ML21321A161: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION
{{#Wiki_filter:}}
 
==Title:==
Advisory Committee on Reactor Safeguards Docket Number:    (n/a)
Location:        teleconference Date:            Tuesday, November 2, 2021 Work Order No.:  NRC-1734                          Pages 1-214 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1716 14th Street, N.W., Suite 200 Washington, D.C. 20009 (202) 234-4433
 
1 1
2 3
4                              DISCLAIMER 5
6 7  UNITED STATES NUCLEAR REGULATORY COMMISSIONS 8        ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 9
10 11          The contents of this transcript of the 12 proceeding of the United States Nuclear Regulatory 13 Commission Advisory Committee on Reactor Safeguards, 14 as reported herein, is a record of the discussions 15 recorded at the meeting.
16 17          This transcript has not been reviewed, 18 corrected, and edited, and it may contain 19 inaccuracies.
20 21 22 23 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701  www.nealrgross.com
 
1 1                    UNITED STATES OF AMERICA 2                  NUCLEAR REGULATORY COMMISSION 3                                + + + + +
4                            690TH MEETING 5            ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 6                                    (ACRS) 7                                + + + + +
8                    TUESDAY, NOVEMBER 2, 2021 9                                + + + + +
10                  The Advisory Committee met via Video 11 Teleconference, at 9:30 a.m. EDT, Matthew W.
12 Sunseri, Chairman, presiding.
13 COMMITTEE MEMBERS:
14            MATTHEW W. SUNSERI, Chairman 15            JOY L. REMPE, Vice Chairman 16            WALTER L. KIRCHNER, Member-at-large 17            RONALD G. BALLINGER, Member 18            VICKI M. BIER, Member 19            DENNIS C. BLEY, Member 20            CHARLES H. BROWN, JR. Member 21            VESNA B. DIMITRIJEVIC, Member 22            GREGORY H. HALNON, Member 23            JOSE A. MARCH-LEUBA, Member 24            DAVID A. PETTI, Member 25            PETER C. RICCARDELLA, Member NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309    www.nealrgross.com
 
2 1 DESIGNATED FEDERAL OFFICIAL:
2            MICHAEL SNODDERLY 3 ALSO PRESENT:
4            GARY BECKER, NuScale 5            MARK BLUMBERG, NRC NRR 6            GREG BROADBENT, Entergy 7            ELIJAH DICKSON, NRC NRR 8            JERRY DOZIER, NRC NRR 9            MICHELLE HART, NRC NRR 10            STEVE JONES, NRC NRR 11            ROBERT KAHLER, NRC NSIR 12            MEENA KHANNA, NRC NRR 13            EDWIN LYMAN, Union of Concerned Scientists 14            MICHAEL MARKLEY, NRC NRR 15            CHARLES MURRAY, NRC NSIR 16            MARCUS NICHOL, Nuclear Energy Institute 17            JOHN PARILLO, NRC NRR 18            FRANKIE PIMENTEL, Nuclear Energy Institute 19            ERIC SCHRADER, NRC NSIR 20            TODD SMITH, NRC NSIR 21            SOLY SOTO LUGO, NRC NMSS 22            SHILP VASAVADA, NRC NRR 23            GREGORY WARNICK, NRC Region IV 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309    www.nealrgross.com
 
3 1                            CONTENTS 2 Opening Remarks by the ACRS Chairman                . . . . . .          4 3 Draft Final Rule for Emergency Planning for Small 4 Modular Reactors and Other New Technologies . . .                        8 5 ISG-Supplemental Guidance for Radiological 6 Consequence Analyses Using Alternative 7 Source Terms  . . . . . . . . . . . . . . . . .                    106 8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433      WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
4 1                    P-R-O-C-E-E-D-I-N-G-S 2                                                              9:31 a.m.
3                CHAIR SUNSERI:            Good morning, everyone.
4 The meeting will now come to order. This is the first 5 day of the 690th meeting of the Advisory Committee on 6 Reactor Safeguards. I'm Matthew Sunseri, the Chair of 7 the ACRS. I'll now call the roll to verify quorum and 8 make sure communications are clear.
9                I'll start with Ron Ballinger.
10                MEMBER BALLINGER:            Here.
11                CHAIR SUNSERI:          Vicki Bier.
12                MEMBER BIER:        Here.
13                CHAIR SUNSERI:          Dennis Bley.
14                MEMBER BLEY:        Here.
15                CHAIR    SUNSERI:              Charles    Brown.            I 16 understand that Member Brown may have some personal 17 matters to take care of today so we'll give him a 18 little leniency here.
19                Vesna Dimitrijevic.
20                MEMBER DIMITRIJEVIC:                I'm here.
21                CHAIR SUNSERI:          Greg Halnon.
22                MEMBER HALNON:          Here.
23                CHAIR SUNSERI:          Walt Kirchner.
24                MEMBER KIRCHNER:            Here.
25                CHAIR SUNSERI:          Jose March-Leuba.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
5 1                    MEMBER MARCH-LEUBA:                Here.
2                    CHAIR SUNSERI:            Dave Petti.
3                    MEMBER PETTI:          Here.
4                    CHAIR SUNSERI:            Joy Rempe.
5                    VICE CHAIR REMPE:              Here.
6                    CHAIR SUNSERI:            And myself. So everyone 7 except Member Brown, and I expect that he'll join us 8 when he can.
9                    MEMBER BROWN:            I'm here.        My laptop was 10 muted and I didn't know it.
11                    CHAIR SUNSERI:            Okay.      Good to hear you.
12                    MEMBER BROWN:            Not Teams so it was the 13 laptop.        I forgot.
14                    CHAIR SUNSERI:            No problem.        All right, 15 great.        Full house then.          We have a quorum.
16                    The ACRS was established by the Atomic 17 Energy Act and is governed by the Federal Advisory 18 Committee Act.          The ACRS section of the USNRC public 19 website provides information about the history of the 20 ACRS and provides documents such as our charter, 21 bylaws, Federal Register notices for meetings, letter 22 reports, and transcripts of all full and subcommittee 23 meetings        including      the    slides        presented    at      the 24 meetings.
25                    The  Committee          provides      its  advice        on NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
6 1 safety matters to the Commission through its publicly 2 available letter reports. The Federal Register notice 3 announcing this meeting was published on October 8, 4 2021 and provided an agenda and instructions for 5 interested parties to provide written documents or 6 request opportunities to address the Committee.
7                  The Designated Federal Officer for this 8 meeting is Mr. Michael Snodderly.                    During this week's 9 meeting the Committee will consider the following 10 topics:
11                  Today we have the draft final rule for 12 Emergency Planning for Small Modular Reactors and 13 Other New Technologies which we will prepare a letter 14 report on that topic.
15                  We have an ISG Supplemental Guidance for 16 Radiological Consequence Analyses Using Alternative 17 Source Terms.        That will be today also.                  We will 18 prepare a letter report on that topic.
19                  Wednesday we have DRAFT NUREG on Advanced 20 Reactors Fuel Qualification.                  We have an Oak Ridge 21 National      Lab report      on  molten        salt  reactor      fuel 22 qualification.      We will begin our deliberation on our 23 bi-annual report on the agency's research program.
24                  Thursday morning we have a planning and 25 procedure session.          Following that, and through the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
7 1 rest of the week, we will work on letter reports. All 2 of the topics that I mentioned will have letter 3 reports.
4                  A communication channel has been opened to 5 allow        members  of    the    public        to    listen    in      on 6 presentation        and  committee        discussions.          We    have 7 received no written comments or requests to make oral 8 statements        from  members        of      the    public  regarding 9 today's session.
10                  There will be an opportunity for public 11 comment and we have set aside time in the agenda for 12 comments from members of the public attending or 13 listening in to our meeting.                  When we call for those 14 public comments, since this is going through the Teams 15 communication link you'll have to use the command *6 16 to      unmute    yourself.          We'll      repeat    that    as      the 17 appropriate time but I just want to give you a heads 18 up on that.
19                  Also, written comments may be forwarded to 20 Mr. Michael Snodderly, the designated federal officer.
21 A transcript of the open portions of the meeting is 22 being kept and it is requested that the speakers 23 identify themselves and speak with sufficient clarity 24 and      volume    so  that      they    can      be    readily    heard.
25 Additionally, participants should mute themselves when NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
8 1 not speaking.
2                  As you can see from that introduction 3 there, we have quite a heavy schedule for this week, 4 a lot of topics, five letter reports potentially, and 5 we will work through those in a straight-forward 6 manner.        I will ask for your patients with me.                    If I 7 seem a little pressy today, it's because we're just 8 trying to work through the agenda.                        We will take 9 whatever time we need to thoroughly review the topics 10 that are at hand.
11                  Let me turn to the members now and see if 12 members have any questions about the agenda or any 13 other comments you would like to make before we get 14 started with the first topic.
15                  All right. I will now turn to Member Greg 16 Halnon for the first topic which is the draft final 17 rule for Emergency Planning for Small Modular Reactors 18 and Other New Technologies.                Greg, all yours.
19                  MEMBER    HALNON:            Thank    you,  Chairman 20 Sunseri.        Good morning to my ACRS colleagues, NRC 21 staff, and those listening in.                    Appreciate this time 22 this morning.
23                  We'll be hearing from the staff and from 24 some other important groups regarding the draft final 25 rule for Emergency Preparedness and for SMRs and Other NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
9 1 Nuclear Technologies.              That will be ONT's that you 2 might hear often throughout the day.                        That's Other 3 Nuclear Technologies.
4                  This    rule      language          is  an    important 5 building block for the future of the country's nuclear 6 infrastructure and it's a key element to the defense 7 in depth for the protection of the health and safety 8 of the public, as well as the occupational wellbeing 9 of our nuclear workers.                The Future Plant Designs 10 Subcommittee reviewed this on September 21st with the 11 staff and now the full Committee will review the 12 language as well as the accompanying regulatory guide.
13                  After    the    subcommittee          we  were      still 14 interest in more detail about engagement of offsite 15 local agencies for exposure and ingestion pathways, as 16 well as the preciseness of the language for selection 17 of accidents to be considered in developing the source 18 term.
19                  We look forward to hearing from the staff 20 and from some other important groups that we will have 21 making some comments on these topics and other topics 22 as well.      With that being said, I'll give the floor 23 over to Greg Warnick, Deputy Director, Division of 24 Emergency and Response for him to kick off the NRC 25 staff presentations.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
10 1                    Greg.
2                    MR. WARNICK:        Thank you.          Yes, my name is 3 Greg Warnick and, as Greg mentioned, I'm the Deputy 4 Director of the Division of Preparedness and Response 5 in      the    Office  of    Nuclear        Security      and  Incident 6 Response. I would like to take this opportunity to 7 thank the ACRS full committee for this opportunity to 8 discuss the draft final rule as we've been presenting 9 here.
10                    With    me    today      are    Eric    Schrader,        EEP 11 technical lead from INSIR; Soly Soto Lugo, rulemaking 12 project manager from NMSS; Charles Murray, technical 13 lead for Reg Guide 1.242 from NSIR; and Michelle Hart, 14 senior reactor engineer in NRR.
15                    I would like to acknowledge the working 16 group          members    and      management            that    supported 17 development          of    the      draft        final      rule    in      this 18 presentation.          It was a tremendous team effort.                      The 19 staff met with ACRS in October 2018 to discuss the 20 Draft Proposed Rule and proposed guidance, and more 21 recently with the future plant's design subcommittee 22 a couple months ago on September 21st.
23                    The staff appreciates the comments and 24 valuable feedback received from the ACRS over the 25 course of this rulemaking.                  Today's presentation will NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
11 1 provide an overview of the draft final rule and 2 guidance including significant changes made from the 3 proposed rule.
4                  As you will hear from the staff, the 5 draft final rule outcomes are technology inclusive and 6 performance        based,    include        a    hazard    analysis      for 7 contiguous facilities, and consider a graded approach 8 to EP and ingestion response planning.
9                  At this time I would like to turn the 10 meeting over to Soly Soto Lugo to begin the staff's 11 presentation.
12                  MS. SOTO LUGO:          Thank you, Greg.
13                  Good    morning,          everyone.          As      Greg 14 mentioned, I am Soly Soto Lugo, project manager for 15 this rulemaking. The draft final rule we are about to 16 discuss        today  includes        new      alternative      emergency 17 preparedness requirements for small modular reactors 18 and other new technologies such as non-light water 19 reactors        and  certain        non-power          production          or 20 utilization facilities.
21                  This  draft      final        rule    is  technology 22 inclusive        and  provides      alternatives          to  develop        a 23 performance-based EP program rather than using the 24 existing EP requirements.                  The scope of this draft 25 final rule is limited to small modular reactors and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
12 1 other new technology facilities for which the NRC 2 expects to receive license applications under 10 CFR 3 Part 50 or Part 52. This draft final rule does not 4 include        within      its      scope          emergency      planning 5 preparation        or    response          for      large    light-water 6 reactors,        fuel    cycle      facilities,            or    currently 7 operating non-power reactors.
8                    Next slide, please. The proposed rule was 9 published in May of last year for a 75-day public 10 comment period.          Then in June the staff had a public 11 meeting        to  provide          the      public      and    external 12 stakeholders an opportunity to ask questions about the 13 proposed rule.          The NRC received no comments in the 14 comment period due to the coronavirus public health 15 emergency and extended the comment period by 60 days 16 in July. The comment period closed in September 2020.
17                    The NRC received comments from over 2,000 18 individuals and organizations including form letters.
19 The staff analysis of the public comments identified 20 over 600 unique comments of the proposed rule, the 21 draft regulatory guidance, regulatory analysis, and 22 environment assessment.
23                    The NRC received comments from state and 24 local        governments,      tribal      governments        and    tribal 25 organizations,          federal        agencies,          members    of      the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
13 1 nuclear          power          industry,              non-governmental 2 organizations, and private citizens. A summary of the 3 NRC responses to the comments will be published upon 4 Commission          approval          of        the        final    rule.
5                    Eric Schrader will discuss some of the 6 public comments we received later in his presentation.
7 The draft final rule package is due to the Commission 8 in December of this year.                With that, I will now turn 9 the presentation over to Eric Schrader who is going to 10 discuss the draft final rule.
11                    Next slide, please.
12                    MR. SCHRADER:            Thanks        Soly,  and      good 13 morning.        Next slide, please.
14                    The NRC chose a graded approach to the 15 draft        final  rule    commensurate            with    the    relative 16 radiological risk and potential hazards presented by 17 the facility.          The staff received direction from the 18 commission        to  proceed        with      rulemaking      using      the 19 performance-based approach.
20                    The performance-based approach bases the 21 adequacy        of    EP  on      the    NRC's        identification          of 22 emergency        response        functions          that    affect        the 23 protection of the public and the health and safety and 24 the        licensee's      successful            execution        of      those 25 functions.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
14 1                    Technology          inclusive            means          the 2 establishment of performance requirements for any SMR 3 or ONT applicant or licensee to use in its emergency 4 plan.          These will be flexible and practical for 5 application to a variety of reactor technologies.                              EP 6 is evolving through the technological innervations and 7 may look a little but different but will always be 8 there.
9                    This draft of the final rule offers a 10 consequence-oriented              approach        to    establishing        EP 11 requirements for SMRs and ONTs.                    This approach refers 12 to the principle evasion decisions on the scope of the 13 EP required upon the potential consequences from a 14 spectrum        of  accidents        including          those  that    could 15 result in a radiological offsite release.
16                    Based on information currently available 17 to the NRC, unique design considerations and the 18 potential for multi-module facilities sites contiguous 19 to or near NRC licensed or non-licensed facilities 20 could        lead  to  a    variety        of      accident    frequency 21 progression times and potential consequences for SMRs 22 and ONTs.
23                    Based on that concern, this framework also 24 includes a hazard analysis that will be required to 25 show that the impact of co-located or contiguous NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
15 1 facility operation is accounted for in the emergency 2 plan and will not negatively impact the licensee's 3 ability to implement its emergency plan.
4                  Next slide, please.                This slide shows a 5 depiction of what the current prescriptive regulatory 6 framework looks like and how the new performance-based 7 framework fits in with that.                      You can see at the 8 beginning there's a number of entry points for the use 9 of either of the two regulatory frameworks.                            Those 10 remain constant.        We'll focus today on the light blue 11 side      to  EP  for    SMRs      and    ONTs      final  draft      rule 12 framework.
13                  There      were      some        changes    made        to 14 50.33a(g)(2) which is one of the entry requirements 15 talking about the content of -- the technical content 16 of the application.          That will be the entry point for 17 which we go into 51.60.              Once we're in 51.60, there 18 will be two options.
19                  There will be an option for EPZ or not an 20 EPZ.      If there's an EPZ that is offsite, you can see 21 that it goes to the left and there's a number of 22 aspects of 51.60 that will go through.                      Then if there 23 is    on-site    and  off-site,          we    see    that  there      are 24 additional requirements of 51.60(b)(1).
25                  Next slide, please.                The framework has NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
16 1 four major key parts.                  Maintenance of performance.
2 The      emergency      plan      is    required          to  describe        how 3 applicants or licensees are going to maintain their 4 preparedness and response to emergency and accident 5 conditions and how provisions employed to maintain 6 emergency plan are up to date.                      Said another way, how 7 will the licensee maintain a reasonable assurance.
8                    Performance objectives.                    Developed and 9 maintain        a    set    of      performance          objectives          and 10 performance thresholds to track the licensee's ERO's 11 ability to implement the emergency response functions 12 in drills and exercises.
13                    Developing that a little bit further, the 14 emergency        response        performance.              A  set    of      key 15 emergency          response        functions          are    required          to 16 adequately demonstrate reasonable assurance that lend 17 themselves          to      a      quantitative            evaluation          of 18 performance.
19                    Then    there's        the      planning      activities.
20 This      is  an  additional        set      of    emergency      response 21 requirements that are more programmatic in nature and 22 do    not    easily    lend      themselves          to  a  quantitative 23 performance evaluation.
24                    EPZ size determination is described in 25 50.33(g)(2).          this requires an EPZ size determination NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
17 1 analysis based on a specific design and site that 2 describes the area within which the public dose is 3 projected to exceed 10 millisieverts or one rem total 4 effective dose equivalent over 96 hours from the start 5 of      the    release  of    radioactive          materials      from        a 6 facility considering accident likelihood, source term, 7 timing of the accident sequence, meteorology, and 8 where predetermined prompt protective measures are 9 necessary.
10                  This    approach          covers        the  two      core 11 attributes of an EPZ.            The first being projected dose 12 savings,        and  the    second,        a    required      urgency        of 13 protective measures to maximize those savings.                              The 14 EPZ is a planning tool in a boundary area in which 15 prompt protective measures are warranted.
16                  Next slide, please. Regulatory Oversight 17 is covered in Section 50.160(b)(1)(iii).                      It requires 18 that all applicants and licensees to use drills and 19 exercises to demonstrate their capabilities in the 20 required emergency response functions that include:
21                  Event    classification              and  mitigation; 22 protective          actions,          communications,              contact 23 arrangements with federal, state, and local tribal 24 government        agencies;        notification            of    off-site 25 organizations; command and control; emergency response NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
18 1 facilities        (or    facility);          staff        and  operations, 2 augmentation,        training,        drills        and  exercises        and 3 periodicities;        radiological            assessment;        core      and 4 vessel damage; radiological conditions; off-site dose 5 projections; protective equipment, re-entry, critique 6 and corrective actions for drills and exercises.
7                  The    specifics          of    how    the  regulatory 8 oversight of the draft final rule will be accomplished 9 is yet to be determined.                The Advance Reactor Policy 10 Branch in NRR has begun an advanced construction 11 inspection oversight framework project to develop 12 recommendations          for      development            of  the      NRC's 13 inspection        and    oversight            guidance      to    support 14 construction and operation of advanced reactors that 15 is      technology      inclusive,            risk      informed,          and 16 performance based.
17                  The process of developing a regulatory 18 oversight framework is expected to take two years 19 following the issuance of the rule.                        No applications 20 using the 51.60 rule are expected in the first two 21 years following the implementation of the rule.
22                  The rule requires each applicant to create 23 a    set      of objectives        and    demonstrate        regulatory 24 compliance        with    each      response          function      and        a 25 corresponding threshold established for the adequate NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
19 1 performance of each emergency response function.                            The 2 NRC      will  review    the    exercise        and    critique      their 3 performance similar to the current process.
4                  The  NRC    expects        applications      for      all 5 different types of advanced reactors and oversight may 6 need to be tailored for the specific designs.                        One of 7 the questions that we've received is talking about 8 performance indicators versus performance objectives.
9 Performance indicators is really not the right term to 10 use in the rule because of the current context in 11 which it's normally used.
12                  Current emergency performance indicators 13 are      not  a  regulatory        requirement          and  do      not 14 demonstrate regulatory compliance.                      They establish a 15 response band in which the NRC allows the license to 16 identify        and    correct          their          weaknesses        and 17 deficiencies.        Below the licensee response band the 18 NRC      applies  additional        inspection          and  oversight 19 resources to evaluate the licensee's approach taken to 20 correct the issue.
21                  The 51.60 rule requires applicants and 22 licensees        to  establish        objectives          and  adequate 23 performance        thresholds        for      each      of  the  response 24 functions listed in 51.60(b)(1)(iii).                      Licensees will 25 evaluate the ERO's performance of these objectives in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
20 1 a post-drill and exercise formal critique, identify 2 weaknesses, deficiencies, and then enter them in a 3 corrective action program.
4                    At  or    above      the      threshold    value      will 5 demonstrate adequate response function implementation 6 and, therefore, regulatory compliance.                        The NRC will 7 monitor the performance objectives and metrics to 8 ensure        that  licensees        are      maintaining      adequate 9 emergency planning and preparedness.                      NRC will assess 10 the performance of the licensee and review the ability 11 of the licensee to take corrective actions in a timely 12 manner.
13                    MEMBER HALNON: Eric, this is Greg Halnon.
14 I just wanted to harp on this just for a second.                                I 15 realize that you guys are still working through the 16 process of getting the overall framework set up and 17 discussing it internally.                  Do you guys have in your 18 mind a set of objectives and/or criteria for this 19 oversight that transcends all technologies such that 20 there is sort of a base level of inspection and 21 oversight        that  you'll      be    doing      the  same    on      all 22 technologies and then banking off to the individual 23 technology specific attributes as well?
24                    MR. SCHRADER:          What we need to keep in 25 mind is what we are attempting to do here in this NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
21 1 performance-based reg guide and rule is to define the 2 what of the regulation and leave the how to the 3 licensee and the applicant so they will be objectives 4 that will correspond to each one of the response 5 functions.
6                  The specifics of what those objectives 7 will be will be based on that technology and how that 8 license is constructed and what the licensee comes up 9 with, but it won't change the fact that they will have 10 to have a set of objectives that meet each one of the 11 response functions 12                  MEMBER HALNON:          Okay.      I understand that.
13 I guess there will be some criticism relative to 14 telling the licensee how do you want us to look at you 15 and let them serve that up without at least some NRC 16 oversight that independently determines what you are 17 going to be looking at.
18                  This is why probably down the road the 19 ACRS will be reviewing the results of your process and 20 looking at it, either the Plant Ops Committee or maybe 21 a combined future design committee.                    We're interested 22 in how you come up with this.                This is an interesting 23 project that you'll be going through realizing that 24 there's        a large  spectrum        of      different    types        of 25 technologies you're trying to cover so it's relatively NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
22 1 --      there's  some    generic        and      there's    some      very 2 specific.
3                  We will be interested in how you develop 4 this since this is one of the first oversight type 5 topics that's come up, at least for me, in the new 6 plant design arena.              You can move on.              I think we 7 understand where you're going with it.                        We'll just 8 review this in the future as you get it ready to go.
9                  MR. SCHRADER:          Okay.        This is a bit of a 10 paradigm shift where we've gone from the luxury of 11 knowing specifically what a design is and specifically 12 what we need to see to demonstrate, or what we need 13 for capabilities for an adequate EP.
14                  Moving      to    this      performance        based      and 15 technology inclusive arena we don't have that luxury 16 so we can only describe it in as much detail as we can 17 the      what  of  the    regulation,            what    needs    to      be 18 demonstrated, what needs to be accounted for. The how 19 part of it we need to leave up to the licensee to be 20 able      to  adapt  and      tailor      those      requirements        to 21 whatever their technology is.
22                  MEMBER HALNON:            I agree.        We've got the 23 luxury in the 0350 -- oh, my goodness, the ROP process 24 of having very tried and true inspection procedures, 25 objectives, and whatnot.              Then you're raking over new NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
23 1 ground here so I fully understand this is going to be 2 evolving.      That's why we're going to kind of provide 3 some oversight on it as we go forward.
4                MEMBER BLEY: Greg, this is Dennis. Could 5 I speak a word in here?
6                MEMBER HALNON:            Absolutely, Dennis.              Go 7 ahead.
8                MEMBER BLEY: I think where some of us are 9 kind of hanging up is the separation between the what 10 and the how is a little bit in the eyes of the 11 beholder.      We're having some of the same discussions 12 in the Part 53 work.            For a lot of people -- let me 13 turn it around.
14                A lot of people are looking for a little 15 more specificity in the what, at least in the way we 16 think about the what, to kind of put -- you say 17 requirements but it's a little more specificity in the 18 requirements for the what to give some confidence that 19 important      issues  won't      slip      out      of the  picture.
20 You'll hear more about that, I think, as we go on from 21 other people.
22                MR. SCHRADER:          All right.
23                MEMBER HALNON:          Go on, Eric.        Thank you.
24                MR. KAHLER:        This is Bob Kahler.                If I 25 could have just one moment.              I'm the branch chief of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
24 1 the Policy and Oversight Branch in NSIR. I think what 2 we keep talking about is the what and the hows but the 3 how is part of the regulation also.                    Not only does it 4 say      what do  you    have      to      have      the  performance 5 objectives in as far as functions, but how you are 6 going to meet them is also part of the description 7 that's required in the emergency plan.
8                We will be reviewing it as part of the 9 application process for us to see it.                    It's not as if 10 it's a piece after the application is approved. It is 11 part of the process so the description of the how to 12 meet -- how the licensee will tell us they are meeting 13 the compliance of the regulations is to be described 14 in the emergency plan.
15                MEMBER BLEY:        Yeah, this is Dennis again, 16 Dennis Bley again. I think we all understand that and 17 there are two pieces to this that raise some concerns.
18 The one piece is thinking about the safety side and 19 saying are we giving enough guidance so that no safety 20 important things will be overlooked. Your response is 21 not unreasonable. Well, we will review very carefully 22 and make sure that's true.
23                The other side is bring-me-a-rock side 24 from the applicant's point of view not quite knowing 25 exactly what will meet the staff's interpretation of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
25 1 whether        we  have    a    plan        that      will  meet        the 2 requirements.        This rulemaking is also in Part 53 and 3 other places now.
4                    MR. KAHLER:            But      that    --  just        to 5 reclarify, that was part of Eric's presentation. That 6 is what the guidance is that we'll be working on for 7 the next two years is to provide to the applicants 8 what it is we plan -- what it is we expect to see in 9 their how and what would be acceptable to us and that 10 is going to be part of that guidance that is going to 11 be provided to them as we develop that over the next 12 two years.          It's not going to be a rock situation.
13 We'll provide them what our expectations are for the 14 how piece.
15                    MEMBER BLEY: Okay. We'll look forward to 16 that.        I guess the same issue we have here and in Part 17 53 is having a rule come out before guidance is 18 available leaves a lot of these open questions for 19 many different kinds of people.
20                    MR. KAHLER:        Understood.          We did have an 21 attempt early on to put something like this together 22 but it was seen at that time that it was something 23 that was a lot due to the complexity of the rule as it 24 is that we wanted to tackle that later in the process, 25 not as part of the rulemaking at this very time since NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
26 1 we are also developing guidance for the rule itself to 2 develop the oversight guidance knowing the time frame 3 of when the final rule would be going to commission 4 and all.
5                We felt like we had opportunity following 6 the rule going to the Commission that we could work on 7 the oversight piece.        I understand your concerns and, 8 yes, we will be looking forward to providing you how 9 we're doing with that oversight process as we're 10 putting the guidance together in the next several 11 years.
12                MEMBER    BLEY:          Okay.        This discussion 13 helped me.      I hope it helps others.                  I guess this 14 trade-off between specificity and flexibility is one 15 we haven't quite had to deal with until we're trying 16 to do these kinds of rules.
17                MR. KAHLER:        Agree, yes.
18                MEMBER HALNON:          Thanks, Bob and Dennis.
19 Just one more attribute yet, Dennis you mentioned the 20 two things.      I would add a third one, that's the 21 predictability of inspections, and not having a unique 22 inspection    criterion      for    each      different    plant        or 23 technology. As little as possible anyway.
24                We do need to consider the inspectors who 25 have to be trained up on the specific technologies and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
27 1 inspection criteria too.                  So, that would be a third 2 aspect of it.
3                    So Eric, I'm going to hand it back to you 4 and let you continue on.
5                    MR. SCHRADER:          All right.        The rule does 6 not      specify    a  required        frequency        for    drill      and 7 exercise.        An applicant's proposed exercise frequency 8 will      have  to  afford      sufficient          opportunities        for 9 emergency response organization members to develop, 10 maintain, and demonstrate their required response 11 functions.
12                    There's also a part of the rule that 13 discusses        maintaining          adequate          staff  to    perform 14 response functions.                And this will help drive the 15 exercise, the adequacy of a proposed frequency for 16 drills and exercises.
17                    They'll need to be -- ensure the fact that 18 there's personnel that are available to perform each 19 of the required response functions. And each of these 20 -- each of these positions will need to have adequate 21 depth to maintain the staffing of these areas.
22                    And turnover of personnel as well as the 23 depth        of  qualified        personnel          will  also      be      a 24 substantial        contributor        to    an    adequate    drill      and 25 exercise determination.                Next slide, please.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
28 1                    The results of the analysis required by 2 50.33(g)(2), determine a specific size distance for 3 the EPZ.        In 50.160(b)(3), emergency planning zone, 4 requires an applicant to shape the actual EPZ boundary 5 based        on  local    and      political        physical      and      land 6 characteristics.
7                    A concept of ingestion pathway emergency 8 planning zones was created in the 1970s.                        Since then, 9 there        have  been    significant            improvements        in      the 10 nation, and federal and state resources' capabilities 11 to identify and remove biologically and radiologically 12 contaminated goods or produce from the food chain.
13                    These capabilities are not dependent upon 14 preplanned actions for a specific area.                          Federal and 15 state        authorities      frequently          issue    precautionary 16 actions or implement quarantines or embargos for non-17 radiological          contaminations              of    foods    without          a 18 predetermined area.
19                    Ingestion response planning requirements 20 under 50.160(b)(4) provide the same capabilities and 21 availability to identify and interdict contaminated 22 food      and  water    in    the    event        of    a  radiological 23 emergency        as    are      required          under      existing          AP 24 regulations.
25                    MEMBER HALNON:            So Eric, I think we need NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
29 1 to probably park here just for a second.                  I know that 2 and just looking forward in your presentation, if you 3 want to push this off to the guidance, we can.
4                But, one of our interests from after the 5 subcommittee was in the selection of accidents, was 6 the determining the EPZ boundary.
7                And    then      the      other      part    was        the 8 development of the ingestion response planning. Which 9 really comes down to just listing capabilities that 10 are out there.
11                And relying on an ad hoc nature of post-12 accident, developing rules and -- not rules, but 13 communications and what not.
14                So, I guess when do you want to deal with 15 those questions that we want to get through?
16                Do you want to do that now?                  Or do you 17 want to do that at the --
18                MR. SCHRADER:        The accident selection I'd 19 rather have Michelle talk to, and the guidance part.
20                MEMBER HALNON:          Okay.
21                MR. SCHRADER:          And as far as the ad hoc 22 response that you're describing, I'd like too just, if 23 we could hold onto that thought for just a couple more 24 slides, I could -- I'll delve a little more into that.
25                MEMBER HALNON: Okay. Well, why don't you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
30 1 go on.        And then let's -- one or both of us stop 2 ourselves and discuss those areas when we get to them.
3                    MR. SCHRADER:                Okay.      That would be 4 great.
5                    Planning activities for those required, 6 facets of an EP program that do not easily lend 7 themselves          to    the      quantitative            evaluation          of 8 performance planning activities described in Section 9 50.160(b)(1)(iv)(a)(1)-(6)                      are        applicable          to 10 applicants and licensees regardless of the EPZ size.
11                    These      include            public      information, 12 coordination with licensees' safeguards contingency 13 plan, communications with the NRC, emergency facility 14 or facilities, site familiarization training, and 15 emergency plan maintenance.
16                    Offsite      planning        activities      that      are 17 contained        in    50.160(b)(1)(iv)(b)(1)-(9)                  and      are 18 additional requirements applicable to applicants and 19 licensees with an EPZ that extends beyond the site 20 boundary, that not all licensees would be subject to 21 both onsite and offsite planning requirements under 22 the rule.        The NRC is not eliminating offsite EP with 23 this rulemaking.
24                    State and local comprehensive all-hazard 25 emergency plans are tested by real events almost daily NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
31 1 across the United States. The hazards that prompt the 2 implementation of these response actions are sometimes 3 immediately dangerous to life and health.
4                  The responses are frequently ad hoc, they 5 save lives, and additionally, communities can still 6 develop        and    maintain          radiological        response 7 capabilities without an NRC requirement for a formal 8 offsite emergency response planning zone.
9                  The NRC has confidence in the ability of 10 OROs to implement their appropriate response actions, 11 when necessary, using a comprehensive all-hazards 12 emergency planning approach.
13                  Offsite      response        organization    general 14 emergency response capabilities are not unique to 15 their radiological emergency response.                    The NRC has 16 confidence as -- the NRC's confidence, as expressed in 17 the NRC regulations in 50.47(c)(1)(iii) and further 18 strengthened by the NRC's recognition of a national 19 level effort, the national incident management system, 20 national      preparedness        goal,        core  capabilities, 21 national preparedness system, and national planning 22 frameworks, in which the NRC participates to improve 23 state and emergency local planning at all levels of 24 government and within the whole community.
25                  Consequently, for SMRs and ONTs without a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
32 1 plume exposure pathway or plume -- without an EPZ or 2 an APZ at the site boundary, there is reasonable 3 assurance          that  appropriate          responses      --  response 4 actions can and will be taken in the event of a 5 radiological emergency without the need for regulatory 6 standards for offsite regulatory emergency response 7 plans          and    its    associated            FEMA    findings        and 8 determinations that offsite plans are adequate and can 9 be implemented.
10                    MEMBER HALNON:            So Eric, I think this is 11 the one place that we're going to stop.                        Because that 12 -- you just mentioned that the NRC has confidence in 13 the local hazards plan.
14                    How do you get that confidence that, you 15 know, Community X is ready to have a nuclear plant, 16 even with the EPZ less than the site boundary?
17                    You still have a tremendous amount of 18 offsite          requirements.              Fire        departments,        law 19 enforcement, medical facilities.
20                    You have communications requirements, just 21 general information requirements, understanding you 22 don't have to have maybe evacuations and other things 23 that are more traditionally in an offsite response 24 organization plan.
25                    But, the all-hazards plans that do have a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
33 1 radiological annex that needs to be reviewed and 2 ensure that it's adequate for -- for potential issues 3 that may come up.
4                    So, how does the NRC gain that confidence 5 when FEMA is not required to review it when it's 6 exempted, when it's the EPZ's less than the site 7 boundary?
8                    MR. SCHRADER:            The comprehensive all-9 hazards planning is based on core capabilities and the 10 ability to have those assets available.
11                    Regardless of what the hazard is, the 12 types or capabilities remain the same.                      Every -- as I 13 stated earlier, a --
14                    MEMBER KIRCHNER: Excuse me. This is Walt 15 Kirchner.          Greg, could I -- could I -- first, I 16 apologize, I missed the subcommittee meeting, and I 17 would have raised this question then.
18                    But Eric, along the lines of what Greg was 19 exploring, there are, you know, EP in general is based 20 on radiological dose and ingestion pathways.
21                    But,    we      have      --      we  will    see      now 22 technologies        that    have      other        potential    accident 23 scenarios that -- I'm choosing my words carefully 24 here.          That  would    involve        potentially,      potential 25 release of toxic materials and/or fire hazards that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
34 1 are well beyond just the radiological consequences.
2                    How are you going to approach this?                    And 3 given that you want to be technology inclusive, there 4 are        hazards    that      go    beyond          the radiological 5 potentially.        And these could prove very challenging 6 to say local authorities and such.
7                    And there's an analogy and experience now 8 with lithium batteries in electric cars where fire 9 departments are just ill prepared to deal with that 10 technology should there be an accident and an ensuing 11 fire.
12                    So, how -- how are you going to approach 13 this as part of the EP rulemaking?                          Because the 14 hazards that might arise are way beyond perhaps most 15 local authorities' capabilities and such.
16                    Would that be part of your review for the 17 EP determination?
18                    MR. SCHRADER: Well, we have two questions 19 here. Should I take them in the order that I received 20 them?        Or --
21                    MEMBER HALNON:            Go ahead and deal with 22 Walt's issue right now.
23                    MR. SCHRADER: All right. Walt's question 24 will be dealt with under the hazard analysis.                        And it 25 will be a graded approach to potential negative impact NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
35 1 on a licensee's ability to implement its emergency 2 plan,        posed  by  whatever        the    hazard    the  facility 3 located on or near the nuclear facility site is.
4                    So, just as you said, depending on what 5 other facility maybe co-located, it might be adjacent 6 to, that could impact it and create some new hazard 7 that would potentially negatively impact the ability 8 -- either the operation of the licensed facility, or 9 its ability to implement its emergency plan, would be 10 dealt with in that arena.
11                    And the --
12                    MEMBER KIRCHNER:              No Eric. I'm talking 13 about the technology --
14                    (Simultaneous speaking.)
15                    MR. SCHRADER:          Okay.        Can I -- would you 16 please take --
17                    MEMBER KIRCHNER:            Okay.
18                    MR. SCHRADER:            Mr. Kirchner, would you 19 please allow me to finish my answer --
20                    MEMBER KIRCHNER:            Sure.
21                    MR. SCHRADER:          Before you -- before you 22 cut me off.
23                    MEMBER KIRCHNER: I'm not cutting you off.
24 I'm hearing you out.              Thank you.
25                    MR. SCHRADER: So, that once you have that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
36 1 characterization of what those responses could be, 2 what those potential hazards are, they'll have to put 3 in aspects to their emergency plan that will deal with 4 those.
5                  Part  of    those      may      be  a new  accident 6 selection criterion. And then that accident selection 7 criteria would have to deal with whether or not 8 there's the EPZ may -- or the EPZ boundary maybe 9 extended or not.
10                  As far as what you're -- what to do with 11 a hazard that is not radiological, I don't think that 12 that's necessarily any different than what we do now 13 with a -- with an industrial hazard.
14                  You have a site that has a large amount of 15 ammonia, and if you have an ammonia leak, that's a 16 very      strong  hazard.          But,      we    don't  require      the 17 licensee to ensure the fact that the offsite has 18 resources enough to respond to that specific chlorine 19 or ammonia leak.
20                  But, the all-hazards, comprehensive all-21 hazards planning has, as one of their capabilities, or 22 core        capabilities      and    their        capabilities      based 23 response to look at what hazards are avail -- what 24 hazards are in that area, what's the likelihood of 25 those hazards, and then what's the potential damage NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
37 1 from those hazards.
2                And then determine through that process, 3 which ones need to be -- have specific planning and 4 procedures dedicated to them.
5                Does that answer your question?
6                MEMBER KIRCHNER: Perhaps I didn't pose my 7 question very well. I'm concerned about technologies, 8 nuclear technologies that have additional hazards to 9 consider beyond a radiological dose.
10                For example, there are technologies being 11 proposed that use highly toxic coolants.              So that the 12 release of the coolant maybe a danger or hazard that 13 exceeds that of the radiological component.
14                There are other designs that will use 15 coolants that are flammable, which adds a degree of 16 complexity to the accident analysis and such.
17                So, where I was going with it, this Eric, 18 was that it may require in the review, additional 19 hazard analysis and capabilities that would affect 20 either the size of the EPZ and/or the requirements of 21 -- on the local community, where the technology is 22 sited.
23                And I -- so, in a general way I was just 24 trying to explore how this would factor into your 25 decisions on what the -- say from a radiological NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309    www.nealrgross.com
 
