10  CFR            2. 1003. The      document                      collection              contained                    electronic                    copies      of all of the          material                        that            was      used            by        parties                      in        the        NRC's              licensing              proceeding                        for        a      high          level        radioactive                        waste repository.                          The            LSN      was        loaded            with          more              than              3    million            documents                        begining                    in          FY-2004          and          continuing                    through FY-201    I.      Document                    addition                  continued                  during                    FY-2011,            however                ,  no    committee                        meetings                were            held        since December                      2003.        DOE            had            planned                    on      submitting                                  an          application                            to      build            a      high          level      waste          disposal                facility              at Yucca            Mountain,                          Nevada                    in          December                  2004,        however                delays            occured                  and              in        the      spring              of2006          DOE          issued          a revised                schedule.                    DOE        certified                  their                LSN      document                      collection                    in          late      2007      and          submitted                            a    License            application                            to the          NRC          in      June              2008.      The        delay                in        DO E's          program                        negated                any            need          for          LSN        meetings                during                  this          period.
During                    FY      2010      DOE          asked              to    withdraw                        the        Yucca            Mountain                        License            Application                    pending                  before            the        NRC.              In FY-2011            and            FY-2012,            Congress                    did          not        appropisate                            any          funds              for        DOE        or      NRC          for        the          Licenseing              of the        Yucca Mountain                      Application.                        NRC        shut          down            the        licensing              review                in        FY-2011            and            preserved                        the        record                of the proceeding.                      The        Atomic            Safety              and          Licensing                    Board              that            presided                  over          the      application                        hearing                  ordered                    the        parties to    submit                  their            LSN      document                      collections                to    the        NRC        Secretary                          for        preservation.                            The          LSN      system                was decom      issioned              at      the        close    of FY-2011.            Litigation                    continued                      before            the      DC    Circuit                Court                      in        FY    - 2012.
20b        . H ow              does      the Committee      bala          n      ce        its me        m        be        rship?
 
The      membership                    of the      LSN ARP    was      balanced                  by      being      drawn          from          among        the      full    spectrum                of parties            to    NRC's licensing            proceeding                for    the      burial        of high        level      radioactive                    waste.        Since      the    burial          site      under        review              is      in    Nevada, the      membership                    includes          the    State        of Nevada,                local    count        y  governments                    of both        Nevada          and      California,                  Indian https    ://www.      fid  o.g  o v  /fa  ca databa    se /rptannualreport                .a sp                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  11      /06 /2012 Page  2  of 2
 
tribes        (represented                        b y    the    National        Congress          of American                Indians),          and      an    environmental                      group        (the      Nevada Nuclear        Waste      Task        Force).      It also    included          the    nuclear          industry,              the    potential              licensee    (DOE)      and      the    licensing agency        (NRC).          Input            by      these        r  e  presentatives                      was    essential          to  the  success      of the      LSN    project.
 
20c      . How                freq  ue      nt  a      nd          relevant  a    re the Co        m      mi ttee  m        ee  tings?
The      LSNARP        did      not    meet          in        FY-2012. The    need      for    additional                meetings          of the    LSNARP        will    be  determined                    based upon      the    outcome          of Court      action        and      Congres          s ional    appropiations.
20d . W          hy          ca          n't    the a    dv  ice      o      r in  fo  rm    a      tion                this co          mmittee  provides  be          ob              ta      ined  elsewhe  re?
The    Committee                    was    formed            as    part    ofa    negotiated              rulemaking                  to  oversee        the    operation              of the      LSN. The    advice provided                by    the    state,        county        and      tribal          governmental                        units,      together            with    other        potential            users      of the      LSN  and EHD  , was      unique          to    this      particular              computer              application.            It was    not    available              from        other        existing      committees            or within      the    NRC      itself.      NRC    considered                it  essential        that      advice        on    the    design      of the  software          and      hardware            should come      from          representatives                      of the    future          hands-on            users      of the      LSN.
20e . W          hy            is ,t n      ecessary          to c          lose      a    nd/or                      pa      rtia      lly        c    lose      c  ommitt    ee  m        ee  tings?
The      LSNARP      did        not    hold    any      closed      meetings              in        FY    2012.
 
21      . Rema            rks In        FY-2012,    Congress            did      not    appropisate                  any      funds        for      DOE    or  NRC    for    the      Licenseing      of the      Yucca      Mountain Application.              At    the    close  of the      FY-2012    year,            Litigation            continued              before      the      DC  Circuit          Court      and      the    future need      for    the    Committee                  remained                uncertain.
 
D esigna              ted  Federa  l Officia      l                    Dr. Andrew            L    Bates      DFO
 
Committee    Me m        be        rs                    Start                                                                                                              End                                                                                                                        Occ          up      a    tio      n M    embe            r Designa            tio      n Bates    ,  Andrew            L                          6/15/2000                        9/30/2012 US    Nuclear Regulatory                                                        Regular          Government Commission                                                                  Employee (RGE)
Brandt,          Jo  y                                    10/1/2000              9/30/2012      Lander        County,            Nevada                                            Representative Clark,        Ray                                          7/1/1999                                  9/30/2012      US    EPA                                                        Ex  Officio Frishman                  , Steve                          7/1/1999                                9/30/2012    State      Of Nevada                                                                                                                                                                                                                                                                            Representative Holden      ,  Robert                                    7/1/1999                                          9/30/2012 National          Congress          of American                                                        Representative Indians Johnson                      ,  Abby                      10/15/2003    9/30/2012      Eureka          County,              Nevada                                                                                                                                                              Representative Kall            ,  Alan                                  7/1/1999                                          9/30/2012    Churchill              County,            Nevada                                                                                                                            Representative Kraft          , Steven                                    1/1/1998                                          9/30/2012    Nuclear          Energy          Institute              -          Energy            Representative Coalition Leake              ,  Harr    y                          6/1/2002                                              9/30/2012        US    Departmant                of Energ        y                                                                                                                        Regular          Government Emplo        y  ee  (RGE)
Mathias,              Linda                                10/1/2001            9/30/2012      Mineral          County,              Nevada                                        Representative McCorkell              , George                            10/1/2000            9/30/2012      Esmeralda                County,              Nevada                                  Representative Murphy,              Malach          y                    12 /18/1989    9/30/2012      Nye  County,            Nevada                                                            Representative Pitts      , Jason                                          10/1/2001              9/30/2012      Lincoln      County,            Nevada                                              Representative Remus                ,  Andrew                            10/1/2001              9/30/2012 Inyo    Count      y  ,  Nevada                                                        Representative Simom,              Mike                                  10/15/2003    9/30/2012    White        Pine    County            Nevada                                                Representative Swanson          ,  David                                  10/1/2009            9/30/2012      Nye  County,            Nevada                                                    Representative Treichel,              Judy                                1/1/1998                                          9/30/2012    Nevada          Nuclear        Waste      Task          Representative Force von      Tresenhau                s en    ,              7/1/2001                                  9/30/2012    Clark      County,              Nevada                              Representative Engelbrech
 
