6610 Nuclear Road
6610 Nuclear Road
Two Rivers, WI 54241-9516
Two Rivers, WI 54241-9516
SUBJECT: POINT BEACH NUCLEAR PLANT, UNIT 1 - NOTIFICATION OF NRC  
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNIT 1 - NOTIFICATION OF NRC  
BASELINE INSPECTION AND REQUEST FOR INFORMATION: INSPECTION  
BASELINE INSPECTION AND REQUEST FOR INFORMATION: INSPECTION  
REPORT 05000266/2025002
REPORT 05000266/2025002
Line 48: Line 49:
respond to, a request for information or an information collection requirement unless the  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control  
requesting document displays a currently valid Office of Management and Budget Control  
Number.October 21, 2024
Number.
M. Durbin 2
October 21, 2024
 
M. Durbin  
2
This letter and its enclosure will be made available for public inspection and copying at  
This letter and its enclosure will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
Line 66: Line 70:
  on 10/21/24
  on 10/21/24


M. Durbin                                                           3
M. Durbin  
 
3
 
Letter to Michael Durbin from Eric Magnuson dated October 21, 2024.
Letter to Michael Durbin from Eric Magnuson dated October 21, 2024.
 
SUBJECT:
SUBJECT:     POINT BEACH NUCLEAR PLANT, UNIT 1 - NOTIFICATION OF NRC
POINT BEACH NUCLEAR PLANT, UNIT 1 - NOTIFICATION OF NRC  
            BASELINE INSPECTION AND REQUEST FOR INFORMATION: INSPECTION
BASELINE INSPECTION AND REQUEST FOR INFORMATION: INSPECTION  
            REPORT 05000266/2025002
REPORT 05000266/2025002
 
DISTRIBUTION:
DISTRIBUTION:
Robert Ruiz
Robert Ruiz
Line 87: Line 89:
Jonathan Feibus
Jonathan Feibus
R3-DORS
R3-DORS
ADAMS Accession Number: ML24295A086
ADAMS Accession Number: ML24295A086
  Publicly Available     Non-Publicly Available     Sensitive     Non-Sensitive
Publicly Available
OFFICE     RIII
Non-Publicly Available
NAME       EMagnuson:gmp
Sensitive
DATE       10/21/2024
Non-Sensitive
                              OFFICIAL RECORD COPY
OFFICE
                    DOCUMENT REQUEST FOR INSERVICE INSPECTION
RIII
 
NAME
 
EMagnuson:gmp
Inspection Report:  05000266/2025002
DATE
 
10/21/2024
 
OFFICIAL RECORD COPY
Inspection Dates:      March 24, 2025 - April 4, 2025
 
 
Inspection Procedures:Inspection Procedure 71111-08, Inservice Inspection
 
 
Lead Inspector:  Eric Magnuson, DORS/ERPB
                              630-829-9798
                              Eric.Magnuson@nrc.gov
 
 
A.        Information for the In-Office Preparation Week


      The following information (electronic copy) is requested by February 24, 2025, to
DOCUMENT REQUEST FOR INSERVICE INSPECTION
      facilitate the selection of specific items that will be reviewed during the onsite inspection
Enclosure
      week. The inspector will select specific items from the information requested below and
Inspection Report:
      request a list of additional documents needed onsite to your staff. We request that the
05000266/2025002
      specific items selected from the lists be available and ready for review on the first day of
Inspection Dates:
      inspection. The following information is applicable to the outage Unit unless otherwise
March 24, 2025 - April 4, 2025
      indicated. If you have any questions regarding this information, please call the inspector
Inspection Procedures:
      as soon as possible.
Inspection Procedure 71111-08, Inservice Inspection
 
Lead Inspector:
      For the upcoming outage, a detailed schedule (including dates, is possible) and
Eric Magnuson, DORS/ERPB
      description of:
630-829-9798
 