38 1 consideration the EPZ is within the site boundary.
2 But, from the toxicity standpoint, it exceeds the site 3 boundary.
4                    Do you see where I'm going with this?
5                    MR. SCHRADER:          Right.
6                    MR. SMITH:          Right.        Eric, this is Todd 7 Smith,        hi. Senior        Level      Advisor      for  Emergency 8 Preparedness and Response.                    Yeah, great questions.
9 And just to address a couple of them.
10                    One, for the non-radiological hazards, the 11 emergency        plan  will      address      that      as well.          For 12 example, fuel fabrication facilities have uranium 13 hexafluoride to deal with.
14                    And in fact, that is the bigger concern in 15 an      emergency      for      those      facilities,        over        the 16 radiological.          And as such, those types of non-17 radiological        hazards        is    part      of    the  all-hazards 18 planning that communities are prepared to deal with.
19                    In regard to our confidence in all-hazards 20 planning, you know, as Eric said, the licensee is part 21 of the whole community. And within the United States, 22 our national preparedness is a goal for everyone.
23                    And FEMA reports to Congress every year on 24 the state of our national preparedness.                                So, we 25 understand          the    level        of      preparedness        in      our NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
39 1 communities.
2                    We    also        see        these      capabilities 3 demonstrated          all    the      time.            Particularly        for 4 interdiction of foodstuffs and water.
5                    And in fact, the NRC performed a study on 6 offsite        response      capabilities            even    outside        of 7 emergency planning zones to be able to interdict food 8 and water.        And we documented that in NUREG/CR-7248, 9 which was published in 2018.
10                    So, we have a lot of evidence that went 11 into this rule of why we have the confidence in these 12 capabilities. And what we're doing here is supporting 13 again,        that  all-hazards          planning        with    another 14 framework        that  fits      into    those      capabilities        base 15 response.
16                    MEMBER HALNON:          So Walt, let me jump in.
17 Todd, how does that get reviewed if the EPZ is within 18 the site boundary and FEMA is excluded from the review 19 of the emergency plan?
20                    MR. SMITH:        Thank you.          The key is that 21 emergency        preparedness        is    more      than  an  emergency 22 planning zone.
23                    So, the EPZ, that's a planning tool, which 24 is related directly to the radiological hazard.                            When 25 would we need to implement a prompt predetermined NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
40 1 action?
2                    The rest of emergency preparedness is 3 about those capabilities.                  Which gets reviewed and 4 this -- we have the findings on that before a licensee 5 gets -- before we issue a license, and then we inspect 6 that over the life of the facility.
7                    MEMBER      HALNON:              Well,  it    was        my 8 understanding        that    50.47(f)          exempts  and  does      not 9 require a FEMA review to get a finding of adequacy if 10 the EPZ is within the site boundary.
11                    That's the new -- that's the new change 12 that we're concerned about.
13                    MR. SMITH:        So, the partnership that we 14 have with FEMA, which is also stated in a Memorandum 15 of Understanding between our agencies, yes, FEMA will 16 review the preparedness of offsites, according to the 17 standards that the NRC has proposed for the site.
18                    So, many facilities that we license do not 19 have emergency planning zones for their emergency plan 20 or offsite EPZs.              And in those cases, we do not 21 require FEMA's assistance in providing the evaluations 22 of the plans.
23                    In all cases, the NRC will perform a 24 review        of the  emergency        plan,      and make  a    final 25 determination and finding.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
41 1                MEMBER HALNON:            It's not the emergency 2 plan I'm concerned about.            It's the all-hazards plan 3 for the local communities, whether or not they're 4 capable, ready, and ready to go.
5                And we've seen at least one event that, 6 granted it was many, many years ago, at Reed College 7 back in '92, or somewhere around that time frame, 8 where nobody was ready.
9                And a lot of lessons learned.                It seems 10 like we're going backwards on this one by exempting a 11 FEMA review when the site boundary is less than -- I 12 mean, the EPZ is less than the site boundary.
13                So, we can move on.              That's just a place 14 that we're going to deviate a little bit as we go 15 forward.
16                I think we'll get more information on that 17 down in the presentation.            So, I --
18                MR. TAYLOR:          Well, this is Bob Taylor 19 again from Policy and Oversight Branch, Branch Chief.
20 I'd just like to reiterate what we've been stating.
21                This  is    for    a    radiological      emergency 22 preparedness and when FEMA's involvement is -- for 23 consultation    is  required        in    order    to review        the 24 radiological emergency preparedness offsite.
25                You're talking about a different area, a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
42 1 different area within FEMA, the all-hazards planning 2 and different review levels that they can go about 3 performing.
4                    But, we're talking about a requirement for 5 a radiological emergency planning offsite.                      And we're 6 saying that for a site that does not exceed one rem 7 offsite in 96 hours, or when immediate protective 8 actions        are  warranted,        there's        no  need  to      have 9 radiological emergency preparedness planning offsite.
10                    But, for these type topics you're talking 11 about, it's all-hazards planning in which FEMA goes 12 about        and  does  their      business        all  the  time      for 13 industrial facilities.                And we have confidence in 14 FEMA's capabilities to do that as they do with every 15 community for every type of industrial facility and 16 other technological hazards that are out there.
17                    But, that's beyond the purview of the 18 rulemaking and of radiological emergency planning.
19 And when we're discussing this, we need to maintain 20 the      focus    of  what    the    --      of    what  the  rule        is 21 accomplishing in providing dose savings to the public 22 from a radiological event at the plant.
23                    So, that -- I just felt that I needed to 24 provide that bit as we're going around talking about 25 different hazards at the site having an impact offsite NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
43 1 with no EPZ.
2                And Todd stated it well in stating that an 3 EPZ is a planning tool for a radiological emergency 4 preparedness.      And we don't want to tie the two 5 together for the all-hazards planning and the EPZ and 6 other hazards that are -- that may or may not exist at 7 the plant.
8                MEMBER HALNON:            Okay.        Thanks Bob.        And 9 I'm going too just -- I'll call on Dennis in just a 10 second, he's got his hand up.
11                But, I just wanted to just ask this one 12 question then.      Then why 50.47(f) then?
13                I mean, why -- why do you exempt FEMA 14 review if in fact no review would be required, at 15 least as a communication tool to let FEMA know that 16 there's a nuclear plant within their community that 17 wasn't there before?
18                MR. SCHRADER:            Can you state -- I'm not 19 certain I understood your question.                    Why -- why --
20                MEMBER HALNON: Why are you -- you are not 21 sending the -- or asking FEMA for review of the plant?
22                If  there's        no      radiological        response 23 required, let them tell you that.                    And let them tell 24 you that the --
25                MR. SCHRADER:            Because that's our job.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
44 1 That's our statutory responsibility and our authority 2 to determine that.
3                  It's not up to FEMA to tell us what's 4 required.        It's up to us to make that determination 5 and then ask FEMA to go out and do an evaluation on 6 what we've determined to be appropriate.
7                  MEMBER HALNON:            Okay.        Dennis, did you 8 want to jump in?
9                  MEMBER BLEY:        Yeah.        Just a quick thing.
10 And maybe the staff will get a hint from this.
11                  The questions you're getting from us, 12 others from other areas of the public and stakeholders 13 have raised similar things.
14                  And you might consider that perhaps the 15 language you have in there allows those of us who 16 aren't writing the rule to misinterpret what you 17 intended.
18                  And maybe a little clarification would 19 help get rid of some of the issues that you're hearing 20 from us right now.          And that I think you'll hear from 21 other people as well.              That's all.
22                  MEMBER HALNON: Okay, Eric. Why don't you 23 move on?
24                  MR. SCHRADER:            All right.        Next slide, 25 please.        Planning activities, we went over this one.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
45 1 So, next slide.
2                    Okay.      Hazard analysis.              The NRC also 3 considers its graded approach to EP, the potential 4 negative impact on a licensee's ability to implement 5 its emergency plan posed by a hazard at a facility 6 located on or near the facility's site.
7                    The  potential          impact      of  a hazard        may 8 require additional EP considerations, preparations, or 9 arrangements that would have to be -- that would 10 otherwise        not  be    needed        in    the    absence    of      the 11 facility.
12                    Consideration of credible hazards includes 13 events at the contiguous or nearby facility that would 14 lead to an emergency response at the SMR or ONT 15 facility, or negatively impact the implementation of 16 their response by them.
17                    It may be appropriate for SMRs and ONTs 18 with contiguous or nearby facilities to consider a 19 quantitative or qualitative assessment of postulated 20 accident        scenarios      at    these        facilities.            The 21 applicant's or licensee's EP program must reflect 22 these        hazards  and    planning          activities      needed        to 23 address them in their emergency response plans.
24                    For  example,        notifying        contiguous        or 25 nearby facilities of an emergency at the nuclear NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
46 1 facility, classifying a hazard from a nearby facility 2 impacting the safe operation of the nuclear facility, 3 providing protective actions for onsite or offsite 4 personnel, and recommending protective actions for 5 nearby facility personnel.                  Next slide, please.
6                  All right, hopefully this will scratch the 7 itch of a lot of what is transpired in the last couple 8 of slides.
9                  Presidential Policy Directive 8, PPD-8, 10 National Preparedness, it's a planning framework that 11 consists      of  five      areas,        prevention,      protection, 12 mitigation, response, and recovery.
13                  In  each      area,      it's      supported    by      an 14 incident      specific      annex.          And      the  response        and 15 recovery area is the nuclear radiological incident 16 annex.
17                  Each annex describes a specific response 18 action and resources available as part of the nuclear 19 response annex as the DOE, National Nuclear Security 20 Administration, Federal Radiological Monitoring and 21 Assessment Center, the FRMAC.                    Next slide.
22                  So, when you look at this slide, you can 23 see all of the FRMAC response capabilities.                        And how 24 they're -- the time frames that they can mobilize and 25 be onsite.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
47 1                    They produce a myriad of support for any 2 type of decision maker.                  As you start at the top 3 there,        the  radiological          assistance        program,        the 4 program team on scene, it can be on scene within six 5 hours.
6                    The RAP team is a first response team. It 7 assesses the emergency situation, it advises decision 8 makers as to what steps could be taken to evaluate and 9 minimize the hazards of the event.
10                    Team support ranges from advice by phone 11 to      sending    skilled,        professional            personnel        and 12 equipment to the scene to help evaluate, assess, 13 advise, isotopically identify, search for, and assist 14 in the mitigation of actual or perceived radiological 15 hazards and risks to workers, the public, and the 16 environment.
17                    The DOE and NNSA implements RAP on a 18 regional basis.          There are nine geographical regions 19 with a minimum of three RAP teams per region.                            A RAP 20 team can be expected on scene within six hours.
21                    There's    a    Consequence          Management      Home 22 Team.          The Consequence Management Home Team is a 23 virtual extension of the FRMAC.                          It operates in 24 preparation for the Consequence Management Response 25 Team arrival and coordination with the deployed FRMAC NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
48 1 assets.
2                The home team is on call 24/7, 365.                        It 3 can respond within one hour during normal business 4 hours, and within two hours after hours.
5                The same data and products and technical 6 assistance are available from the Home Team as from 7 the FRMAC response.        And includes interpretations of 8 measurements,      protective          action        recommendations, 9 calculations of derived response levels, worker turn-10 back limits and stay times.
11                When    a    Management          Response    Team,        a 12 Consequence Management Response Team is onsite, it's 13 a 25-member team with 3,500 pounds of equipment ready 14 to deploy within four hours of notification.
15                The  team      augments        the    RAP  team      and 16 includes expertise in radiation monitoring, sampling, 17 analysis, assessment, safety, health, support with --
18 support and logistical functions.
19                It's designated for the quick response and 20 rapid radiological data collection and assessment to 21 provide early health affects information and timely 22 characterization      of      a  radiological          situation        to 23 officials responsible for making and implementing 24 protective actions.
25                In addition, the response team has the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
49 1 capability to provide escort services for emergency 2 workers entering a potentially contaminated area, for 3 lifesaving or forensic operations.
4                  Phase two of the response teams available 5 in less than 12 hours of active -- within less than 12 6 hours from activation, provides additional personnel 7 and equipment. If needed, NNSA can request additional 8 DOE and National Laboratory trained professionals, as 9 well as additional personnel and equipment to augment 10 and assist in operations.
11                  A REACTS team is also an aspect that can 12 be activated.      It can activate within one hour and be 13 onsite within 12 hours.
14                  It's a -- the REACTS team is a world-15 renowned      specialized        medical        team  consisting        of 16 physicians      and    nurses,        paramedics,        and    health 17 physicists to educate, advise, consult on medical 18 aspects of ionized radiation illness and injuries.
19 It's deployable 24/7, 365.
20                  All of these aspects are available, as you 21 can see, within a matter of hours of being requested.
22 They also can --
23                  MEMBER HALNON:            Could you -- could you 24 walk through just how that gets requested?                      I mean, 25 starting in the control room when there is an accident NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
50 1 occurring.
2                  How does that all get activated?                      It's 3 really good stuff.            I just wanted to know what the 4 process was to get it activated.
5                  MR. SCHRADER:          Okay.
6                  MEMBER HALNON: Put a context around those 7 times you were talking about.
8                  MR. SCHRADER:            They would be -- they 9 wouldn't be part of the licensee. This is all -- this 10 is all for the offsite.
11                  So, the licensee would notify the offsite 12 of an event that would be affecting the offsite that 13 would need to have some type of special response.
14                  So, at this point we're in a situation 15 where the EPZ is -- extends beyond the site boundary.
16 So, once the --
17                  MEMBER HALNON:            So those would not be 18 available for people for --
19                  MR. SCHRADER:          Oh, absolutely.          This is 20 available      for  any    offsite        response      organization, 21 regardless of what the type of event is.
22                  It could be a spent fuel spill on a 23 highway.      It could be a resin spill.              It could be any 24 number of different, IEDs, dirty bombs, any type of 25 radiological event, this is available to.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
51 1                  It also includes any type of radiological 2 power plant type of response.                  So, regardless of what 3 it is, the offsite just has to contact the FRMAC and 4 request the services.
5                  This is --
6                  (Simultaneous speaking.)
7                  MEMBER HALNON:          Which means they need --
8                  MR. SCHRADER:          This is --
9                  MEMBER HALNON:          They need to know about 10 the accident onsite, even if it's within the EPZ then.
11                  MR. SCHRADER: Well, they would have to be 12 aware of some need for it, yes.                    If that's what you 13 mean.
14                  MEMBER HALNON:          Yeah.        Well, I guess it 15 gets back question is, how do they know if there's no 16 requirements for offsite planning, if the EPZ is --
17                  MR. SCHRADER:          I think we --
18                  MEMBER HALNON:          We don't need to go back 19 through it again. But, that's just -- it adds to that 20 same thing that Dennis was saying, that relative to 21 the clarity of --
22                  MR. SCHRADER:          Regardless of -- if we go 23 back and we look again at the requirements, the 24 response      functions,      and    the      planning    activities, 25 you'll see in both sets, there are communication NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
52 1 requirements with the offsite, regardless of whether 2 there is an EPZ at the site boundary or not.
3                  There is still a requirement to be able to 4 deal with those offsite response functions that would 5 be needed regardless, such as fire, EMS, police, any 6 of those first responders, or any other type of 7 response      that  would        be    needed        because    of      some 8 specialty event onsite.
9                  So, those communication pathways still 10 need to be, to remain open.                  The drill and exercise 11 program still needs to include each one of those first 12 responder type agencies.
13                  So,  it's      not    like      when  you  say      that 14 there's a site boundary EPZ you are now completely 15 devoid of any type of conversation or communication 16 offsite.        That's not the case.
17                  It's just a matter of whether or not the 18 EPZ extends beyond the site boundary.                    And whether or 19 not within that EPZ there is a requirement for prompt 20 protective measures.
21                  If there is not a requirement for prompt 22 protective measures because of the time frame of the 23 accident progression or some other aspect, some other 24 timing aspect at which the delay for the need of the 25 protective measures is longer than what the -- what it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
53 1 would take for the offsite response organization to 2 implement      a  protective        measure,          then  there's        no 3 requirement for that planning tool, that emergency 4 preparedness zone.
5                  MEMBER HALNON:              Okay.      Go on.        We're 6 running a little bit behind schedule.                      So, let's --
7 let's move through it.
8                  MR. SCHRADER:          Okay.
9                  MEMBER HALNON: It's not your fault. It's 10 my fault, so go ahead.
11                  MR. SCHRADER: Next slide, please. Public 12 comments, this was one of the -- one of the questions 13 asked by the ACRS.
14                  FEMA  indicated          that      they  supported          a 15 revised EP regulatory framework for SMRs and ONTs.
16 However, opposed the potential for a site boundary EPZ 17 and reliance on the all-hazards approach for the 18 offsite response.
19                  We responded to the proposed rule that 20 offered the same level of protection and current 21 regulatory framework that dose consequences to the 22 public would be similar and therefore human health 23 impacts would be similar.
24                  And that as we've gone over numerous times 25 here, the actions that would be needed to respond to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
54 1 a    radiological      emergency        are      not    unique  to      the 2 offsite.
3                    If you need to evacuate personnel, it 4 wouldn't be any different than if you were in some 5 area that had no radiological offsite formal training, 6 but had a wild fire or something approaching the 7 community.
8                    That community, the people that are in 9 these OROs, these offsite response organizations, 10 these        professional        emergency          management      agency 11 directors and manager and that, are a very well 12 skilled, very high competent group of people.
13                    And they can figure out how to evacuate a 14 designated        portion      of    their      population    ahead        of 15 whatever the hazard is.              We've seen this in wildfire 16 events.        We've seen this in hurricane coming ashore.
17 We've seen it in tankers derailing and having some 18 sort of life threatening ammonia or some type of 19 chlorine gas or something like that.
20                    These      are        very          competent,        very 21 professional people.                And they know what they're 22 doing.
23                    And it's really a bit of -- it's really 24 kind of disrespectful to say that because they don't 25 have a radiological offsite emergency response plan NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
55 1 that they can't do any of these things. That they are 2 -- that is well within their -- their charter and 3 their expectations to perform.
4                  FEMA also argued that the rule does not 5 take into account consideration of a full spectrum of 6 events.        Threats that are beyond potential design 7 basis accidents for SMRs.
8                  But, in fact the license applications must 9 include        licensing    basis      events,        and  the  required 10 analysis to contain the spectrum of accidents that are 11 considered for the facility's emergency response plan.
12 And these include beyond design basis events and their 13 licensing basis accidents.
14                  Additionally, EP requires the knowledge of 15 the potential dose consequences and accident timings 16 of the radiologic -- potential radiological releases.
17 The DOE --
18                  MEMBER HALNON:            Yeah Eric.        It's just --
19 I just need to respond to one thing.                        You know, the 20 50.47 FEMA finding is a determination that the state 21 and      local    emergency        plans        are      adequate.          Not 22 radiological emergency plans, but emergency plans.
23                  So,  I    acknowledge            the    fact  that      the 24 emergency plans have been able to handle those other 25 hazards well.        I won't dispute that.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
56 1                    But, I also want to respect the unique 2 nature        of  a  nuclear      hazard      that      is  not  like        a 3 wildfire.        So, we can move on.
4                    Let's go on.        And you don't need to have 5 to respond to that.            But that's just where my head's 6 at.
7                    So, go on.
8                    MR. SCHRADER:            DOE      is    actually,      they 9 submitted three sets of comments.                        Two in favor of, 10 and one that challenged the rule.
11                    But, the third submission basically went 12 point by point in a second submission that challenged 13 the      rule,    and  refuted        each      of    those  comments 14 submitted.
15                    Basically, they were along the same -- the 16 ones in -- the ones within the DOE response followed 17 much of the same theme as FEMA's concerns.
18                    So, the same responses that you'll see in 19 the comment response document with the rule.                        You can 20 see the details of how they were responded to.                            Next 21 slide, please.
22                    Significant changes to the proposed rule.
23 The EPZ size determination in the proposed rule was 24 defined as a single criterion. That area projected to 25 exceed 10 millisieverts and one rem total effective NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
57 1 dose over 96 hours.
2                We received a number of public comments 3 that questioned the adequacy of just one criteria.
4 And asked for additional detail on that.
5                We then revised the rule and added to it 6 additional detail that talks to the requirements of a 7 list of accident likelihood's source term, timing of 8 accident      sequences,          meteorology            as        major 9 considerations to be included in the radiological 10 consequence analysis used in the determination of the 11 EPZ size.
12                We also added a second criterion that 13 talked to the determination that the need for prompt 14 protective    measures      was    necessary.          Revisions        to 15 50.160(b)(3)    included      the    idea      that  there    was      a 16 potential that the -- given the new criteria in 17 50.33(g)(2), that there could be no EPZ at all, if the 18 criteria, one or both criteria were not met.
19                So, the staff recognized this and added a 20 criterion, an entry criteria to 50.160(b)(3) saying 21 that for those applicants and licensees with an EPZ, 22 that they would need to incorporate the boundaries and 23 describe a physical description of the EPZ within 24 their emergency planning zone.
25                Timeliness        for    initial        exercise,        the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
58 1 initial proposed rule stated that it needed to be done 2 no later than 18 months before the issuance of a COL 3 or for -- I'm sorry, issuance of an operating license, 4 or the initial fuel load date for a combined operating 5 license.
6                They received public comment that the 7 timeline was not appropriate.                      And as a result, 8 revised the draft rule to allow greater flexibility 9 and revising the requirements for that drill to be no 10 later than -- from no later than 18 months before to 11 within two years before an initial fuel load or an 12 operating license.        Next slide, please.
13                The definition of small modular reactor 14 was revised to include a per-module discussion.                        And 15 that makes it in alignment with the definition in 16 52.1, which is the -- which is where the initial 17 definition of small modular reactor from this 50.160 18 rule came from.
19                We revised 72.32(c), the independent fuel 20 storage installation, ISFSI, to include the -- a plan 21 meeting the requirements of 50.160. Currently it says 22 the plans meeting the EP requirements of only 50.47(b) 23 would also meet the requirements for 50.32 -- I'm 24 sorry, 72.32.      So, that was revised to say 50.47 25 and/or 51 -- or 50.160.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
59 1                  We  revised        the    section      for  50.160(b) 2 language describing initial issuance of an operating 3 license.        Initially it said we would not issue an 4 operating license to a licensee.
5                  That actually didn't make a lot of sense.
6 So, it was revised to say an operating license, an 7 initial operating license would not be issued to an 8 applicant.        Next slide, please.
9                  We  added        --    we    just    discussed      this 10 earlier, 50.47 denotes the application complying with 11 50.160. And when paragraphs (a)(2), (b) and (c)(2) of 12 50.47 applied -- do not apply to offsite radiological 13 emergency response plans.
14                  Which is when an offsite emergency plan is 15 not required to meet 50.47(b) or if the plume exposure 16 pathway does not extend beyond the site boundary.
17                  We  revised        the    reporting      requirements 18 under        the  radiological        assessment        aspect    of      the 19 radiological response functions from -- to be more 20 applicable to those groups that are actually needed to 21 have the information as opposed to the whole operating 22 reactor.
23                  So, it was revised to say, language or the 24 information        would    be    reported        to  the  applicable 25 response personnel.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
60 1                We  revised        50.160(b)(1)(iv)(B)(4)                  to 2 require an ETE.      And that ETE would be to include the 3 area within the site boundary.                          As the original 4 description of the ETE could be interpreted to not 5 need to include the area within the site boundary.
6 Next slide.
7                We  clarified          in    Section      50.33(g)(2),
8 inclusion of tribal governments.                  The staff clarified 9 that the applicant complying with 50.160 would need to 10 submit an emergency plan for a participating tribal 11 government.
12                A participating tribal government means a 13 federally      recognized        tribal      government      that      has 14 decided to participate in FEMA's offsite radiological 15 emergency      preparedness          program,          and  act    as      an 16 independent entity with its own radiological emergency 17 response plan.
18                This    was      added    to    address    the    public 19 comment to ensure tribal government inclusion in the 20 regulatory process for the NRC tribal policy.
21                That's all that I have.
22                MEMBER HALNON:            Very good.
23                MR. SCHRADER:              Additional      questions?
24 Concerns for --
25                MEMBER HALNON:            No, we'll move on.                  I NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
61 1 think the next issue will focus in on the spectrum of 2 accidents that we're going to be talking about down --
3 down the road.
4                But, thank you, Eric. That, you know, was 5 informative.        I    appreciate            you    weathering        our 6 questions and concerns.
7                And we were due for a break.                    But, I'm 8 thinking that we'll just kind of push on through the 9 draft REG Guide.        And then we'll take a break in 10 between the staff's presentation and the public.
11                So, go ahead.
12                MEMBER BIER:        Greg?
13                MEMBER HALNON:          Yes?
14                MEMBER BIER:        I do have one question or 15 comment that I would like to make, just following up 16 on some of the earlier discussion about can we, and 17 should we rely on the professional expertise of the 18 local emergency responders?
19                And first of all, I agree that most of 20 them are extremely well qualified.                    However, I don't 21 know to what extent there are past experiences in non-22 nuclear disasters where the local community emergency 23 responders were not well prepared and professional.
24                And that may not be sort of a legal 25 responsibility of NRC to prepare for that.                    But, even NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
62 1 if it is the fault of the local community organization 2 to be prepared, it will still come back as a negative 3 for the nuclear industry as a whole.                        If we end up in 4 that situation.
5                    So, that's just one comment.
6                    MEMBER HALNON: Thank you, Vicki. I would 7 refer people to Information Notice 92-79.                          And you'll 8 get taste of what that would look like.                          That's the 9 Reed College release in Portland, Oregon.
10                    And granted, it's many, many, many years 11 ago.      And we've got a lot going for us now.                    But, that 12 was a -- kind of the illustration of what Vicki was 13 saying.
14                    MR. SCHRADER:            But, I don't know that 15 that's        necessarily      a    good    example.        I  mean,        no 16 disrespect intended.
17                    But, that Reed College incident started 18 with the onsite.              And the fact that the emergency 19 preparedness program onsite was not well prepared to 20 deal with it.
21                    It really had nothing to do with the 22 response        of  the    offsite        as    much    as  it  did      the 23 inability of the onsite emergency response plan to be 24 implemented in the manner it was expected to be.
25                    MEMBER HALNON:            Yeah.        I don't want to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
63 1 focus in on that event.              I'm just saying that's an 2 illustration of what ill-prepared license, either the 3 licensee or offsite plans could look like.                      And the 4 concerns the public would have with that.
5                So, I acknowledge your point there, Eric.
6 Thanks.
7                MEMBER BIER:        Well, and Hurricane Katrina 8 was an example, where even after a major exercise, 9 Hurricane Pam, the emergency response capability was 10 still ill-prepared.
11                And obviously, I don't think any of the 12 situations we're talking about are going to be of the 13 magnitude of Hurricane Katrina.
14                But, you can have, you know, ill-prepared 15 local agencies for whatever reasons, so.
16                MR. TAYLOR:        And I think -- this is Bob 17 Taylor again.      I think Vicki, you pointed out, is the 18 legal aspects of the statutory authority of the NRC 19 and how much we can put into the regulation.
20                And also, based upon the technology and 21 the      extent  of  the      dose      offsite        and what      we're 22 permitted to -- to provide for within our regulations.
23                So, that's where we're working with at 24 this point.
25                MEMBER BIER:        Yeah.        I appreciate that.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
64 1                MEMBER HALNON:            Thank you.        Let's move 2 onto the draft Reg Guide.
3                CHAIR SUNSERI:            Yeah Greg, this is Matt.
4 Just to be clear, we're close enough to lunch where I 5 suggest we just push on through without a break.                        And 6 then we'll just break at lunch.
7                MEMBER HALNON:            Okay.      Thanks, Matt.
8                MR. MURRAY:          Okay.        Good morning.          I'm 9 Charles Murray, and I'm an Emergency Preparedness 10 Specialist in the Office of Nuclear Security and 11 Incident Response.          And I'll be covering the draft 12 Regulatory Guide today.
13                Reg Guide 1.242, the purposes of the Reg 14 Guide is, identifies methods and procedures that the 15 staff of the NRC considers acceptable for use by 16 applicants and licensees for small modular reactors 17 and non-light water reactors, non-power production 18 utilization facilities to demonstrate compliance with 19 performance-based emergency preparedness requirements.
20                In    the      Title        10      Code  of    Federal 21 Regulations,      10    CFR      50,      domestic      licensing        of 22 production    and  utilization          facilities      and    10    CFR 23 50.160, the emergency preparedness for small modular 24 reactors,      non-light        water        reactors,      non-power 25 production or utilization facilities.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
65 1                  And the applicability, again, it applies 2 to the same there, the applicants for and holders of 3 construction permits, early site permits, operating 4 license, and combined license for the SMRs, non-light 5 water reactors, and non-power production utilization 6 facilities under the same provisions of 10 CFR Part 7 50.      Next slide, please.
8                  Conforming changes to the Reg Guide, those 9 were made based on changes that were made to the draft 10 final rule language.              And you heard some of those 11 earlier        examples      in      Eric's          portion    of        the 12 presentation.
13                  We  did      include        additional      reference 14 documents.      Specifically Reg Guide 1.233 and revision 15 two of NUREG-0654 to the Reg Guide.
16                  We  enhanced        the      guidance    on  accident 17 likelihood source term timing of the accident sequence 18 and meteorology. And we do have a slide, but we'll be 19 talking about sort of the specifics of it a little 20 later in the presentation.
21                  We did add, also added the definition of 22 safe conditions to the glossary.                    Next slide, please.
23                  Appendix        A,    general          methodology        for 24 establishing plume exposure pathway emergency planning 25 zone      size. This    provides        a    general    methodology NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
66 1 acceptable    to    the      NRC    for      the  analysis        for 2 establishing a plume exposure pathway EPZ size.
3                And within Appendix A we did add Section 4 A-3.1, which is event selection.                Which discusses the 5 applicant's consideration of accident likelihood.
6                And again, we do have a specific slide, a 7 couple of slides down, where we go into a little more 8 detail on the event selection process.                  Next slide, 9 please.
10                Appendix B, development of source term 11 information.        This      was      provided      in    previous 12 discussions with the ACRS.              It was expanded.
13                The discussion on source terms by adding 14 this Appendix, which is the development of information 15 on source terms to Reg Guide 1.2.4.
16                This Appendix provides further clarifying 17 guidance on the development of information on source 18 terms and probabilistic risk assessment.                Next slide, 19 please.
20                Okay. This slide here, Appendix A-3.1, 21 event selection.      I'd like to turn the presentation 22 over to Michelle Hart.          Michelle?
23                MS. HART:          Yes, thank you.            This is 24 Michelle Hart, I'm in NRR and I'm a reactor engineer 25 of reviewing advanced reactors.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
67 1                  In response to public comments and to 2 provide more clarity in Appendix A, the staff expanded 3 the        discussion    of      event        selection    for      what 4 radiological        release      events      should    be used      in    a 5 facility specific plume exposure pathway EPZ size 6 justification analysis.
7                  Because the rule is applicable to light 8 water reactor SMRs and other new technologies, power 9 and non-power reactors may be used in conjunction with 10 new license applications under Part 50 or 52, the 11 guidance in Appendix A of the Reg Guide, including 12 that on event selection is given at a high level to be 13 generally applicable to the different technologies and 14 license application information.
15                  The event selection should be carefully 16 done to ensure that the radiological releases with 17 large potential consequences that may affect the size 18 of the EPZ are evaluated.                  Our concept is that the 19 applicant should use the events evaluated in the 20 license        application        safety        analysis  report        as 21 candidate radiological release scenarios for use in 22 the EPZ size justification analysis.
23                  Reg Guide 1.242 uses the term licensing 24 basis events to mean the entire collection of event 25 sequences considered in the design and licensing basis NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
68 1 of the facility. Because of the range of technologies 2 in licensing frameworks, the Reg Guide provides some 3 examples of the events that may be included in the 4 license application.
5                    For example, light water reactor SMRs may 6 have design basis accidents and severe accidents, 7 which we would expect them to use in the EPZ size 8 analysis as candidate scenarios.
9                    Non-light water reactors may have chosen 10 to use the risk-informed method in NEI 18-04, also 11 called        the  Licensing        Modernization          Process,        for 12 determining the licensing basis events and may have 13 design basis events, design basis accidents, and 14 beyond design basis events.
15                    Some applicants may have used a maximum 16 hypothetical accident for their safety case, and that 17 would also be included in the analysis.
18                    MEMBER HALNON: So Michelle, this is Greg.
19 For light water reactors, SMRs that are pretty much 20 under design right now, right?
21                    That includes Chapter 15 and 19 accidents 22 -- Chapter 19 accidents, as well, which Chapter 19 is 23 just like everything.
24                    How  does      a  licensee          or an  applicant 25 eliminate some of the 19 accidents, such that it's not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
69 1 just looking at everything?
2                    MS. HART:        Right.      So, the Reg Guide, we 3 do talk in some detail about some considerations they 4 should use for like scoping out analyses or scoping 5 out scenarios, for lack of a better term.
6                    I think when you're talking about the 7 plume        exposure    pathway        EZP      size  justification 8 analysis, there are those two criteria that we were 9 talking about, and the second criterion is the need 10 for a prompt protective measures.
11                    And so, timing of the accident releases 12 can be used as justified, you know, if it is a release 13 scenario that you have plenty of time for an off-site 14 organization to determine, and in conjunction with the 15 licensee, what actions may have to be taken at what 16 point.
17                    And to be able to effectively take those 18 actions in the time to affect dose savings. So that's 19 one consideration.
20                    I think, you know, when we're talking 21 about this analysis, we want to ensure that you're 22 finding all of those large releases that you may have 23 to take action for, and that's what the plume exposure 24 pathway emergency planning zone is helping as a tool 25 to do.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
70 1                MEMBER HALNON:          So part of the issue here 2 with that and some designers is that it's much easier 3 and more effective to design a plant to a -- and a 4 plan, for that matter -- to a very specific bright 5 line design criteria.
6                This kind of makes it kind of fuzzy.
7 We're running into the same type of issues with other 8 parts, Part 53, such as the ALARA consideration, as 9 well.
10                However,        you    know,        I    understand        the 11 balance that Dennis mentioned earlier between being 12 specific and being flexible.
13                I guess the unknowns -- and I know you're 14 dealing with this with the NuScale topical report, as 15 well -- will we ever get to a point where we will have 16 a specific bright line that we can design to, relative 17 to criteria that -- whether it be quantitative or 18 qualitative criteria, that we can just say, here it 19 is?
20                MS. HART:        So I think, you know, that was 21 certainly a consideration as we were developing this 22 guidance, was that balancing of all the different 23 technologies and all the different considerations that 24 you      could have,    and      it    may      be    easier  for      some 25 facilities    at  some      specific        sites      to  make      that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
71 1 determination on the face of it than it would be for 2 others.
3                  I think, you know, considering that this 4 is a rule that is not for a specific technology, it's 5 not for a specific set of sites, it could be, you 6 know, people remotely sited in Alaska, you know, or it 7 could be people in the middle of a city -- you know, 8 I say middle of a city, that might be overstating it 9 -- that there are all these different considerations 10 we have to take into account, and I think a certain 11 amount of this will become clearer as people try to 12 exercise that.
13                  The bright line, I don't think there will 14 ever be a bright line, but the criterion itself, the 15 dose related criterion that is in the regulation will 16 remain as the goal to aim for for determining if, you 17 know, a prompt protective measure is necessary, or a 18 protective measure is necessary, and then the prompt 19 part of that is also the second criterion.
20                  MEMBER HALNON: Okay. Right, I think that 21 -- go ahead.
22                  MEMBER PETTI:            Michelle, this is Dave.
23 Just      to  follow  on      that,      what      about the      event 24 likelihood, including uncertainty?
25                  There has to be a cutoff, right, at some NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
72 1 probability that, you know, a ten to the minus 12 2 event is very different than a ten to the minus 5 3 event.        What --
4                    (Simultaneous speaking.)
5                    MS. HART: Right. And so for -- yeah, for 6 this rule, we're saying that whatever you are using 7 for your safety analysis, whatever that cutoff was for 8 what is appropriate to evaluate in your licensing 9 basis events, is the same cutoff that you start with.
10                    We  are    not    saying        that  you  need        to 11 necessarily have to consider events outside of that 12 frequency range that you have already used, if you're 13 using specific event frequency.
14                    Or if you're using a different measure of 15 likelihood, it's another discussion that we may have 16 to have because it's not expected that everybody would 17 use PRA in that manner, or determine event frequency.
18                    MEMBER PETTI:          Yeah.        Okay, thanks.
19                    MS. HART:          Were there any additional 20 questions on this?
21                    (Simultaneous speaking.)
22                    MEMBER HALNON:            Yeah, I was going to ask 23 if any other members have questions about criteria and 24 specifics?
25                    It seems like there's still going to be a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
73 1 gap between what an applicant desires versus what 2 you're able to provide.
3                  Is there room for getting more specific in 4 your description at this point, or is this as specific 5 as      you're    willing        to    go,        relative  to      these 6 considerations?
7                  What I'm trying to understand is the first 8 couple applicants that come in and exercise this will 9 have lengthy discussions with you, but what we're 10 trying to prevent is iterations that cost a lot of 11 money        both  in  regulatory          uncertainty      and    design 12 uncertainty.
13                  MS. HART:      Right.        I think at this point, 14 this is, you know, the right amount of what to do, and 15 the flexibility to allow for different ways to do this 16 that applicants may provide.
17                  We did have a description. I mean, it may 18 be a fairly high-level description that you do have to 19 consider internal and external events and all sources, 20 multi-module and multi-unit events, and interactions, 21 you      know,    that  you      need      to    look  at the    entire 22 potential releases for your facility.
23                  We do have some additional information on 24 how you may scope out analyses based on likelihood, 25 and we did have a consideration of release timing, and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
74 1 we gave an example from NUREG-0396, which was the 2 basis        for the  current        regulatory          framework        for 3 emergency planning that came up with the 10-mile EPZ 4 for the large light water reactors.
5                  So  I    think      we've        given  sufficient 6 information      for    applicants            to      understand      what 7 considerations that they should use.
8                  We're not giving them details on how to do 9 that at this time.          Maybe we'll learn some things as 10 we go along.
11                  MEMBER HALNON:          Okay.      Well I'm certainly 12 not an expert in this area, but it feels just to me 13 that, you know, we have an equation of risk and we've 14 only got one portion of it.
15                  We look at the consequence, and we don't 16 have a probability in that.              So nevertheless, I think 17 some of the comments coming from our groups will also 18 explore some questions there too.                    Any other members?
19                  MEMBER PETTI:          Michelle?
20                  MEMBER HALNON:          Go ahead.
21                  MEMBER PETTI:          Yeah, this is Dave again.
22 The issue of source term here, when you look at Reg 23 Guide 1.183, it clearly says that you can't use that 24 approach, or that additional considerations are needed 25 beyond what is in 1.183.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
75 1                When you read the appendix here, it's 2 fuzzy. But I assume it's, you know, what other source 3 terms associated with the licensing basis events, 4 would be sort of how you'd line that up.
5                I just worry that there's maybe a hole 6 here for light water reactors, SMRs, and then advanced 7 systems, and LWR, where there's not a lot of guidance 8 about, you know, what's an acceptable source term.
9                Maybe I'm missing Appendix B, but can you 10 help me there?
11                MS. HART:        So,      in    Appendix  B,      if    I 12 remember correctly -- I'm trying to pull it up -- we 13 do      point  to  that    if    an    applicant      does    have        a 14 probabilistic risk assessment, that you could develop 15 source terms based on that.
16                And of course, the non-light water reactor 17 PRA standard does give guidance on what is considered 18 in developing source terms.
19                The light water reactor PRA standard, of 20 course, is not -- level two and level three are not 21 endorsed at this time, but has similar information, 22 and so there's some expectation that we would have 23 that you could use that information to help you to 24 determine your beyond design basis accident source 25 terms.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
76 1                  MEMBER PETTI:          Okay.
2                  MS. HART:      And so, you know, of course we 3 do have SECY papers and we have a long history in the 4 NRC of the commission approving that non-light water 5 reactors could have mechanistic source terms, and I 6 acknowledge that we do not have specific guidance on 7 how to develop mechanistic source terms.
8                  However, we do have information and we're 9 planning to put that on the public website on how to 10 develop mechanistic source terms for non-light water 11 reactors, as well.
12                  MEMBER PETTI:          Okay, thanks.
13                  MEMBER BLEY:          Excuse me, this is Dennis 14 Bley.        Michelle?
15                  MS. HART:        Mm-hmm?
16                  MEMBER BLEY:        Can you expand on your last 17 statement a little?              I think we'd be interested in 18 that, what you're about to put on the website.
19                  MS. HART:          So, what we have done to 20 prepare for non-light water reactor licensing, we have 21 some reports, I think from Idaho National Lab and from 22 Argonne, on how to develop mechanistic source terms.
23                  It's  very      similar        to    the information 24 that's in the non-light water reactor PRA standard, 25 and so it's that kind of level of detail, like what NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
77 1 considerations to use and how to get the information, 2 and what information to be used.
3                    So it's not like Reg Guide 1.183, which 4 gives you a source term for light water reactors, it's 5 information on how to develop a source term, and any 6 other pieces of information that we can put up there.
7                    And I apologize, I haven't looked to see 8 if we have actually put it on the website yet.
9                    MEMBER BLEY:        That's okay.          I think we've 10 seen most of that, but we look forward to following 11 this up later on.
12                    MS. HART:        All right.            And so, I think 13 that was everything I wanted to talk about on this 14 slide.        Were there any additional questions?
15                    MEMBER HALNON: It does not sound like it.
16 Thank you, Michelle.
17                    MS. HART:        All right, thank you.                Next 18 slide, please.
19                    MEMBER HALNON:          And I guess it's open to 20 the members.        Is there any other questions to follow 21 up before we go into the comments from our groups?
22                    Okay. We will press on. The next part of 23 this presentation will come from Marc Nichol. Marc is 24 from NEI.
25                    Marc, you have about ten minutes to make NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
78 1 your remarks.
2                If it goes beyond ten minutes, I'm going 3 to start interrupting you, so make sure to get your 4 points out first.
5                MR. NICHOL:        Okay, thank you, Chairman, 6 Halnon, and other ACRS members.                    Just to make sure, 7 could you hear me okay?
8                MEMBER HALNON:              Yes, you're loud and 9 clear.
10                MR. NICHOL:        All right, great.        Thank you 11 for the opportunity to make remarks on the NRC's final 12 rule        and guidance      for    SMR      and  other    nuclear 13 technologies, emergency preparedness.
14                My name is Marc Nichol, senior director of 15 New Reactors at the Nuclear Energy Institutes.                          The 16 comments below are made on behalf of the nuclear 17 energy industry.
18                We've been engaging with the NRC staff on 19 performance-based EP for advanced reactor since the 20 issue was first identified in 2010, and we strongly 21 support issuance of the final rule.
22                The commission's advanced reactor policy 23 statement has encouraged the nuclear industry to 24 develop designs with enhanced safety features.
25                The industry has responded to this policy NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
79 1 goal with designs featuring smaller cores and reliance 2 on passive safety systems.
3                    These features reduced the potential for 4 accidents and increased the time available to take 5 mitigation or protective actions.
6                    The overall lower risk provides a sound 7 rationale for the EP changes proposed by the NRC 8 staff.
9                    The NRC's rule recognizes the enhanced 10 safety of advanced reactor design and establishes EP 11 requirements that are commensurate with the potential 12 consequences to the public from an accident.
13                    Most advanced reactors are expected to 14 demonstrate        that    they      can      meet      the dose      based 15 consequence limits for plume exposure EPZ at distances 16 much less than the ten mile radius used by current 17 operating reactors.
18                    In all cases, the applicant will have to 19 provide        the  NRC  with      a    site      specific    technical 20 justification for their proposed EPZ size.
21                    In some cases an advanced reactor may 22 present a lesser hazard to the public than some non-23 nuclear facilities, such as petrochemical facilities.
24                    The final rule uses essentially the same 25 EP technical basis as that underlying the requirements NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
80 1 applicable to the current operating reactors, and 2 therefore will maintain the same level of public 3 protection.
4                There will be no reduction in defense in 5 depth. Rather, EP activities are appropriately scaled 6 to reflect the potential hazards posed by a facility.
7                The rule provides clear and reasonable 8 regulatory requirements for designers, applicants, and 9 licensees.
10                We support the performance based approach 11 used in the rule as it will allow for innovation and 12 flexibility in addressing the EP requirements.
13                It  also      aligns        with      the NRC's      prior 14 approval of emergency preparedness zones for the TVA 15 Clinch River ESP.
16                We do believe, however, there is one area 17 where the rule would benefit from additional clarity.
18                The rule states that the plume exposure 19 pathway EPZ must include the area in which the public 20 dose exceeds one rem TEDi over 96 hours from the 21 release of radioactive materials from this facility 22 considering accident likelihood and source term, and 23 timing of the accident sequence in meteorology.
24                However, as was just discussed on Slide 25 24, the proposed rule of guidance does not fully NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
81 1 address the subject of accident likelihood.
2                  For example, how likely must an event be 3 to not be considered for a sizing analysis for an 4 emergency planning zone?
5                  The lack of sufficient detail in the 6 proposed guidance to inform an application leaves the 7 determination of which event should be included or 8 excluded      to  be  clarified          during        the NRC  review, 9 potentially through NRC request for information and 10 applicant revisions of the documentation.
11                  As a current example, we understand that 12 the lack of this clarity has been a challenge in the 13 NRC's review of the NuScale topical report on the EPZ 14 methodology.
15                  We believe there should be clear guidance 16 with respect to which internal and external events are 17 included.
18                  For example, defining the cutoff frequency 19 and uncertainty bounds, and consistency between the 20 application of the guidance to light water and non-21 light water reactor designs.
22                  Absent better definition criteria on this 23 topic, the NRC's goal to create regulatory stability, 24 predictability, and clarity through this rule will not 25 be fully met.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
82 1                In closing, we believe the codification of 2 the new requirements will provide for regulatory 3 stability,    predictability,              and      clarity    in      the 4 licensing process, and eliminate the need for serial 5 EP exemption requests.
6                This makes sufficient use of the NRC and 7 applicant resources.
8                The provisions are consistent with the 9 Atomic Energy Act, commission's policy statement on 10 regulations of advanced reactors, and past staff 11 requirement memorandums.
12                We also note that in addition to meeting 13 NRC requirements, a facility owner and operator will 14 be responsible for engaging state and local elected 15 officials,      emergency          management          agencies,        and 16 community to gain confidence in the siting of an 17 advanced reactor facility.
18                In  this      manner,        the      facility    owner-19 operator will work with communities to implement 20 emergency response capabilities, even in cases where 21 the EPZ is at a site boundary.
22                Therefore,        the    rule      is  important        to 23 facilitate the safe and efficient deployment of a new 24 generation of U.S. designed reactors, all producing 25 carbon-free power, an outcome that's good for our NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
83 1 economy, national security, and one that supports 2 global efforts to mitigate climate change.
3                    Thank you for the opportunity to make 4 these comments.
5                    MEMBER HALNON: Thank you, Marc. Is there 6 any questions to follow up?
7                    Okay, Ed, Dr. Lyman, you're up, if you 8 wanted to get your slides up.                    Again, ten minutes.
9                    Marc actually gave you a few more extra, 10 so come to about 12 minutes, I'll start interrupting 11 you, so go ahead and get your slides up and we 12 appreciate your comments.
13                    DR. LYMAN:        Yes, there may be a delay in 14 loading.        Let's see what's happening here.
15                    MEMBER HALNON:          Okay.
16                    DR. LYMAN:        Okay.      Sorry, this is a slow 17 process.
18                    (Simultaneous speaking.)
19                    MEMBER HALNON:          It's all right.        That's 20 okay.          Technology is not our friend always.                      All 21 right.
22                    DR. LYMAN:        I think we're in business.
23                    MEMBER HALNON:          They're starting to come 24 up, yes.
25                    DR. LYMAN: All right, there you go, okay.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309      www.nealrgross.com
 