Tota        l Co        unt      of Commi                ttee    Members                                                        18
 
h ttp  s :/ /www. fid    o  . gov /facad      at ab as  e/rpt  a  nn u a  l report      . as  p                                                                                                                                                                        1 1/06  /2012 Page      1 of 2 2012  Current            FY  Report:                  Review        of Federal              Advisory                Committee                                                                                                                                                                                                                                      Committee    Menu
 
I 1/6/2012 2:59:44        PM I    . Departm    ent  or    Ag en    cy                                                                                                                                                                                                                                                                                                          2. Fisca      l Year Nuclear                  Regulatory                          Commission                                                                                                                                                                                                                                                                                              2012
 
3        Co      mmittee  or    SubCommittee                                                                                                                                                                                                                                                                              3b        . GSA  Committee  No        .
Advisory                  Committee                              on      the          Medical                Uses      of Isotopes                                                                                                                                                                                                                                1102
 
4          Is this New        Durin    g  Fisca  l Year?                                                          5. C urrent C harter                                                                                                                                                                                                                                                                                6. Expec          ted  R en      ewa              l Dat e 7. Expected    Term      Date No                                                                                3/    14/ 2012                                                                                                                                                                                                                                                                                                                                  3/14  / 2014 8a        . Wa                s Terminated      Dur    ing      FY    ?                                                                            8b        . Spec    ific T  erm    in      a    tion  Authority                                                                                      Sc    .Actu    a      l Term      ina    tion        Date No                                                                                                                            42    u.s.c.                  2201 9  . Agency                      Recomm                          endation                fo  r Next  FY                                          I 0a. L  eg  islation        R eq    to  T erminat    e?                                                                      I Ob      . Legislatio      n        Pending      ?
Continue                                                                                                                                No
 
11                  Estab              lishm        ent  Authority                                        Agency              Authority
: 12. Spec    ific      Estab    lishm        ent  Aut  hor  ity                                                                                                                                                                                                                                                                                                                                                      I 3  . Effective  D a      te                                                                                                                                                                        14  . Co        mmittee Type 14 c    . Pres  idential?
42    u.s.c.                    2201                                                                                                                                                                                                                                                                                                                      7/1/1958 Continuing No
: 15. De scription of Co        mm                ittee                                                                                                                                            Scientific                Technical                      Program Advisory                        Board
 
I 6a        . Tota        l Number                of R eports 3
16b        . Report Titles  and                  Dates Permanent                              Implant                      Brachytherapy                                          Final              Report                                                                                                                                                                    10/    18/2  011 Permanent                                Implant                    Brachytherapy                                        Revised                  Final            Report                                                                                                                                              2/7/  2012 Electronic                    Signatures                          Report                                                                                                                                                                                                                                                4/    16/ 2012
 
17a          O pen        :                                                                                      4                    17b        . Closed                                                                    0                                                                                                                        17c    . Partially        Closed
* 2 17d  . Total  Meetings 6 M    ee  ting  Purpo          ses and                  Dates
 
ACMUI              Teleconference                                                                                                                                                                  10/    18/2011      10/    18 / 2011 ACMUI              Teleconference                                                                                                                                                                12 /    15 / 2011        12  /  15/2011 ACMUI              Teleconference                                                                                                                                                                2/7/ 2012  2/7/  2012 ACMUI                  Meeting                                                                                                                                                                    4/    16/  2012  4/    17/ 2012 ACMUI              Teleconference                                                                                                                                                                7/ 9/ 2012  7/ 9/  2012 ACMUI                Meeting                                                                                                                                                                    9/  20 /  2012  9/  21    /  2012
 
Current  Fisca  l Y      ea      r                                                            N  ext    Fiscal      Year I Sa(    I    )  Personne            l Pmts to  Non              -F ederal M  emb              ers                                                                                                                                            $102,824                                                                                            $103,000
 
I 8a(2)        Perso nn              el Pmts to    Federal Members                                                                                                                                                                                                    $0                                                                                                  $0
 
I 8a(3)        Perso  nn              el Pmts to    Federa l Staff                                                                                                                                                                              $249,061                                                                                            $250,000
 
I 8a(4)        Personne                  l Pmt s to  Non-member                                    Co        nsult                    ants                                                                                                                          $0                                                                                                  $0
 
I 8b(    I) T  rave    l a        nd          Per Diem        to    No        n-F      edera    l Members                                                                                                                                          $31,506                                                                                              $32,000
 
i 8b(2)        Travel and                Per Diem        to          Federa    l  Mem        bers                                                                                                                                                                    $0                                                                                                  $0
 
I 8b(3)        Travel and                Per D  iem t o        Federal Staff                                                                                                                                                                            $4,442                                                                                                $4,500
 
I 8b(4)        Travel a      nd          Per D iem          to    Non-Member                                Co        ns        ultant s                                                                                                                          $0                                                                                                  $0
 
I 8c      .O ther(rents, us      er c    ha      rges,grap  hics    ,printing,mail  etc)                                                                                                                                                                            $0                                                                                                  $0
 
18d                                                                                                Total                                                                                                                                          $387,833                                                                                            $389,500
 
I 9 . Federal Staff Support      Years                                                                                                                                                                                                                              1.6                                                                                                  1.6
 
20a.        How                do        es  the Committee    a    ccompli          sh its purpose      ?
 
The        NRC        staff          believes            that              licensees,              the        general                  public,              and            medical                professionals                          benefit              when            recognized ex    perts              provide                  advice              to  the        staff.          This        advice              enables              staff        to    develop                rules            that            will      maintain                          public            safety,              while not          inappropriately                                          intruding                          upon            the        practice                of medicine.                  The        Staff        provides                      a    summar                        y    of issues          to      be addressed                      during                    meetings,                  and            the        ACMUI              discusses                the          issues        and          gives        advice              and            makes                recommendations                                              to the        Staff.              Furthermore,                                        the        ACMUI                keeps          staff        abreast                  of new      developments.                            This          ongoing              communication                                    helps http    s:    //www.fido.gov                  /facadatabase            /rptannualreport                  .asp                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                1  1/06  /2012 Page  2  of 2
 