Eric.Magnuson@nrc.gov
          a. List of all Non-Destructive Examinations (NDEs) planned to be performed as part
A.
              of your American Society of Mechanical Engineers (ASME) Code Inservice
Information for the In-Office Preparation Week
              Inspection (ISI) Program (include edition and addenda of Code committed to),
The following information (electronic copy) is requested by February 24, 2025, to  
              and NDEs planned for other systems performed as part of a Risk-Informed ISI
facilitate the selection of specific items that will be reviewed during the onsite inspection  
              Program, or other augmented inspection programs (e.g., ASME Code Case
week. The inspector will select specific items from the information requested below and  
              N-770 examination of dissimilar metal welds and examinations to meet an
request a list of additional documents needed onsite to your staff. We request that the  
              industry initiative). Description shall include component ASME Code Class,
specific items selected from the lists be available and ready for review on the first day of  
              component IDs, categorization (Section XI, Risk Informed, or Augmented, etc.),
inspection. The following information is applicable to the outage Unit unless otherwise  
              and dates/times the NDEs are scheduled to be performed.
indicated. If you have any questions regarding this information, please call the inspector  
 
as soon as possible.
          b. Reactor pressure vessel upper head (RPVUH) examinations required by
For the upcoming outage, a detailed schedule (including dates, is possible) and  
              Title 10 of the Code of Federal Regulations (CFR), Part 50.55a(g)(6)(ii)(D) and
description of:
              Code Case N-729;
a.
 
List of all Non-Destructive Examinations (NDEs) planned to be performed as part  
          c.   Steam generator (SG) tube inspection and repair activities for the upcoming
of your American Society of Mechanical Engineers (ASME) Code Inservice  
              outage or SG secondary side examinations;1 and
Inspection (ISI) Program (include edition and addenda of Code committed to),  
 
and NDEs planned for other systems performed as part of a Risk-Informed ISI  
          d. List of Welding on Code Class 1, 2, or 3 components to be performed during the
Program, or other augmented inspection programs (e.g., ASME Code Case  
              outage.
N-770 examination of dissimilar metal welds and examinations to meet an  
 
industry initiative). Description shall include component ASME Code Class,  
 
component IDs, categorization (Section XI, Risk Informed, or Augmented, etc.),  
 
and dates/times the NDEs are scheduled to be performed.  
 
b.
 
Reactor pressure vessel upper head (RPVUH) examinations required by  
1Note 1 - If no SG examinations are planned for this outage, please confirm when the next SG examination will occur
Title 10 of the Code of Federal Regulations (CFR), Part 50.55a(g)(6)(ii)(D) and  
Code Case N-729;
c.
Steam generator (SG) tube inspection and repair activities for the upcoming  
outage or SG secondary side examinations;1 and
d.
List of Welding on Code Class 1, 2, or 3 components to be performed during the  
outage.
1Note 1 - If no SG examinations are planned for this outage, please confirm when the next SG examination will occur  
and no further information is required for the items identified above requesting SG related information.
and no further information is required for the items identified above requesting SG related information.


DOCUMENT REQUEST FOR INSERVICE INSPECTION
2
e.
List identifying NDE reports (Volumetric, Surface, and Visual), which have
identified relevant indications on ASME Code Class 1 and 2 Systems since the
beginning of the last refueling outage. For indications that were accepted as-is for
continued service, provide schedule of successive exams required by Code.
f.
List of repair/replacement welds in ASME Code Class 1, 2 and 3 Systems, which
have been fabricated since the beginning of the last refueling outage.
g.
List of Title 10 CFR Part 21 reports applicable to your structures, systems, or
components within the scope of ASME Code Section XI that have been identified
since the beginning of the last refueling outage.
h.
List of corrective action documents related to ISI and SG issues such as piping or
SG tube degradation or damage or errors identified during piping/SG tube
examinations since the beginning of the last refueling outage. 
i.
List of Boric Acid Corrosion Control (BACC) program corrective action
documents identified since the beginning of the last refueling outage.
j.
Copy of latest revision to the Inservice Inspection Program Plan.
k.
Point of contact information (names and site numbers) for ISI/SG/BACC/Welding.
B.
Onsite Information to be provided to the inspector on the first onsite date.
The following information is requested for only specific items that are
selected by the inspector from list A above:
a) A copy of ASME Section XI, Code Relief Requests applicable to the selected
items.
b) Copies of applicable NDE procedures, weld procedure specifications (WPS),
NDE procedure qualification records, WPS qualification records, NDE personnel
performance qualification records, welder performance qualification records,
BACC corrective action documents and associated screenings/evaluations, ISI
and SG related corrective action documents.
c)
Copy of the ASME Section XI, Code of record for the selected items.
d) Copy of the applicable Code of Construction for repair/replacement activities on
selected items.
e) If SG ECT examination is being conducted during the outage, provide copies of
the following:
*
Copy of SG history documentation given to vendors performing ET of the
SGs during the upcoming outage.1