84 1 Sorry about that.
2                Yes, on behalf of the Union of Concerned 3 Scientists, I appreciate the opportunity to discuss 4 our concerns with the draft final EP rule for SMRs and 5 ONTs.
6                So, overall UCS would welcome a truly 7 science-based      revision        to      emerge      as    planning 8 requirements that really uses the best available 9 information      to    align        protective          measures          to 10 radiological      risks      while      fully      accounting        for 11 uncertainties and the need for defense in depth.
12                And I believe that would require up front 13 an acknowledgment that if you're going to go to a 14 mechanistic, source term based EPZ determination, that 15 that could potentially lead to larger EPZ sizes than 16 the current ten miles, as well as lower ones, a 17 priori, but the underlying presumption here that they 18 won't necessarily be smaller than ten miles indicates 19 that there is a bias built into the entire process 20 from the get-go, and that's a concern to me.
21                The draft final rule largely seems to 22 provide cover for reactor vendors who have already 23 made the case to the public, and presumably their 24 investors, that their designs do not need an off-site 25 EPZ.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
85 1                    And if you look at the Nuclear Industry 2 Council's vendor survey I have provided recently, 3 that's        clear that    100    percent        of  the developers 4 surveyed already believe that they have the site 5 boundary EPZ low, or below without even presumably 6 having a rule to help them determine that.
7                    So, this is a step function.              If you can 8 show that you don't need an EPZ beyond the site 9 boundary, the applicant would be absolved of any off-10 site EP requirements, except for the kind of vague 11 communication requirements that we heard of earlier, 12 but there are no firm requirements for that.
13                    And then the entire offsite EP burden 14 would fall on public emergency management agencies, 15 which is really an unfunded mandate.
16                    And not only may these agencies lack the 17 necessary radiological expertise, especially if you're 18 dropping an SMR or a microreactor in a community 19 that's never had any experience with nuclear power, 20 then it's unreasonable to expect that they may have 21 the resources or the expertise to be able to do that 22 without a firm requirement consultation with the 23 applicant, who is fully familiar with the reactor 24 design and safety aspects.
25                    And in addition, there's environmental NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
86 1 justice impact of this as well by putting that entire 2 burden on local populations.
3                    There could be a variation depending on 4 the resources available to local emergency management 5 agencies' off-site response.
6                    There is a financial component to that, 7 the equipment and training that's needed, and that 8 simply        could  lead      to    an    implicit        bias    in      the 9 application of this rule.
10                    Overall, we're concerned that there's an 11 overall reduction to defense in depth associated with 12 the approach to licensing new reactor technologies 13 that essentially the PRA is used for a broad suite of 14 regulatory rollbacks compared to the current licensing 15 basis for reactors, including not just EP, but also 16 security, the use of safety grade equipment, and the 17 existence          of    a      pressure          resisting      physical 18 containment.
19                    All those things together could lead to a 20 significant reduction to defense in depth based on 21 single PRA analysis.
22                    And so, we have general concerns about 23 that        and  how  this      EPZ    rule        could  potentially 24 contribute to that reduction to defense in depth.
25                    We've heard about event selection.                            I NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
87 1 think the committee seems to get the issue that we're 2 concerned that if the rule is not specific enough --
3 and I mean the rule, not simply the guidance, but the 4 rule to -- you need that specificity to prevent 5 applicants    from  fine-tuning            the      event  selection 6 analysis to achieve this significant goal of not 7 having the off-site EPZ, or any of those requirements.
8                So that's a pretty big incentive to game 9 this process, and that's why there need to be firm 10 ground rules to make sure there's a level playing 11 field for all applicants.
12                And that's already been discussed.
13                The NuScale draft topical report has been 14 essentially stalled for years because of an argument 15 that where you've cut off external event frequencies, 16 and also the Oklo Combined Operating License also 17 appears to be stalled because of a dispute over how 18 you define maximum credible accident.
19                So, this is already coming up, and so the 20 vague rule and guidance language will only contribute 21 to that.
22                The initial proposed rule used the term 23 spectrum of credible accidents, which was not defined 24 anywhere, and the draft final rule is actually even 25 less specific because -- or leaning sideways, going NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
88 1 from spectrum of credible accidents, to just saying 2 you have to consider various factors, but it doesn't 3 say the extent to which you have to consider them or 4 to    provide    any    standards          for    how    those    will      be 5 considered.
6                  And the draft guidance and its reference 7 to licensing basis events doesn't help because that is 8 also not defined anywhere in the regulations, and we 9 don't know where things are going with Part 53, but 10 this is independent of that, so that doesn't help in 11 my view, and I think I actually agree with NEI's 12 comment        that    by    not      addressing          this  likelihood 13 question one way or another, you're not really moving 14 the ball forward.
15                  We heard that FEMA objects to significant 16 aspects        of  this    rule,      especially          related    to      the 17 elimination        of    any      off-site        or    formal    off-site 18 emergency planning on the part of the licensees, and 19 the Department of Energy deputy under secretary Jay 20 Tilden,        also  made      similar        comments        in  a    rather 21 remarkable sequence of events, where he on behalf of 22 his        office    submitted          critical          comments,        also 23 highlighting this issue of accident selection and lack 24 of defense in depth, but it was only the next day when 25 the NNSA administrator walked those back.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
89 1                I don't believe Mr. Tilden was unfamiliar 2 with or didn't expect the consequences of what he did, 3 and so I would interpret this as a public airing of 4 significant      differences          between          NNSA  and        its 5 radiological    functions,          its      concern      for    counter 6 terrorism and the Department of Energy's Nuclear 7 Energy Office and its promotional role in pushing 8 these things forward.
9                So, I would give those remarks significant 10 consideration,      even      though        they      were  officially 11 withdrawn.
12                The addition of the seven criterion from 13 the original proposed rule that this predetermined 14 prompt protective measure standard, I believe it could 15 potentially reduce the equivalence of this rule with 16 the current licensing basis for EPZ size because that 17 does not seem to be present in NUREG-0396, which is 18 tied to the EPA tags.
19                It seems to me that satisfying the EPA tag 20 itself is the standard for when predetermined prompt 21 protective measures would be needed.
22                And so, I feel like adding this additional 23 criterion really weakens the rule even further, makes 24 it more vague and harder for the public to understand.
25                Other      technical            aspects      that        are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
90 1 inconsistent with department basis or missing the lack 2 of addressing acute exposures, the potential for acute 3 fatalities from a large radiological release.
4                There's no separate standard for that 5 anymore, and there's no consideration of thyroid dose 6 requirements which could -- or should be distinct from 7 the whole-body dose, especially for children.
8                It  could      lead    to      potentially    a    more 9 sensitive safety requirement for those more sensitive 10 groups, with regard to thyroid exposure.
11                They also have a scope -- is inconsistent 12 because I believe large light water reactors, should, 13 you know, if you're going with what's sauce for the 14 goose is sauce for the gander, and I believe that a 15 mechanistic    source      term      based        technically      based 16 approach for determining EPZ size could develop to 17 larger EPZs for a large light water reactor in ten 18 miles, and I just have some examples from Fukushima, 19 which I'm not going to go through, but you can review 20 those, and also calculations from advanced reactors so 21 the notion that advanced reactors are somehow -- or 22 anything that calls itself an advanced reactor is 23 necessarily going to be smaller, safer, and have to 24 have potentially lower off-site consequences, is not 25 validated by analyses both from the distant past, and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
91 1 also the recent past.
2                    Here are some examples from fast reactors.
3                    And so, another big gap is not addressing 4 sabotage        events,    and      when      you're      talking      about 5 accident likelihood, again, the issue is sabotage, 6 which is essentially orthogonal to that because you 7 can't        really  rule    out    sabotage          events  based        on 8 likelihood.
9                    That is a separate component that will 10 always require addressing large radiological releases.
11                    It could be caused by a sabotage event, 12 even if that would be a very low frequency event and 13 accident        space,  and      the    public        deserves    to      be 14 protected from that off-site.
15                    And finally, other aspects.
16                    We heard about what's in the guidance, 17 about        other  sources        and      how      do  you    address 18 multi-module effects, all very vague, and without more 19 specificity, again, you're going to have this very 20 relativistic, very subjective approach to this rule, 21 and I think the public -- I'm confused.
22                    If you not only have flexibility in how 23 you meet the requirements, but also how essentially 24 you design those requirements, and that doesn't give 25 enough        granularity        to      what's        actually      being NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
92 1 accomplished to protect the public here, and it's 2 another significant consideration, and I'm always 3 keeping in mind that the NRC has a responsibility to 4 the public to make sure there's transparency in what 5 it's doing, and that requires some level of specific 6 standards, which are inspectable and enforceable, and 7 that means clarity in the rule.
8                    And that's all I have, and thank you, and 9 I hope I didn't exceed my time this time.                  Thank you.
10                    MEMBER HALNON:              No, you're fine, Dr.
11 Lyman.        Any members have questions for Dr. Lyman?
12                    Okay. At this time, I'm going to ask the 13 -- see, there is one request to make comment from 14 somebody.
15                    Oh see, I have a hand up somewhere.                  Who 16 just raised their hand?
17                    MR. SNODDERLY:          Member Halnon, I believe 18 it's Gary Becker from NuScale.
19                    MEMBER HALNON:            Okay, yeah. So that's 20 what I was just going to recognize Gary Becker.
21                    So Gary, as always, as I've asked the 22 others to be brief, but don't compromise your message.
23                    MR. BECKER:        Okay, thank you.        Can you 24 hear me okay?
25                    MEMBER HALNON:              Yes, you're loud and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309      www.nealrgross.com
 
93 1 clear.
2                MR. BECKER:        Great, thank you, and thank 3 you very much for the time to speak today.                          At the 4 outset, I want to note that overall, NuScale supports 5 this rulemaking.
6                We    believe          it's        needed      and      it's 7 appropriate, and in many respects, it's very well 8 considered.
9                But  as    I    stated        at    the  subcommittee 10 meeting in September, we do have, NuScale, concerns 11 about the lack of clarity in the new rule and Reg 12 Guide 1242, particularly on the issue of the event 13 selection for EPZ sizing.
14                I  did    some      advanced          written    comments 15 yesterday      that  I  think      will      be    included    in      the 16 transcript, and I don't want to recount all those 17 here, but the fact of the matter is that there's 18 nothing in the rule, and very little in the guidance 19 to guide us on the appropriate accident likelihood for 20 consideration for EPZ sizing.
21                In other words, have unlikely an event 22 must be to not consider it for EPZ sizing.
23                And the conversation I heard today did 24 nothing really to help ease my concerns.
25                In response to some questions today, NRC NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
94 1 indicated      that  basically          they      can't  provide        any 2 detailed information on event selection now, but they 3 indicated that an applicant needs to, I think the 4 quote was find all of the potential large releases, 5 end quote, and look into every event in the so-called 6 licensing basis of Chapter 15 and 19.
7                Surely that can't be the standard.                      The 8 entire scope of Chapter 19, at least in the case of a 9 PWR like NuScale, essentially has no bounds.                              It 10 evaluates      nearly    every      sequence,        regardless        of 11 frequency.
12                And in fact, the applicants using NEI 13 18-04, which are by definition non-LWRs, they're able 14 to limit the bounds of their accident frequency to 15 their licensing basis events, which have a defined 16 frequency of greater than 5E to the minus seventh, so 17 that provides them a starting point, but LWRs don't 18 even get that level of guidance, let alone anything to 19 guide us further in the event screening beyond the 20 realm of so-called licensing basis events.
21                And NRC pointed to the need for prompt 22 protective      measures      as    one      guide    post  in    event 23 selection, which just simply does not answer the 24 question of how likely an event to consider?
25                And finally I'll note that we don't think NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
95 1 that this is a question that's specific to sites or 2 technologies as was suggested today.
3                We  believe        this        issue  of    accident 4 likelihood and event selection is essential to the EPZ 5 size and aspect of the rulemaking.
6                It's a generic question, and it speaks to 7 the policy of how unlikely an event should be for pre-8 planned emergency actions to be developed around it.
9 In other words, what is reasonable to consider?
10                The rule as it is in the guidance, with 11 respect to EPZ sizing, does not achieve regulatory 12 predictability,      and    it  doesn't        seem  to  be    risk-13 informed at all. It doesn't define the frequency size 14 risk situation.
15                I do want to spend a little bit of time on 16 potential, you know, where we could potentially go 17 from here, where NuScale sees there's a path to 18 providing a better definition.
19                Section 3.7 of the guidance probabilistic 20 dose aggregation gives us some clues, and NRC pointed 21 a little bit to that today.
22                And that might help us make this rule and 23 guidance risk-informed performance based.
24                That  section        discusses        how  NUREG-0396 25 examines the conditional probability of exceeding NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
96 1 various dose criteria, and it concluded that the ten 2 mile EPZ was a sufficient size of the projected doses 3 from traditional DVAs and most core melt sequences 4 would not achieve PAG levels outside EPZ.
5                  And  for      worst      core      melt  sequences, 6 immediate life threatening doses -- in other words, 7 200 rem, would not generally occur outside EPZ.
8                  That framework may provide an opportunity 9 to bring some more clarity to this rule and guidance 10 on event selection.
11                  I want to point out that in SECY-97-020, 12 staff acknowledged that two aspects of modifying EPZ 13 framework would include addressing the probability 14 level of accidents to consider an emergency planning, 15 and the use of increased safety in one level of the 16 defense        in  depth    framework          to    justify    reducing 17 requirements in another level.
18                  NUREG-0396, turning back to what the NRC 19 and its counterparts did in the NUREG-0396.
20                  They  began      with      a  starting      point        of 21 accumulative probability of a core melt accident of 22 approximately one in 20,000 per reactor year, 5E to 23 the minus five.
24                  Now,  I'll      note      that's      a  core    damage 25 probability.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
97 1            That's roughly on the order of the core damage 2 frequency safety goal that was later established.
3                    For those core melt accidents, NUREG-0396 4 found that the ten mile EPZ resulted in a 30 percent 5 change of exceeding PAG levels, so the resulting 6 probability of exceeding PAG doses at ten miles for an 7 LLWR, a large light water reactor, is 1.5E to the 8 minus fifth per reactor year, one chance in 50,000 per 9 reactor year.
10                    With uncertainty, it should be noted.
11                    Clearly and explicitly timed, the EPZ 12 sizing        methodology    to    this      performance    level,        a 13 likelihood of exceeding PAGs, that EPZ boundary of 14 about        1E  to  minus      5,    would        be risk-informed, 15 performance          based,        and      consistent      with        the 16 commission's safety goals, and would very clearly 17 allow as the staff envisioned in that SECY-97-020, for 18 the use of increased safety in one level, the defense 19 in depth, which is the core damage prevention level, 20 to justify offsetting requirements in another level, 21 emergency planning.
22                    In  fact,      I'll    note      it would  seem      to 23 address Mr. Lyman's concern over reduction in overall 24 defense in depth quite well.
25                    Invoking this analogous performance level NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
98 1 of the ten mile EPZ, which is again 1.5E to the minus 2 five likelihood of exceeding PAGs for the reference 3 generic plant that was analyzed, that performance 4 level doesn't alone answer the question of event 5 frequency, especially when it comes to some external 6 event, external hazard event initiators, so there's 7 still need to be work done on specific sequence screen 8 selection.
9                But it seems like perhaps an appropriate 10 starting point.
11                In conclusion, NuScale does not believe 12 it's appropriate to defer detailed consideration of 13 event selection to an applicant seeking to implement 14 the guidance.
15                We believe this question's essential to 16 the rulemaking effort, and it needs to be resolved on 17 a generic basis, and subject to the Commission's 18 approval as part of this rulemaking process.
19                Thank you very much.
20                MEMBER HALNON:            Thank you, Gary.        Any 21 other members of the public that would like to make a 22 comment?
23                CHAIR SUNSERI:          And just as a reminder, 24 you'll have to unmute yourself by using *6 if you're 25 a member of the public.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309    www.nealrgross.com
 
99 1                MEMBER HALNON:            Okay, I don't hear any 2 other comments.
3                At this point then, we're going to close 4 the public comment period, and I'm going to ask the 5 ACRS members if anyone would like to either make a 6 comment or discuss any of the topics that were brought 7 up.
8                This is an ACRS member time to kind of 9 discuss what we're going to be later putting into a 10 letter report.
11                So  any      comments,          any    questions,        any 12 thoughts from ACRS members?
13                MEMBER DIMITRIJEVIC:                  Hi Greg, this is 14 Vesna.
15                I just would like to make a very general 16 comment because I struggle a lot with this question of 17 specificity, and setting the likelihood of the -- you 18 know, events to be selected defining this maximum 19 credible accident, and I really couldn't find.
20                I mean, I thought about that a lot before 21 this meeting. I couldn't really find something.
22                We tried with the thing -- is it a better 23 solution to state, like, you know, less specific or 24 more specific.
25                And my main concern in this area is when NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
100 1 it comes to uncertainty.                You know, if you specify 2 certain frequencies, then you get in this area of how 3 big are uncertainties associated with those, you know, 4 events and likelihoods?
5                  And we are talking, you know, CDF or LERF, 6 and uncertainties associated with this.
7                  And so in this moment I decide that I 8 don't have a really -- I mean, a big issue with this 9 lack of the specificity, and I heard the NuScale 10 presentation and I see that this is something which 11 will work for them          and it can be discussed with the 12 staff and addressed on the specific case, but I think 13 that actually once when we don't really have a good 14 way        to  address    big      uncertainties,          then        that 15 specificity, you know, we'll always struggle in these 16 situations.
17                  So, you know, I was -- that's one of the 18 areas I'm very interested in. What to do, what is the 19 right approach in situations when you have, you know, 20 huge        uncertainties        associated          with,  you      know, 21 numerical answers, so.
22                  So I just wanted to make these general 23 comments, so.
24                  MEMBER HALNON:          Thanks, Vesna.
25                  It  sounds      like      there's      some  guidance NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
101 1 options, information out there that we could get a 2 little bit more specific to get as was put forward as 3 a starting point, but again, I want to rely on some of 4 y'all that have much more experience in the PRA and 5 the uncertainty likelihood in the areas of topics.
6                    So, if any of the other members have any 7 comments on that, I would appreciate it.
8                    Okay, well, it doesn't sound like there's 9 a lot of things rolling, moving around in your all's 10 heads.        It sounds like we've got a pretty good path 11 forward.
12                    I  do  appreciate          everybody's      endurance 13 through some of the questions.
14                    I know that, you know, this is a very long 15 and complex -- I mean, it's a short rule, but it's 16 very      complex    when    you    start        looking    at  all      the 17 tentacles into other Reg Guides and other areas of 18 analysis that are needed, and then the implications of 19 having that one decision of EPZ less than the site 20 boundary, versus greater than the site boundary.
21                    That's a very important, specific, and 22 precedent-setting decision that has to be made, and 23 we'll        put  forward    --    if    the    NRC    staff  will        be 24 reviewing that in earnest I am sure, and putting a lot 25 of    questions,      especially        in    the      early  stages        of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
102 1 exercising this rule and guidance.
2                  So, I don't think there is any question 3 that the NRC staff would not come to the right 4 decisions and whatnot.
5                  It really comes down to is the rule and 6 the      guidance  at  this      point        specific    enough        and 7 flexible enough, I guess that's that balance that --
8 remember Dennis was talking about?
9                  Is it in its framework that we can deal 10 with and that we can understand and provide assurance 11 that this was going to come out with the right answer 12 at the end?
13                  And I think that all the work that's been 14 done, all the comments that are made, and all the 15 questions that were asked, I think it all is again, a 16 learning application, and some of the aspects of this 17 rule that will be determined during the first couple 18 applicants.
19                  They may be painful, but I think they'll 20 be good lessons learned in the long run, so we will 21 continue      to  think      through        this,    and  we'll        be 22 developing a letter report and reading that into the 23 record later into this whole committee meeting when 24 Chairman Sunseri feels it's the right time.
25                  But we've got a lot of stuff to do, so we NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
103 1 will continue to work through the agenda items.
2                So with that, I'll open one last time for 3 any member to discuss or ask a question.
4                Given none, Chairman Sunseri, it's back to 5 you.
6                CHAIR SUNSERI: Thank you, Greg, and thank 7 you, members.
8                So, we're off my expectation a little bit.
9 We're not going to get an opportunity to read in this 10 letter report.
11                We do have a hard stop at noon to pick up 12 with the Planning and Procedures Subcommittee Meeting, 13 which is scheduled for noon, so we will break here 14 soon to support the rest of the schedule, and we will 15 reconvene this full committee meeting at 1:00 p.m.
16                But just to let you know, I did allow the 17 conversation and presentation material to cut into our 18 deliberation time for this morning.
19                We were supposed to start deliberating at 20 11:00, but I thought the discussion was good and would 21 help us in our deliberation as we go forward.
22                So even though we didn't get to reading in 23 the letter and discussing our major points with that, 24 I think the information that we received will help us 25 when we get to that point in time.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309    www.nealrgross.com
 