ensure          that    staff      is    aware      of important                    issues    during          critical        stages      of rule    development.                  When        issues    that        need special        emphasis              arise,      working          groups        and      subcommittees                    are      formed.
20b        . How                does      the Co      mmittee  balanc                      e its m      emb              ership?
Membership                          is      balanced              by      placing        individuals              of diverse          specialty            on    the  committee.                For      instance,          there      are members                  who    represent                both      diagnostic          and      therapeutic                  applications              of medicine.        There        are    members                who    have    a regulatory                  function          within        their        specialties.        There            is    a    member              who    represents                medicine            from          an    administrative standpoint,                and      there          is  a    patient          advocate            member,                who    represents                patients'              interests.            ACMUI            members                also perform              regular          self-evaluations,                        in    which      they        give    feedback              on    the    appropriateness                        of the    committee's com position.
20c      . H ow                frequent  and                releva      nt  are      the Com            mittee    m        ee  tings?
Committee                  meetings          are    generally                held    semi-annually.                    The    committee                  will  hold    more        frequent                meetings          when important                  issues    emerge          or  when        issues    need      timely            resolution.
20d  . Wh          y        can't              the advice      or      inform      atio n        this co          mmittee provides  be        obtain              ed elsew    here?
NRC    continues            to  strive          to    achieve          its  goal    of creating            risk-informed,                    performance                    -  based        regulations              that      provide for    the      health        and      safety        of the    public        while    imposing                no    unnecessary                burden            on    licensees.      Furthermore,                      the medical            profession          continues              to    see    regular          advances            that      create          unique        regulatory                  challenges.          The    advice      and recommendations                            from            medical          professionals              who  are    exposed        to  these    advances                is    crucial            to    the    NRC staffs ability            to  continue              to    regulate            effectively.
 
20e . Wh          y          is it n      ecessary          to      c    lose      a      nd/o                    r  partially close  co        mmittee  m      ee tings?
Meetings        are    closed      to  conduct        annual          ethics        briefings,          conduct            reviews      of paperwork              of a    personal          and confidential                nature,            and      to    discuss      administrative                          matters              that      are      purely          internal              to  Committee                    business.      It would be  inappropriate                          to  conduct          these      types      of meetings          openly.        They        must          be  conducted              privately                to  allow    Committee members                the    freedom                to  ask    and      answer        personal            questions          and        to    protect          individuals'                    privacy.
 
2  1      Remarks
 
D es ignated          Federa  l Official:                Mr. Christian                    E  Einberg            DFO
 
Commi                    ttee    Memb                ers                                                                                                                                        Start                                                                                                                End                                                                                                                                  Occupat                  ion                                                                                                                                                                                                                                                                                                                                                                                                                                                                        M  emb              er Designation Bailey,                    Ms. Darice        G.                                3 /26 /2012                      3/26/2016                    State      Government                    Representative                                                                  Special      Government Employee            (SGE)
Guiberteau,                      Dr.                            1/10/2011              1/10/2015                        Diagnostic          Radiologist                                                                        Special      Government Milton      J.                                                                                                                                                                                                                    Employee            (SGE)
Langhorst,                  Dr. Susan                        9/28/2009              9/28 /2013                      Radiation              Safety        Officer                                                            Special      Government M.                                                                                                                                                                                                                                Employee            (SGE)
Malmud              ,  Dr.      Leon    S.                    5/20 /2002                      5/20/2013                      Health        Care    Administrator                                                          Special      Government Employee            (SGE)
Mattmuller,                    Mr .                            3 /30/2008                      3/30/2016                      Nuclear          Pharmacist                                                                      Special      Government Steven              R.                                                                                                                                                                                                            Employee            (SGE)
Palestro            ,  Dr.                                      9/22 /2011                          9/22 /2015                      Nuclear Medicine                                                                                                                                              Physician Special      Government Christopher                  J.                                                                                                                                                                                                    Employee            (SGE)
Suh,        Dr. Jon          H.                                10 /18 /2010      10 /17 /2014      Radiation              Oncologist                                                                                          Special      Government Employee            (SGE)
Suleiman,                    Dr. Orhan                                              1/1/2004                                              1/1/2014                                            Food    and      Drug      Administration Regular          Government H.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Representative Employee            (RGE)
Thomadsen                    ,  Dr.      Bruce                10/15/2007        10/15 /20 I 5    Medical          Physicist          -        Therapy                                                                          Special       Government R.                                                                                                                                                                                                                                Employee             (SGE)
Yan      Decker,              Dr.                                                                                                                                            10/3/2005                            10/3/2013                      Nuclear        Cardiologist Special       Government William                A.                                                                                                                                                                                                          Employee           (SGE)
Weil,          Ms. Laura              M.                                                            8/29 /2011                        8/29/2015              Patients'                Rights        Advocate                Special       Government Employee             (SGE)
Welsh,          Dr. James              S.                                                      2/25 /2007                        2/25 /2015                      Radiation              Oncologist                          Special       Government Employee           (SGE)
Zanzonico,                    Dr. Pat        B.                            3 /8/2010                                          3 /8/2014                                        Nuclear Medicine                                                                                                                                            Medical        Physicist Special      Government Employee          (SGE)
 
Total    Count          of Committee    Membe                rs                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          13
 
https:    //www.fido.gov              /facadatabase        /rptannualreport              .asp                                                                                                                                                                                                                                        11     /06 /2012}}

Latest revision as of 19:55, 24 November 2024

2012 Annual Report - Review of Federal Advisory Committee
ML24059A220
Person / Time
Issue date: 12/03/2012
From:
NRC/SECY
To:
References
Download: ML24059A220 (1)


Text

......

2012 Current FY Report: Review of Federal Advisory Committee 11 /14/2012 2: 16:08 PM Page 1 of 6 Committee Menu I Department or Agency

2. Fiscal Year 2012 Nuclear Regulatory Commission
3. Committee or SubCommittee Advisory Committee on Reactor Safeguards 3b. GSA Committee No.

207

4. Is this New During Fiscal Year?
5. Current Charter
6. Expected Renewal Date
7. Expected Term Date No 12/10/2010 12/10/2012 8a. Was Terminated During FY?

8b. Specific Termination Authority Sc.Actual Termination Date No CJ. Agency Recommendation for Next FY Continue I Oa.Legislation Req to Terminate?