                                                                                        Enclosure
DOCUMENT REQUEST FOR INSERVICE INSPECTION
                DOCUMENT REQUEST FOR INSERVICE INSPECTION
3
 
*
 
Copy of procedure containing screening criteria used for selecting tubes for  
        e.  List identifying NDE reports (Volumetric, Surface, and Visual), which have
in-situ pressure testing and the procedure to be used for in-situ pressure  
            identified relevant indications on ASME Code Class 1 and 2 Systems since the
testing.1
            beginning of the last refueling outage. For indications that were accepted as-is for
*
            continued service, provide schedule of successive exams required by Code.
Copy of previous outage SG tube operational assessment completed  
 
following ET of the SGs (provide this document even if no SG ET is planned  
        f.  List of repair/replacement welds in ASME Code Class 1, 2 and 3 Systems, which
for current outage).
            have been fabricated since the beginning of the last refueling outage.
*
 
Copy of most recent SG Degradation Assessment (provide this document  
        g.  List of Title 10 CFR Part 21 reports applicable to your structures, systems, or
even if no SG ET is planned for current outage).
            components within the scope of ASME Code Section XI that have been identified
*
            since the beginning of the last refueling outage.
Copy of most recent SG Condition Monitoring Assessments.1
 
*
        h.  List of corrective action documents related to ISI and SG issues such as piping or
Copy of the document describing the ET acquisition equipment to be applied  
            SG tube degradation or damage or errors identified during piping/SG tube
including ET probe types. Also identify the extent of planned tube  
            examinations since the beginning of the last refueling outage.
examination coverage with each probe type.
 
*
        i.    List of Boric Acid Corrosion Control (BACC) program corrective action
Provide procedures with guidance/instructions for identifying and plugging SG  
            documents identified since the beginning of the last refueling outage.
tubes.1
 
*
        j.    Copy of latest revision to the Inservice Inspection Program Plan.
Identify and quantify any SG tube leakage experienced during the previous  
 
operating cycle. Also provide documentation identifying which SG was  
        k.  Point of contact information (names and site numbers) for ISI/SG/BACC/Welding.
leaking and corrective actions completed or planned for this condition.
 
f)
B.        Onsite Information to be provided to the inspector on the first onsite date.
If RPVUH examinations are being conducted during the outage, provide copies  
 
of the following:  
      The following information is requested for only specific items that are
*
      selected by the inspector from list A above:
Last performed volumetric and/or surface examination reports
 
*
        a)  A copy of ASME Section XI, Code Relief Requests applicable to the selected
Procedures used during for examinations.  
            items.
*
 
History of past RPVUH indications
        b)  Copies of applicable NDE procedures, weld procedure specifications (WPS),
1 Note 1 - If no SG examinations are planned for this outage, please confirm when the next SG examination will occur  
            NDE procedure qualification records, WPS qualification records, NDE personnel
            performance qualification records, welder performance qualification records,
            BACC corrective action documents and associated screenings/evaluations, ISI
            and SG related corrective action documents.
 
        c)  Copy of the ASME Section XI, Code of record for the selected items.
 
        d)  Copy of the applicable Code of Construction for repair/replacement activities on
            selected items.
 
        e)If SG ECT examination is being conducted during the outage, provide copies of
            the following:
            * Copy of SG history documentation given to vendors performing ET of the
                SGs during the upcoming outage.1
 
 
 
 
 
 
 
 
                                            2
                  DOCUMENT REQUEST FOR INSERVICE INSPECTION
 
 
              *  Copy of procedure containing screening criteria used for selecting tubes for
                  in-situ pressure testing and the procedure to be used for in-situ pressure
                  testing.1
 
              *  Copy of previous outage SG tube operational assessment completed
                  following ET of the SGs (provide this document even if no SG ET is planned
                  for current outage).
 