104 1                  So, with that said then, we will find the 2 time in the agenda to read in this report and get our 3 major comments.
4                  We will soon here recess until 1:00 p.m.,
5 at which time at 1:00 p.m. we will take up the ISG 6 Supplemental Guidance for radiological consequence 7 analysis using the alternate source term.                I'm having 8 trouble speaking today.
9                  Anyway, does any members have anything 10 they want to say, or any comments before we recess for 11 lunch?
12                  MEMBER HALNON:          Matt, this is Greg, just 13 one last time I wanted to thank the NRC staff.
14                  I think they're very responsive to our 15 questions and tolerant of our wandering through this 16 complex guidance and rule -- I do think they did an 17 excellent job, so just wanted to give them a kudos.
18                  CHAIR SUNSERI:          Yeah, I appreciate that, 19 Greg.        I remiss in doing that.
20                  I thought all the speakers that we heard 21 from today did a good job, and, you know, at least in 22 my mind, this is a complicated issue, as you pointed 23 out.
24                  I mean, the relationship between the NRC 25 and FEMA and how they interact with each other to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309    www.nealrgross.com
 
105 1 govern this topical area is much like the NRC and OSHA 2 in the industrial safety arena, where there, you know, 3 there is a dominant agency, and then, you know, they 4 try to coordinate so they don't double-dip, so to 5 speak.
6                  And I think that is probably something 7 that we need to sort out as we contemplate our letter 8 report.
9                  Anyway, any other members? All right, it's 10 11:50 Eastern Time.            We're going to recess the full 11 committee. At 12:00 noon, we will pick up subcommittee 12 meeting        on    the      planning          and    procedures.
13                  So, thank you and we will see you back 14 here at 1:00.
15                  And oh, by the way, the Planning and 16 Procedure Subcommittee is on this same Teams channel, 17 so you don't have to exit to participate in it. Thank 18 you.
19                  (Whereupon, the above-entitled matter went 20 off the record at 11:50 a.m. and resumed at 1:00 p.m.)
21                  CHAIR SUNSERI:              We will go ahead and 22 reconvene the ACRS meeting now.
23                  I will start with a roll call following 24 lunch, so begin with Ron Ballinger.
25                  MEMBER BALLINGER:            Here.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
106 1                CHAIR SUNSERI:          Vicki Bier?
2                MEMBER BIER:        Here.
3                CHAIR SUNSERI:          Dennis Bley?
4                MEMBER BLEY:        Here.
5                CHAIR SUNSERI:          Charles Brown?
6                MEMBER BROWN:          Here.
7                CHAIR SUNSERI:          Vesna Dimitrijevic?
8                MEMBER DIMITRIJEVIC:                Here.
9                CHAIR SUNSERI:          Greg Halnon?
10                MEMBER HALNON:          Here.
11                CHAIR SUNSERI:          Walt Kirchner?
12                MEMBER KIRCHNER:            Here.
13                CHAIR SUNSERI:          Jose March-Leuba?
14                MEMBER MARCH-LEUBA:              Here.
15                CHAIR SUNSERI:          Dave Petti?
16                MEMBER PETTI:          Here.
17                CHAIR SUNSERI:          Joy Rempe?
18                VICE CHAIR REMPE:            Here.
19                CHAIR SUNSERI:          And, myself.
20                So, thank you all.                  Welcome back.          I 21 appreciate your patience this morning.                      We have a 22 pretty heavy agenda as I mentioned, and I'll try to do 23 better with breaks and culminations.
24                So, having said that, we don't have a 25 break scheduled this afternoon, but in about an hour NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
107 1 or so, I'll leave it to the presenters to let me know 2 when you find a good place in your presentations for 3 a 15 to 20 minute break.
4                Okay, so just advise me when that comes up 5 and then we will take a break in about an hour, hour 6 and 10 minutes or so.
7                So, the next topic on our agenda is the 8 Supplemental Guidance for Radiological Consequence 9 Analysis Using Alternate Force Terms, and I will turn 10 to Member Petti for this session.
11                Dave, it's all yours.
12                MEMBER PETTI:          Thank you, Matt.
13                Members, before we start I just want to 14 say this is a very interesting topic.                  We're going to 15 be hearing about alternative source terms in our 16 subcommittee week in November.                    The update of Reg 17 Guide 1.183. So, these sort of dovetail nicely, so 18 pay close attention.
19                With that, let me invite NRR management 20 Meena to kick things off.
21                MS. KHANNA:        Good afternoon Member Petti 22 and ACRS members.        I'm Meena Khanna, and I serve as 23 the Deputy Director of the Division of Risk Assessment 24 in NRR.
25                Thank you for the opportunity today for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
108 1 the staff to share advances in our regulatory reviews 2 of      radiological      consequence            analysis,      using        the 3 alternate source term.
4                    I do want to note that Mike Franovich 5 really wanted to be here today, however, he is in 6 Vienna participating in the IAEA technical meetings 7 for two weeks.          But, he did ask that I convey his 8 apologies for not being here today.
9                    The NRR staff briefed the subcommittee 10 members        on    this      topic        on      July    23,    and        we 11 really appreciate the feedback that we received.
12                    At that time, we highlighted a few recent 13 regulatory transformations to improve our efficiency 14 and reliability as regulators.
15                    A  major      theme      is    that    our  licensing 16 reviews        or    other        regulatory            decisions,        and 17 backfit/forwardfit actions must be risk informed.
18                    There      are        two        particular        staff 19 requirements memoranda that have provided guidance and 20 direction to the staff on these times.                      One regarding 21 MD 8.4 on backfitting and forwardfitting and issue 22 finality; and the other associated with NuScale's 23 inadvertent actuation block valves, also shown on the 24 slide.
25                    As noted in the November 2019 memo to the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
109 1 executive director for operations on applying risk 2 informed principles, the NRC's application of risk 3 informed        decision      making        continues      to  evolve        as 4 improved realism, evaluation techniques, and other 5 information are applied to improve our decisions.
6                    With that, sorry, let me start this over.
7 What that means to the staff is that there are 8 tremendous opportunities to apply engineering and risk 9 insights        to  inform      our    traditional        deterministic 10 reviews.
11                    There      is      a    significant        amount          of 12 information that we have today to support our reviews, 13 including plant operating experience, as well as our 14 experiences from post-Fukushima activities, to make 15 more realistic and ultimately better decisions.
16                    In  addition,          cultural        realignment        is 17 needed        to  ensure      that      we      identify    and    resolve 18 challenges and roadblocks for the appropriate and 19 consistent integration of risk insights.
20                    Important agency activities to address --
21                    (Simultaneous speaking.)
22                    MS. KHANNA:        I'm sorry, I'll continue.
23                    CHAIR SUNSERI:            If you are not a member 24 speaking, please mute your microphone, please.
25                    Thank you.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
110 1                    MS. KHANNA:          Okay, thanks.            I'll start 2 over with that sentence.
3                    In  addition,          cultural        realignment        is 4 needed        to  ensure      that      we      identify      and    resolve 5 challenges and roadblocks for the appropriate and 6 consistent integration of risk insights.
7                    Important agency activities to address 8 NRC's internal cultural realignment needs are detailed 9 in the previously mentioned memo to the EDO.
10                    Most recently, the Be riskSMART initiative 11 is driving agency wide practices for a uniform risk 12 and reward mind set, and use of graded approaches in 13 our safety, security, and other agency business.
14                    The development of the ISG serves as an 15 example of NRC's continuous efforts in working towards 16 becoming a more modern and risk informed regulator.
17                    Today you will hear from a collective 18 strength of a diverse team with deep experience in 19 seismic          analysis,          plant        systems,        component 20 engineering, operating experience, and risk assessment 21 on top of accident and consequence analysis.
22                    After the staff's presentation, you will 23 be hearing from two NRC staff members regarding some 24 different views related to the in arms staff guidance.
25                    It  is      important          to    note  that        the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
111 1 information pertinent to these different views is not 2 publicly available, nor has the staff responsible for 3 the ISG received the details on these matters as yet.
4                  It is also important to note that these 5 different views represent the personal views of these 6 individuals, and not of the NRC.
7                  At  this      moment,          NRC  management        is 8 currently reviewing these differing views under the 9 established process and at this time, a final decision 10 on the merits of these differing views has not been 11 issued.
12                  We will carefully consider the supporting 13 details of the different views we hear today, and once 14 a final decision is made available to the staff, we 15 will evaluate if any of these issues impact with 16 positions stated in the ISG.
17                  I do want to express my appreciation to 18 Kevin Hsueh and his team, for all their significant 19 contributions to the ISG. As you know, there has been 20 quite a significant amount of work done by the team.
21                  And at this time, I'm going to turn the 22 meeting over to Jerry.
23                  Thank you.
24                  MR. DOZIER:        Good afternoon.        My name is 25 Jerry        Dozier,  I'm    a    Senior        Reliability    and      Risk NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
112 1 Analyst in the Radiation Protection and Consequences 2 Branch, in the Division of Risk Assessment.
3                  First, we will hear from John Parillo 4 regarding the use of risk insights in four MSIV 5 leakage LARs, followed by Dr. Shilp Vasavada, who will 6 provide an overview of the ISG, and then I will 7 provide an overview of public comments with some 8 examples.
9                  Steve Jones, from the Division of Safety 10 Systems, and Dr. Elijah Dickson, an expert in accident 11 dose        analysis,    may      be    responding    to    specific 12 questions.        John Parillo has our next slide.
13                  MR. PARILLO:        Thank you, Jerry.
14                  Slide 4 includes excerpts from Section 15 50.67, Accident Source Term, and highlights that the 16 rule states the NRC may issue the amendment only if 17 the applicant's analysis demonstrate with reasonable 18 assurance, that specific dose acceptance criteria will 19 not be exceeded.
20                  The regulation does not postulate a cause 21 for the accident, or how the analysis should be 22 performed.        Assumptions that are acceptable to the 23 staff are contained in Reg Guide 1.183.                  However, the 24 Reg Guide does not provide an acceptable aerosol 25 deposition model for the important BWR mainstream NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
113 1 isolation valve leakage pathway.
2                    Slide 5?
3                    As stated previously, Reg Guide 1.183 does 4 not contain an MSIV leakage aerosol deposition model.
5 In addition, the staff has concerns with the aerosol 6 settling velocities used in researcher's accident 7 evaluation branch report AEB-98-03.
8                    This report was an assessment of the 9 radiological consequences for the Perry Pilot Plant 10 application, which included an assessment of MSIV 11 leakage.
12                    In 2006, the NRC issued a regulatory issue 13 summary,        which    included          general      concepts        that 14 licensees should consider when modeling main steamline 15 deposition.
16                    However, the risks did not provide an 17 acceptable        model,    or    a    reference      to  one,      that 18 licensees        could  follow      to    provide      confidence        in 19 gaining staff acceptance of their LARs.
20                    As such, the risk did not resolve the 21 ongoing issues with the assessment of MSIV leakage.
22                    In 2009 the NRC published Draft Guide 1199 23 for public comment as a proposed revision to Reg Guide 24 1.183.        DG 1199 provided a model for assessing MSIV 25 leakage. However, the approach described in the draft NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
114 1 guide proved to be very challenging for licensees and 2 has never been implemented in a license amendment 3 request.
4                    Slide 6?
5                    Slide      6      summarizes            a    significant 6 uncertainty and counted in the review of the four 7 recent MSIV leakage amendment requests.
8                    The interaction between aerosol removal by 9 drywell sprays and the subsequent aerosol removal due 10 to    main    steamline      deposition,          as    modeled    by      the 11 licensees, was questioned.
12                    Sensitivity analyses were submitted that 13 indicated that if the power conversion system is 14 assumed to be intact, providing a pathway to the 15 condenser, the dose reduction would be substantial.
16                    The    effectiveness            of      an  intact      power 17 conversion        system      providing          a    pathway      to      the 18 condenser,        is  acknowledged            by    the    NRC  staff        as 19 evidence by assumptions in Appendix C of Reg Guide 20 1.183,        for  the  evaluation            of    the    BWR  rod-drop 21 accident.
22                    For    this      accident,          a    pathway    to      the 23 condenser        is  assumed        without        any    conditions          or 24 specifications. However, for the MSIV leakage pathway 25 in Appendix A, current guidance discusses the need for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
115 1 components in the power conversion system to be safe 2 shut down, earthquake qualified to credit hold up and 3 deposition.
4                Slide 7.
5                Slide    7    shows      the      total main      steam 6 isolation      valve  technical        specification      allowable 7 leakage for the boiling water reactive fleet.
8                The recently approved amendments allowed 9 four plants that had been operating with MSIV leakage 10 limits among the lowest in the industry as shown in 11 red, to increase their allowable MSIV leakage limits 12 to values more representative of the fleet, as shown 13 in green.
14                Please note that the Fitzpatrick plant was 15 not only operating with the lowest MSIV leakage in the 16 fleet, but was the last BWR operating with the more 17 restrictive thyroid dose acceptance criteria prior to 18 adopting the alternative source term methodology in 19 conjunction with its MSIV leakage increase request.
20                It should be noted that a major driver for 21 licensees requesting increases in their allowable MSIV 22 leakage, is to reduce the significant worker dose 23 incurred during maintenance activities required to 24 maintain very low MSIV leakage values.
25                In addition, the committee should be aware NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
116 1 that the subject LARs did not request credit for the 2 substantial reduction in dose from suppression pool 3 scrubbing, or credit for a realistic post-accident 4 drywell pressure profile.
5                  Slide 8.
6                  Slide 8 depicts how the NRC staff used 7 risk insights to support its conclusion of reasonable 8 assurance.        The key points that we would like to 9 convey are: the licensee's sensitivity analyses are 10 not part of their licensing basis analyses of record.
11                  A  pathway        to    the      condenser  was      not 12 credited      in  the  analyses        of      record. And,      the 13 licensees provided analyses which met the acceptance 14 criteria in 10 CFR 50.67.
15                  And,    the      staff's          determination        of 16 reasonable assurance was supported by the recognition 17 that there is a high probability that doses will be 18 significantly        lower      than      those      estimated  by      the 19 licensees, using deterministic methods that do not 20 credit hold up and deposition of the main steam 21 isolation valve leakage within the power conversion 22 system.
23                  This    essential          concept    explains        the 24 relationship between the review of the four license 25 amendment requests, and the use of risk insights to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
117 1 support our deterministic reviews.
2                  Slide 9.
3                  To summarize, the four LARs were completed 4 using        a team  approach.            Each      safety evaluation 5 includes a section on risk and engineering insights to 6 support the staff's reasonable assurance finding.
7                  The ISG is being developed to memorialize 8 the staff's risk and engineering insights, as employed 9 in the four safety evaluations.
10                  Slide 10?
11                  Slide 10 describes staff efforts to revise 12 Reg Guide 1.183.        The draft guide contains three MSIV 13 leakage models, as well as a streamlined procedure to 14 allow credit for an intact power conversion system 15 employing insights from the ISG.
16                  The staff's intention is that the revised 17 guidance will provide licensees with a methodology 18 that will have a more predictable regulatory outcome.
19                  Now, Dr. Shilp Vasavada will discuss the 20 technical content of the ISG.
21                  MR. VASAVADA:          Okay, thanks, John.
22                  This is Shilp Vasavada, and I work in the 23 Division of Risk Assessment in NRR. I will provide an 24 overview of the ISG, starting with the technical 25 context.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
118 1                As John very clearly explained, the NRC 2 staff can be faced with review challenges due to input 3 parameter      uncertainty        in      the      dose calculations 4 submitted by the licensees.
5                Most of these dose calculations do not 6 credit any of the SSEs beyond the outboard MSIVs.
7 And, quantitative credit, as John pointed out, which 8 changes the analysis of record for holdup in the 9 condenser, is available through that 1999 safety 10 evaluation on a BWRG topical.
11                The staff recognized again as any great 12 team approach, that realistic pathways for efficient 13 products exist through the power conversion system, 14 which can help overcome review challenges and support 15 the staff in reaching a reasonable assurance finding.
16                Next slide, please.
17                What I said verbally in the previous slide 18 can be depicted pictorially using this slide and the 19 next one.      This slide essentially shows how the MSIV 20 dose calculations, or MSI leakage dose calculations, 21 are actually performed, which is that everything 22 outside the, I'm sorry, downstream of the outboard 23 MSIVs is considered to not exist, and the leakage is 24 considered to be a ground level leakage to the turbine 25 building.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
119 1                  Next slide.
2                  However, in reality, there are several 3 pathways for the fission products to, through the 4 power conversion system as is illustrated in this 5 figure.        Basically, there is a conservative double 6 forest of piping.
7                  And, these pathways can provide holdup 8 volumes if the configuration is viewed realistically, 9 than in the, rather than in the stylized postulated 10 manner which was illustrated in the previous slide.
11                  So, the technical assessment we performed, 12 which supports this ISG, was essentially done to 13 double up the confidence in the availability of these 14 realistic pathways and thereby, in the ability of the 15 staff to use them as a decision making input when 16 performing their reviews.
17                  Next slide, please.
18                  We  are    on    slide      14,    and this      slide 19 provides a very high level overview of the key inputs 20 that went into the technical assessment.                    We provided 21 additional details during the subcommittee meeting.
22                  We essentially cast the problem of whether 23 there is high confidence in the availability of the 24 realistic pathways in the form of a risk triplet.
25                  Having done that, we looked at operational NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
120 1 insights, random failure properties for components 2 such as MOVs, which are present in the realistic 3 pathways, and the seismic capacity of the components 4 in the realistic pathway.
5                  Taking    all      of      this      together    in      an 6 integrated      manner,      we    double        up    the    technical 7 assessment to, which is supporting this particular 8 ISG.
9                  Next slide, please.
10                  I'll spend maybe a few minutes on the 11 seismic capacity evaluation and, to do the evaluation 12 of the seismic capacity of the PCS components, power 13 conversion system components.
14                  We reviewed several diverse sources of 15 information that compiled fragility data, which is the 16 conditional probability of failure, given a seismic 17 event.
18                  In addition, we also looked at insights 19 from      post-earthquake      walkdowns,          and    we  performed 20 representative risk calculations to estimate the risk 21 of gross failure of the PCS.
22                  The fragility information included sources 23 from NUREGs, as well as industry sources and reports, 24 as well as recently submitted seismic PRAs in response 25 to post, agency's post-Fukushima actions.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
121 1                  We also reviewed post-earthquake walkdown 2 reports for North Anna and Kashiwazaki-Kariwa, which 3 is in Japan.        Both are, sorry, Kashiwazaki-Kariwa is 4 a BWR.
5                  Both these plants experienced earthquakes 6 that        exceeded    their        respective          design      basis 7 earthquake.        And, in that review, we focused on any 8 impacts to PCS components.
9                  We also reviewed the IAE report on the 10 walkdown at the Onagawa plant in Japan, following the 11 Great Tohoku Earthquake of 2011.
12                  What all of that information led to was 13 the determination of a lower bound medium fragility, 14 which encompasses the different failure modes of SSEs 15 in the power conversion system.
16                  During the subcommittee meeting, there was 17 a    discussion    on  the      source        of    the  lower      bound 18 fragility compared to the weak path in the realistic 19 pathway.        So, I'll take a minute to clarify that.
20                  The weak point of the main condenser, or 21 in the realistic pathway, with respect to the hold-up 22 of fission products and gasses would be the expansion 23 boot between the bottom of the low pressure turbines, 24 and the main condenser shell.
25                  However, information on the fragility of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
122 1 this component was not available.                    Consequently, the 2 assessment, the technical assessment used information 3 on the seismic fragility of a related elastomeric 4 component,    which    is    the    expansion        joint    for      the 5 circulating water connection to the tube side of the 6 main condenser.
7                As  we    mentioned          in    the  subcommittee 8 briefing, an opening in the condenser shell does not 9 significantly impact the hold-up of aerosols and 10 gasses because of the large volume and low driving 11 head.
12                And    expansion            joint      represents          a 13 conservative fragility of elective to important SSEs 14 such as piping involved in the PCS, and therefore, for 15 the purposes of this ISG as a decision making input, 16 can capture the impacts of the gross failure of the 17 PCS.
18                Next slide, please.
19                So, in summary of our assessment going 20 through all of that concluded that there is a high 21 probability    that    doses      will      be    lower  than      those 22 estimated, strictly using traditional deterministic 23 methods, which include accepted assumptions and that 24 do not credit hold-up and retention of the MSIV 25 leakage within the power conversion system.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
123 1                This    is      the      key      insight    from        the 2 assessment, and it forms the recommendation for the 3 ISG.
4                Next slide, please.
5                With that background, I just kind of bring 6 it back into context that the objective of the ISG is 7 to provide a near term regulatory footprint, a formal 8 regulatory footprint, for the staff's use of this 9 primary insight that I just talked about in the 10 previous slide.
11                We expect that the ISG will be used by the 12 staff to offset uncertainty and input parameters for 13 deterministic calculations, and thereby help the staff 14 reach its reasonable assurance finding during reviews.
15                We  want      to    take      this    opportunity        to 16 reiterate that the ISG does not change the licensee's 17 responsibilities      to      demonstrate            compliance      with 18 regulation, including 10 CFR 50.67, nor does it change 19 any acceptable methods for demonstrating compliance 20 with 10 CFR 50.67.
21                That's it from my end and I'll turn it 22 over to Jerry Dozier, I believe, to take it forward.
23 Thanks.
24                MR. DOZIER:            Since the previous ACRS 25 subcommittee meeting, we did have some changes to the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
124 1 draft ISG at that time.
2                  OGC provided some editorial comments to 3 the ISG for clarity that were incorporated.                      OGC also 4 added        a section  regarding          backfitting        and    issue 5 finality discussion.
6                  The staff included a new Attachment C with 7 the      analysis  of  public        comments,        and  the    staff 8 provided        clarification          regarding          the    modeling 9 uncertainty related to the ISG. Next slide.
10                  Thirty-three        comments          were    received.
11 Thirteen of those comments were received from NEI; 19 12 anonymous comments were given; and one comment, which 13 was really not applicable to the whole study, was 14 given by Liberty Toussaint.                They actually gave like 15 a financial report, so it was kind of not applicable.
16                  One of the comments resulted in a change 17 to the ISG.          The full text of the comments and 18 associated resolution are provided in ADAMS at the ML 19 number on the board.
20                  And, when we did submit that, we did have 21 some duplicate information in the comment section that 22 we will remove before our final ISG.
23                  The following table provides a summary 24 roll up, or categories, of public comments, followed 25 by      slides  with    general        explanations        for        the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
125 1 disposition of various types of comments. Next slide.
2                    So, of those comments, we tried to bend 3 them into various categories. You'll see on the right 4 the number of comments that we had in each of the, the 5 categories.
6                    Basically, we had a category for, you 7 know, the purpose of the ISG. We had several comments 8 regarding formal credit to the applicant's design 9 basis.        As we've expressed earlier, credit means that 10 the analysis of record would show that the, for 11 example, the condenser was credited and of course, 12 those type of things are actually done in accordance 13 with the Reg Guide, not, but for our ISG, it's 14 basically a reasonable assurance determination.
15                    We had comments regarding use of risk 16 insights.          Also,    comments          regarding    the    review 17 process, and how we developed the ISG and the Reg 18 Guide 1.183 review process.
19                    We    had      a    question          regarding        the 20 uncertainty, and we changed the ISG as a result of 21 that comment.          Then, we had comments regarding ISG 22 should        not  improve      or    is      contrary    to  existing 23 regulations.        We had about 14 of those comments.
24                    And, then we had some comments that felt 25 like we were, we would be using Reg Guide 1.174 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
126 1 instead of the LIC-206 process.
2                We'll    talk      about        each      one  of    these 3 categories with maybe a specific example.
4                For the first, it would be, and now next 5 slide, would be on the comment that we changed the 6 ISG, and I'll turn that back over to Dr. Vasavada.
7                MR. VASAVADA:          Thanks, Jerry.
8                So, on this comment as Jerry mentioned, we 9 did receive a, this public comment on the treatment of 10 uncertainties in the ISG.
11                The comment stated if I paraphrase, that 12 modeling uncertainties were ignored when they are 13 known to you can say dominate parameter uncertainties 14 in the evaluation of risk.
15                While    modeling        uncertainties          were      not 16 ignored, we did identify the need to clarify the 17 discussion in Section 2.5 of Appendix A of the ISG, to 18 explicitly      state    how      parametric            and    modeling 19 uncertainties      were      addressed          in      the    technical 20 assessment supporting the ISG.
21                So, for modeling uncertainties, we added 22 clarification to the previous language to state that 23 this uncertainty was addressed via conservatisms in 24 the      ISG's technical      evaluation,            as  well    as      the 25 unchanged      conservatisms          in      the      domestic        dose NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
127 1 calculations.        And, the rest, that the guidance for 2 doing those which again, was not changed by this ISG.
3                  We added discussion in Section 2.5 of 4 Appendix      A  of  the    ISG,      to    also    state  that      the 5 fragility values in the sources referenced in the 6 technical assessment, were doubled up using state of 7 practice      matters,      which      is      also    another    way      of 8 addressing modeling uncertainty, which according to 9 Reg Guide 1.174, identifies the modeling uncertainty 10 as where there is no consensus approach.
11                  Next slide, please.
12                  And, I'll let Jerry start, and then I'll 13 take over.
14                  Thanks, Jerry.
15                  MR. DOZIER: Okay, for this one, there was 16 several comments about where we're using the Reg Guide 17 1.174, which is used to change the licensing basis.
18                  And, like I said, we were actually using 19 LIC-206 to use risk insights to come up with a 20 reasonable assurance determination.                      But I'll turn it 21 back over to Dr. Vasavada to explain the resolution of 22 that comment.
23                  MR. VASAVADA: Thanks, Jerry. So, this is 24 Shilp again.      Excuse me.
25                  As Jerry mentioned, the precedent shows NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
128 1 that MSIV leakage LARs are not risk informed following 2 the Guidance in 1.174 and 1.177.                    And, risk, insight, 3 the use of risk insights for the staff is not limited 4 or precluded if the amendment is not risk informed.
5                  In addition, our rationale also is that 6 the ISG is not the sole decision making basis for the 7 MSI leakage analysis review.                      It actually provides 8 support, if necessary, to the NRC staff to reach its 9 reasonable        assurance          finding          that  applicable 10 regulations have been met when they are evaluating 11 this dose analysis, which is again, following the 12 guidance in the Reg Guide.
13                  And, there are associated uncertainties 14 with the import parameters to those dose calculations.
15                  So, the ISG is used, if it is used, in 16 conjunction with the deterministic analysis review.
17 And, that deterministic analysis review forms the 18 primary basis for the staff decision.
19                  Moreover, if you look at the entirety of 20 the MSIV leakage analysis and review, one can state, 21 clearly        state,  that      defense        in-depth  and    safety 22 margins continue to exist not only because of the rule 23 itself and what it states, but also because of the 24 conservatisms in the guidance for determining dose 25 calculations.          No accords or standards, which are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
129 1 already in use are being changed.
2                    And, the ISG technical assessment also 3 does not take any credit for the margin that high 4 pressure piping would be, would have of any of the 5 subject to a low pressure scenario, which is the case 6 for the MHA.
7                    So, in short because of all these reasons, 8 we did not agree with this comment.
9                    I'll turn it back to Jerry.
10                    MEMBER KIRCHNER: Shilp, before you go on, 11 this is Walt Kirchner.
12                    MR. VASAVADA:          Yes.
13                    MEMBER KIRCHNER: So, the maximum, the MHA 14 for this particular set of plants is what?                      Could you 15 just give us the definition of what was used for the 16 MHA?
17                    MR. VASAVADA:          Sure.        So, I'll give what 18 my understanding, but I would also request John or 19 Elijah        to  jump  in      and    correct        me, or    provide 20 additional context.
21                    My understanding is what was used was a 22 double-ended guillotine break of the recirc line, 23 suction line, right, John?                  Am I correct?
24                    MR. PARILLO:        Well, Shilp, the way I look 25 at      the    maximum  hypothetical            accident,    it's      the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
130 1 accident        that's  described          via      a    footnote  in      the 2 regulation.
3                    And, basically what it is is the core 4 melts, and appreciable amounts of fission products are 5 released into the containment so that the containment 6 is assumed to be leaking at its design based its 7 leakage.
8                    In other words, the core melts but the 9 containment holds.              That is really what a maxima 10 hypothetical accident is.
11                    Now,  in      guidance        now    it's  currently 12 referred to as a LOCA, which Shilp mentioned would be 13 a major pipe break as postulated as a cause.
14                    But the footnote does not address any 15 cause.        It simply states that the analysis generally 16 assumes substantial core melt with an appreciable 17 release of fission products into the containment.
18                    MEMBER    KIRCHNER:              Okay,    so  this        is 19 traditional from 10 CRF 50 and 52 in terms of a 20 postulated MHA?
21                    MR. PARILLO:        Exactly.
22                    (Simultaneous speaking.)
23                    MEMBER KIRCHNER:            Best way to start.
24                    MR. PARILLO:        It --
25                    MEMBER KIRCHNER:            Okay, thank you.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
131 1                    MR. PARILLO:          -- absolutely goes back to 2 100.11 from 1962.
3                    MEMBER KIRCHNER:              Right, right.      Okay, 4 thank you.
5                    MR. PARILLO:          Thank you.
6                    DR. DICKSON:        Hi, this is Elijah Dickson.
7 We do real actual consequence analyses in NRR, you 8 know, with John Grillo.
9                    The technical bases of this MHA source 10 term can be found in NUREG 1465, and if you're curious 11 to know what type of accident sequences were used to 12 derive that source term and how they did the modeling 13 in MELCOR, it could be found there.
14                    MEMBER KIRCHNER:              Thank you.
15                    MR. VASAVADA: This is Shilp, I'll turn it 16 back to Jerry.          Jerry and Hess, you are taking over, 17 right?        Thanks.
18                    MR. DOZIER:          Okay, so we're continuing 19 with the discussion of some of the public comments, 20 and Dr. Vasavada shared two of those.
21                    I'm going to share a few of those that 22 were general.          I'll give the specific words to give 23 the commentor, to characterize it better.                    You'll see 24 in the slides basically a summary, and how we resolved 25 those comments.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309      www.nealrgross.com
 
132 1                Okay, this first comment was NRC 2021  2 06 draft-0003-6.      It was an NEI comment.
3                This section of the ISG provides when the 4 ISG was developed, and that the technical assessment 5 identified the PCS as a realistic and available holdup 6 volume for fission products.
7                The ISG also concludes that there is high 8 confidence in the SSEs in the PCS to provide a volume 9 for holdup, and retention of fission products.
10                The  question        is      why    isn't  the    staff 11 incorporating this well thought out risk informed 12 methodology into Reg Guide 1.183?                  Why is this method 13 being limited for use only by the NRC staff when 14 reviewing AST LARs?
15                For that positive comment we did have to 16 say it's out of scope.          This comment is out of scope 17 for the ISG because it relates to the update of 18 Regulatory Guide 1.183, which is a separate document.
19                Once the draft of Reg Guide of 1.183 is 20 complete, the public will be given an opportunity to 21 provide comment on the guidance document prior to 22 issue.
23                No changes were made to the final ISG as 24 a result of this comment.
25                MEMBER PETTI:            So question here.              You NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
133 1 didn't answer their question, which I understand, it's 2 out of scope. But you are incorporating this in 1.183 3 and you'll have the opportunity to talk about it --
4                  MR. DOZIER:        Yes --
5                  (Simultaneous speaking.)
6                  MEMBER PETTI:          -- later.
7                  MR. DOZIER:        -- and then you'll see that 8 in the wrap up slide at the end.
9                  Yes, we are moving forward with, of course 10 with, okay, in this particular case, we were using the 11 risk insight.
12                  In the Reg Guide 1.183, it would be how 13 the applicant would use that information to change 14 their licensing basis to get the full credit and 15 change the numbers, the calculations of record to that 16 new, to that.      And, they would use Reg Guide 1.183 to 17 do that.
18                  For the ISG of course we did not change 19 any numbers in their calculation of record.
20                  MEMBER    PETTI:            Yes. So,    help        me 21 understand just from a process perspective given the 22 timing of this relative to 1.183.
23                  Why did you feel this needed to be issued 24 now?        Is there some LARs right out there right now 25 that wouldn't, you know, be covered until, you know, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
134 1 relative to the timing of 1.183?
2                  MR. DOZIER: Maybe when industry is there, 3 that might be a good question for them is anything 4 coming in.        But to my knowledge, we do not have any 5 rush to get this out to support a license amendment 6 request.
7                  MEMBER PETTI:            So, why go, again, I'm 8 trying to understand the process.                      Why go through an 9 ISG when you could have just, you know, gone and done 10 the relevant changes you wanted to make in 1.183?
11                  MR. DOZIER:        This change will actually go 12 into the standard review plan because it's for the 13 staff's guidance.
14                  Reg Guide --
15                  MEMBER PETTI:          Ah, okay.
16                  MR. DOZIER:            --      1.183    is    for      the 17 applicant, and also for us to review with.
18                  MEMBER PETTI:          Yes.
19                  MR. DOZIER:          But this is how we would 20 review and come up with our reasonable assurance 21 determination.        And, that's why this is a separate 22 project.
23                  MEMBER PETTI:          Got you, thanks.
24                  VICE CHAIR REMPE:            So, this is Joy, and I 25 guess        I'd like  to    ask    Dave's        question    a    little NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
135 1 different way.
2                In light of the fact that you are updating 3 Reg Guide 1.83 and you're going to be putting it out 4 for public comments, is there the potential that you 5 may learn something from Reg Guide 1.83's update that 6 will require you to go back and make some additional 7 changes to this ISG?
8                MR. DOZIER:        Well, this ISG is basically 9 memorializing what we've already done in four LARs.
10                Of course, when we're updating Reg Guide 11 1.183, and I think maybe some of my colleagues should 12 answer, answer that question further, I'm sure, I mean 13 we are updating it and we are learning things. But to 14 this point, we've not found anything that would change 15 this ISG.
16                MS. KHANNA: And Jerry, this is Meena, I'm 17 going to just add on.
18                So, we thought about this question as 19 well, and where we are right now is that we've 20 completed all the work as Jerry mentioned that this 21 does document the strategy, the approach, the review 22 that we took for the four LARs that we've reviewed.
23                We do believe that we're in a good place 24 to be able to issue this if, you know, if the ACRS 25 members agree.      And again, it has not been finalized NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309      www.nealrgross.com
 