1 Ob.Legislation Pending?

No 11. Establishment Authority

12. Specific Establishment Authority Statutory (Congress Created)

I 3. Effective Date

14. Committee Type Continuing 14c. Presidential?

42 U.S.C. Sect. 2039 & 2232 1/1/1957

15. Description of Committee 16a. Total Number of Reports 40 16b. Report Titles and Dates Scientific Technical Program Advisory Board Initial ACRS Review of 1) The NRC Near Term Task Force Report on Fukushima and 2) Staffs Recommended Actions to be Taken Without Delay Draft Final Regulatory Guide (RG) 1.82, "Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident," Revision 4 No 10/13/2011 10/17/2011 Enhancing the Fuel Cycle Oversight Process 10/17/2011 ACRS Review of Starrs Prioritization of Recommended Actions to be Taken in Response to Fukushima 111812011 Lessons Learned (SECY-I 1-0137)

Nine Mile Point Nuclear Station, Unit 2, Extended Power Uprate Application 11/10/2011 Draft Fin Rev 6 of Standard Rev Plan Br Tech Position 7-19,Guidance for Eval of Div & Defense-in-Depth in Digital Computer-Based lnstru & Ctrl System Report on the Safety Aspects of the Progress Energy Florida, Inc. Combined License Application for Levy Nuclear Plant, Units 1 and 2 Proposed Requirements for ITAAC Maintenance and Draft Final Regulatory Guide 1.215, "Guidance for ITAAC Closure Under JO CFR Part 62" 11/14/2011 12/7/2011 I 2/8/2011 Res to 10/28/1, EDO Letter ACRS Recommendations Topical Rpt NEDC-33173P, Supplement 2, Parts 1211212011 I, 2, &3, "Analysis of Gamma Scan Data & Removal ofSLMCPR Margin" Revised Branch Technical Position on Concentration Averaging and Encapsulation of Low-Level Radioactive Waste Proposed Draft Rule for JO CFR 50.46c, "Emergency Core Cooling System Performance During Loss-of-Coolant Accidents" Draft JO CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Daiichi Event Draft Final Revision I to Regulatory Guide 1.93, "Availability of Electric Power Sources" Response to 2/27/12 Letter Regarding Final Disposition of Fukushima-Related ACRS Recommendations in Letters dated October 13, 2011 and November 8,2011 ACRS Review of Proposed Orders in Response to Fukushima Lessons Learned (SECY-12-0025)

Chapters 6, 7, 11, 13, 15, 16, & 18 Safety Evaluation Report with Open Items Associated with U.S.

Evolutionary Power Reactor Design Certification Application Fin SER Associated with the Florida Power and Light Turkey Point Nuclear Plant, Units 3 and 4, License Amendment Request for an Extended Power Uprate Extremely Low Probability of Rupture Project I 2/13/2011 1/26/2012 2/15/2012 2/16/2012 3/13/2012 3/14/2012 3/15/2012 3/20/2012 4/23/2012 Report on the Safety Aspects of the License Renewal Application for the Columbia Generating Station 4/24/2012 Response to the January 24, 2012, EDO Letter Regarding the Progress Energy Florida Combined h ttps :/ /www. fido. gov /facadata base/rptann ualreport. asp 4/25/2012 11/14/2012

License Application for Levy Nuclear Plant, Units I and 2 Chapters 6, 7, 15, & 18 of the SER with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application Spent Fuel Pool Scoping Study Draft Commission Paper, "Risk-Informed Regulatory Framework for New Reactors" Review and Evaluation of the NRC Safety Research Program, NUREG-1635, Volume IO 4/25/2012 4/25/2012 4/26/2012 4/30/2012 State-of-the-Art Reactor Consequence Analysis (SOARCA) Project 5/15/2012 Draft Final NUREG-1921, (EPRI Report 1023001), "EPRI/NRC-RES Fire Human Reliability Analysis 511712012 Guidelines Chapters 3, 9, 14, and 19 of the Safety Evaluation Report with Open Items Associated with the U.S.

Evolutionary Power Reactor Design Certification Application 5/18/2012 Grand Gulf Nuclear Station, Unit I, Extended Power Uprate License Amendment Request 6/18/2012 Proposed Revision I to Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, 611812012 ASME OM Code" NRC Staffs Draft Plans and Status Summaries for Tier 3 Japan Lessons Learned Recommendations 6/19/2012 Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit I, License 612012012 Amendment Request for an Extended Power Uprate Draft Interim Staff Guidance Documents in Support of Tier I Orders Draft Final NUREG-1934 (EPRI 1023259), "Nuclear Power Plant Fire Modeling Analysis Guidelines (NPP FIRE MAG)"

SECY-12-0081, "Risk-Informed Regulatory Framework for New Reactors" 7/17/2012 7/17/2012 7/17/2012 Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 2, License 712312012 Amendment Request for an Extended Power Rate Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel 9/11/2012 Chapters 5, 8, IO, 11 and 12 of the SER with Open Items for the Comanche Peak Nuclear Power Plant, 911812012 Units 3 and 4, US-APWR Reference Combine License Application Interim Staff Guidance 8, Revision 3, "Burn up Credit in the Criticality Safety Analyses of PWR Spent Fuel in Transportation and Storage Casks" Chapter 9 of the Safety Evaluation Report with Open Items for the US-APWR Design Certification Application 9/18/2012 9/18/2012 Draft Regulatory Guide DG-1290 (Proposed Revision of Regulatory Guide 1.59), "Design-Basis Floods 912512012 for Nuclear Power Plants" 17a Open:

71 17b. Closed 4

Meeting Purposes and Dates Radiation Protection and Nuclear Materials ABWR Planning and Procedures Power Uprates Plant Operations and Fire Protection 587th Full Committee APIO00 Plant License Renewal US APWR ESBWR Future Plant Designs Planning and Procedures 588th Full Committee EPR Planning and Procedures (w/Commissioners)

Planning and Procedures APWR Thermal Hydraulic Phenomena https ://www.fido.gov/facadatabase/rptannualreport.asp 17c. Partially Closed:

10/4/2011 10/4/2011 10/4/20 II 10/4/20 II I 0/5/20 I I 10/5/2011 10/5/201 I 10/5/2011 10/5/201 I 10/5/2011 10/6/20 II I 0/8/2011 10/18/2011 10/19/2011 10/19/2011 10/19/2011 10/20/201 I 10/20/201 I 10/21/201 I 10/21/201 I 11 /2/20 II 11 /2/20 II 11/2/201 I 11/2/2011 11/3/2011 11/5/2011 11/14/201 I 11 /15/2011 11/29/2011 11/29/201 I 11/29/2011 11/29/2011 11/30/2011 11/30/2011 11/30/2011 11/30/201 I 3