              *  Copy of most recent SG Degradation Assessment (provide this document
                  even if no SG ET is planned for current outage).
 
              *  Copy of most recent SG Condition Monitoring Assessments. 1
 
              *  Copy of the document describing the ET acquisition equipment to be applied
                  including ET probe types. Also identify the extent of planned tube
                  examination coverage with each probe type.
 
              *  Provide procedures with guidance/instructions for identifying and plugging SG
                  tubes.1
 
              *  Identify and quantify any SG tube leakage experienced during the previous
                  operating cycle. Also provide documentation identifying which SG was
                  leaking and corrective actions completed or planned for this condition.
 
          f) If RPVUH examinations are being conducted during the outage, provide copies
              of the following:
 
              *  Last performed volumetric and/or surface examination reports
 
              *  Procedures used during for examinations.
 
              *  History of past RPVUH indications
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1 Note 1 - If no SG examinations are planned for this outage, please confirm when the next SG examination will occur
and no further information is required for the items identified above requesting SG-related information.
and no further information is required for the items identified above requesting SG-related information.
                                            3
}}
}}

Latest revision as of 10:06, 24 November 2024

Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002
ML24295A086
Person / Time
Site: Point Beach 
Issue date: 10/21/2024
From: Magnuson E
NRC/RGN-III/DORS/RPB2
To: Durbin M
Point Beach
References
IR 2025002
Download: ML24295A086 (1)


See also: IR 05000026/2025002

Text

Michael Durbin

Site Vice President

NextEra Energy Point Beach, LLC

6610 Nuclear Road

Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNIT 1 - NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION: INSPECTION

REPORT 05000266/2025002

Dear Michael Durbin:

On March 24, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline

Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed

March 24, 2025, through April 4, 2025.

Experience has shown that this inspection is resource intensive both for the NRC inspector and

your staff. In order to minimize the impact to your onsite resources, and to ensure a productive

inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups.

The first group identifies information necessary to ensure that the inspector is adequately

prepared. The second group identifies the information the inspector will need upon arrival at the

site. It is important that all of these documents are up-to-date, and complete, in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that our

regulatory contact for this inspection will be Kim Locke of your organization. If there are any

questions about this inspection or the material requested, please contact the lead inspector

Eric Magnuson at 630-829-9798, or via email at eric.magnuson@nrc.gov .

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

October 21, 2024

M. Durbin

2

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

Eric Magnuson

Engineering and Reactor Projects Branch

Division of Operating Reactor Safety

Docket No. 50-266

License No. DPR-24

Enclosure:

Document Request for Inservice Inspection

cc: Distribution via LISTSERV

Signed by Magnuson, Eric

on 10/21/24

M. Durbin

3

Letter to Michael Durbin from Eric Magnuson dated October 21, 2024.

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNIT 1 - NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION: INSPECTION

REPORT 05000266/2025002

DISTRIBUTION:

Robert Ruiz

RidsNrrDorlLpl3

RidsNrrPMPointBeach

RidsNrrDroIrib Resource

Jack Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

David Curtis

Jonathan Feibus

R3-DORS

ADAMS Accession Number: ML24295A086

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

EMagnuson:gmp

DATE

10/21/2024

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR INSERVICE INSPECTION

Enclosure

Inspection Report: 05000266/2025002

Inspection Dates:

March 24, 2025 - April 4, 2025

Inspection Procedures:

Inspection Procedure 71111-08, Inservice Inspection

Lead Inspector:

Eric Magnuson, DORS/ERPB

630-829-9798

Eric.Magnuson@nrc.gov

A.

Information for the In-Office Preparation Week

The following information (electronic copy) is requested by February 24, 2025, to

facilitate the selection of specific items that will be reviewed during the onsite inspection

week. The inspector will select specific items from the information requested below and

request a list of additional documents needed onsite to your staff. We request that the

specific items selected from the lists be available and ready for review on the first day of

inspection. The following information is applicable to the outage Unit unless otherwise

indicated. If you have any questions regarding this information, please call the inspector

as soon as possible.

For the upcoming outage, a detailed schedule (including dates, is possible) and

description of:

a.