136 1 yet; it's still going through concurrence.                          So, we 2 will be able to address any comments that we need to.
3                    In addition to that, this will be a living 4 document so we can at any time, go back.                      Even if we 5 issue it, we can go back and add anything if we learn 6 anything new. That's something that we can definitely 7 do with an ISG.
8                    VICE CHAIR REMPE:              And, then you'd come 9 back to ACRS and it just seems like again, ACRS is 10 supposed        to  be  considered          a    safety,  not    process 11 efficiency.        But why not do them at the same time and 12 be done?
13                    MS. KHANNA: Yes, so, that's definitely an 14 option.        We respect and appreciate that and knowing 15 that the ACRS meeting on the Reg Guide is actually 16 November 19 and it's so close to this date, we don't 17 see an issue there.
18                    But at the end of the, we would say that 19 we've done a robust review.                        We don't expect any 20 changes        but  you're      absolutely          right,  if    there's 21 something that comes about that's significant, we 22 would definitely come back to you.
23                    But again, I will just say that we're okay 24 with waiting.        Our recommendation was to move forward 25 because we believe that we're in a good place.                            But NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
137 1 knowing that the ACRS subcommittee meeting is just 2 around        the corner,      that's      also      an option    that's 3 available.
4                    VICE CHAIR REMPE: Because again, what the 5 subcommittee says doesn't really count. It'll be when 6 the full committee does the letter on it, okay?
7                    But thank you for your response.
8                    MS. KHANNA:        Sure.
9                    MEMBER PETTI:          That helps a lot.          Thank 10 you.
11                    MS. KHANNA:        Okay, Jerry?
12                    MR. VASAVADA:          Jerry, you may be on mute 13 if you're talking.            I'm sorry.
14                    MR. DOZIER:          Yes, I was on mute.                  I 15 apologize for that.
16                    Okay, so continuing with the comments and 17 again, we were, these are generalized comments, but 18 several of the ISG comments related to obtaining 19 formal credit in the licensees' design basis.
20                    And, again, you know, just like we've 21 already talked about, this comment was out of scope.
22 And, it relates to the Reg Guide 1.183 and we'll be 23 addressing it, in it because with this ISG, we're not 24 crediting or changing anything in the licensees' 25 design basis.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
138 1                So, next slide.
2                We  had      also      some      generalized    public 3 comments regarding use of risk insights.                    With this 4 one I'm actually going to read the comment.
5                It would be NRC 2021-106 draft-0011, and 6 it says: The NRC is confusing the use of PRA in 7 quantitative health objectives with the intent of the 8 regulations in 10 CFR Part 20 and 10 CFR 50.67.
9 Limits on radiation dose for protecting workers and 10 the public are based on preventing the likelihood of 11 cancer in the exposed population.
12                The proposed ISG would adversely affect 13 the dose to workers, and especially control room 14 operators charged with mitigating the consequences of 15 accidents, and have adverse impacts on public health 16 and safety, and protecting the environment.
17                The NRC disagrees with the comment.                      The 18 ISG cannot and does not change any regulation.                            It 19 does not specify or change the acceptable methods for 20 performing dose calculations to meet the regulations 21 in 10 CFR Part 20, and in 10 CFR 50.67.
22                The ISG does not alter the licensee's 23 analysis of record to meet 10 CFR 50.67.                  It provides 24 support for the NRC staff to reach a reasonable 25 assurance conclusion that the applicable regulations NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
139 1 have        been  met      when        evaluating          traditional 2 deterministic        analysis        containing          parameters      with 3 associated uncertainty.
4                  Further, the technical assessment for the 5 ISG uses neither a probabilistic risk assessment as 6 defined in NUREG 2122, nor does it rely on the 7 quantitative health objectives.
8                  No changes were made to the final ISG as 9 a result of this comment. Next slide.
10                  There was several comments related to 11 generalized public comment regarding the ISG in the 12 Reg Guide 1.183 review process. This will be, I'll be 13 quoting from the comment. An example comment would be 14 NRC 2021-0106 draft-0004.
15                  The draft ISG represents a substantial 16 departure from the design basis of falling water 17 reactors, and should be reviewed by the Atomic Safety 18 Licensing Board Panel. The staff disagrees with the 19 comment.
20                  The ISG does not change or result in 21 departures from the design basis of boiling water 22 reactors.        The ISG does not alter the licensee's 23 analysis of record to meet 50.67, or any system 24 qualifications.
25                  It provides support for the NRC staff to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
140 1 reach a reasonable assurance conclusion that the 2 applicable regulations have been met, when evaluating 3 traditional            deterministic              analysis    containing 4 parameters with associating an uncertainty.
5                    NRC's process for interim staff guidance 6 documents is being followed by this ISG. This process 7 described in LIC-508 Development Issuance Enclosure of 8 Interim Staff Guidance Documents for the Office of 9 Nuclear Reactor Regulation, involves internal review, 10 review        by    the  advisory          committee    for    reactor 11 safeguards, the ACRS, the Office of General Counsel, 12 and the members of the public.
13                    No changes were made to the final ISG as 14 a result of this comment. Next slide.
15                    One more group of comments, and we had 16 several of these that says that the ISG should not be 17 approved.        And, I'll give an example of one of these, 18 which would be NRC 2021-0106 draft-0005.
19                    The proposed ISG allows plants to operate 20 with        the    greatest      safety        equipment    credit        for 21 mitigating          the    release        of      radiation    adversely 22 affecting operators in the control room.                          The ISG 23 credit for condenser holdup is non-conservative and is 24 not supported by experimental testing for the removal 25 of radionuclides. As such, the ISG would not meet the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
141 1 regulations in 10 CFR 50.67 for control room dose. The 2 staff disagrees with this comment.
3                  And, it's pretty much the same thing I 4 said on the other. The ISG does not specify or change 5 the        acceptable    methods          for        performing        dose 6 calculations to meet the regulations.
7                  The ISG does not alter the licensee's 8 analysis of record to meet 10 CFR 50.67.                          The ISG 9 provides      support    for    the    NRC      staff    to  reach        a 10 reasonable assurance conclusion that the applicable 11 regulations have been met when evaluating traditional 12 deterministic      analysis        containing          parameters      with 13 associated uncertainty.
14                  The ISG does not provide any quantitative 15 credit for condenser holdup, which would change the 16 licensee's analysis of record.                    Quantitative credit 17 for condenser holdup is a purview of Reg Guide 1.183.
18                  No changes were made to the final ISG as 19 a result of this comment. Next slide.
20                  MEMBER    HALNON:            Jerry,    this  is      Greg 21 Halnon.
22                  Did you analyze how the commentors or 23 commentor got to the point that they said that the 24 control room dose would be higher?
25                  Your  answer        is      it's      not,  and    their NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
142 1 question was it is.            What's the gap there?              How did 2 they --
3                  (Simultaneous speaking.)
4                  MR. DOZIER:        For the --
5                  MEMBER HALNON:          -- I'm sorry.
6                  MR. DOZIER: -- for the, you know, we only 7 had the comment as read.                  So, we did not have any 8 additional information other than the comment was 9 anonymous, and so we did not have any additional 10 information to review other than what we saw since the 11 comment was anonymous.
12                  MEMBER HALNON:            Okay.        So, rather than 13 read something into it, just hand off to 1.183 and add 14 more detail for that effort.                        So, basically the 15 answer.
16                  MR. DOZIER:        I wouldn't say hand off but 17 yes, I guess that's true.
18                  MEMBER HALNON:              Okay.      I mean I can 19 postulate different scenarios that could get there, 20 but I don't have any, I don't want to read something 21 into a comment and make something of it, but I 22 understand where you're going. Thanks.
23                  MR. DOZIER:        Right, and also when we're 24 responding to these comments, we have to get OGC 25 review.        And, they're very good at what they do.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
143 1                MEMBER HALNON:          Yes, I understand.
2                MEMBER PETTI: Just another question here.
3                Doesn't the changing of the leak rate and 4 allowing a little higher leak rate from these valves 5 actually help the workers?                Because there's a fair 6 amount of dose they take in, you know, making sure 7 that they meet that, the tech spec.
8                MR. DOZIER:          Maybe        I  could  get      John 9 Parillo to do that because he did one slide that 10 actually showed that. And, then perhaps when NEI gave 11 the presentation, they could say what their burden 12 was.
13                Because you know, as far as radiation, the 14 maintenance of these big valves in the main steam 15 tunnel is a very high radiation area.
16                But let me --
17                MEMBER PETTI:          I'm just saying you know, 18 you've got two different, right?                      These comments 19 really don't talk about that, which is an important 20 consideration in the overall scheme.
21                MR. PARILLO:        Yes, this is John Parillo.
22                That's exactly right and as I mentioned, 23 that's really the driver, one of the main drivers 24 behind licensees that have requested an increase in 25 this MSIV leakage.        It's because this is a very dose NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
144 1 intensive job to maintain these valves with very, very 2 low leakage.
3                  And    remember,          these      leakages    are      in 4 standard cubic feet per hour.                  So, they're still very 5 low.      Even as they have increased them, they're still 6 very low.
7                  And, so the maintenance and the real what 8 I would say the real dose to workers, is a major 9 consideration in this effort.                    Thank you.
10                  MEMBER HALNON:          Yes, this is Greg, and on 11 the contrary, you can say more leakage downstream of 12 the MSIVs just makes higher doses throughout the plant 13 as well, or other items.
14                  So, you could argue it both ways.                          It 15 comes down to magnitude and that's what you don't have 16 the analysis in front of us to be able to look at.
17                  MR. DOZIER:          We sometimes framed it as 18 calculated dose versus real dose in the maintenance.
19 Okay, so for the takeaways, what's next?
20                  The ISG result in consideration of a large 21 holdup volume in future MSIV leakage LARs. It offsets 22 uncertainty in input parameters for deterministic 23 calculations.        It supports the staff's reasonable 24 assurance finding during reviews, and realize it's 25 only applicable, this insight is only applicable if NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
145 1 quantitative credit is not included in the licensee's 2 calculations.
3                    So, it was something they could have done 4 but they didn't do, but we know that if they did, they 5 would have had a substantial reduction in calculated 6 dose.
7                    The ISG does not change the licensee's 8 responsibility to demonstrate compliance with 10 CFR 9 50.67.            Acceptable        methods          for  demonstrating 10 compliance remain unchanged.
11                    The ISG is expected to be transitioned to 12 a standard review plan, section 15.0.1 and as the 13 question earlier was, this is the answer: formal 14 condenser        holdup    credit        for      licensees    is    being 15 considered in a revision to Reg Guide 1.183.
16                    And, that was our last slide.
17                    MEMBER PETTI:          Well, thank you.
18                    MR. DOZIER:        Thank you.
19                    MEMBER PETTI:        Okay, with that let's hear 20 I guess, the different views.
21                    MR. SNODDERLY:              Yes, thank you Member 22 Petty.        Mark Blumberg, if you could bring up your 23 slides? Thank you.
24                    And,    then      just      as    Chairman    Sunseri 25 suggested a time for a break, I would suggest that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
146 1 after Mark and Mike Markley go, that might be a time 2 for a break although I know the staff wanted to maybe 3 make some comments after.
4                  But that probably would be the best time.
5 But let's let Mark get through his material first.
6 Thanks.
7                  MR. BLUMBERG:          Are we ready?
8                  MEMBER PETTI:          Go ahead.
9                  MR. BLUMBERG:            Okay.        My name is Mark 10 Blumberg as Mike said.              Mike Markley and I would like 11 to thank you for the opportunity to provide our 12 differing views on this draft ISG, the tender review 13 by the ACRS.
14                  As noted previously, these remarks that we 15 will make represent mine and Mike's views, and do not 16 represent positions of the NRC staff or management.
17                  Just to give you some background on me, 18 I'm a Senior Reactor Engineer in the NRC's Division of 19 Risk Assessment, and have been working in this area of 20 nuclear        engineering        and    radiological        consequence 21 analysis for 37 years.
22                  For many of the last 23 years, I've been 23 the      technical    lead      for    Regulatory        Guidance        and 24 Computational Code Development at the NRC for accident 25 analysis, including DG 1199, which is a draft revision NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
147 1 to Reg Guide 1.183, and the current draft revision, 2 which is DG 1389, that will be undergoing review by 3 the ACRS.
4                For Mike and me, our goal today is inform 5 your consideration and recommendations, on the ISG 6 using our related experience and knowledge.
7                The regulatory process for compliance with 8 10 CFR 50.67 is a very systematic process.                      A method 9 for demonstrated compliance with 50.67 is contained in 10 Reg Guide 1.183.
11                The process and methods described in the 12 draft ISG can, and have been used, to circumvent that 13 guidance by approving licensing actions that are wrong 14 because they don't comply with the regulations.
15                A stated purpose of the ISG is for the NRC 16 staff to resolve differences between the licensees' 17 methods and assumptions, and those deemed acceptable 18 to the NRC. On its own initiative, the NRC has used 19 methods upon which the ISG is based to approve license 20 amendments    in  a    manner      that      is    contrary  to      the 21 licensing process.
22                In particular, the NRC has done this 23 without requiring the applicants to fix errors in 24 their analyses, or in supplements to the license 25 amendment request.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
148 1                  In contrast, the current standard review 2 plan has the staff resolve these differences by having 3 the licensee fix significant differences, and by 4 basing our acceptance upon the licensee's docketed 5 analysis containing methods and assumptions that we do 6 find acceptable.
7                  The current SRP 15.01 and Reg Guide 1.183 8 methods are consistent with 10 CFR 50.67.                        However, 9 the proposed ISG method is not.                    The NRC staff should 10 not be developing the analysis to support approval of 11 license amendments by offsetting methods we do not 12 find acceptable.
13                  Because the regulation states that the NRC 14 may approve the application only if the applicant's 15 analysis demonstrates reasonable assurance, the ISG 16 method is not consistent with the regulations Reg 17 Guide 1.183, or the SRP.
18                  All information relied on for the NRC's 19 license        amendment    must    be    signed      under  oath      and 20 affirmation, and submitted to the NRC document control 21 desk, but that did not happen for the precedence in 22 which this ISG is based.
23                  The ISG asserts that it does not change 24 these systematic methods. We disagree. While the ISG 25 does not explicitly change Reg Guide 1.183, it does NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
149 1 implicitly change these methods by being based upon 2 engineering insights that conflict with Reg Guide 3 1.183.
4                The  engineering            insights      in  the      ISG 5 discount release pathways from the MISV valve stem, 6 bonnets, and other direct leakage to the steam tunnel.
7                HCR's concerns in the past regarding these 8 pathways were previously considered so significant to 9 safety, that it led to the installation of safety 10 related leakage control systems to mitigate these 11 release pathways.
12                The  ISG      engineering            insights    credit 13 mitigation of the MSIV leakage to the steam tunnel by 14 crediting the non-safety related steam tunnel space 15 and blowout door seals, and the pathway itself through 16 the MSIV packing.
17                In contrast, Reg Guide 1.183 does not 18 credit these non-safety related structures, or the 19 MSIV leakage pathway for mitigation.
20                Reg Guide 1.183 Regulatory Position 5.1.2 21 in part states that credit may be taken for accident 22 mitigation features that are safety related, and 23 required to be operable by technical specifications.
24                Neither the steam tunnel nor the blowout 25 door seals meet this regulatory position, yet the ISG NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
150 1 engineering analysis credits them.
2                  More    importantly,            some  steam    tunnel 3 designs        open  directly        to    the      non-safety    related 4 turbine buildings that are open to the environment.
5                  Reg Guide 1.183 Appendix A, Regulatory 6 Position 6.4 and 6.5 provide acceptable MSIV leakage 7 modeling        for  designs        without        engineering    safety 8 features, or components capable of performing their 9 safety functions.
10                  In these designs, the releases to the 11 steam tunnel should be assumed to be an unprocessed 12 release to the environment.
13                  The ISG discounts all releases to the 14 steam tunnel despite the fact that all the allowable 15 MSIV leakage could be released to the steam tunnel.
16                  The surveillance testing performed for the 17 MSIV leakage text pack does not discriminate where the 18 leakage        originates,      making        it    possible  that      all 19 leakage        is  to  the      steam      tunnel,      and  operating 20 experience studies indicate that approximately one in 21 seven BWR MSIV failures is related to the valve stem 22 leakage.
23                  Since these release pathways would bypass 24 any mitigation by the condenser that is central to the 25 ISG logic, not considering these pathways constitutes NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
151 1 a significant flaw in the ISG technical basis.
2                  The ISG in its engineering insights are 3 based largely on methods used by the NRC staff to 4 approve four license amendment precedents containing 5 numerous errors.
6                  These errors and the lack of compliance 7 with        the regulations        in      one      of  these    license 8 amendments, have been confirmed by an independent 9 panel of experts.
10                  These panel results are currently not 11 publicly available, but will become available in the 12 future for your review, and your consideration.
13                  One of the errors involved the NRC staff 14 approving a calculation with an aerosol deposition 15 model that is known to be orders of magnitude in the 16 non-conservative direction.
17                  Approval of the ISG would allow the use of 18 these grossly non-conservative models to improperly 19 calculate accident doses for demonstrating compliance 20 with the regulations.
21                  As  such,      the    ISG      does  not  meet      the 22 principles in Reg Guide 1.174, in that the regulation 23 is not met.
24                  The engineering insights that credited 25 mitigation of the MSIV leakage in the flow pass are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
152 1 inconsistent with our knowledge and reviews of a prior 2 similar issue.
3                Dr. Dana Powers reviewed methods that 4 asserted mitigation releases by cracks in reactor 5 containment buildings.
6                It is our understanding that the aerosols 7 of the sizes considered in these analyses would likely 8 follow the slipstreams around any obstacles and that 9 extrapolation of available experiments to model these 10 pathways was questionable.
11                His  report      SAND2009-1701          stated      that 12 deposition of particles also can be limited by the 13 bounce from surfaces defining the leakage pathways, 14 and by resuspension of particles to positive on these 15 surfaces.
16                Resuspension of deposited particles can be 17 triggered by changes in flow conditions, particle 18 impact on the deposits, and by shock or vibration to 19 the surface, on the surfaces.                Therefore, credit for 20 MSIV valve packing similarly would be questionable 21 and likely, very small.
22                The  ISG      also      depends      upon  crediting 23 pathways to the condenser without requiring licensees 24 to provide docketed information confirming that the 25 pathway can, and will be used, and operated in a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
153 1 manner credited in the analysis.
2                  Once again, this is inconsistent with the 3 regulation that requires us to approve the amendment 4 based upon the licensee's docketed analysis, and not 5 our      own  personal    NRC      staff      judgment  on  how      the 6 facility will be operated.
7                  Next, Mike Markley will address the last 8 bullet with you, but first I'd like to summarize what 9 I've provided so far.
10                  ISG methods have, and will be, used to 11 approve        accident        analysis          calculations        with 12 assumptions and methods not deemed acceptable to the 13 NRC.
14                  This staff approval is based upon NRC 15 staff judgment, not using systematic methods, and not 16 based upon docketed information.
17                  The  engineering            insights    in  the      ISG 18 disregard the modeling pathways to the environment 19 previously considered so important that safety related 20 systems were installed to mitigate these pathways.
21                  These pathways bypass the condenser relied 22 upon in the ISG's engineering insights.                    Engineering 23 insights      in  the    ISG      are    inconsistent      with      our 24 scientific        knowledge,      and    conflict      with  the      NRC 25 approved systematic methods in the Reg Guide 1.183.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
154 1                In closing, I appreciate the committee's 2 time to hear our differing views with the ISG.                        Much 3 more information regarding the details of our views, 4 and those of the independent panel, can be found in 5 over 110 pages of documentation and recommendations 6 that will be released to the public in the future.
7                We feel the ACRS could add substantial 8 value to their review by considering the views, these 9 views, and issues in these documents.
10                Next,    I'd      like        to      turn  over        the 11 presentation to Mike Markley.
12                VICE  CHAIR      REMPE:          Mark,  before        you 13 switch, in your comments, you mention several reg 14 guides that provide guidance for how to assess the 15 leakage. Could you say those numbers again? I didn't 16 quite them in my notes.
17                MR. BLUMBERG:          Sure.        The main guidance 18 documents for assessing the leakage of what a licensee 19 proposes to meet compliance with 50.67 is Reg Guide 20 1.183.
21                VICE CHAIR REMPE:            But you gave a couple 22 other numbers in your discussion I thought. I'm aware 23 of 1.183, but you mentioned like some others when you 24 were talking.
25                MR. BLUMBERG:        Well, I mentioned Dr. Dana NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
155 1 Powers' report which was SAND2009-1701.                        Is that 2 perhaps what you're thinking of?
3                VICE CHAIR REMPE:                No, again, I should 4 have stopped you when you said it, but I didn't want 5 to interrupt you.          But I thought you mentioned a 6 couple of reg guides when you said that there is 7 guidance already available to the staff, but maybe I 8 misheard, too.
9                MR. BLUMBERG:            I did cite a couple of 10 regulatory positions from Reg Guide 1.183.                        One of 11 those was Regulatory Position 5.1.2.
12                VICE CHAIR REMPE:                That's it.        It's a 13 regulatory position, okay.            So say that number again?
14                MR. BLUMBERG:          5.1.2.
15                VICE CHAIR REMPE:            Okay.
16                MR. BLUMBERG:        And Regulatory Guide 1.183 17 Appendix A, Regulatory Position 6.4 and 6.5.
18                VICE CHAIR REMPE:                  Okay, yes.          I do 19 remember a six something or other.                    Thank you.
20                MR. BLUMBERG: You're welcome.
21                MEMBER BLEY:        Mark?
22                MR. BLUMBERG:          Yes.
23                MEMBER BLEY:        This is Dennis Bley.                Can 24 you tell us what the status of the DPO is right now?
25 I don't think we've actually seen all the documents NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
156 1 yet, but I appreciate your presentation.
2                MR. BLUMBERG:            That's      correct.          The 3 documents are not to be made available until the 4 process is complete.          We are currently awaiting the 5 NRR Director's decision on the matter.                    So what has 6 happened is the differing views have been provided in 7 a report and that report has been assessed by a panel 8 of independent experts.          And then that report, along 9 with other information is being used by the NRR 10 Director to make a decision.
11                MEMBER BLEY:          Okay.        Thanks very much.
12 We're kind of between a rock and a hard place on this 13 one since all we have is what you've told us today, 14 but thanks for talking through it.
15                MR. BLUMBERG:          I share that --
16                MR. SNODDERLY:              Mark,      this  is      Mike 17 Snodderly.      You're still showing your cover slide.
18 Could you please -- did you mean to do that?
19                MR. BLUMBERG:        No, I did not.          I did not.
20                MR. SNODDERLY:          Thank you.
21                MR. BLUMBERG:            I just fired into the 22 presentation    and    missed        turning        the  slide.            I 23 apologize to the members for doing that.
24                MEMBER PETTI:          And your colleague wanted 25 to speak?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
157 1                  MR. MARKLEY:        Yes.
2                  MEMBER PETTI: Go ahead.
3                  MR. MARKLEY:        This is Mike Markley.
4                  MEMBER KIRCHNER: Before you change, Mike, 5 before you start -- this is Walt Kirchner.
6                  Mark,    you      mentioned          in  one of your 7 bullets, you mentioned an independent panel.                      Can you 8 share who that is?        Is it an NRC staff panel or is it 9 independent outside expertise or who is this panel?
10                  MR. BLUMBERG:          The panel is a group of 11 independent NRC experts.
12                  MEMBER    KIRCHNER:              So    these  are      NRC 13 employees --
14                  MR. BLUMBERG:          That were not tied to the 15 matter.
16                  MEMBER KIRCHNER: Who were not tied to the 17 ISG effort or to you.            Okay.        Thank you very much.
18                  MR. BLUMBERG:          You're welcome.
19                  MR. MARKLEY: This is Mike Markley and I'm 20 speaking here myself today as Mark and sharing my 21 views.        I  do  not      represent          the    NRC  staffs        or 22 managements. I've been in the nuclear industry for 40 23 years, 34 at the NRC, 6 years as a senior staff 24 engineer for the ACRS with a Reliability and Peer PRA 25 Subcommittee and Operations Subcommittees.                      I had the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
158 1 pleasure of working with Dr. Apostolakis and other 2 members through the early debates of Reg Guide 1.174 3 and the individual applications.
4                  For the past 13 years, I've been Branch 5 Chief in the Division of Operating Reactor Licensing 6 and DORL of NRR.            And in DORL, the branch chiefs 7 reviewed this draft ISG when it was a White Paper in 8 April        of last  year      and    we    offered  comments      and 9 recommended        against        concurrence          on  it,        not 10 collectively because obviously, there were two branch 11 chiefs who signed out these amendments that we've been 12 talking about.
13                  But some of the comments that we offered 14 at that time is that it was a substantial departure 15 from the design basis of BWRs and that the draft 16 guidance allowed plants to operate with the greatest 17 safety equipment credited to mitigate accidents.                        And 18 fixing the plant is always better than fixing the 19 paper and this appears to be a paper-only fix via 20 license amendments.            And the NRC should not miss to 21 use risk analysis to advocate or justify adverse 22 industry trends or safety culture of not fixing the 23 plant.
24                  The direct guidance is risk based and does 25 not ensure meeting the regulations in terms of dose.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
159 1 The proposed guide is not an approved method supported 2 by    Reg    Guide  1.183      in    its      current    form  and      the 3 proposed guidance cuts the public out of the process 4 for review and comment on the proposed generic changes 5 for the licensing basis of BWRs.
6                    And then again, the proposed guidance 7 would also then --- we recommended at that time that 8 the guidance would benefit from ACRS review, so we 9 would rather have seen that on the front end when it 10 was a draft White Paper before the four plants set 11 precedence that you're seeing now that are credited 12 for the development of the ISG.
13                    Nevertheless, the unapproved White Paper 14 was used to approve the four plants to set precedence.
15 I'm glad it's now receiving ACRS review, but it should 16 have come first.
17                    I've known Mark Blumberg over the years 18 and I've worked with him through a number of complex 19 licensing actions where the NRC staff and licensees 20 disagreed.        With that exception, Mark's analysis was 21 found to be correct and the licensees were either 22 supplemented with new submittals and revised analysis 23 or withdrawn from the NRC consideration.
24                    There are calculations on professional 25 differing        views    regarding          the      accuracy    of      the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
160 1 licensees' analysis meeting the regulations for the 2 four precedents.          We have concerns the NRC staff's 3 methods and the ISG will codify the propagation of 4 these errors in future licensing actions.                        It's also 5 inconsistent with the licensing process and public 6 interest        for  the    NRC    staff        to    develop  analysis 7 supporting licensee requests rather than the licensees 8 submitting the information to justify the technical 9 basis on the docket.
10                  I want to note that the ACRS can provide 11 expertise        to  assist        the      NRC      staff,    especially 12 regarding the analytical methods.                        We fundamentally 13 disagree with the calculation analysis of control dose 14 meeting        50.67  and      the    NRC      staff's      approach        to 15 resolving the technically valid and relevant public 16 comments.        That's all I have.              Thank you.
17                  MEMBER PETTI:          Okay, thank you.
18                  MR. MARKLEY:          Okay.
19                  MEMBER PETTI: Well, we've been at this --
20 why don't we take the break and then come back?                                  I 21 know NRR management wanted to say something.                          Unless 22 they feel they could do it quickly, what's your 23 preference, Meena?
24                  MS. KHANNA:          So thank you.            We're okay 25 with taking a break.            I would like to ask a couple of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
161 1 my staff members to speak to some of the information 2 that we heard from the two individuals if that's okay 3 after the break, if you guys can support that, we'd 4 like to do that and then I have some --
5                  MEMBER PETTI:        That's fine.      That's fine.
6 So --
7                  MEMBER BLEY:        This is Dennis.        Can I ask 8 you a question? I'm a little concerned about us being 9 asked to comment on the ISG when we know there is a 10 DPO sitting out there and we don't know the results of 11 that.        It just feels out of sequence.
12                  MEMBER KIRCHNER:              I share that concern.
13 This is Walt, Dennis.
14                  MEMBER PETTI:          I do, too.
15                  MEMBER KIRCHNER:            Yes, it seems that the 16 NRC's internal process should be completed before we 17 weigh in so to speak.
18                  MEMBER PETTI:          Because there's a lot of 19 technical assertions here and the differing views that 20 need to be -- I mean some are process related which we 21 don't necessarily have to deal with, but there are 22 technical issues here that were enumerated that --
23                  MEMBER    KIRCHNER:            There's  substantive 24 technical questions being raised here that, as you 25 said, even if we put aside the process aspect, that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
162 1 probably would bear further review.                      It's just -- I'm 2 just following my intuition right now.
3                  MEMBER HALNON:            This is Greg.          I share 4 that because we kind of had the same discussion with 5 the Seabrook issue with the ASR.                      We need to let the 6 internal processes work out, otherwise we end up de 7 facto influencing those processes.
8                  MEMBER BALLINGER:              This is Ron.      I also 9 agree.        I think we're going to be unanimous.                        I'm 10 trying to find underlying documents which is what I 11 would like to see.
12                  MEMBER    PETTI:          So    Meena,  you    had      a 13 comment?
14                  MS. KHANNA:        Yes.      Thank you. So I just 15 want to know, I respect the thoughts that we're 16 hearing here.        I do want to mention that the DPO was 17 not on the ISG.        It was on the FitzPatrick MSIV SER.
18 So I just want to be careful as far as, you know, 19 we're talking about process.                    We believe that it's 20 well founded.        I would like to have the staff have an 21 opportunity to speak to you guys about their views on 22 what they've heard.
23                  And then I do want to mention also, we 24 weren't privy to all this information.                      The staff has 25 been responsible for the ISG.                  It's just now hearing NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
163 1 this. We did have the opportunity to have the slides 2 that was presented.          It did help to have some more 3 context based on what we heard today.                    So we would 4 like to have the opportunity after a break to have a 5 few staff members to speak to you if you don't mind.
6 But again, respect and appreciate where you're coming 7 from, but we don't see the issues that have been 8 raised here. I think impacting the ISG directly, I 9 think they go well beyond the ISG.                    So maybe if you 10 guys can give us an opportunity to provide some 11 information that we have and then we can take it from 12 there.
13                MEMBER PETTI: Sure. So members, what I'm 14 thinking is we can talk about some of this after we 15 hear from the staff members as we have our usual 16 deliberation after we hear stuff at full committee.
17                So let's until the half hour, so come back 18 at 30 minutes after.
19                VICE CHAIR REMPE:              And are we going to 20 hear from NEI then, too?
21                MEMBER PETTI:          Yes.      After we hear from 22 the other employees, then we'll hear from NEI and then 23 any other public comments.
24                VICE CHAIR REMPE:            Thank you.
25                CHAIR SUNSERI:          So Dave, there's one more NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
164 1 question and then I have a comment.                      Go ahead, Mike 2 Snodderly.
3                  MR. SNODDERLY:          I'm sorry, sir, I didn't 4 have my hand up.
5                  CHAIR SUNSERI: Okay. It was up, but it's 6 now down.
7                  All right, so let's take a 20-minute break 8 and reconvene 20 until the start of the hour.                              All 9 right?
10                  MEMBER PETTI:          Okay.        Great.
11                  CHAIR    SUNSERI:            Thanks.      So    we      are 12 recessed until 20 until.
13                  (Whereupon, the above-entitled matter went 14 off the record at 2:19 p.m. and resumed at 2:40 p.m.)
15                  CHAIR SUNSERI:              Okay, it's 20 minutes 16 before the hour.        We will reconvene the session here.
17 This is Matt Sunseri.
18                  Before I turn it over to Member Petti for 19 (audio interference) I'd just like to say a couple of 20 things. First off, we appreciate hearing the different 21 views from the two presenters today, from a technical 22 perspective, ACRS is trying to make a decision on the 23 ISG.        We're trying to formulate comments on the ISG 24 and we want to hear different views.                      And so I think 25 we heard the different views.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
165 1                    It is not our obligation or our job to get 2 in      the    middle    of    internal        Agency      processes        on 3 resolving the different views.                        And so any further 4 remarks from staff or whatever, please keep that in 5 mind.        You know, we're not involved in the process, 6 we're just here to hear the different opinions so that 7 we      can      formulate      our      comments          on  the    ISG.
8                    And if anybody has any questions about 9 that, you can ask me.
10                    I will now turn it over to Dave.
11                    Dave?    Member Petti.
12                    MEMBER PETTI:          Okay, let's pick up where 13 we left off and hear from staff.
14                    MS. KHANNA:        Okay, thank you so much.                So 15 I'm going to turn the presentation over to Elijah, Dr.
16 Elijah Dickson.            And he's going to walk us through 17 some thoughts that he'd like to share and we'd like to 18 also hear from a couple of the other members of the 19 staff.        Thank you.
20                    DR. DICKSON:          Thank you, Meena.            Again, 21 Elijah Dickson.            I do these design basis accident 22 radiological consequence analyses in NRR Division of 23 Risk Assessment. And I'd like to provide you a little 24 bit of perspective in regards to how we go about 25 performing these analyses and the criteria or the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
166 1 figure of merit in terms of dose that we're computing, 2 as well as discuss some of the conservatisms and 3 margins that we rely on in the regulatory guidance 4 when we're performing these analyses. These analyses, 5 their intention is conservative, right?              And they're 6 not intended to represent any actual sequence of 7 events, but rather intended to be surrogates to enable 8 the deterministic valuation of the facility's response 9 to a design basis accident.
10                The doses that we're computing aren't 11 actual doses.      These are figures of merit.              And in 12 that, there's as it's wrapped up in Regulatory Guide 13 1.183 and 1.195, the analyses or the guidance that we 14 use to perform the analyses, there is quite a bit of 15 margin and conservatism in these calculations.
16                So you can kind of bin them into three 17 different categories: analytical margin in regards to 18 the code that we're using. There are margins in 19 regards to the removal mechanisms that we use or that 20 we compute and then use in our computer code.                      And 21 then, of course, there's transport assumptions.                    And 22 changing any one of these three categories, you can 23 increase or decrease your figure of merit, that dose 24 value, by tens of percentage points or by orders of 25 magnitude. It depends on what you want to credit in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309      www.nealrgross.com
 