17d. Total Meetings 78 Page 2 of 6 11/14/2012

ESBWR 589th Full Committee Reliability and PRA Power Uprates Materials, Metallurgy & Reactor Fuels Plant Operations and Fire Protection Radiation Protection and Nuclear Materials Planning and Procedures 590th Full Committee Regulatory Policies and Practices Planning and Procedures 591st Full Committee EPR Power Uprates Reliability and PRA Regulatory Policies and Practices Materials, Metallurgy & Reactor Fuels Reliability and PRA Planning and Procedures 592nd Full Committee Reliablity and PRA US APWR Planning and Procedures Planning and Procedures (ACRS Retreat) 593rd Full Committee Regulatory Policies and Practices Power Uprates Radiation Protection and Nuclear Materials Reliability and PRA Thermal Hydraulic Phenomena Planning and Procedures 594th Full Committee 11/30/2011 11/30/2011 12/1/2011 12/3/2011 12/14/2011 12/14/2011 12/14/2011 12/14/2011 12/15/2011 12/15/2011 12/15/2011 12/15/2011 1/18/2012 1/18/2012 1/18/2012 1/18/2012 1/19/2012 1/20/2012 2/8/2012 2/8/2012 2/8/2012 2/8/2012 2/9/2012 2/11/2012 2/21/2012 2/23/2012 2/24/2012 2/24/2012 3/6/2012 3/6/2012 3/6/2012 3/6/2012 3/6/2012 3/6/2012 3/7/2012 3/7/2012 3/7/2012 3/7/2012 3/8/2012 3/10/2012 3/21/2012 3/21 /2012 3/22/2012 3/23/2012 4/11/2012 4/11/20 I 2 4/11/2012 4/11/2012 4/12/2012 4/13/2012 4/25/2012 4/25/2012 4/26/2012 4/26/2012 4/27/2012 4/27/2012 5/8/2012 5/8/2012 5/8/2012 5/9/2012 5/9/2012 5/9/2012 5/10/2012 5/12/2012 Fukushima (Lessons Learned Task Force) 5/22/2012 5/22/2012 Fukushima (Disposition of NTTF Tier 3 Recommendations) 5/22/2012 5/23/2012 Power Uprates Radiation Protection and Nuclear Materials Planning and Procedures 595th Full Committee Reliability and PRA Fukushima Power Uprates US APWR Radiation Protection and Nuclear Materials Plant License Renewal Planning and Procedures Regulatory Policies and Practices 596th Full Commitee 596th Full Commitee Reliability and PRA Fukushima (Seismic Hazards)

Fukushima (NTTF Recommendation 1) 5/24/2012 5/24/2012 6/5/2012 6/5/2012 6/5/2012 6/5/2012 6/6/2012 6/8/2012 6/19/2012 6/19/2012 6/20/2012 6/20/2012 6/22/2012 6/22/2012 7/9/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7/10/2012 7 /10/2012 7/11/2012 7/13/2012 7/11/2012 7/13/2012 7/26/2012 7/27/2012 8/15/2012 8/15/2012 8/15/2012 8/15/2012 https://www.fido.gov/facadatabase/rptannualreport.asp Page 3 of 6 11/14/2012

Plant License Renewal Fukushima Planning and Procedures 597th Full Commitee Regulatory Policies and Practices Radiation Protection and Nuclear Materials (Spent Fuel Transportation Risk Assessment)

Plant License Renewal US APWR I 8a( I ) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff I 8a(4) Personnel Pmts to Non-member Consultants I 8b( I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members I 8b(3) Travel and Per Diem 10 Federal Staff I 8b(4) Travel and Per Diem to Non-Member Consultants I 8c.Other(rents,user charges,graphics,printing,mai I etc.)

18d Total

19. Federal Staff Support Years 20a. How does the Committee accompl ish its purpose?

8/16/2012 8/16/2012 9/5/2012 9/5/2012 9/5/2012 9/5/2012 9/5/2012 9/5/2012 9/6/2012 9/8/2012 9/18/2012 9/18/2012 9/18/2012 9/18/2012 9/19/2012 9/19/2012 9/20/2012 9/20/2012 Current Fiscal Year

$964,077

$0

$3,357,486

$184,135

$429,003

$0

$27,875

$33,318

$266,691

$5,262,585 37.0 Next Fiscal Year

$970,000

$0

$3,675,440

$184,135

$450,453

$0

$29,269

$33,318

$251,000

$5,593,615 37.0 The Advisory Committee on Reactor Safeguards (ACRS) reports to the Nuclear Regulatory Commission (NRC) and provides the Commission with independent reviews of, and advice on, the safety of proposed or existing NRC-licensed reactor facilities and the adequacy of applicable safety standards. The ACRS was established as a statutory committee by a 1957 amendment to the Atomic Energy Act of 1954. With the enactment of the Energy Reorganization Act of 1974, the licensing functions of the Atomic Energy Commission (AEC) were transferred intact from the AEC to the NRC. The ACRS has continued in the same advisory role to the NRC with its responsibilities changing with the needs of the Commission. Some ACRS tasks are mandated by statute or regulation; some are in response to direction by the Commission, or requests from the NRC staff, or other stakeholders; and some are self initiated in response to ACRS concerns on important regulatory and safety-related matters. The ACRS, upon request from the Department of Energy (DOE), provides advice on the safety of U.S.

naval reactor designs. Upon request, the ACRS also provides technical advice to the Defense Nuclear Facilities Safety Board. The ACRS and its Subcommittees meet regularly in public, Federal Advisory Committee Act (FACA)-regulated meetings to review matters within the scope of its responsibilities. ACRS meeting agendas, meeting transcripts, and letter reports are available for downloading or viewing on the Internet at http://www.nrc.gov/reading-rm/doc-collections/#acrs. The ACRS and its Subcommittees held 78 meetings during FY 2012, including 11 Full Committee meetings that were attended by all ACRS members of which 3 were partially closed meetings. The ACRS members are chosen for their technical expertise relevant to the safety issues important to the Commission. Consultants are used on occasion to augment the expertise of the ACRS members.

The Committee has a full-time staff that provides technical support and administrative services in compliance with FACA requirements. ACRS Subcommittees normally consist of three to six ACRS members with the expertise needed to review in detail the regulatory and safety issues and to formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Stakeholders' participation in ACRS meetings is encouraged and routinely occurs. The Committee's advice, in the form of written reports, is only produced by the Full Committee, and reports on significant regulatory matters are discussed with the Commission in public meetings.

The ACRS conducts an ongoing review of its priorities and schedules to ensure that regulatory matters within its scope of responsibilities are being properly addressed and within its resources, and timely advice is provided to the Commission. Input from the Commission, the NRC staff, and affected stakeholders is used in this process. A Memorandum of Understanding with the NRC Executive Director for Operations (EDO) provides a framework for NRC staff interaction with the ACRS. The ACRS conducts self-assessments to improve its effectiveness and efficiency. The focus of the ACRS work during FY 2012 includes review of: license renewal applications; power uprate applications; design certification applications for the US Advanced Pressurized Water Reactor (US-APWR) and the Evolutionary Power Reactor (EPR); amendments to the certified designs for the Advanced Boiling Water Reactor (ABWR), digital instrumentation and control matters, pressurized water reactor sump performance issues, fuel cycle oversight processes; license applications for New Reactors; Probabilistic Risk Assessment, Fire Protection, and events at the Fukushima Dai-ichi site.

https://www.fido.gov/facadatabase/rptannualreport.asp Page 4 of 6 11/14/2012

20b. How does the Committee balance its membership?