List of all Non-Destructive Examinations (NDEs) planned to be performed as part

of your American Society of Mechanical Engineers (ASME) Code Inservice

Inspection (ISI) Program (include edition and addenda of Code committed to),

and NDEs planned for other systems performed as part of a Risk-Informed ISI

Program, or other augmented inspection programs (e.g., ASME Code Case

N-770 examination of dissimilar metal welds and examinations to meet an

industry initiative). Description shall include component ASME Code Class,

component IDs, categorization (Section XI, Risk Informed, or Augmented, etc.),

and dates/times the NDEs are scheduled to be performed.

b.

Reactor pressure vessel upper head (RPVUH) examinations required by

Title 10 of the Code of Federal Regulations (CFR), Part 50.55a(g)(6)(ii)(D) and

Code Case N-729;

c.

Steam generator (SG) tube inspection and repair activities for the upcoming

outage or SG secondary side examinations;1 and

d.

List of Welding on Code Class 1, 2, or 3 components to be performed during the

outage.

1Note 1 - If no SG examinations are planned for this outage, please confirm when the next SG examination will occur

and no further information is required for the items identified above requesting SG related information.

DOCUMENT REQUEST FOR INSERVICE INSPECTION

2

e.

List identifying NDE reports (Volumetric, Surface, and Visual), which have

identified relevant indications on ASME Code Class 1 and 2 Systems since the

beginning of the last refueling outage. For indications that were accepted as-is for

continued service, provide schedule of successive exams required by Code.

f.

List of repair/replacement welds in ASME Code Class 1, 2 and 3 Systems, which

have been fabricated since the beginning of the last refueling outage.

g.

List of Title 10 CFR Part 21 reports applicable to your structures, systems, or

components within the scope of ASME Code Section XI that have been identified

since the beginning of the last refueling outage.

h.

List of corrective action documents related to ISI and SG issues such as piping or

SG tube degradation or damage or errors identified during piping/SG tube

examinations since the beginning of the last refueling outage.

i.

List of Boric Acid Corrosion Control (BACC) program corrective action

documents identified since the beginning of the last refueling outage.

j.

Copy of latest revision to the Inservice Inspection Program Plan.

k.

Point of contact information (names and site numbers) for ISI/SG/BACC/Welding.

B.

Onsite Information to be provided to the inspector on the first onsite date.

The following information is requested for only specific items that are

selected by the inspector from list A above:

a) A copy of ASME Section XI, Code Relief Requests applicable to the selected

items.

b) Copies of applicable NDE procedures, weld procedure specifications (WPS),

NDE procedure qualification records, WPS qualification records, NDE personnel

performance qualification records, welder performance qualification records,

BACC corrective action documents and associated screenings/evaluations, ISI

and SG related corrective action documents.

c)

Copy of the ASME Section XI, Code of record for the selected items.

d) Copy of the applicable Code of Construction for repair/replacement activities on

selected items.

e) If SG ECT examination is being conducted during the outage, provide copies of

the following:

Copy of SG history documentation given to vendors performing ET of the

SGs during the upcoming outage.1

DOCUMENT REQUEST FOR INSERVICE INSPECTION

3

Copy of procedure containing screening criteria used for selecting tubes for

in-situ pressure testing and the procedure to be used for in-situ pressure

testing.1

Copy of previous outage SG tube operational assessment completed

following ET of the SGs (provide this document even if no SG ET is planned

for current outage).

Copy of most recent SG Degradation Assessment (provide this document

even if no SG ET is planned for current outage).

Copy of most recent SG Condition Monitoring Assessments.1

Copy of the document describing the ET acquisition equipment to be applied

including ET probe types. Also identify the extent of planned tube

examination coverage with each probe type.

Provide procedures with guidance/instructions for identifying and plugging SG

tubes.1

Identify and quantify any SG tube leakage experienced during the previous

operating cycle. Also provide documentation identifying which SG was

leaking and corrective actions completed or planned for this condition.

f)

If RPVUH examinations are being conducted during the outage, provide copies

of the following:

Last performed volumetric and/or surface examination reports

Procedures used during for examinations.

History of past RPVUH indications

1 Note 1 - If no SG examinations are planned for this outage, please confirm when the next SG examination will occur

and no further information is required for the items identified above requesting SG-related information.