167 1 the analysis itself.
2                  And so, there are two big ones I'd like to 3 point out to you.          The first one is in regards to the 4 transport of this beyond design basis source term that 5 we're using.        So when we're doing the calculations to 6 assess leakage out of for instance MSIVs, we assume 7 that the leakage is at the design pressure of the 8 containment post-LOCA. And that leakage is assumed to 9 go for 24 hours after which we allow licensees to have 10 a deterministic reduction in the leakage rate by 50 11 percent.
12                    So post-LOCA, for instance, in a BWR, the 13 drywell        will  reach      about      45      pounds,    very,      very 14 quickly, post LOCA.                However, we don't credit the 15 safety related drywell sprays to accurate and reduce 16 the pressure in containment.                  And that happens over a 17 period of about two minutes. So you'll see a pressure 18 spike in the containment at around 45 pounds and then 19 it decreases like a step function once these safety-20 related drywell sprays accurate down to around 5 21 pounds or so.
22                  And if you were to model it this way, the 23 critical        flow  through      these      main    steam  isolation 24 valves would be reduced and a leakage would be at 25 much, much smaller rates.                And this would be an order NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
168 1 of magnitude type dose reduction in the calculations.
2 So there's quite a bit of margin there in regards to 3 the transport assumption of that source term through 4 these        particular    valves        or      even    through        the 5 containment leakage.
6                  Now another area in which there's quite a 7 bit of margin and this is something that would be 8 allowed        in  Reg  Guide      1.183      Rev. 0. It's      also 9 discussed in our Standard Review Plan and that is we 10 generally don't allow for suppression pool scrubbing 11 of halogens and iodines.                I can't think of a single 12 facility that we've allowed this for.
13                  So when we're performing the analyses, we 14 assume that the source term itself isn't a drywell, 15 right, and then we use that concentration of that 16 source term to then model the transport through the 17 various reactor systems, through the containment, and 18 then subsequently out to the environment. However, we 19 don't credit suppression pool scrubbing, right?                              So 20 when      the  event  does      occur,        your    safety  related 21 automatic depressurization valves, they pop open, the 22 EDS system actuates which is part of the ECCS of a 23 BWR.
24                  They then direct the source term in effect 25 down through the downcomers, through the T-Quenchers, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
169 1 into a very, very large body of water and the bubbles 2 rise up between three and six feet.                      We know that the 3 amount of halogens, based off of the study that we've 4 done such as NUREG 11.50 and SOARCA that upwards to 95 5 percent of the dosimetrically important radionuclides, 6 specifically radioiodine, is actually suppressed and 7 maintained        in  the      suppression            pool  and  this        is 8 something that we do not credit in the DVA calcs. We 9 just assume that all of that source term is in the 10 drywell regardless of the ADS system not -- regardless 11 of the ADS system working.
12                  Now when the source term is there in the 13 pool itself, we have -- we can, we could allow for 14 credit,        decontamination          factor        credit,    anywhere 15 between five and ten.              That's discussed in Standard 16 Review Plan 6.5.5.            And then if you also use a newer 17 source term, they can take DFs or decontamination 18 factors, upwards towards 50, right?
19                  So  we    know      that      in    the  calculations 20 themselves, the DVA radiological consequence analyses 21 that there's quite a bit of conservatism, the orders 22 of magnitude conservatism baked into the calculations 23 because of the regulatory positions. And the one that 24 I just mentioned here, this one particular regulatory 25 position        for    not        allowing          decontamination            of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
170 1 radionuclides going through the suppression pool, that 2 dates back to the early '70s.
3                  And I mean there's obviously areas of 4 improvement, but these are things I think we need to 5 remember when we're talking about these types of 6 calculations.            They're        highly        stylized.      They're 7 deterministic in nature. Some date back 50 plus years 8 now.        They don't utilize updated information from 9 analyses such as NUREG-1150 and SOARCA.
10                  And with that, I'd like to turn it back 11 over to any other staff members that would like to 12 provide        their  two      thoughts          or    I  can  take      any 13 questions.
14                  MR. JONES:          Well, hearing no questions, 15 this is Steve Jones in the Containment Appliance 16 Systems Branch.          I just wanted to address the credit 17 or well, not actual calculational credit, but just 18 discuss the reasons we believe the power conversion 19 system provides a hold up, a realistic hold up volume 20 for any release that does make it through the main 21 steam system and around the MSIVs.
22                  First      of      all,        we      did  assess        the 23 construction of the main steam system. It's generally 24 constructed to a conservative code, designed for very 25 high      pressure  and      high    temperature          applications, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
171 1 obviously, and subject to enhance quality assurance 2 although it typically falls short of safety related 3 for the plants that we're discussing here.
4                  We're not assuming that this adds any 5 specific value and the function we're looking for is 6 just that there is a volume that does not allow early 7 leakage of whatever material may get by the MSIVs 8 directly      to  the    atmosphere          outside    the    reactor 9 building      which  is    what's      assumed      in  the    actual 10 analysis of record.          So the performance criteria for 11 the main steam system is fairly low. And we looked at 12 the flow paths that provide a way for that to either 13 perhaps get to the high pressure turbine area and then 14 eventually leak to the environment or go through other 15 paths through the main power conversion system and 16 arrive at the condenser.
17                  And  of    course,        we    also  discuss        the 18 pathways that may bypass that such as the stems of the 19 main steam isolation valves or would be -- there would 20 be some stem leakage, but that's a partition point 21 where not all the leakage is going to go out the stem.
22 Most likely, some goes through the main steam system 23 and some may leak into the steam tunnel, but again, 24 that is an analyzed structure for -- to maintain its 25 integrity following a steamline break or some accident NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
172 1 such as that.        So there is some hold up within that 2 area and not an immediate direct release to the 3 environment.
4                  I did want to touch on one thing, the Reg 5 Guide looks at Reg Guide 1.183, we were earlier 6 discussing        some      of      the      points      there.          It's 7 specifically talking about engineered safety features 8 which typically involve emergency power supplies to 9 support fans or valve actuation or damper actuation 10 that might mitigate the dose consequences such as 11 standby gas treatment or what previously existed for 12 many of these plants when the earlier source term, the 13 initial TID source team was used where there is a need 14 for        automatic    actuation,            emergency    power,          or 15 procedures for operators to start this.                      We are just 16 looking        in  this    case,      we    are      just  crediting        or 17 considering that the main steam system is likely to be 18 present. It doesn't need to change state.                        We're not 19 relying on any valves to change position. We're just 20 assuming the normal conditions that would exist post-21 accident, without any actuation or any engineered 22 safety feature actuation that might result.
23                  I guess I'll leave it there unless there 24 are any other questions.                I'll turn it back over to 25 Meena.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
173 1                  MEMBER    HALNON:            Steve,    this  is    Greg 2 Halnon.        I  know  the      steam      tunnels    in  BWRs    have 3 boundaries from the standpoint of actuation in steam 4 tunnel pressure and temperature so that you can't just 5 have a bunch of leakage going into the steam tunnel 6 without being addressed by the plant staff.
7                  But what is the power conversion, the non-8 safety main steam condensate feedwater systems have 9 outside of containment that would prevent a plant from 10 just allowing a steam leak to continue on which would 11 change the assumption that the system is there and 12 fully intact?
13                  MR. JONES: Okay, in general, there are --
14 first in the steam tunnel, you have high temperature 15 sensors that feed into the engineered safety feature 16 system that would cause a main steam isolation.                            And 17 there's also typically high temperature sensors in the 18 turbine building itself that would react to a steam 19 line        release  and      those      factor        into    different 20 calculations related to releases from a main steam 21 line break.
22                  MEMBER HALNON:          Yes, the BWRs I've worked 23 at, I know that we've had leaks in the steam systems 24 and we've scheduled in leak repair companies to come 25 in and leak repair them online, and what not.                              But NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
174 1 those leaks, they could go on for days and even get 2 worse until the plant is geared up to actually fix it.
3 And some of them do cause shut downs, but there is no 4 tech spec or required action other than the licensee's 5 prudent maintenance.
6                    MR. JONES:          Okay, I think I understand 7 your point.          Yes, I mean some level of leakage could 8 exist.        It would have to be a fraction of I guess full 9 steam flow though, a very small fraction to not cause 10 actuation of those temperature sensors or other leak 11 response to actually isolate the main steam lines and 12 shut down the reactor.
13                    But at the same time, the post-accident 14 conditions we're looking at realistically, again are 15 relatively        low    pressure        upstream          of  the    MSIVs, 16 containment design pressure 45 pounds or so, and 17 leakage rates, again on the order of a couple hundred 18 standard cubic feet per hour and then going into very 19 large piping systems that have hundreds of cubic feet 20 of volume just in the main steam lines and then 21 getting to other areas like the turbine or potential 22 --      the      high    pressure        turbine          first  and      then 23 potentially going into the low pressure turbine and 24 the main condenser, going through drain paths or 25 bypassing the turbine -- leaking past the turbine NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
175 1 bypass        valves  and    getting        to    the    main  condenser 2 directly from the steam lines.
3                    Any leakage path would just be one other 4 way for that to release to get to the turbine building 5 environment, but it's still performing the function 6 we're really crediting which is delaying that release, 7 holding up the material to some extent.                            We're not 8 factoring in a specific value here. We're just saying 9 that logically it's not like this release is going 10 straight        to  the  environment.            We    have  a  lot      of 11 confidence that the main steam system itself and all 12 the pressure boundaries are going to for the most part 13 contain it, but there are obvious leakage spots with 14 the valve stems, the turbine shaft seals, and then 15 again any minor leaks that may be preexisting in the 16 plant.        Does that respond to your question?
17                    MEMBER HALNON: Yes, to some extent. Just 18 another follow up. Does the ISG drive the reviewer to 19 look at the aggregate leakage on the secondary side to 20 address what -- so if you have so many cubic feet per 21 hour going through the main steam isolation valves and 22 leakage, going into the power conversation system, the 23 amount of that that gets to the condenser is going to 24 be based on how much leakage there is on its way.                            And 25 does the ISG ask those questions and make sure there's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
176 1 a commensurate level of control?
2                  Again, if you've got a leak in the steam 3 tunnel, you have automatic actuations and tech spec 4 values, but downstream of that, you have nothing, 5 nothing to drive an action by the licensee.
6                  MR. JONES:        Well, the turbine building, 7 you know, also has the steam leak temperature sensors, 8 so --
9                  (Simultaneous speaking.)
10                  MEMBER HALNON:          -- building.
11                  MR. JONES:        Right.        I mean it would take 12 a very large leak to actuate those.                      But at the same 13 time, it's still just a fraction of the overall steam 14 flow.
15                  MEMBER HALNON:          Okay.        You're banking on 16 the margins that Elijah --
17                  MR. JONES:          Well, I think what we're 18 banking on really here is that first of all, there's 19 no credit in the actual analysis.                      We're just saying 20 we're comparing what happens assuming that right at 21 the boundary of the reactor building that material is 22 released      at  the    ground        level        directly    to      the 23 atmosphere.      Or it's much more realistically likely 24 that it would be held within piping systems and that 25 are very large relative to the leak rate, you know.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
177 1                MEMBER HALNON:          Right.
2                MR. JONES:      And delaying that release for 3 hours or more and you know, potentially directing it 4 to very large volumes and at very low driving heads.
5 There's really not much to push this material through 6 the steam system at a high rate.
7                MEMBER      HALNON:            So    that's    a    good 8 qualitative argument.          Is there quantitative analysis 9 that shows that or do you -- are you just banking on 10 the fact -- that's not the right way of saying it, but 11 are you crediting the fact that you know it's going to 12 be less and you get a bounding analysis.
13                MR. JONES:          That's the point for this 14 review, for the ISG is that we're not taking any 15 actual credit.      We're considering that this -- that 16 there is some additional conservatism. This is one of 17 many places where there's additional conservatism 18 because there would be a hold up realistically of any 19 releases that get by the main steam isolation valves 20 and would not go to the environment as quickly and 21 may, in fact, be held up in some of these volumes for 22 a very long period of time.
23                MEMBER HALNON: Okay. Thanks, that helps.
24 Appreciate that.
25                MS. KHANNA:        Okay.      Thanks. Steve, thank NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
178 1 you so much. Are there any other staff members that 2 wanted to convey any other thoughts?
3                MR. PARILLO:          Yes, this is John Parillo 4 and I just wanted to stress to the Committee that 5 approximately 50 percent of the BWR fleet has taken 6 numerical credit for a pathway to the condenser using 7 the guidance that was put out in the '90s, which had 8 them do walk downs and so on.                    There was a safety 9 evaluation.
10                So the arguments about steam leaks and so 11 on, those would be applicable to those licensees that 12 have already credited a pathway to the condenser.
13 What the ISG do is use more updated seismic criteria, 14 which has been discussed, to say that now we have a 15 much better idea of what that seismic capability would 16 be of the power conversion system.
17                And also as I mentioned, in the Appendix 18 C to Reg Guide 1.183 for the rod drop accident the 19 credit for a pathway to the condenser is given with no 20 subsequent characterizations needed on the behalf of 21 the licensee.      So I just thought that might be of 22 interest to the Committee.              Thank you.
23                MS. KHANNA:        Okay.        Thanks, John.
24                Okay. So I'm going to just provide some 25 concluding remarks because I know that we need to move NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
179 1 forward.        So first of all I want to just say on behalf 2 of the NRR Management Team we do appreciate the 3 different views that both Mark and Mike presented 4 today, and I also appreciate the opportunity that they 5 ACRS Full Committee provided for us to share our 6 recommendations          of      path      forward        based    on      the 7 information that we have heard today.
8                    After considering all the views presented 9 by the staff, including the different views, I believe 10 that        the  ISG    does      not      change      the  licensee's 11 responsibility to demonstrate compliance with 10 CFR 12 50.67, nor does it change the acceptable methods for 13 demonstrating compliance with 10 CFR 50.67.
14                    It's important to note that the ISG does 15 not provide an analysis to replace the licensee's 16 analysis.        It is really to assist the staff in using 17 engineering judgment and making reasonable assurance 18 findings        on  the    licensee's          submissions.        And      as 19 discussed earlier this type of thinking was definitely 20 directed by the Commission.
21                    The ISG was developed to memorialize the 22 NRC staff's practice on using risk and engineering 23 insights, again as documented in each of the four MSIV 24 safety evaluations and as you heard from the staff we 25 have identified significant conservatisms while also NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
180 1 accounting for some of the uncertainties associated 2 with an MSIV leakage.
3                    I also would like to acknowledge that each 4 of    the    four  safety        evaluations          received    thorough 5 reviews by the NRC staff including OGC's no legal 6 objection prior to the issuance of the staff approvals 7 on these amendment requests. And then again I do want 8 to reiterate that we're not using ISG to make a 9 reasonable        assurance          finding        not      to  replace        the 10 licensee's analysis.
11                    I do recognize that there is an internal 12 ongoing independent review of the differing views as 13 we heard earlier, and that's associated with one of 14 the four safety evaluations with only a small group of 15 NRC      staff    that    have      had    access        to  the  detailed 16 information.          When the internal review is complete a 17 case        file    including          the      differing        views,        the 18 independent panel report, and a decision memo will be 19 made available to not only the NRC staff, but also to 20 the public, however since the review is still ongoing 21 and not complete yet, the technical staff working on 22 the ISG and presenting to the Committee do not have 23 access to the information because the NRC's process to 24 evaluate differing views limits its access.
25                    So    after        considering          the  robust        and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
181 1 detailed technical assessments that the staff have 2 conducted in support of developing the ISG, including 3 the substantial conservatisms that been identified, as 4 well        as    the  information            that      the  staff        has 5 communicated today and the differing views that were 6 presented,        I  am  recommending            that    the  Committee 7 proceed with approving the ISG as I don't view the 8 issues raised today as influencing the ISG.
9                    My  recommendation              is    based    on      the 10 following factors that you've pretty much heard, but 11 I just want to sum them up very quickly:
12                    The staff mainly based its regulatory 13 finding        of  adequate      protection          on  the  licensee's 14 deterministic analysis.
15                    The staff performed an assessment of the 16 seismic ruggedness of the power conversion system and 17 the main condenser to achieve high confidence that the 18 systems will remain available after a safe shutdown 19 earthquake for fission product dilution, holdup and 20 retention.
21                    The staff also used engineering judgment 22 and      risk    insights      to    support          the  deterministic 23 conclusion. The staff did not use these risk insights 24 as the main basis for our regulatory findings.
25                    And lastly consistent with the statements NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
182 1 of consideration for 10 CFR 50.67 the NRC staff 2 leveraged        these  risk      insights        in    a  manner      that 3 complements the deterministic approach and supports 4 the traditional defense-in-depth philosophy.
5                    In summary, we're not aware of any errors 6 in the MSIV SER, nor in the ISG that stand behind --
7 I'm sorry, and stand behind the assessments that the 8 staff have completed for both the SE and the ISG.                              As 9 the independent review efforts continue to progress 10 and if there are any significant findings that would 11 change our recommendation, we will immediately 12 inform the Committee of any changes that are needed.
13 And      if    the  Committee      determines          the  need    of      an 14 additional meeting, we'll certainly support.
15                    We see the ISG separate from the differing 16 views        raised  on    the      FitzPatrick            SER,    however 17 recognizing the challenges with these two aspects the 18 reg guide obviously -- we know that we're very close 19 to coming to you guys to meet with the Subcommittee on 20 Reg      Guide    1.183    on    November        19th.        That's      the 21 Subcommittee meeting.
22                    And then also with -- knowing that these 23 differing        views    are      out    there        we  fully    --      we 24 appreciate the fact that all of these do pose a 25 challenge, but at the end of the day we don't see the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
183 1 need of a delay as a process for the reg guide, which 2 includes a 30 to 60-day OMB review which would lead us 3 to a January issuance date, should allow for us to 4 consider the resolution of the DPO and any comments on 5 the reg guide.
6                  And with that I'm going to close.
7                  VICE CHAIR REMPE:            So, Meena, this is Joy 8 and I'm just kind of struggling with what I'm hearing 9 from you versus what I see in this slide, and even if 10 you go to the cover slide, the differing view.                            The 11 title of this says it's on ISG and all of -- many of 12 these bullets pertain to ISG, not the single LAR, but 13 nothing has been provided by the staff on the ISG?
14                  MS. KHANNA:          Yes.        So I mean, I'll go 15 ahead and respond.            So what we see is the differing 16 views are specific to the amendment, the license 17 amendment request SE that was issued.                      The process 18 that        we've  laid    out      here,        again  taking        into 19 consideration          risk-informed                decision      making, 20 everything that you've heard with respect to all the 21 conservatisms.          And    there      are      --  I mean,      we    do 22 recognize that there are uncertainties, but even with 23 considering those uncertainties we believe that the 24 process that we've identified stands on its own and 25 it's very consistent with the Commission direction.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
184 1                  And again, I can ask my staff to speak to 2 this, but we just see them both as very different 3 issues.        One is the review process that we've taken.
4 And then again this -- it was based on risk-informed 5 -- right, we used some risk-informing decision making 6 and the deterministic review that was done as well.
7 But the issues that were raised on the LAR, again I 8 would say that those are separate from our review 9 process.
10                  VICE    CHAIR      REMPE:            So  theoretically 11 speaking if the independent panel were to side with 12 the differing view on the single LAR, do you think 13 that maybe the ISG would be changed?
14                  MS. KHANNA:                There's      a    definite 15 possibility of that.                Honestly, unless I see the 16 decision        that's    been      made      from      the    director's 17 decision, I wouldn't be able to speak to that because 18 there's always a chance.              And that's why I was saying 19 we fully respect and appreciate the challenge that --
20 bottom line we have -- as I mentioned, you had brought 21 this up earlier as well, right, the Reg Guide 1.183, 22 we're very close to bringing that to you guys, the 23 Subcommittee, on November 19th, understanding that 24 there could be -- there's a process associated with 25 those differing views and it could be delayed.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
185 1                But we really -- we feel that the ISG 2 stands on its own, but I can't -- it wouldn't be fair 3 for me to say that there would be nothing that would 4 come out from the differing view evaluation that was 5 done that would not impact the ISG.                  I can tell you 6 that I don't believe that it would, but that's -- I'm 7 not going to be -- that's not going to be fair unless 8 we see what the decision is made, if that -- I don't 9 know if that --
10                (Simultaneous speaking.)
11                VICE CHAIR REMPE:            So again, I guess I'm 12 still puzzled why the staff has put -- in light of the 13 fact we aren't aware of any LARs being submitted why 14 the staff is pushing so much to go ahead and get this 15 reviewed and the reg guide.                It just seems like the 16 process would be more direct to get this resolved and 17 then move forward with the other items, but I guess 18 there's no insights you can give me on that.
19                MS. KHANNA:        No, and we fully appreciate 20 and respect that. If that's the decision that's made, 21 we don't see -- I mean I'm trying to figure out if 22 there's any cons in delaying the issuance of the ISG.
23 Again with the 30 to 60 days that we have to wait to 24 get the OMB review maybe it will just work out that 25 everything will be resolved in an appropriate time NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
186 1 frame, but I can't sit here and tell you that there's 2 any reason for us to move forward except for the fact 3 that we've completed our work.                  We see a difference 4 between the ISG and the issues that were raised today.
5                I mean honestly this is the first time 6 that the staff have heard all these issues.                      We have 7 some time before we issue the ISG.                    It's still under 8 concurrence    so  there      is    time      that  we  can      take 9 consideration of what we've heard today, which -- and 10 we can have some more dialog with both Mike and Mark 11 as appropriate and as needed.
12                Honestly, I hear you.                I think at the end 13 of the day if you determine that you want to wait, we 14 understand. And then we'll just work to a schedule 15 that we have knowing that we -- right now we have the 16 January date for the ISG; and Tekia can definitely 17 speak to the details of that if you'd like some more 18 details, but if things don't get resolved by then, 19 then we can certainly wait until an appropriate time 20 to be able to make sure that everybody has all the 21 information that they need to make a decision.
22                CHAIR    SUNSERI:              Yes,    this  is    Matt.
23 There's a couple of hands up.                I want to take them in 24 the order that they've come, so we'll go with Mark 25 Blumberg first.      Mark?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
187 1                  MR. BLUMBERG: Yes, I don't know. I think 2 there's a problem associated with -- and a disjoint 3 between the -- our differing views and those of the 4 staff.        I think that one of those issues has to do 5 with this reliance upon conservatisms that aren't in 6 the license amendments and don't become part of the 7 licensing basis.          It becomes a matter of the staff 8 basing their acceptance upon what they think how 9 things should be and not based upon those things that 10 are in the docket, or on the docket.
11                  And the second is that -- and just with 12 respect to John Parillo's comments, that 50 percent of 13 the licensees had used methodologies that had credited 14 the condenser.        What's proposed in the ISG is a very 15 different animal and that's because the staff is 16 making the judgments that were required in the staff's 17 SE to approve that alternatively hitched treatment 18 pathways and that meant that we don't go out and check 19 to make sure that valves can function in the way that 20 they're credited in the analysis. We don't go out and 21 make sure that the procedures are in place to make 22 sure that those valves will be operated in a manner 23 that we're crediting.              And so it creates a disjoint.
24 And that's one of the major issues that I see between 25 what's being proposed in the ISG and what's been NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309      www.nealrgross.com
 
188 1 previously done.
2                  CHAIR SUNSERI:          Thank you.        Next is Vicki 3 Bier.
4                  MEMBER BIER:        Yes, thanks.          Yes, this is 5 actually in a way kind of similar to Mark's comment 6 just a minute ago.          I guess I'm struggling to figure 7 out how to think about this because on the one hand it 8 maybe seems inappropriate if we think of this as staff 9 giving licensees relief that they haven't asked for, 10 right? Like shouldn't it be incumbent on the licensee 11 to make an argument for why particular relief or 12 differing interpretation or whatever is justified?
13                  On the other hand I can also think of it 14 from the point of view of, okay, in the staff's own 15 work if they see as -- the situation has changed or 16 knowledge has improved that they have conservatisms in 17 their        analyses  that      are    no    longer    justified          or 18 required, then it seems appropriate that fine, they 19 can go ahead and relax those conservatisms.                        But I'm 20 having trouble figure out which of these frameworks 21 that fits into better and how to interpret this.
22                  CHAIR SUNSERI:          All right.        Good.      Thank 23 you.
24                  Dave, back to you.
25                  MEMBER PETTI:          Okay.        I guess with that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
189 1 we've got about 15 minutes left in this session.                              We 2 may end up going over a little bit, but let's get 3 NEI's -- I think that's right, it's -- no, it's 4 Entergy that's got comments.
5                  MS. PIMENTEL:            Right.        Good afternoon, 6 Chairman      Sunseri    and      ACRS    Committee        members,      NRC 7 staff, and members of the public.                      My name is Frankie 8 Pimentel.          I'm    a    senior        project      manager        for 9 Engineering and Risk at NEI. I just want to thank you 10 for      the  opportunity        today      to    share    our  industry 11 comments based on our review of the supplemental 12 guidance for radiological consequences analyses using 13 the alternative source terms.
14                  We believe there are many opportunities 15 where engineering and risk insights can be applied to 16 improve        risk-informed          decision          making    and        we 17 appreciate the NRC's application of risk insights in 18 this ISG to improve the realism and the evaluation 19 techniques supporting decision making.
20                  Now I'd like to introduce Greg Broadbent, 21 the senior staff engineer and Entergy's Corporate 22 Nuclear        Analysis      Department,            who    will    present 23 industry's comments.              Thank you.
24                  MR. BROADBENT:            Thanks, Frankie.
25                  Can you guys hear me?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
190 1                CHAIR SUNSERI:          Yes.
2                MR. BROADBENT:          Okay.        Again, I am Greg 3 Broadbent. I've got some 25 years or so of experience 4 in dose analysis from -- starting in 1992 and seeing 5 the big transition from TID to the alternative source 6 term for all our plants and looking forward to the 7 revision to the Reg Guide 1.183 and everything that 8 we've learned in the last 20 years.
9                With regard to risk-informed regulation 10 the industry certainly does support the staff pursuing 11 these risk-informed approaches.                    As they noted in 12 their introductory remarks they want to move that 13 direction,    and  certainly        from      our    perspective        it 14 allows us to spend our resources in areas that are 15 most important to safety.
16                And I think there was some discussion 17 about MSIV leakage, and allowing us to have higher 18 MSIV leakage rates does reduce the doses that people 19 get when they have to go in and repair those valves or 20 fix those valves for relatively minor leakage flow 21 rates. Also modification budgets and stuff like that.
22 We would prefer to spend our resources in areas that 23 are most important to safety.
24                And we have seen some recent successes 25 including GSI 191 and 50.46 using risk-informed or NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
191 1 statistical-type approaches. And we consider this and 2 certainly hope that this ISG is the first step in 3 risk-informing          the        deterministic          radiological 4 analyses.          A lot of other things have been risk-5 informed.        This is one of the last frontiers really 6 from our perspective on risk-informing the process.
7 And the industry certainly supports these approaches 8 and Reg Guide 1.183 and including them to whatever 9 detail is necessary in Reg Guide 1.183, the upcoming 10 revision.
11                    Let's see.        Did I get everything?            Okay.
12 The ISG conclusions.              The power conversion system is 13 highly likely to remain intact.                      That's what the ISG 14 had indicated. It's built to high standards. We have 15 high confidence in the SSCs and the power conversion 16 system to provide sufficient volume for holdup and 17 retention of fission products, and that a steam line 18 is important for plant operation. If the steam line's 19 not working, the plant's not working.                      So it is very 20 highly likely to remain intact post-accident.
21                    I think there was some discussion about 22 steam leaks.        Certainly plants get steam leaks.                      If 23 you consider all the piping that we have on the 24 secondary system of our plants, there can be steam 25 leaks.        They don't happen very often, but if you've NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
192 1 got      1,000 pounds    of    steam      on    one  side  and      the 2 atmosphere on the other, it doesn't take a very big 3 hold to generate a steam flume.                  But it's relatively 4 easy to identify.      There are temperatures sensors in 5 these rooms. The steam gets condensed and it shows up 6 in leakage and liquid to rad waste.
7                So the piping, the BOP piping does or can 8 leak, but those are leaks that we fix.                    If it's in 9 important rooms, then we may have to shut down. Or if 10 the leak is big enough, it make take a few days for us 11 to call somebody out and get it fixed. But in general 12 that's typically the standard for leaks.
13                And as I mentioned, there's a lot of 14 piping that can leak, but also from the analysis 15 perspective there's a lot of piping that can delay the 16 source terms and provide a played out surface or a 17 deposition surface for accident mitigation.
18                And as I think previously mentioned, half 19 the plants have already demonstrated that they do have 20 structural    integrity      with    very      rigorous  analyses 21 consistent with a 1990s vintage BWR Owners Group 22 report and validates the regulatory PCS credit for 23 other accident analyses.              As I mentioned, half the 24 plants have demonstrated it for LOCA.                      A hundred 25 percent of our plants credit the power conversion NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
193 1 system after a control rod-drop accident.                      And with 2 that event there's no additional analysis related to 3 any sort of seismic robustness for the plant's safe 4 shutdown earthquake to credit that for the control rod 5 drop accident.
6                  And the ISG does incorporate relevant 7 operating experience, particularly from Fukushima.
8 Also        the  1990s    vintage        BWR      Owners  Group      that 9 originally kind of broached the subject that did use 10 earthquake date, but it was a non-nuclear facilities 11 of that time.        And we do recommend that there be an 12 allowance for explicit credit for the conclusions of 13 the ISG and the upcoming reg guide.
14                  And the steam lines are important to us 15 from      an  analysis    perspective            and  the  realistic 16 modeling of those steam lines can make a significant 17 difference in the analysis.                      The steam lines are 18 directly coupled to the reactor vessel in boiling 19 water reactors and the calculated dose from those 20 steam lines can be very significant, particularly if 21 there are some very conservative assumptions applied 22 to that in terms of deposition and leakage rates and 23 all that.
24                  Also from our perspective; and I think the 25 staff stepped through this with one of their slides, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
194 1 there's been a lot of uncertainty regarding what's 2 acceptable in terms of those deposition models.                        Reg 3 Guide 1.183 Revision 0 didn't have anything that was 4 acceptable. There was some work done for one of the 5 pilot plants and AEB 98-03 that staff has had some 6 issues with and doesn't want applied.                  So it's been 7 kind of a moving target for us and so we'd like to see 8 something specific in the upcoming reg guide.
9                So our conclusions are just that we can 10 concur with the ISG that the power conversion system 11 is a realistic and available holdup volume for fission 12 products and there is a high confidence that the SSCs 13 and the power conversion system will provide a volume 14 for holdup and retention of fission products.
15                We did provide some comments to the ISG.
16 Our comments were really more focused on applicability 17 to new plants. Also how this is going to be actually 18 applied and the upcoming revision to Reg Guide 1.183, 19 we would suggest that that credit be with little or no 20 additional    analysis      consistent          with the    current 21 position on the control rod drop accident.                      And we 22 recognize that most of those comments, or really all 23 of those comments were deferred to Reg Guide 1.183 24 where that will be discussed in more detail.
25                That's all I have in terms of my slides.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
195 1 Any questions for me?
2                  MEMBER PETTI:          Members, questions? Thank 3 you.
4                  MR. BROADBENT:            No problem.
5                  MEMBER PETTI:            So with that, members, I 6 think we have to spend a few minutes just talking 7 about our path forward.
8                  MR. SNODDERLY:          I'm sorry.      Member Petti?
9                  MEMBER PETTI:          Yes.      Oh --
10                  MR. SNODDERLY:          You need to ask public --
11 yes.
12                  MEMBER PETTI:          Yes.
13                  MR. SNODDERLY:            If there are any members 14 of the public --
15                  (Simultaneous speaking.)
16                  MEMBER PETTI:              I'm sorry.        Any other 17 public comments out there?                      If so, please un-mute 18 yourself, *6, provide your comment.
19                  Okay.      I don't hear any. So with that, 20 members, we have to figure out a path forward here.
21 I do have a draft largely based on what we had heard 22 at the Subcommittee meeting before we heard some other 23 things        today. So      I'm      interested      in    people's 24 perspectives on a path forward.
25                  MEMBER KIRCHNER:              Dave?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
196 1                  MEMBER PETTI:          Yes?
2                  MEMBER KIRCHNER:            This is Walt.        I don't 3 know that this is a path forward, but may I make an 4 observation?
5                  MEMBER PETTI:          Sure.
6                  MEMBER KIRCHNER:              Let me see if I can 7 summarize what's been going through my head listening 8 to today's presentations.
9                  We're    starting          with        a  problem      that 10 basically involves cost and exposure and tradeoffs at 11 operating plants.        Certainly it seems reasonable from 12 an ALARA perspective to allow a larger leakage in the 13 main      steam  isolation      valves        such      that  excessive 14 maintenance is not being performed which results in 15 exposure, occupational exposure in particular.                                So 16 there are some -- I'll call ALARA, but there are some 17 dose exposure resource tradeoffs. So that seems to be 18 at the root of the licensing -- the LARs that are 19 submitted.
20                  When I step back and separate all the --
21 there's -- I just have a problem with this, that this 22 is risk-informed, but maybe that's a personal issue.
23 To me what we see is a best estimate approach to -- a 24 best estimate real engineering approach to a problem 25 rather than the stylized Chapter 15 deterministic NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
197 1 approach which; this isn't entirely true, but I'll say 2 it, only lets you credit safety-related systems that 3 are demonstrated to survive the SSCs, et cetera, et 4 cetera.
5                  So it's certainly realistic to include the 6 balance of plant and the volume that that presents for 7 potential deposition and certainly holdup so it works 8 both in reducing the source term as well as delaying 9 it.      That seems perfectly logical to me.
10                  Some of the arguments we hear about things 11 are -- again in Chapter 15 space so many conservative 12 assumptions are laid upon each other.                    So for example 13 you're doing the analysis at a higher pressure than 14 probably would actually be predicted to drive the 15 source term out of the containment and through a leak 16 in the main steam isolation valve.                    I certainly agree 17 with that, that the -- in actuality the pressures 18 would likely be lower.              That would lower the relief 19 rate.
20                  So what we're seeing is something that 21 differs from what I'll call traditional Chapter 15 22 analyses.      It's certainly logical.                It's certainly a 23 means for the staff to make the reasonable assurance 24 determination.        We saw this before in resolution of 25 GSI-191 issues from some of the applicants.                                I'm NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
198 1 thinking here that this ISG is in a sense creating a 2 precedent.        I could think of other examples where one 3 would        deviate  from      the    results        of  a  rigorous 4 deterministic Chapter 15 analysis with all of its 5 conservatisms and come to a better -- I'll call it a 6 best estimate assessment of how the plant performed 7 under actual accident conditions.
8                  So to me what's at issue here, without 9 weighing in on a number of process issues, is this 10 seems to be creating a precedent that's consistent 11 with some past Commission direction to the staff, yet 12 I am sensitive to the fact that it -- as was pointed 13 out by some of the commentators, that it gets you away 14 from a rigorous interpretation of the regulations and 15 their application in a standard Chapter 15 analysis.
16                  So I just was trying to summarize in my 17 own mind what we're looking at here.                      It seems to me 18 that this ISG represents yet another precedent kind of 19 event and how we actually analyze nuclear power plant 20 safety.        And I'll stop there.
21                  MEMBER PETTI:          Yes, it just seems to me 22 that this is just one on the road of -- as the staff 23 is being asked to risk-inform more and more and as 24 when      we've  talked    ourselves          about    risk-informing 25 Chapter 15, it's going to morph a little, right?                              I NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
199 1 mean, it's not going to follow the same exact path 2 that the historic approaches took.
3                  I don't tend to think of this as best 4 estimate. I'd call it maybe better estimate. I still 5 think        there's  a    better        estimate        with    still        a 6 conservative view, if you will, because there are 7 still assumptions, conservative assumptions built in 8 into the stylized approach here.                      It's just maybe a 9 little less stylized than the historic approach.
10                  And so that may be just part of what you 11 end up dealing with as one starts to risk-inform a lot 12 of these issues, whether they be GSI-191, now this 13 one.        It's part of the evolution process perhaps at 14 the agency, but again I've only been on the Committee 15 for two years.
16                  CHAIR    SUNSERI:            So,      Dave,  I  have        a 17 suggestion here, and maybe this will move us forward.
18 But we're kind of discussing major points right now, 19 so I would suggest that we do a read-in of the letter 20 that      you  have  drafted      based      on    the  Subcommittee 21 report.        Then we can consider what we've heard today 22 and what you've put together and discuss it further in 23 our major comments.              And then at that point we can 24 decide if we have enough information to move forward 25 with the letter or (audio interference) a later date.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
200 1 That's my recommendation.
2                MEMBER PETTI:          Okay.
3                CHAIR SUNSERI: Anyone else? Anybody else 4 have a different idea?
5                MEMBER BLEY:        Well, this is Dennis.                My 6 own leaning after this; and I was not able to attend 7 the Subcommittee meeting, so I missed out on that --
8 after what I heard today I would be really tempted to 9 put this off for one or two months and get that next 10 Subcommittee meeting in and perhaps your resolution on 11 the DPO.
12                CHAIR SUNSERI:          Any others?
13                MEMBER BROWN:        Yes, this is Charlie.            And 14 Dennis can correct me if I'm wrong, but several years 15 ago we had another one of the ones when they came 16 forward with the DPOs also, but the DPO was able to be 17 discussed because it had conclusions and they'd gone 18 and addressed each of the issues.                  And management had 19 made a decision to go one way or the other.                              It 20 doesn't sound like we're there yet on this particular 21 one unless --
22                MEMBER BLEY:          Yes, Charlie's right.                I 23 know there's been a couple of them that we had, and 24 they were already resolved and just a side issue, even 25 before that, and it was before I was on the Committee, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
201 1 (audio interference) to kind of be a cork for a 2 decision about a DPO. But that was a special case, so 3 I wouldn't think about that at all.
4                  I agree with what Matt said, unless we're 5 specifically called in the DPO is not our business to 6 follow, but it would be really nice to see the results 7 before we say something that maybe ends up being 8 directly      opposite    to    how    it    turns  out.      And      I 9 understood that it's not on this, but it really does 10 affect this.        It could depending on how it gets 11 resolved by the staff and management.
12                  CHAIR SUNSERI:          Yes, that's why I was --
13 you're right, Dennis, and that's why I was suggesting 14 at least we should -- I don't -- have an open mind is 15 not the way to say it, but at least if we hear the 16 letter, read it in; we have time, we can read it in 17 and then you can say oh, yes, clearly this is impacted 18 or clearly it's not.          I don't know which way it would 19 go.      But anyway, just an idea.
20                  MEMBER BLEY:          No objection to that.              I 21 just -- if were Dave I would probably say I want to 22 put it off, but that's -- I think going ahead and 23 reading it is fine.
24                  CHAIR SUNSERI:              I don't disagree that 25 that's where we probably were going to land on this NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
202 1 thing, but I just wanted to -- before just jumping in 2 and the decision, just kind of get to the conclusion 3 of where we are today.
4                  VICE CHAIR REMPE:              But are we still at 5 that conclusion? We've heard a lot today and what was 6 in the letter could it have an impact when we weren't 7 fully        informed  when      we  --      when      that  letter      was 8 drafted?
9                  CHAIR SUNSERI: Well, our letter shouldn't 10 have anything in it that hasn't been presented to us.
11 I mean --
12                  VICE CHAIR REMPE:              But we were not aware 13 of the DPO or the differing view.
14                  CHAIR SUNSERI:            Well, how does that --
15 that      shouldn't    impact      anything        from    a  technical 16 perspective.
17                  VICE CHAIR REMPE:              Well --
18                  (Simultaneous speaking.)
19                  CHAIR    SUNSERI:            --    technical      issues, 20 right?
21                  VICE CHAIR REMPE:            I'm thinking about the 22 way that -- how the reg guide's resolved and some of 23 the technical details if this draft letter has some 24 recommendations        in    it    that      we    ourselves      may      not 25 support afterwards. And that's why I'm kind of siding NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309            www.nealrgross.com
 