The Commission appoints ACRS members with the scientific and engineering expertise needed to address the safety issues of importance to the Commission. Members are sought who can provide an independent perspective on nuclear safety issues, outstanding scientific and technical ability, balanced and mature judgment, and a willingness to devote the time required to the demanding work involved. Members do not have fixed terms.

However, absent unusual circumstances, they do not serve more than three, four year terms. Members are reappointed in excess of this period only if there is a compelling continuing need for their expertise. Vacancies in the ACRS membership are filled from the pool of applicants which exists after solicitations of interest are published in the Federal Register, trade and professional society publications, and in the press. Recommendations to the Commission as to the selection of qualified candidates from this pool are made by the ACRS Member Candidate Screening Panel. The ACRS provides input to this Panel. During FY 2012, the membership was comprised of individuals with diverse employment backgrounds and included those with expertise in the areas of nuclear power plant operations; probabilistic risk assessment; analysis of severe reactor accident phenomena; design of nuclear power plant structures, systems, and components; chemical engineering; digital instrumentation and control; materials and metallurgy; health physics; and thermal-hydraulics and computational fluid dynamics.

The diversity of viewpoints represented by current members is based on special fields of interest, employment experience, and technical expertise. These member attributes provide the Committee with the balance of highly qualified technical expertise and diverse safety perspectives necessary to carry out the Committee's statutory responsibilities effectively.

20c How frequent and relevant are the Committee meetings?

The ACRS and its Subcommittees held 78 meetings during FY 2012, of which 11 were Full Committee meetings.

The number of meetings held in a reporting period is directly related to the number of nuclear safety matters to be reviewed as required by statute; the number of rules and regulatory guidance referred to the Committee for review and comment; the number of special reviews requested by the Commission, EDO, or other Federal Government organizations; and other safety issues of particular concern to the Committee and its stakeholders.

The Full Committee normally meets IO times a year for 3 days to consider important safety-related nuclear issues, license applications, generic issues, significant regulatory matters, rules, and regulatory guidance. The ACRS Subcommittees, which are normally comprised of three to six members with the relevant expertise, meet as necessary with stakeholders to conduct in-depth reviews of particular matters for later consideration by the full membership during Full Committee meetings. Although not required by the revised FACA, Subcommittee meetings are conducted under the same FACA procedures as the Full Committee meetings to facilitate public participation and to provide a forum for stakeholders to express their views on regulatory matters being considered by the ACRS. Reviews are conducted during each Full Committee meeting to assess the relevance of proposed review topics, resource needs, and the priority of each activity. These assessments have the benefit of input from the Commission, EDO, and other stakeholders. All ACRS meetings for this reporting period addressed either matters for which ACRS review was required by statute or regulation, specific requests from either the Commission or the EDO, or other important regulatory and safety-related matters self-initiated in response to ACRS concerns.

20d. W hy can't the advice or in formation this committee provides be obtained elsewhere?

The ACRS is an independent body of recognized experts in the field of nuclear reactor safety whose Congressional mandate is to provide the Commission with independent advice. Particular duties of the ACRS (e.g., review of operating reactor license renewal applications, extended power uprate amendments, new reactor designs, and rules and regulatory guidance) are dictated by statute or regulation. In addition, functional arrangements exist wherein, upon request, the ACRS provides advice to the Department of Energy and the Defense Nuclear Facilities Safety Board. The Commission has its own expert staff on whom it relies in the day-to-day regulation of nuclear power facilities. The ACRS provides the Commission and the NRC staff with an independent, critical review of high level regulatory issues under consideration by the NRC and independent technical insights as to important matters needing Commission attention. The ACRS members are part-time special government employees with other full-time interests and activities in related fields, and provide a breadth of experience, an independent perspective on issues, and technical knowledge that is not duplicated by the NRC's full-time government employees. A standing Committee such as the ACRS remains current with respect to nuclear safety issues of importance to the NRC, including those related to reactor operating experience, regulatory reform, and NRC's needs for safety research, and provides an independent, collegial judgment regarding these issues that other part-time consultants could not provide. The ACRS meetings provide an important forum for stakeholders to express freely their concerns on safety issues and the regulatory process. A number of important safety initiatives have had their origins in ACRS deliberations. Through the ACRS, the public and the Congress are ensured of an independent technical review and evaluation of the safety of NRC-licensed facilities, proposed reactor designs, significant regulatory and safety issues, and of providing an opportunity for stakeholder input.

20e. Why is it necessary to close and/or partially close committee meetings?

According to 5 U.S.C. 552b (c), ACRS meetings can only be closed for the following reasons:

  • Protect information classified as national security information* Discuss information relating solely to internal personnel rules and/or practices* Protect unclassified safeguards information* Protect proprietary information* Protect information provided in confidence by a foreign source* Prevent invasion of personal privacy* Prevent disclosure of https://Vvww.fido.gov/facadatabase/rptannualreport.asp Page 5 of 6 11/14/2012

information the premature disclosure of which would be likely to significantly frustrate implementation of a proposed Agency action 21. Remarks None Designated Federal Official: Jamila Perry DFO Committee Members Start End Occupation Abdel-Khalik, 9/7/2010 5/31/2012 Southern Nuclear Distinguished Professor, George W.

Dr. Said I.

Woodruff School of Mechanical Engineering, Georgia Institute of Technology, Atlanta, GA Armijo, Dr.

Joseph S.

Banerjee, Dr.

Sanjoy Bley, Dr.

Dennis C.

Brown Jr.,

Mr. Charles H.

Corradini, Dr. Michael L.

Powers, Dr.

Dana A.

Ray, Mr.

Harold B Rempe, Ms.

Joy Ryan, Dr.

Michael T Schultz, Dr.

Steven Shack, Dr.

William J.

Sieber, Mr.

John D.

3/9/2010 3/8/2014 Adjunct Professor of Materials Science and Engineering, University of Nevada, Reno, NV 7/26/2010 7/25/2014 Distinguished Professor of Chemical Engineering and Director of the Institute for Sustainable Energy Technologies, The Grove School of Engineering at the City College of New York, NY 8/30/2011 8/29/2015 President of Buttonwood Consulting,lnc., Oakton, VA 4/28/2012 4/27/2016 Senior Advisor for Electrical Systems, BMT Syntek Technologies, Inc., Arlington, VA 9/7/2010 9/6/2014 Professor and Chairman of Department of Engineering Physics, University of Wisconsin, Madison, WI 6/6/2010 6/5/2014 Senior Scientist, Sandia National Laboratories, Alburquerque, NM 6/23/2012 6/22/2016 Retired Chief Executive Vice President, Southern California Edison Company, Rosemead, CA 10/7/2010 10/6/2014 Directorate Fellow, Idaho National Laboratory, Idaho Falls, ID 7/6/2012 7/5/2016 Principal, Michael T. Ryan and Associates, LLC, Lexington, SC 1/9/2012 1/8/2016 Consultant, International Atomic Energy Agency; Retired Engineering Manager, Nuclear Design Duke Energy Corporation, Charlotte, NC 8/1/2009 7/31/2013 Retired Associate Director, Energy Technology Division, Argonne National Laboratory, Argonne, IL 7/12/2011 7/11/2015 Retired Senior Vice-President, Nuclear Power Division, Duquesne Light Company, Pittsburgh, PA Skillman, Mr. 8/21 /2011 8/20/2015 President and Principal, Skillman Technical Resources, Gordon Hershey, PA Stetkar, Mr.