203 1 that I would rather not read it in until we've -- we 2 have all the information.              But again, it's just one 3 member's opinion.
4                MEMBER DIMITRIJEVIC:                This is Vesna.          I 5 think it cannot hurt for us to read this letter. Dave 6 already wrote it.        He present some opinions.                We can 7 see what are those opinion depend on these resolution 8 on -- of DPO, when it's done.                So I mean, I think he 9 can -- Dave usually writes a short letter, so I don't 10 think -- I didn't see this letter on the SharePoint, 11 so --
12                MEMBER PETTI:            It's very short; you're 13 right.
14                MEMBER DIMITRIJEVIC:                Yes, so I think it 15 doesn't really hurt us to read it.
16                MEMBER PETTI:            So let me just ask a 17 question, because this is an odd case.                        We could 18 recommend      that  the      ISG    not      be    issued  until      the 19 differing view is resolved. If it's resolved one way, 20 then -- and it doesn't have to come back to us, then 21 we're okay.      If it isn't, then we request that they 22 come back to us because it can affect 1.183.                      It can 23 affect -- this is going to roll into the Standard 24 Review Plan, that we put up a caveat like that that 25 gives them option A, option B.                  Is that something --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
204 1                  CHAIR SUNSERI:          I mean does that really 2 buy anything?      I mean the staff sounds like they want 3 to issue the ISG and just saying writing a letter, say 4 don't issue it until later, I mean does that buy 5 anything?
6                  MEMBER HALNON:            This is Greg.          Without 7 trying to do the DPO issue, but DPO, the differing 8 opinion talks about errors that were made.                    And if in 9 fact those -- unless the ACRS does some kind of 10 analysis or assessment of whether or not we believe 11 those errors were made and they're being translated 12 into the ISG, I don't see how we can opine on whether 13 or not the ISG is okay or not.
14                  We have two competent technical opinions 15 that one says there's an error; one that says not. So 16 I would be uncomfortable going one way or the other 17 until a process to determine whether or not they 18 really were errors or not.
19                  CHAIR SUNSERI:          Ron?
20                  MEMBER BALLINGER: Yes, I'm with Dennis on 21 this because in the past times we've had a different 22 opinion.      I'm not sure it was a DPO, the last one we 23 looked at.      I think it related to one of the license 24 renewals      and related        to    corrosion        of some      kind, 25 underground piping or something.                    But in any case we NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
205 1 had a complete resolution of the issue before we went 2 forward.
3                And I just think that I'm not comfortable 4 thinking that we're not playing with a full deck when 5 we make an opinion.        We presume, like Matt said, that 6 we only decide based on what we have been given.                    We 7 should be sure that what we've been given is complete 8 enough so that we can make a proper decision.
9                CHAIR SUNSERI:          Thank you.
10                So, Dave, you know more about what's in 11 your draft letter than any of us, so I think I would 12 just lean on you for the recommendation.              Is it worth 13 pursuing or do you just want to delay it to a later 14 time?
15                MEMBER PETTI:          I think based on comments 16 from the members we ought to just delay.
17                CHAIR SUNSERI:              Sounds like the right 18 decision to me.
19                MR. SNODDERLY:          Chairman Sunseri, this is 20 Mike Snodderly.        You may want to hear from Meena 21 Khanna or whosever the highest manager on the line 22 about whether they would rather have a letter that 23 says wait until you resolve the differing view or 24 whether they would pull it, and also how this -- and 25 should it be pulled until Reg Guide 1.183 is ready?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309    www.nealrgross.com
 
206 1                So I didn't know if Meena wanted to weigh 2 in, but -- yes, I mean right now the Committee has 3 been requested to write a letter and does the staff 4 want that letter even if it would have this -- and not 5 a negative recommendation, but a recommendation that 6 says you ought to resolve this differing view before 7 you move forward?
8                MEMBER BALLINGER:            This is Ron. I think 9 that's -- I don't know that that's a proper thing.                      I 10 think we make our own decisions regardless.
11                MR. SNODDERLY:          So and don't forget that 12 the staff has asked for a letter on the ISG.
13                CHAIR SUNSERI:          Yes, but they --
14                MR. SNODDERLY:          So if you want to 15 issue --
16                CHAIR SUNSERI: -- have also said in their 17 closing remarks that they understood if we decided 18 that we needed to delay it.              So they've already --
19                MR. SNODDERLY:                Okay. If    you're 20 comfortable with that, yes, then Scott should -- yes, 21 just want to make sure we get the logistics right.
22                CHAIR SUNSERI:            And I agree with Ron.
23 It's our decision.        I mean --
24                MR. SNODDERLY:          Very good.
25                CHAIR SUNSERI:          So anybody else?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309      www.nealrgross.com
 
207 1                MEMBER DIMITRIJEVIC: Well, we're going to 2 have a discussion on 1.183 in the couple weeks, right?
3                MEMBER PETTI:          Yes.
4                MEMBER DIMITRIJEVIC:                Well, this DPO be 5 resolved before?
6                MEMBER    PETTI:          I    think    it's  a    good 7 question to ask our management, what's the schedule 8 for resolution, if the know at this point.
9                MS. KHANNA:        Thank you for the question.
10 So at this point I can't tell you exactly.                      There's 11 various parts of the process that the DPO could end up 12 in, so it could be a matter of two to three months.
13 So it just depends on where the DPO goes, to be honest 14 with you at this point.
15                MEMBER PETTI:          But there's a very small 16 chance that it would be in two weeks before 1.183 --
17                MS. KHANNA:        I would say that that's fair 18 to say. Without knowing all the details, yes, I think 19 that's fair to say that it won't be done.
20                So if you don't mind, I would like to 21 recommend that maybe we pursue the Reg Guide 1.183 22 Subcommittee    meeting        and    then      revisit  when      the 23 appropriate time is to do the Full Committee meeting 24 if things haven't been addressed with the differing 25 views, if that would be something that you guys would NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
208 1 consider.
2                    MEMBER PETTI:            Yes, I think we can do 3 that.        I think right now the Full Committee for 1.183 4 is out in -- I think it's in March, so if that had to 5 slip a month, I think that would probably be okay.
6                    MS. KHANNA:        Okay.        Thank you.
7                    CHAIR SUNSERI:          Does any member disagree 8 with delaying this letter report?
9                    All right. There you have it. So we will 10 postpone          writing    a    letter        on      this  until      the 11 appropriate time downstream.                        Dave will work with 12 staff.        Staff will -- our staff.              Our staff will work 13 with the other side of the -- the other side's staff 14 to decide when the appropriate time to come back.
15 We'll move forward with the November I think it's 19th 16 Subcommittee on the reg guide, and then we'll go 17 wherever that leads us. That a fair conclusion, Dave?
18                    MEMBER PETTI:          Yes.
19                    CHAIR SUNSERI: All right. Well before we 20 leave this topic I just want to say one thing: Thanks 21 to all the presenters on this topic.                            One of the 22 values of any ACRS review is that it really creates an 23 opportunity for a variety of technical viewpoints to 24 be discussed in what I'll say a transparent public 25 forum.          If you look at our Committee, even our own NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
209 1 Committee composition is intentionally diverse to 2 promote looking at technical issues from different 3 perspectives,      and      certainly          we    have  firsthand 4 experience with differing views on some topics. So we 5 appreciate the challenge that's going on here.
6                But however, at the end of the day these 7 differing views make our reviews stronger and our 8 conclusions better.          And I expect the same kind of 9 outcome from this topic will occur, so really do want 10 to thank all of the presenters for taking the time 11 today and your patience with us as we strive to get 12 the information we need to make the best decision that 13 we can on this.      So thank you.
14                MEMBER BALLINGER:            This is Ron. I'd like 15 to make a comment, if I could.
16                CHAIR SUNSERI:          Sure.      Go ahead.
17                MEMBER BALLINGER:            I hope that I've heard 18 it wrong, but I thought that I heard a staff member, 19 I don't know who it was, say that depending on the 20 assumptions that they -- an applicant makes, which --
21 and it's their discretion.              That may be where I hope 22 I'm wrong. They could change the answer by several 23 orders of magnitude.          In spite of the fact that it's 24 a stylized calculation and all that kind of stuff, 25 which we understand, that's -- being able to alter the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
210 1 result in a stylized, even stylized calculation by 2 several orders of magnitude by choosing assumptions 3 which are allowed, is that the right way to do things?
4 I hope I've heard them wrong.
5                  MEMBER PETTI:            Yes, I don't know.              I'd 6 have to go back and look at the record, the context of 7 which the statement was made, but I mean, you know --
8                  DR. DICKSON:          This is Elijah Dickson.
9                  MEMBER KIRCHNER: Matt, this is Walt. Can 10 I follow on to Ron just quickly?                        One of the things 11 that when we meet with the staff again I found a 12 little bit in light of some of the additional comments 13 we had the differing professional views.                        This whole 14 business of what's credited and isn't is bothering me, 15 not from a logical engineering analysis standpoint, 16 but from what's in the regulations versus what's in an 17 ISG or a reg guide.                  I mean reg guides are not 18 regulations.          Those are recommended approaches or 19 acceptable        approaches        to    the      staff.      But      the 20 regulations are the regulations.
21                  I'm  a    little      concerned        that  we    heard 22 differing interpretations of what could be credited 23 and what not.          Are we substantially departing from 24 what's in the regulations versus what's in the reg 25 guides?        That would be something when we visit with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433          WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
211 1 the staff again I would like to explore and clear up 2 because I certainly agree with the idea of doing a 3 much better realistic engineering analysis, but is it 4 consistent          with    what        the        existing      statutory 5 requirements in the regulations are?
6                    That's more process than engineering and 7 safety, but I have a concern there.                        I just wanted to 8 note that for the future discussions.
9                    CHAIR SUNSERI:          Okay.        We have two hands 10 up.      I think, Dennis, I see yours, but I want to go to 11 Elijah Dickson first because his was up, then it was 12 down, and now it's back up.                We'll go to him and then 13 we'll go to Dennis.
14                    DR. DICKSON: Thank you very much. I'll be 15 quick.        Yes, I made the comment that depending on the 16 assumptions you make in these types of analyses can 17 impact the final dose results.                            And there are a 18 handful of regulatory positions that if you made an 19 improvement to that regulatory position you can change 20 that dose result, this figure of merit result by an 21 order of magnitude or two orders of magnitude.                            It's 22 true with the regulatory guidance.
23                    Now I had heard just briefly too that 24 there's discussion between the regulation and the 25 guidance,        right?      The    regulation          itself  doesn't NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
212 1 discuss how you get to that particular figure of merit 2 value.        That's all left to regulatory guidance.                      The 3 rule      itself,    50.67,        it's      pretty      sparse    on      its 4 language.        It doesn't tell you step by step how you 5 get to that particular answer.
6                    CHAIR SUNSERI:            All right.      Thank you.
7                    Now, Dennis?
8                    MEMBER      BLEY:          Yes,      thanks.      Nothing 9 substantive.          I just wanted to ask Mike Snodderly, 10 when the transcript comes in for this one, please 11 distribute it as -- immediately to all of us. There's 12 so much useful information in today's discussion and 13 I'd really like to see that as soon as possible and 14 even before you get minutes made up or anything like 15 that.        So --
16                    MR. SNODDERLY: Yes, of course. Yes, sir.
17                    MEMBER BLEY:          -- thanks.
18                    MR. SNODDERLY:            Yes.
19                    CHAIR SUNSERI:          Anyone else? Okay.          Thank 20 you.
21                    So we're done with this topic, we're at a 22 kind of a point in our agenda where we can't go 23 forward on anything. And I knew I probably was (audio 24 interference) until Thursday morning, but we have --
25 nearly two hours was left in our agenda today.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
213 1                VICE  CHAIR      REMPE:            Matt,  there's          a 2 research review letter.
3                CHAIR SUNSERI: We could do the read-in of 4 the draft emergency planning rule, if Greg is ready.
5                And I understand, Joy, that you want to 6 get the research done.
7                VICE CHAIR REMPE:            Yes, I just thought --
8 if Greg isn't -- anyway, I thought you weren't going 9 to allow Greg to read, but yes, after that we --
10 that's why it's sitting out there. Any time we've got 11 a spare moment, let's do it.
12                CHAIR SUNSERI:          Right. Greg, are you --
13                MEMBER HALNON:            We can do it, Matt.                I 14 think during our discussion time frame there's going 15 to be a road map of some of the items that were in and 16 out of the rule based on EPZ site boundary that I'd 17 like to be able to have at my fingertips.                      We asked 18 the staff to possibly think about doing that for us, 19 and we didn't give them enough time I don't think, 20 apparently. So I was working on it to try to get a --
21 can read the letter in as it stands.                    I think there 22 will be some substantive changes based on what we 23 heard today, but we can read in what we have already 24 set.
25                CHAIR SUNSERI:          Yes, I'd like to read it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433        WASHINGTON, D.C. 20009-4309          www.nealrgross.com
 
214 1 in and at least get some -- the big comments out of 2 the way so that if you need to do some more homework 3 or work between now and later in this week in this 4 meeting schedule, that you'll have an opportunity to 5 do that and coordinate with whoever you need to.                            Is 6 that fair?
7                    MEMBER HALNON:            Certainly can do that.
8 Sure.
9                    CHAIR SUNSERI:          So let's take a 15-minute 10 break.        We'll reconvene at 10 after the hour and then 11 we'll start with the letter that Member Halnon is 12 preparing.        Okay?
13                    Anything else before we go?              Dennis, is 14 your hand still up from last time or you got something 15 new?
16                    MEMBER BLEY:            It's still up from last 17 time.        Sorry.
18                    CHAIR SUNSERI:          No problem. Okay.      So we 19 are recessed until 10 after the hour.                    Thank you.
20                    (Whereupon, the above-entitled matter went 21 off the record at 3:55 p.m.)
22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1716 14th STREET, N.W., SUITE 200 (202) 234-4433            WASHINGTON, D.C. 20009-4309        www.nealrgross.com
 
Advisory Committee on Reactor Safeguards 10 CFR Parts 50 and 52 Emergency Preparedness for Small Modular Reactors and Other New Technologies November 2, 2021
 
NRC Staff Presenters
* Soly Soto Lugo, NMSS - Rulemaking PM
* Eric Schrader, NSIR - Technical Lead
* Charles Murray, NSIR - RG 1.242 Lead
* Michelle Hart, NRR - Senior Reactor Engineer 2
 
===
Background===
3
 
===Background===
* Proposed rule
  - Published the proposed rule for public comments on May 12, 2020
  - Comment period: total of 135 days (ended on Sept 25, 2020)
* Public comments
  - Received comments from 2,212 individuals and organizations, including 2,087 form letters
  - Identified 649 unique comments on the proposed rule
  - Responses to public comments will be published upon Commission approval of the final rule
* Draft final rule due to the Commission by December 30, 2021 4
 
Draft Final Rule Language 5
 
Draft Final Rule Language Technical Basis and Major Provisions
* Graded approach to EP:
  - Performance-Based
  - Technology-Inclusive
  - Risk-Informed
  - Consequence-Oriented
  - Hazard analysis 6
 
Draft Final Rule Language (cont.)
New Alternative Performance-Based Framework 7
 
Draft Final Rule Language (cont.)
* New Alternative Performance-Based Framework
  - Section 50.160(b)(1) demonstrate effective response in drills and exercises for emergency and accident conditions
* Scalable approach for determining plume exposure pathway EPZ size
  - Section 50.33(g)(2) CP, OL, ESP or COL applicants complying with § 50.160 must submit the analysis used to determine the EPZ size 8
 
Draft Final Rule Language (cont.)
Regulatory Oversight
* Section 50.160(b)(1) requires applicants and licensees to use drills and exercises to demonstrate their capabilities in the required emergency response functions
* The NRC staff is in the process of developing a regulatory oversight framework that is technology-inclusive, risk-informed, and performance-based
* Performance Objectives -vs- Performance Indicators 9
 
Draft Final Rule Language (cont.)
* EPZ Boundary and Physical Characteristics
  - Section 50.33(g)(2) applicants must propose their EPZ
  - Section 50.160(b)(3) requires applicants to describe in their emergency plans the boundary and physical characteristics of the EPZ
* Requirement to Describe Ingestion Response Planning
  - Section 50.160(b)(4) establishes ingestion response planning requirements 10
 
Draft Final Rule Language (cont.)
* Onsite and Offsite Planning Activities
  - Section 50.160(b)(1)(iv)(A) contains required onsite and offsite planning activities for all applicants and licensees
* Offsite Planning Activities
  - Section 50.160(b)(1)(iv)(B) contains required offsite planning activities for applicants with a plume exposure pathway EPZ that extends beyond the site boundary 11
 
Draft Final Rule Language (cont.)
* Requirement for Hazard Analysis
  - Section 50.160(b)(2) requires a hazard analysis of facilities contiguous to or near an SMR or ONT facility
* Consideration of Credible Hazards
  - Activate the emergency plan
  - negatively impact implementation of the emergency plan 12
 
Presidential Policy Directive 8 / PPD-8, National Preparedness PPD-8 National Planning Framework requires:
* A Planning Framework, covering five areas -
Prevention, Protection, Mitigation, Response and Recovery
* Response and Recovery area - Nuclear/Radiological Incident Annex
* Annexes describe response and resources available
* Part of the Nuclear/Radiological Incident Annex is the DOE/National Nuclear Security Administration (NNSA)
Federal Radiological Monitoring and Assessment Center (FRMAC) 13
 
FRMAC Activation Timeline Approximate Readiness Time After Activation - Emergency (Early) Phase Activation Sequence for Various DOE-Related Assets Once Authorized DOE/NV/25946- 980 FRMAC Operations Manual (May 2010) 14
 
FEMA and DOE Public Comments
* Federal Emergency Management Agency
  - Supported modifying regulatory framework, but opposed potential for site boundary EPZs
  - Argued the rule does not consider full spectrum of threats and beyond design basis accidents
* U.S. Department of Energy
  - Supported the proposed rule
  - The revised EP framework would provide more appropriate approach for SMRs 15
 
Significant Changes to the Proposed Rule
* Revised section 50.33(g)(2) EPZ sizing criteria
* Revised section 50.160(b)(3) to include entry criteria
* Revised sections 50.160(c)(1)-(2) to allow licensees greater flexibility for initial exercise demonstration 16
 
Other Changes to the Proposed Rule
* Revised section 50.2 definition of small modular reactor
* Revised section 72.32(c) to clarify that the emergency plan that meets the requirements of sections 50.47 or 50.160 satisfies the EP requirements of section 72.32
* Revised section 50.160(b) to state the reasonable assurance finding required in section 50.47(a)(1) apply to section 50.160 applicant 17
 
Other Changes to the Proposed Rule (cont.)
* Added new paragraph 50.47(f) denoting when the offsite emergency response plan requirements in § 50.47(a)(2), (b), and (c)(2) do not apply
* Revised sections 50.160(b)(1)(iii)(F)(1), (3) and (4) to refer to applicable response organizations
* Revised section 50.160(b)(1)(iv)(B)(4) to ensure ETEs include area within the site boundary 18
 
Other Changes to the Proposed Rule (cont.)
* Clarified that an applicant complying with section 50.160 needs to submit an emergency plan of a participating Tribal government
* Relocated requirements for site familiarization and maintenance of emergency plan to section 50.160(b)(1)(iv)(A) to ensure requirements are applicable to all applicants and licensees 19
 
Draft Regulatory Guidance RG 1.242, Performance-Based Emergency Preparedness for Small Modular Reactors, Non-Light Water Reactors, and Non-Power Production or Utilization Facilities 20
 
Draft Regulatory Guidance
* Conforming changes to the regulatory guide
  - Made conforming changes based on changes to the draft final rule language
  - Included additional reference documents
  - Enhanced the guidance on accident likelihood, source term, timing of the accident sequence, and meteorology
  - Added the definition of safe conditions to the glossary 21
 
Draft Regulatory Guidance (cont.)
* Appendix A, General Methodology for Establishing Plume Exposure Pathway Emergency Planning Zone Size
  - Provides a general methodology acceptable to the NRC for the analysis for establishing plume exposure pathway EPZ size
  - Added Section A-3.1, Event Selection, which discusses the applicants consideration of accident likelihood 22
 
Draft Regulatory Guidance (cont.)
* Appendix B, Development of Information on Source Terms
  - Provides guidance to develop source terms for plume exposure pathway EPZ size evaluations 23
 
Draft Regulatory Guidance (cont.)
* Appendix A-3.1 Event Selection
  - Use licensing basis events as candidate radiological release scenarios
  - Considerations
* Internal and external initiators
* All sources
* Multi-module and multiunit
* Event likelihood including uncertainty
* Timing of the releases 24
 
Questions 25
 
Acronyms and Abbreviations
* AMS - Aerial Measuring System
* NARAC - National Atmospheric
* ACRS - Advisory Committee on        Release Advisory Center Reactor Safeguards
* NMSS - Office of Nuclear Material
* CFR - Code of Federal Regulations  Safety and Safeguards
* NRC - U.S. Nuclear Regulatory
* CMHT - Consequence                  Commission Management Home Team
* NRR - Office of Nuclear Reactor
* CMRT - Consequence                  Regulation Management Response Teams
* NSIR - Office of Nuclear Security and
* CP - construction permit            Incident Response
* COL - combined license
* OL - operating license
* DOE - Department of Energy
* ONT - other new technologies
* EP - emergency preparedness
* PM - project manager
* EPZ - emergency planning zone
* REAC/TS - Radiation Emergency
* ESP - early site permit            Assistance Center/Training Site
* RAP - Radiological Assistance
* ETE - evacuation time estimate      Program
* FEMA - Federal Emergency
* RG - Regulatory Guide Management Agency
* SMR - small modular reactor
* FRMAC - Federal Radiological Monitoring and Assessment Center 26
 
27 Protective Action Recommendation DOE/NV/25946- 980 FRMAC Operations Manual (May 2010) 28
 
Key Messages DOE/NV/25946- 980 FRMAC Operations Manual (May 2010) 29
 
Supporting Graphics DOE/NV/25946- 980 FRMAC Operations Manual (May 2010) 30
 
Speaker Notes DOE/NV/25946- 980 FRMAC Operations Manual (May 2010) 31
 
NEI Remarks on the SMR & ONT EP Final Rule and Guidance Meeting of the Full ACRS on November 1, 2021 Thank you for the opportunity to make remarks on the NRCs final rule and guidance for SMR and ONT EP. My name is Marc Nichol, Senior Director of New Reactors at the Nuclear Energy Institute. The comments below are made on behalf of the nuclear energy industry.
We have been engaging with the NRC staff on performance-based EP for advanced reactors since the issue was first identified in 2010 and we strongly support issuance of the final rule.
The Commissions Advanced Reactor Policy Statement has encouraged the nuclear industry to develop designs with enhanced safety features. The industry has responded to this policy goal with designs featuring smaller cores and reliance on passive safety systems - these features reduce the potential for accidents and increase the time available to take mitigation or protective actions. The overall lower risk provides a sound rationale for the EP changes proposed by the NRC staff.
The NRCs rule recognizes the enhanced safety of advanced reactor designs and establishes EP requirements that are commensurate with the potential consequences to the public from an accident. Most advanced reactors are expected to demonstrate that they can meet the dose-based consequence limits for the plume exposure Emergency Planning Zone at distances much less than the 10-mile radius used by current operating reactors. In all cases, the applicant will have to provide the NRC with a site-specific technical justification for the proposed EPZ size. In many cases, an advanced reactor may present a lesser hazard to the public than some non-nuclear facilities, such as petrochemical facilities.
The rule uses essentially the same EP technical basis as that underlying the requirements applicable to currently operating reactors and therefore will maintain the same level of public protection. There will be no reduction in defense-in-depth; rather, EP activities are appropriately scaled to reflect the potential hazards posed by a facility. The rule provides clear and reasonable regulatory requirements for designers, applicants and licensees. We support the performance-based approach used in the rule as it will allow for innovation and flexibility in addressing the EP requirements. It also aligns with the NRCs prior approval of EP for the TVA Clinch River ESP.
We believe there is one area where the rule would benefit from additional clarity. The rule states that the plume exposure pathway EPZ must include the area in which the public dose exceeds 1 rem TEDE over 96 hours from the release of radioactive materials from the facility considering accident likelihood and source term, timing of the accident sequence, and meteorology. However, the proposed rule and guidance does not fully address the subject of accident likelihood; for example, how unlikely must an event be to not be considered for a
 
NEI Remarks on the SMR & ONT EP Final Rule and Guidance Meeting of the Full ACRS on November 1, 2021 sizing analysis for an emergency planning zone. The lack of sufficient detail in the proposed guidance to inform an application leaves the determination of which events should be included or excluded to be clarified during the NRC review; potentially through NRC requests for information and applicant revisions of the documentation. As a current example, we understand that the lack of this clarity has been a challenge in the NRCs review of the NuScale topical report on the EPZ methodology. There should be clear guidance with respect to which internal and external events are included (e.g., cutoff frequencies and uncertainty bounds) and consistency between the application of the guidance to light-water and non-light-water designs. Absent better definition/criteria on this topic, the NRCs goal to create regulatory stability, predictability, and clarity through this rule will not be fully met.
To summarize, we believe the new EP framework will be beneficial for the licensing of advanced reactor designs and provide reasonable assurance of adequate protection for the public. The rule provisions are consistent with the Atomic Energy Act, Commissions Policy Statement on the Regulation of Advanced Reactors, and past Staff Requirements Memorandums. We also note that in addition to meeting NRC requirements, a facility owner/operator will responsibly engage with State and local elected officials, emergency management agencies, and communities to gain public confidence in the siting of an advanced reactor facility. Such engagements would include working with communities to put emergency response capabilities in place, even in cases where an offsite EPZ is not required.
Finally, the rule supports the safe and efficient deployment of a new generation of U.S.-
designed reactors, all producing carbon-free power - an outcome thats good for our economy and national security, and one that supports global efforts to mitigate climate change.
 
UCS Comments on the Draft Final EP Rule for SMRs and ONTs Edwin Lyman Director of Nuclear Power Safety Union of Concerned Scientists Presentation to the ACRS November 2, 2021
 
General comments
* UCS would welcome a science-based revision to emergency planning requirements that strives to use the best available information to better align protective measures to radiological risks, while fully accounting for uncertainties and the need for defense-in-depth
  - An objective rule would acknowledge up front that EPZs could be larger or smaller than 10 miles
* Unfortunately, the draft final rule is a far cry from this goal. Its purpose seems largely to provide cover for reactor vendors who have already publicly claimed that their designs do not need an offsite EPZ
  - Presumption is that only smaller EPZs would result for any SMR or ONT, regardless of the details of the technology
  - Disregards one of the major lessons of Fukushima: the essential value of planning for the unexpected!
 
2021 Nuclear Industry Council vendor survey (N.B.: The answer is already predetermined!)
 
No Offsite EPZ, No EP requirements
* The draft final rule would provide a get-out-of-jail-free card for power reactor applicants seeking to avoid any offsite EP requirements
  - a step function if the EPZ is determined to be within the site boundary
* Entire offsite EP burden then falls on public emergency management agencies: an unfunded mandate
  - May lack the necessary radiological expertise
  - Could lead to disproportionate impacts on disadvantaged populations, depending on local economic conditions and resources
 
Concern: Cumulative effect of RIPB licensing initiatives
* General reductions in defense-in-depth despite the common-cause reliance on the PRA in the LMP, etc.
* The rule should not be an option for FOAK reactor designs, but only for reactors that have accumulated significant operating experience to validate the PRA
 
Concern: Event selection
* The rule should be specific enough to prevent applicants from fine-tuning selection and analysis of events to achieve the desired result: no offsite EPZ
* Example: Arbitrarily chosen seismic event frequency cutoff in NuScale draft Topical Report on EPZ size
* But vague rule and guidance language opens the door for back-calculating from desired outcome
* Proposed rule: used undefined term spectrum of credible accidents for evaluating off-site emergency phase doses
* Draft final rule is even less specific: considering accident likelihood and source term, timing  and meteorology.
(§50.33(g)(2))
* Draft guidance: Licensing basis events (is also left undefined in the regulations)
 
Comments of DOE Deputy Under Secretary Jay Tilden
* On July 22, 2020, DOE Deputy Under Secretary for Counterterrorism and Counterproliferation Jay Tilden submitted independent comments critical of the EP draft rule (ML20204A847):
  - The proposed EPZ strategy may not provide the same defense-in-depth [as the current framework] against the full spectrum of nuclear accident scenarios  given the lack of operational history for SMR technologies, the source term determination and evaluation of credible accident scenarios are purely theoretical  this circumstance should lead the NRC  to be more conservative
* On July 23, NNSA Administrator Lisa Gordon-Hagerty requested that Mr. Tildens comment be withdrawn
* On September 25, Tilden and DOE Assistant Secretary for Nuclear Energy Rita Baranwal submitted joint comments that stated the new NRC approach [for EPZ size]  will assure public safety
* Mr. Tildens original comments should not be so easily discounted
 
Concern: Additional hurdle
* Draft final rule contains a second vague condition for an offsite EPZ: there must be a need for predetermined, prompt protective measures.
Staff have not clearly explained what this means
* AND statement means that applicants will have a second way to avoid offsite EP requirements even if the plume EPZ extends beyond the site boundary
* Appears inconsistent with the EPA PAG (Protective Action Guide) requirement underlying the first condition (< 1 rem in 4 days)
 
Concern: Does not address acute exposures, thyroid dose
* Draft final rule is inconsistent with previous planning basis for EP because it does not clearly address protection from immediate, life-threatening doses from the worst core-melt sequences
  - Low-probability, high-consequence initiating events could be screened out completely
* Does not include thyroid dose early phase PAG for infants which could be limiting in some scenarios
 
Concern: Inconsistent scope
* Why are non-LWRs (such as a fast reactors) of any size in the scope of the rule, but not large LWRs?
* Large LWRs could have EPZs > 10 miles utilizing this methodology
* No reason to believe a priori that large non-LWRs could not experience accidents with severe off-site consequences
 
NARAC Fukushima simulations Nearly 20 miles
 
NARAC (cont.)
Over 30 miles
 
Clinch River Breeder thyroid doses at 0.41 miles (1000 MWe)
 
PRISM (380 MWe) fast reactor doses Grabaskas, D. et al. Regulatory Technology Development Plan Sodium Fast Reactor: Mechanistic Source Term - Trial Calculation, ANL-ART-49, Vol.1., Oct. 2016
 
Concern: Lack of inclusion of sabotage events
* Draft final rule does not (explicitly) consider the potential for hostile actions as an external event initiator that could affect issues such as event timing, progression, and severity, and thus could factor into the EPZ size determination
 
Concern: Lack of specifics on site-wide analysis
* Draft final rule and guidance provide no details on how applicants should consider multi-module accidents and interactions, and how to address other potential sources of radiological release (spent fuel storage, on-site processing)
* Important because accumulated spent fuel storage could prove to be the largest single potential source of release onsite (see, e.g.
NuScale)
 
From:            Becker, Gary To:              Snodderly, Michael
 
==Subject:==
[External_Sender] Advance comment for ACRS Full Committee Meeting on EP for SMRs Date:            Monday, November 01, 2021 3:06:21 PM Attachments:      image001.png
: Mike, Tomorrow I intend to make some comments during the public comment portion of the EP meeting. I wanted to provide an advance summary if it might aid the Committee in their preparations and deliberations. Depending on the substance of tomorrows discussions, I may provide appropriate additional details orally and follow-up in writing.
At I stated at the ACRS subcommittee meeting in September, NuScale is concerned about the lack of clarity in the new rule and RG 1.242. The final rule language states that the plume exposure pathway EPZ must include the area in which the public dose exceeds 1 rem TEDE over 96 hours from the release of radioactive materials from the facility considering accident likelihood and source term, timing of the accident sequence, and meteorology. But neither the proposed rule nor the Reg Guide adequately address that subject of appropriate accident likelihood, i.e., how unlikely must an event be to not be considered for an EPZ sizing analysis. The proposed rule and Statements of Consideration lack any indication to an applicant as to an acceptable event frequency envelope, while the Reg Guide provides very little more. RG 1.242 offers licensing basis events (LBEs) as a starting point for consideration, but for LWRs the definition of LBEs is of little help; moreover it is inconsistent with the scope of LBEs for non-LWRs using the NEI 18-04 approach and for facilities employing a maximum hypothetical accident. Then, within the set of LBEs, RG 1.242 does not prescribe or suggest an acceptable accident likelihood screening threshold.
NRC Staff acknowledged in SECY-97-020 that, to make changes to the EP requirements, it would require significant expenditure of staff resources to address the probability level, if any, below which accidents will not be considered for EP and the use of increased safety in one level of the defense-in-depth framework to justify reducing requirements in another level. Faced with that task in modifying the current framework for SMRs and ONTs, the Staff have promulgated a rule without addressing the probability level in a meaningful manner. In SECY-15-0077, Staff noted they may require future Commission direction" in "determining appropriate accidents to be evaluated, but Staff have neither offered nor sought such direction. The rule and guidance defer the question of accident likelihood to individual applicants to resolve with the Staff. NuScale believes NRC should provide, in either the rule or the guidance, clear direction on the scope of internal and external events to be included in EPZ sizing (e.g., cutoff frequencies and uncertainty bounds). In particular, NuScale believes the treatment of some external hazards, such as earthquakes, require special attention in the new rule because they were only crudely considered in the technical basis underlying the existing EP requirements (i.e. WASH-1400 and NUREG-0396).
Consistent with the rules stated intent to increase predictability, the final rule and RG 1.242 should provide clear, well-supported, and reasonable guidance on which internal and external events are to be included in EPZ sizing; that guidance should be risk-informed and performance-based, and should
 
be consistent between light-water and non-light-water designs. We believe these are essential, high-level, subjective questions that are being deferred to a time and manner least appropriate for their considerationindividual applicants that will be seeking expeditious review of their EP during the licensing of a particular site.
: Regards, Gary Becker Regulatory Affairs Counsel email: gbecker@nuscalepower.com web: www.nuscalepower.com office: 541.360.0549 The contents of this email are intended only for the person to whom it is addressed. If you received it by mistake, please inform me by reply email and then delete the message and any attachments. This email may contain proprietary, confidential and/or privileged material, which doesn't change if it is sent to an unintended recipient. Unless you have my consent, please do not copy, forward, or reveal the contents of this email to anyone.
 