9/5/2011 9/4/2015 Principal, Stetkar & Associates, Lake Forest, CA John W.

Total Count of Committee Members 15 https ://www.fido.gov/facadatabase/rptannualreport.asp Member Designation Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Page 6 of 6 11/14/2012

2012 Current FY Report: Review of Federal Advisory Committee 11 /6/2012 3:19:28 PM Page 1 of 2 Committee Menu I Department or Agency Nuclear Regulatory Commission 3 Committee or SubCommittee Licensing Support System Advisory Review Panel

4. Is th is New During Fiscal Year0 No
5. Current Charter 12/3/2010
6. Expected Renewal Date 12/3/2012 8a. Was Terminated During FY?

8b. Specific Termination A uthority No 9 Agency Recommendation for Next FY Continue 11 Establishment Authority

12. Specific Establ ishment Authority 42 u.s.c. 2201
15. Description of Committee 42 u.s.c. 2201 I 0a Legislation Req to Terminate?

No Agency Authority

13. Effective Date 1/19/1975 Non Scientific Program Advisory Board
14. Committee Type Continuing
2. Fiscal Year 2012 3b. GSA Committee No.

1104

7. Expected Term Date Sc.Actual Termination Date I Ob Legislation Pending?

14c. Presidential?

No I6a. Total Number of Reports I 7d. Total Meetings No Reports for this Fiscal Year.

I Sa( I ) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff No Meetings for this Fiscal Year.

I 8a(4) Personnel Pmts to Non-member Consultants J 8b( I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members I 8b(3) Travel and Per Diem to Federal Staff J 8b(4) Travel and Per Diem to Non-Member Consultants 18c Other(rents,user chargcs,graphics,printing,mai l etc)

I8d Total I 9. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?

Current Fiscal Year Next Fi scal Year

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0 0.0 0.0 The Nuclear Regulatory Commission relied on the Licensing Support Network Advisory Review Panel (LSNARP) for advice and recommendations on the design and operation of the searchable electronic database (Licensing Support Network (LSN)) for documents that were relevant to the licensing of a geologic repository for the storage of high level nuclear waste as defined in 10 CFR 2. 1003. The document collection contained electronic copies of all of the material that was used by parties in the NRC's licensing proceeding for a high level radioactive waste repository. The LSN was loaded with more than 3 million documents begining in FY-2004 and continuing through FY-201 I. Document addition continued during FY-2011, however, no committee meetings were held since December 2003. DOE had planned on submitting an application to build a high level waste disposal facility at Yucca Mountain, Nevada in December 2004, however delays occured and in the spring of2006 DOE issued a revised schedule. DOE certified their LSN document collection in late 2007 and submitted a License application to the NRC in June 2008. The delay in DO E's program negated any need for LSN meetings during this period.

During FY 2010 DOE asked to withdraw the Yucca Mountain License Application pending before the NRC. In FY-2011 and FY-2012, Congress did not appropisate any funds for DOE or NRC for the Licenseing of the Yucca Mountain Application. NRC shut down the licensing review in FY-2011 and preserved the record of the proceeding. The Atomic Safety and Licensing Board that presided over the application hearing ordered the parties to submit their LSN document collections to the NRC Secretary for preservation. The LSN system was decom issioned at the close of FY-2011. Litigation continued before the DC Circuit Court in FY-2012.

20b. How does the Committee balance its membership?

The membership of the LSN ARP was balanced by being drawn from among the full spectrum of parties to NRC's licensing proceeding for the burial of high level radioactive waste. Since the burial site under review is in Nevada, the membership includes the State of Nevada, local county governments of both Nevada and California, Indian https://www.fido.gov/facadatabase/rptannualreport.asp 11 /06/2012

tribes (represented by the National Congress of American Indians), and an environmental group (the Nevada Nuclear Waste Task Force). It also included the nuclear industry, the potential licensee (DOE) and the licensing agency (NRC). Input by these representatives was essential to the success of the LSN project.

20c. How frequent and relevant are the Committee meetings?

The LSNARP did not meet in FY-2012. The need for additional meetings of the LSNARP will be determined based upon the outcome of Court action and Congressional appropiations.

20d. Why can't the advice or in formation this committee provides be obtained elsewhere?

The Committee was formed as part ofa negotiated rulemaking to oversee the operation of the LSN. The advice provided by the state, county and tribal governmental units, together with other potential users of the LSN and EHD, was unique to this particular computer application. It was not available from other existing committees or within the NRC itself. NRC considered it essential that advice on the design of the software and hardware should come from representatives of the future hands-on users of the LSN.

20e. Why is,t necessary to close and/or partially close committee meetings?

The LSNARP did not hold any closed meetings in FY 2012.

21. Remarks In FY-2012, Congress did not appropisate any funds for DOE or NRC for the Licenseing of the Yucca Mountain Application. At the close of the FY-2012 year, Litigation continued before the DC Circuit Court and the future need for the Committee remained uncertain.

Designated Federal Official Dr. Andrew L Bates DFO Committee Members Bates, Andrew L Brandt, Joy Clark, Ray Frishman, Steve Holden, Robert Johnson, Abby Kall, Alan Kraft, Steven Leake, Harry Mathias, Linda McCorkell, George Murphy, Malachy Pitts, Jason Remus, Andrew Simom, Mike Swanson, David Treichel, Judy von Tresenhausen,

Engelbrech Total Count of Committee Members Start End Occupation 6/15/2000 9/30/2012 US Nuclear Regulatory Commission 10/1/2000 9/30/2012 Lander County, Nevada 7/1/1999 9/30/2012 US EPA M ember Designation Regular Government Employee (RGE)

Representative Ex Officio 7/1/1999 9/30/2012 State Of Nevada Representative 7/1/1999 9/30/2012 National Congress of American Representative Indians 10/15/2003 9/30/2012 Eureka County, Nevada Representative 7/1/1999 9/30/2012 Churchill County, Nevada Representative 1/1/1998 9/30/2012 Nuclear Energy Institute - Energy Representative Coalition 6/1/2002 9/30/2012 US Departmant of Energy Regular Government Employee (RGE) 10/1/2001 9/30/2012 Mineral County, Nevada 10/1/2000 9/30/2012 Esmeralda County, Nevada 12/18/1989 9/30/2012 Nye County, Nevada 10/1/2001 9/30/2012 Lincoln County, Nevada 10/1/2001 9/30/2012 Inyo County, Nevada 10/15/2003 9/30/2012 White Pine County Nevada 10/1/2009 9/30/2012 Nye County, Nevada 1/1/1998 9/30/2012 Nevada Nuclear Waste Task Force 7/1/2001 9/30/2012 Clark County, Nevada 18 Representative Representative Representative Representative Representative Representative Representative Representative Representative h ttps :/ /www. fido. gov /facadatabase/rptann ual report. asp Page 2 of 2 11/06/2012

2012 Current FY Report: Review of Federal Advisory Committee I 1/6/2012 2:59:44 PM Page 1 of 2 Committee Menu I. Department or Agency Nuclear Regulatory Commission 3 Committee or SubCommittee Advisory Committee on the Medical Uses of Isotopes 4 Is this New During Fiscal Year?

No 8a. Was Terminated During FY?

No

9. Agency Recommendation for Next FY Continue 11 Establishment Authority
5. Current Charter
6. Expected Renewal Date 3/14/2012 3/14/2014 8b. Specific Termination Authority 42 u.s.c. 2201 I 0a. Legislation Req to Terminate?

No Agency Authority

12. Specific Establishment Authority I 3. Effective Date
14. Committee Type Continuing 42 u.s.c. 2201 7/1/1958
15. Description of Committee Scientific Technical Program Advisory Board I 6a. Total Number of Reports 3

16b. Report Titl es and Dates Permanent Implant Brachytherapy Final Report Permanent Implant Brachytherapy Revised Final Report Electronic Signatures Report 17a Open:

M eeting Purposes and Dates ACMUI Teleconference ACMUI Teleconference ACMUI Teleconference ACMUI Meeting ACMUI Teleconference ACMUI Meeting I Sa( I ) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff 4

I 8a(4) Personnel Pmts to Non-member Consultants I 8b( I) Travel and Per Diem to Non-Federal Members i 8b(2) Travel and Per Diem to Federal Members I 8b(3) Travel and Per Diem to Federal Staff I 8b(4) Travel and Per Diem to Non-Member Consultants I 8c.Other(rents,user charges,graphics,printing,mail etc) 18d Total I 9. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?

17b. Closed 0

17c. Partially Closed*

10/18/2011 10/18/2011 12/15/2011 12/15/2011 2/7/2012 2/7/2012 4/16/2012 4/ 17/2012 7/9/2012 7/9/2012 9/20/2012 9/21 /2012 Current Fiscal Year

$102,824

$0

$249,061

$0

$31,506

$0

$4,442

$0

$0

$387,833 1.6 2

2. Fiscal Year 2012 3b. GSA Committee No.

1102

7. Expected Term Date Sc.Actual Termination Date I Ob. Legislation Pending?

14c. Pres idential?

No 10/18/2011 2/7/2012 4/16/2012 17d. Total Meetings 6 Next Fiscal Year

$103,000

$0

$250,000

$0

$32,000

$0

$4,500

$0

$0

$389,500 1.6 The NRC staff believes that licensees, the general public, and medical professionals benefit when recognized ex perts provide advice to the staff. This advice enables staff to develop rules that will maintain public safety, while not inappropriately intruding upon the practice of medicine. The Staff provides a summary of issues to be addressed during meetings, and the ACMUI discusses the issues and gives advice and makes recommendations to the Staff. Furthermore, the ACMUI keeps staff abreast of new developments. This ongoing communication helps https://www.fido.gov/facadatabase/rptannualreport.asp 11/06/2012

ensure that staff is aware of important issues during critical stages of rule development. When issues that need special emphasis arise, working groups and subcommittees are formed.

20b. How does the Committee balance its membership?

Membership is balanced by placing individuals of diverse specialty on the committee. For instance, there are members who represent both diagnostic and therapeutic applications of medicine. There are members who have a regulatory function within their specialties. There is a member who represents medicine from an administrative standpoint, and there is a patient advocate member, who represents patients' interests. ACMUI members also perform regular self-evaluations, in which they give feedback on the appropriateness of the committee's com position.

20c. How frequent and relevant are the Committee meetings?

Committee meetings are generally held semi-annually. The committee will hold more frequent meetings when important issues emerge or when issues need timely resolution.

20d. Why can't the advice or information this committee provides be obtained elsewhere?

NRC continues to strive to achieve its goal of creating risk-informed, performance-based regulations that provide for the health and safety of the public while imposing no unnecessary burden on licensees. Furthermore, the medical profession continues to see regular advances that create unique regulatory challenges. The advice and recommendations from medical professionals who are exposed to these advances is crucial to the NRC staffs ability to continue to regulate effectively.

20e. Why is it necessary to close and/or partially close committee meetings?

Meetings are closed to conduct annual ethics briefings, conduct reviews of paperwork of a personal and confidential nature, and to discuss administrative matters that are purely internal to Committee business. It would be inappropriate to conduct these types of meetings openly. They must be conducted privately to allow Committee members the freedom to ask and answer personal questions and to protect individuals' privacy.

21 Remarks Designated Federal Official: Mr. Christian E Einberg DFO Commi ttee Members Start End Occupation Member Designation Bailey, Ms. Darice G.

3/26/2012 3/26/2016 State Government Representative Special Government Guiberteau, Dr.

Milton J.

Langhorst, Dr. Susan M.

Malmud, Dr. Leon S.

Mattmuller, Mr.

Steven R.

Palestro, Dr.

Christopher J.

Suh, Dr. Jon H.

1/10/2011 1/10/2015 Diagnostic Radiologist 9/28/2009 9/28/2013 Radiation Safety Officer 5/20/2002 5/20/2013 Health Care Administrator 3/30/2008 3/30/2016 Nuclear Pharmacist 9/22/2011 9/22/2015 Nuclear Medicine Physician 10/18/2010 10/17/2014 Radiation Oncologist Suleiman, Dr. Orhan 1/1/2004 1/1/2014 Food and Drug Administration H.

Representative Thomadsen, Dr. Bruce 10/15/2007 10/15/20 I 5 Medical Physicist - Therapy R.

Yan Decker, Dr.

10/3/2005 10/3/2013 Nuclear Cardiologist William A.

Weil, Ms. Laura M.

8/29/2011 8/29/2015 Patients' Rights Advocate Welsh, Dr. James S.

2/25/2007 2/25/2015 Radiation Oncologist Zanzonico, Dr. Pat B. 3/8/2010 3/8/2014 Nuclear Medicine Medical Physicist Total Count of Committee Members 13 https://www.fido.gov/facadatabase/rptannualreport.asp Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Regular Government Employee (RGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Special Government Employee (SGE)

Page 2 of 2 11/06/2012