From:            Becker, Gary To:              Snodderly, Michael
 
==Subject:==
[External_Sender] RE: RE: Advance comment for ACRS Full Committee Meeting on EP for SMRs Date:            Wednesday, November 03, 2021 7:06:53 PM Attachments:      image001.png Thank you Mike. Here is a written version of my comments yesterday for the record. //
At the outset, overall NuScale believes this rulemaking is needed, appropriate, and in many respects well considered.
However, as I stated at the ACRS subcommittee meeting in September, NuScale is concerned about the lack of clarity in the new rule and RG 1.242, particularly on the issue of event selection for EPZ sizing. I sent some advanced written comments yesterday that I won't recount in full here. In essence, there's nothing in the rule and very little in the guidance to guide us on appropriate accident likelihood, i.e., how unlikely must an event be to not be considered for an EPZ sizing analysis. The conversation I heard today did nothing to help ease my concerns. In response to questions today, NRC have indicated that basically they can't provide any detailed information on event selection now. Most troubling was the suggestion that we need to "find all of the potential large releases," looking to every event in the so-called "licensing basis" of Chapters 15 and 19. Surely that can't be the standard, because a PRA such as NuScale's essentially evaluates every sequence regardless of frequency. And non-LWRs using NEI 18-04 are able to limit the bounds of accident frequency to their LBEs, which have a frequency of greater than 5E-7. LWRs don't even get that level of guidance, let alone anything to guide us in further screening. NRC pointed to the need for prompt protective measures as one criterion, which does not answer the question of how unlikely an event to consider. And we don't think it is a question specific to sites or technologies--we believe the issue of accident likelihood and event selection is essential to the EPZ sizing aspect of this rulemaking. And it is a generic question that speaks to the policy of how unlikely an event preplanned emergency actions should be developed for; in other words what is reasonable to consider. The rule, with respect to EPZ sizing, does not achieve regulatory predictability, and in fact doesn't seem to be a "risk-informed" rule at all--how can the rule be risk-informed if it doesn't define the frequency side of the risk equation?
As I noted in my written comments, the guidance's section on "event selection" is of little help. But Section 3.7 "Probabilistic Dose Aggregation" does give us some clues on how we might make EPZ sizing risk informed and performance based. That section discusses how NUREG-0396 examined the conditional probability of various exceeding dose criteria and concluded the 10 mile EPZ was of sufficient size such that projected doses from the traditional DBAs and "most" core melt sequences would not exceed PAG levels outside the EPZ, and for the worst core melt sequences immediate life threatening doses would not generally occur outside the EPZ. RG 1.242 states that the methodologies used for event selection, identification of source terms, modeling of releases, and aggregation of potential offsite doses should provide similar confidence that appropriate offsite planning will be identified This framework may provide an opportunity to bring greater clarity on event selection to the rule and guidance. I'll note that in SECY-97-020, Staff acknowledged that two aspects of modifying the EP
 
framework would be (1) addressing the probability level of accidents to consider in emergency planning, and (2)the use of increased safety in one level of the defense-in-depth framework to justify reducing requirements in another level. NUREG-0396 began with a starting point of a cumulative probability of a core melt accident of approximately 1 in 20,000 (5E-5) per reactor year. A core damage probability on the order of the Safety Goals established later. For those core melt accidents, NUREG-0396 found that the 10 mile EPZ resulted in a 30% chance of exceeding PAG levels. The resulting probability of exceeding PAG doses at 10 miles for a LLWR is 1.5E-5 per reactor year (one chance in 50,000 per reactor-year) (with uncertainty). Clearly and explicitly tying the EPZ sizing methodology to this performance level--a likelihood of exceeding PAGs at the EPZ boundary of about 1E-5--would be risk-informed, performance based, consistent with the Commission's Safety Goals, and allow, as envisioned in SECY-97-020 for the "use of increased safety in one level of the defense-in-depth (core damage prevention)to justify offset requirements in another level (EP)." In fact, it would seem to address Mr. Lyman's concern over a reduction in overall defense-in-depth quite well.
Invoking the analogous performance level of the 10 mile EPZ (that is, a 1.5E-5 likelihood of exceeding PAGs) does not alone answer the question of event frequency, especially when it comes to some external hazard event initiators. Work would still need to be done, but it seems like an appropriate starting point.
In conclusion, NuScale does not believe it's appropriate to defer detailed consideration of event selection to an applicant seeking to implement the guidance. We believe this question is essential to the rulemaking effort and needs to be resolved on a generic basis subject to Commission approval as part of the rulemaking process.
Gary Becker Regulatory Affairs Counsel email: gbecker@nuscalepower.com web: www.nuscalepower.com office: 541.360.0549 The contents of this email are intended only for the person to whom it is addressed. If you received it by mistake, please inform me by reply email and then delete the message and any attachments. This email may contain proprietary, confidential and/or privileged material, which doesn't change if it is sent to an unintended recipient. Unless you have my consent, please do not copy, forward, or reveal the contents of this email to anyone.
From: Snodderly, Michael <Michael.Snodderly@nrc.gov>
Sent: Tuesday, November 2, 2021 8:58 AM To: Becker, Gary <gbecker@nuscalepower.com>
 
==Subject:==
RE: RE: Advance comment for ACRS Full Committee Meeting on EP for SMRs Of course. Ill notify you when letter writing for this matter starts at this email address.
From: Becker, Gary <gbecker@nuscalepower.com>
Sent: Tuesday, November 02, 2021 11:54 AM To: Snodderly, Michael <Michael.Snodderly@nrc.gov>
 
==Subject:==
[External_Sender] RE: Advance comment for ACRS Full Committee Meeting on EP for SMRs
 
Thank you Mike. With the change in schedule today (no ACRS deliberation on the EP rule), would you possibly be able to inform me for when that deliberation is rescheduled? I wont be able to tune into other sessions to keep abreast of the fluid schedule.
Thank you, Gary Becker Regulatory Affairs Counsel email: gbecker@nuscalepower.com web: www.nuscalepower.com office: 541.360.0549 The contents of this email are intended only for the person to whom it is addressed. If you received it by mistake, please inform me by reply email and then delete the message and any attachments. This email may contain proprietary, confidential and/or privileged material, which doesn't change if it is sent to an unintended recipient. Unless you have my consent, please do not copy, forward, or reveal the contents of this email to anyone.
From: Snodderly, Michael <Michael.Snodderly@nrc.gov>
Sent: Monday, November 1, 2021 1:06 PM To: Becker, Gary <gbecker@nuscalepower.com>
 
==Subject:==
RE: Advance comment for ACRS Full Committee Meeting on EP for SMRs I will forward these comments to the Members and make sure they are added to the transcript.
From: Becker, Gary <gbecker@nuscalepower.com>
Sent: Monday, November 01, 2021 3:06 PM To: Snodderly, Michael <Michael.Snodderly@nrc.gov>
 
==Subject:==
[External_Sender] Advance comment for ACRS Full Committee Meeting on EP for SMRs
: Mike, Tomorrow I intend to make some comments during the public comment portion of the EP meeting. I wanted to provide an advance summary if it might aid the Committee in their preparations and deliberations. Depending on the substance of tomorrows discussions, I may provide appropriate additional details orally and follow-up in writing.
At I stated at the ACRS subcommittee meeting in September, NuScale is concerned about the lack of clarity in the new rule and RG 1.242. The final rule language states that the plume exposure pathway EPZ must include the area in which the public dose exceeds 1 rem TEDE over 96 hours from the release of radioactive materials from the facility considering accident likelihood and source term, timing of the accident sequence, and meteorology. But neither the proposed rule nor the Reg Guide adequately address that subject of appropriate accident likelihood, i.e., how unlikely must an event be to not be considered for an EPZ sizing analysis. The proposed rule and Statements of Consideration lack any indication to an applicant as to an acceptable event frequency envelope, while the Reg Guide provides very little more. RG 1.242 offers licensing basis events (LBEs) as a starting
 
point for consideration, but for LWRs the definition of LBEs is of little help; moreover it is inconsistent with the scope of LBEs for non-LWRs using the NEI 18-04 approach and for facilities employing a maximum hypothetical accident. Then, within the set of LBEs, RG 1.242 does not prescribe or suggest an acceptable accident likelihood screening threshold.
NRC Staff acknowledged in SECY-97-020 that, to make changes to the EP requirements, it would require significant expenditure of staff resources to address the probability level, if any, below which accidents will not be considered for EP and the use of increased safety in one level of the defense-in-depth framework to justify reducing requirements in another level. Faced with that task in modifying the current framework for SMRs and ONTs, the Staff have promulgated a rule without addressing the probability level in a meaningful manner. In SECY-15-0077, Staff noted they may require future Commission direction" in "determining appropriate accidents to be evaluated, but Staff have neither offered nor sought such direction. The rule and guidance defer the question of accident likelihood to individual applicants to resolve with the Staff. NuScale believes NRC should provide, in either the rule or the guidance, clear direction on the scope of internal and external events to be included in EPZ sizing (e.g., cutoff frequencies and uncertainty bounds). In particular, NuScale believes the treatment of some external hazards, such as earthquakes, require special attention in the new rule because they were only crudely considered in the technical basis underlying the existing EP requirements (i.e. WASH-1400 and NUREG-0396).
Consistent with the rules stated intent to increase predictability, the final rule and RG 1.242 should provide clear, well-supported, and reasonable guidance on which internal and external events are to be included in EPZ sizing; that guidance should be risk-informed and performance-based, and should be consistent between light-water and non-light-water designs. We believe these are essential, high-level, subjective questions that are being deferred to a time and manner least appropriate for their considerationindividual applicants that will be seeking expeditious review of their EP during the licensing of a particular site.
: Regards, Gary Becker Regulatory Affairs Counsel email: gbecker@nuscalepower.com web: www.nuscalepower.com office: 541.360.0549 The contents of this email are intended only for the person to whom it is addressed. If you received it by mistake, please inform me by reply email and then delete the message and any attachments. This email may contain proprietary, confidential and/or privileged material, which doesn't change if it is sent to an unintended recipient. Unless you have my consent, please do not copy, forward, or reveal the contents of this email to anyone.
 
From:                    YOUNG, David To:                      Burkhart, Larry Cc:                      Snodderly, Michael
 
==Subject:==
[External_Sender] Comment on today"s ACRS discussion concerning the SMR & ONT EP Rule Date:                    Thursday, November 04, 2021 11:31:59 AM Please see the comment below.
FEMA does not have regulatory authority to set EP requirements for NRC licensees; that authority resides with the NRC. FEMAs role is to evaluate the adequacy of offsite plans and response capabilities if the NRC has determined that an offsite EP program is needed. The NRC consults with FEMA during licensing reviews and their input is considered in licensing decisions.
The proposed rule includes an EPZ sizing criterion that requires the plume exposure pathway EPZ to include areas where predetermined, prompt protective measures are necessary. Predetermined, prompt protective measures would not be necessary if an Offsite Response Organization (ORO) has sufficient time to assess an accident (including discussions with the licensee) and determine what protective measures should be implemented. So if the applicant can demonstrate through their EPZ sizing analysis that releases exceeding EPA PAGs do not occur until late in a sequence (after many hours), there is no need for prompt protective measures, and the associated advance planning. It is also important to keep in mind that every facility will have an onsite E-Plan/EP program with capabilities to mitigate the effects of an accident.
Some additional points: 1) There is ample evidence that OROs can implement effective ad hoc evacuations. With many hours before a significant release, there is no reason to believe that an effective evacuation could not be performed. 2) If a collocated facility (e.g., a chemical plant) could present a hazard to a community, then that hazard would be addressed through other FEMA planning and funding processes (i.e., not the REPP). 3) Since 2001, Congress has appropriated over $53 billion for state and local homeland security and emergency preparedness. That funding, and associated FEMA planning guidance and training, have enabled effective all-hazards response plans. 4) As documented in recently published NUREG/CR-7285, Nonradiological Health Consequences from Evacuation and Relocation, evacuations introduce significant health risks to the public. They should be a high hurdle to their implementation. 5) Mandating an offsite EP program with no technical basis would impose an unnecessary burden, which would seem to violate direction given in Congressional acts and Executive Orders.
David Young l Senior Technical Advisor Nuclear Security and Incident Preparedness Nuclear Energy Institute (202) 739-8127 This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited. If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message. IRS Circular 230 disclosure: To ensure compliance with requirements imposed by the IRS and other taxing authorities, we inform you that any tax advice contained in this communication (including any attachments) is not intended or written to be used, and cannot be used, for the purpose of (i) avoiding penalties that may be imposed on any taxpayer or (ii) promoting, marketing or recommending to another party any transaction or matter addressed herein.
 
From:                  YOUNG, David To:                    Snodderly, Michael; Burkhart, Larry
 
==Subject:==
[External_Sender] Another comment for ACRS consideration Date:                  Thursday, November 04, 2021 12:55:06 PM Attachments:            image001.png Concerning the 1980 law, Public Law 96-295, cited in the deliberations this morning (as I understood the conversation), please see the comment below. This comment is from a previous NEI letter that addressed the topic.
  ., we respectfully disagree with FEMAs suggestion in its comments on the proposed rule that congressional action may be necessary for the NRC to finalize this rulemaking.
Specifically, under the heading Initial Premises and Assumptions, FEMA states:
FEMA acknowledges NRC decisions on obtaining and maintaining operating licenses are based, in part, on a composite review of offsite emergency capabilities and those provided by the licensee within the plant. The NRC has the authority, utilizing FEMAs input, to determine the relative importance of offsite emergency preparedness in the licensing decision. Thus, we assume that adequate offsite emergency planning and preparedness are still considered essential to obtaining and maintaining an operating license. Also, FEMA believes community preparedness is a shared responsibility and a critical component of preparedness is the local communitys participation in identifying risk and building the appropriate capabilities to mitigate against the identified risk.
To the extent that the proposed rule alters these premises regarding the consultative relationship between the NRC and FEMA and the relative importance of offsite emergency planning and preparedness, FEMA believes any change in consultation requirements would involve a matter of significant public policy which may ultimately have to be resolved by Congress as was done in the passage of the NRC Authorization Act of 1980, Public Law 96-295.10 First, in our view, this proposed rulemaking does not seek to alter the premises regarding the consultative relationship between the NRC and FEMA. Rather, consistent with NRCs broad statutory authority, the proposed rule recognizes that the current emergency preparedness requirements and guidance were developed with a focus on large, light-water reactors and seeks to provide a framework for small modular reactors (SMR) and other nuclear technologies (ONT) that considers the advances in designs and safety research. The proposed rule puts forward a performance-based approach to emergency preparedness for SMRs and ONT, which includes the possibility that an SMR or ONTs plume exposure EPZ may not extend beyond the site boundary. Offsite emergency planning for such facilities would not be required by the NRC.11 9
See, e.g., Mass v. US NRC, 856 F.2d 378, 383 (1st Cir. 1988) (finding that offsite emergency planning falls within the NRCs area of expertise and that NRC is specifically authorized and directed to determine whether emergency plans adequately protect the public.); Mass v. US NRC, 878 F.2d 1516, 1524 (1st Cir. 1989)(upheld NRCs decision to allow restart of the Pilgrim nuclear power plant, despite a FEMA finding that the licensees emergency preparedness plans were inadequate and concluding that although the NRC must base its ultimate finding on a review of FEMAs findings and determinations, it need not give those findings conclusive weight.; State of Ohio ex rel. Celebrezze v. US NRC, 868 F.2d 810, 813 (6th Cir.1989)(The responsibility for evaluating and approving the plans is shared between [FEMA] and the NRC .
  . . but final decision-making authority on a plans adequacy rests with the NRC.).
10 FEMA Comments: Nuclear Regulatory Commission 10 CFR Parts 50 and 52, [NRC-2015-0225] RIN 3150-AJ68 Emergency Preparedness for Small Modular Reactors and Other New Technologies, Federal Register Notice, dated 12 May 2020, July 20, 2020 (FEMA Comments), at pg. 2.
11 See Proposed Rule, at pgs. 28,448, 28,452.
But for facilities where the plume exposure EPZ extends beyond the site boundary - i.e., SMR and ONT facilities requiring specific, offsite radiological emergency preparedness planning -
 
the current NRC/FEMA consultation process would remain unchanged. The proposed rule also makes clear that [t]he NRCs proposal not to require offsite planning activities for facilities with plume exposure pathway EPZs at the site boundary does not affect FEMAs responsibility for overall emergency management and providing assistance to State and local response organizations.12 Nor does it affect the responsibility of State and local governments to establish and maintain comprehensive emergency management plans.13 Further, neither the early NRC authorization legislation discussed above, nor the decisions of the U.S. Courts of Appeals in this area, support the notion that this rulemaking involve[s] a matter of significant public policy which may ultimately have to be resolved by Congress.14 Although FEMA seems to rely upon the 1980 Authorization Act to support this proposition, that narrowly-tailored legislation does not - 40 years later - constrain the NRCs ability to engage in this rulemaking using its current appropriated funds. In fact, on its face, the 1980 Authorization Act authorizes funds to be appropriated for the fiscal year 1980.15 This specific authorization further conditions the use of any fiscal-year-1980 funds authorized to be appropriated on the Commission making certain findings regarding State, local, or utility emergency preparedness plans - either in consultation with FEMA or on its own.16 Fiscal Year 1980 funds were appropriated to the NRC both before and after enactment of the 1980 Authorization Act.17 There is no indication in the 1980 Authorization Act itself, or either of the relevant Appropriations Acts, that the restrictions provided in the 1980 Authorization Act were intended to survive the NRCs use of funds appropriated for the 1980 fiscal year.18 Indeed, as noted below, at least one federal court has described the 1980 Authorization Act as expired. And absent explicit language to the contrary, there is a strong presumption against construing substantive provisos or general provisions in annual appropriations as permanent legislation.19 Contrary to the suggestion in the FEMA comments, the early NRC Authorization Acts provide insight into Congress intent when it authorized the funds to create the current emergency preparedness regulatory framework. In our view, that intent was clear:
Congress directed that NRC consult with FEMA on the adequacy of offsite emergency preparedness in the licensing and regulation of utilization facilities in situations where offsite emergency planning was necessary. However, Congress left the ultimate 12 Proposed  Rule, at pg. 28,449.
13 Id.
14 FEMA  Comments, at pg. 2.
15 1980  Authorization Act, at Sec.101(a).
16 Id.
17 See Energy and Water Development Appropriation Act, 1980, Pub. L. 96-69, Title IV - Independent Agencies (Sept.
25, 1979) (1980 Appropriations Act); Supplemental Appropriations and Rescission Act, 1980, Pub. L. 96-304, Title I
- Independent Agencies (July 8, 1980) (1980 Supplemental Appropriations Act).
18 Both the 1980 Appropriations Act and the 1980 Supplemental Appropriations Act appropriate funds to the NRC for the Fiscal Year 1980 to remain available until expended. The 1980 Authorization Act conditions use of funds authorized to be appropriated for Fiscal Year 1980. While the no year approach to funding means that all of the funds appropriated for Fiscal Year 1980 were not required to be utilized in that fiscal year, there is no indication that the restrictions in the 1980 Authorization Act were intended to survive exhaustion of those funds.
19 See, e.g., Principles of Federal Appropriations Law: Chapter 2 The Legal Framework, United States General Accountability Office (Fourth Ed., 2016 Revision) (Since an appropriation act is made for a particular fiscal year, the starting presumption is that everything contained in the act is effective only for the fiscal year covered. Thus, the rule is: A provision contained in an annual appropriation act is not to be construed to be permanent legislation unless the language used therein or the nature of the provision makes it clear that Congress intended it to be permanent.). Id. at pg. 2-86.
responsibility for making decisions regarding the adequacy of both on-site and offsite radiological emergency planning squarely with the Commission. In fact, the D.C. Circuit specifically held in 1991 that the 1980 Authorization Act, an expired fiscal appropriations law,
. . . did not limit the licensing discretion otherwise conferred on the Commission by Congress.20 The court further concluded that Congress left to the NRC's discretion the
 
specific requirements of emergency planning, including the authority to develop generic standards that would reasonably assure the public safety without having to examine the specific safety consequences of each emergency plan for each plant.21 Finally, this proposed rulemaking is consistent with the Congressional expectations embodied in the Nuclear Energy Innovation and Modernization Act (NEIMA), as enacted on January 14, 2019.
Specifically, in NEIMA, Congress directed the NRC to establish a risk-informed, technology-inclusive framework to license and oversee advanced nuclear technologies. In doing so, it specifically identified emergency preparedness as an area to be addressed by the NRC.22 Thus, if any congressional direction were required for the NRC to pursue this issue (and it is not), it seems that Congress provided that direction in Section 103 of the NEIMA.
David Young l Senior Technical Advisor Nuclear Security and Incident Preparedness Nuclear Energy Institute (202) 739-8127 This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited. If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message. IRS Circular 230 disclosure: To ensure compliance with requirements imposed by the IRS and other taxing authorities, we inform you that any tax advice contained in this communication (including any attachments) is not intended or written to be used, and cannot be used, for the purpose of (i) avoiding penalties that may be imposed on any taxpayer or (ii) promoting, marketing or recommending to another party any transaction or matter addressed herein.
 
Supplemental Guidance for Radiological Consequence Analyses Using Alternative Source Terms DRA-ISG 2021-XX Meena Khanna, Deputy Director, Division of Risk Assessment Jerry Dozier, Senior Reliability and Risk Analyst, Division of Risk Assessment Steve Jones, Senior Safety and Plant Systems Engineer, Division of Safety Systems Shilp Vasavada, Senior Reliability and Risk Analyst, Division of Risk Assessment John Parillo, Senior Reactor Engineer, Division of Risk Assessment November 2, 2021 1
 
Introductory Remarks Becoming a more modern, risk-informed regulator:
    - Licensing, other regulatory decisions, and backfit/forward fit actions must be risk-informed. (SRM-SECY-19-0036, SRM-SECY-18-0049)
    - Improved realism, evaluation techniques, and additional information are applied to improve risk-informed regulatory decision making. (ML19319C832)
    - Culture re-alignment is needed to ensure that we identify and resolve challenges and roadblocks for the appropriate and consistent integration of risk insights.
2
 
Outline
* Background and context (deterministic review using risk insights)
* Overview of the Interim Staff Guidance (ISG)
* Changes to the ISG based on Public Comments
* Public Comments regarding the ISG 3
 
                &sect; 50.67 Accident source term.
* b) Requirements. (1) A licensee who seeks to revise its current accident source term in design basis radiological consequence analyses shall apply for a license amendment under &sect; 50.90. The application shall contain an evaluation of the consequences of applicable design basis accidents previously analyzed in the safety analysis report.
  * (2) The NRC may issue the amendment only if the applicant's analysis demonstrates with reasonable assurance that..
4
 
Regulatory Guide 1.183 Main Steam Line Challenges Frequent point of RG 1.183 Rev 0 does not                            contention between contain an aerosol                            licensees and the NRC AEB-98-03 RIS 2006-04 deposition model for the                        staff was the deposition of main steam lines (MSL)                          iodine in the main steam lines Draft Guide 1199 contained an aerosol deposition model but was never used by a licensee 5                                                        5
 
4 MSIV Leakage LARs Submitted from March to October 2019 Using RG 1.183 Rev. 0
* LARs included drywell spray removal and main steam line (MSL) deposition in their MSIV leakage models generally consistent with RIS 2006-04 and past precedent.
    - LIC-206 invoked by PM for multi-disciplinary risk insights
    - Staff questioned how the drywell sprays would impact subsequent MSL aerosol deposition
    - Licensees provided a sensitivity analysis examining the impact of several parameters
    - Of the parameters evaluated, a pathway to the condenser provided a substantial dose reduction 6
 
Total MSIV TS Allowable Leakage - BWR Fleet 2021 450 400 350 300 250 200 150 100 50 0
7
 
Using Risk Insights to Support Reasonable Assurance in the Review of LARs The staffs determination of reasonable assurance was LARs included        supported by the drywell spray        recognition that there is a removal in addition  high probability that doses Reasonable Assurance to main steam line  will be significantly lower of Meeting 10 CFR (MSL) deposition in  than those estimated by      50.67 Requirements; their MSIV leakage  the licensee using            Consistent with IAB models, which was    deterministic methods (the            SRM questioned by the staff.
AOR) that do not credit holdup and retention of the MSIV leakage within the Power Conversion System.
8                                                    8
 
Using Risk Insights to Support Reasonable Assurance in the Review of LARs (Cont'd)
* All four MSIV leakage LAR reviews were completed using a team approach.
* Each safety evaluation includes a section on risk and engineering insights to support staffs reasonable assurance finding.
* ISG has been developed to memorialize staffs practice.
9
 
Draft RG 1.183 Rev. 1 (DG-1389)
* Staff efforts underway using an integrated team to revise RG 1.183, Alternative Radiological Source Terms for Evaluating DBAs at Nuclear Power Reactors.
* An ACRS meeting has been scheduled for November 19, prior to the issuance of DG-1389 for public comment.
* DG-1389 contains MSIV leakage models as well as a streamlined procedure to allow credit for an intact power conversion system.
10
 
Technical Context for ISG
* Review challenges due to input parameter uncertainty
* Most dose calculations do not credit any SSCs beyond outboard MSIVs
* Quantitative credit for holdup in condenser through 1999 safety evaluation (SE) on a BWROG TR
      - Not used by four LARs due to resource challenges in meeting SE conditions
* Realistic pathways for fission products exist through the power conversion system (PCS) 11
 
Assumed Release Path per RG 1.183 Outboard MSIVs Diagram Courtesy: IAEA 12
 
ISG Release Path Considerations Diagram Courtesy: IAEA 13
 
Key Inputs to the Technical Assessment Supporting ISG Operational            Random Insights              Failure Probabilities Problem Formulation                                      Seismic using Risk Triplet                              Capacity Technical Assessment 14
 
Approach for Seismic Capacity Evaluation in Technical Assessment Supporting ISG Fragility Data                        Lower Bound Median
* Multiple and diverse sources              Fragility to
* Recent seismic probabilistic risk    Encompass Seismic assessments (PRAs)                      Failure Modes Operating Experience - Walkdowns Representative Risk
* North Anna Estimation
* Kashiwazaki-Kariwa
* The Great Tohoku Earthquake of 2011 15
 
Primary Insight from Technical Assessment Supporting ISG High probability that doses will be lower than those estimated strictly using traditional deterministic methods, which include accepted assumptions, that do not credit hold-up and retention of the Main Steam Isolation Valve (MSIV) leakage within the power conversion system (PCS) 16
 
Objective and Expectations of ISG
* Objective: Near-term formal regulatory footprint for staffs use of primary insight from technical assessment
* Expectations:
    - Used by staff to offset uncertainty in input parameter(s) for deterministic calculations
    - Supports staffs reasonable assurance finding during reviews
    - Transitioned to Standard Review Plan Section 15.0.1
* Caveats:
    - Does not change the licensees responsibility to demonstrate compliance with 10 CFR 50.67
    - Does not change acceptable methods for demonstrating compliance with 10 CFR 50.67 17
 
Changes to the ISG Since the ACRS Sub-Committee Meeting
* OGC provided editorial comments to the ISG for clarity that were incorporated. OGC also added a section regarding Backfitting and Issue Finality Discussion.
* Staff included a new Attachment C with the analysis of public comments.
* Staff provided clarification regarding the modeling uncertainty related to the ISG.
18
 
Public Comments Received on ISG
* 33 comments received
      - 13 comments received from NEI, 19 anonymous comments, and 1 comment from Liberty Toussaint
      - 1 of the comments resulted in a change to the ISG
* The full text of the comments and associated resolution are provided in ADAMS at ML21278A372
* The following table provides a summary rollup or categories of public comments, followed by slides with general explanations, for the disposition of the various types of comments 19
 
General Topic of Comment                        #
of Comments Comments regarding                              5 purpose/applicability/background of ISG Comments regarding formal credit to applicants 5 design basis Comments regarding use of risk insights        3 Comments regarding ISG and RG 1.183 review      3 process Question regarding uncertainty                  1 Comments regarding ISG should not be approved  14 or is contrary to existing regulations 20                                                2 Comments regarding use of RG 1.174
 
Public Comment # NRC-2021-0106-DRAFT-0017 The NRC staff's approach to handling uncertainties in the ISG is deficient in that it only addresses parameter uncertainties. Modeling uncertainties are ignored, altogether, when it is generally known that modeling uncertainties dominate parameter uncertainties in the evaluation of risk.
Resolution: Section 2.5 of Appendix A of the ISG was updated for clarity.
* Section 2.5 of the Appendix A to the ISG explicitly addresses parametric and modeling uncertainties in the selected lower bound median fragility value.
* Parametric uncertainty is accounted for through the use of the lognormal uncertainty factors for the lower bound median fragility. Conservatisms are included within the ISG as well as the unchanged conservatisms in the deterministic dose calculations that address modeling uncertainties. Further, as noted in RG 1.174, modeling uncertainty arises when the industrys state of knowledge is incomplete, and opinions may vary on how the models should be formulated. The fragility values in the sources referenced in Appendix A to the ISG were developed using state-of-practice methods, which also address modeling uncertainty.
21
 
Public Comment #NRC-2021-0106-DRAFT-0008 The proposed ISG does not meet the principles of Regulatory Guide 1.174 and 1.177 for risk-informed changes to the current licensing basis.
Resolution: The staff does not agree with this comment.
* The ISG uses engineering and risk insights to provide support for the NRC staff to reach a reasonable assurance conclusion that the applicable regulations have been met when evaluating traditional deterministic analyses containing parameters with associated uncertainty.
* Therefore, the ISG is not the sole decision-making basis for the MSIV leakage analysis review. MSIV leakage LARs are not formally risk-informed using the guidance in RGs 1.174 and 1.177.
* Further, the use of risk insights by the staff is not limited to risk-informed LARs, as demonstrated by LIC-206.
* Because the ISG is going to be used to support the staffs reasonable assurance findings when evaluating traditional deterministic MSIV leakage analyses containing parameters with associated uncertainty, it needs to be used in conjunction with the deterministic analysis reviews, which provide the primary basis.
* Defense-in-depth exists in the dose analysis because of the assumption of the maximum hypothetical accident (MHA).
22
 
Generalized Public Comment Regarding Purpose/Applicability/Background of ISG The ISG was developed, and the technical assessment identified the PCS as a realistic and available hold-up volume for fission products. The ISG also concludes that there is high confidence in the SSCs in the PCS to provide a volume for holdup and retention of fission products. Why isnt the Staff incorporating this risk-informed methodology into Regulatory Guide (RG) 1.183?
Resolution: Comment out of Scope.
    - This comment is out of scope of the ISG because it relates to RG 1.183, which is a separate guidance document.
    - Once the draft of RG 1.183 is complete, the public will be given an opportunity to provide comments on the guidance document prior to issuance.
23
 
Generalized Public Comment Regarding Formal Credit to Applicants Design Basis Several ISG comments related to obtaining formal credit in the licensees design basis Resolution: Comment out of scope.
    - This comment is out of scope of the ISG because it relates to RG 1.183, which is a separate guidance document.
    - The ISG only relates to the staffs reasonable assurance determination and does not provide credit or change the licensees design basis.
    - Once the draft of RG 1.183 is complete, the public will be given an opportunity to provide comments on the guidance document prior to issuance.
24
 
Generalized Public Comment Regarding Use of Risk Insights Why is the staff using PRA rather than bounding deterministic analysis? The NRC is confusing the use of PRA and quantitative health objectives with the intent of the regulations in 10 CFR Part 20 and 10 CFR 50.67.
Resolution: The NRC staff disagrees with the comment.
* The ISG cannot and does not change any of the regulations.
* The ISG does not specify or change the acceptable methods for performing dose calculations to meet the regulations in 10 CFR Part 20 and at 10 CFR 50.67.
* The ISG does not alter the licensees analysis of record to meet 10 CFR 50.67.
* The ISG provides support for the NRC staff to reach a reasonable assurance conclusion that the applicable regulations have been met when evaluating traditional deterministic analyses containing parameters with associated uncertainty.
* Further, the technical assessment for the ISG uses neither a probabilistic risk assessment as defined in NUREG-2122 nor does it rely on the quantitative health objectives.
25
 
Generalized Public Comment Regarding ISG and RG 1.183 Review Process The draft ISG represents a substantial departure from the design basis of boiling water reactors.
Resolution: The NRC staff disagrees with the comment.
* The ISG does not change or result in departures from the design basis of boiling water reactors.
* The ISG does not alter the licensees analysis of record to meet 10 CFR 50.67 or any system qualifications.
* The ISG provides support for the NRC staff to reach a reasonable assurance conclusion that the applicable regulations have been met when evaluating traditional deterministic analyses containing parameters with associated uncertainty.
* NRCs process for interim staff guidance documents is being followed for this ISG. This process, described in LIC-508, Development, Issuance, and Closure of Interim Staff Guidance Documents for the Office of Nuclear Reactor Regulation, involves internal review, review by ACRS, OGC, and members of the public.
* The jurisdiction of the Atomic Safety and Licensing Board Panel (ASLBP) is generally limited to reviewing contested matters in NRC adjudications.
26
 
Generalized Public Comment Regarding ISG Should Not be Approved or Contrary to Existing Regulations The proposed ISG allows plants to operate with degraded safety equipment credited for mitigating the release of radiation adversely affecting operators in the control room.
The proposed ISG appears to be an aggressive attack on the regulations intended to protect workers and the public from exposure to radiation.
Resolution: The NRC staff disagrees with the comment.
The ISG does not specify or change the acceptable methods for performing dose calculations to meet the regulations.
* The ISG does not alter the licensees analysis of record to meet 10 CFR 50.67.
* This ISG provides support for the NRC staff to reach a reasonable assurance conclusion that the applicable regulations have been met when evaluating traditional deterministic analyses containing parameters with associated uncertainty.
* The ISG does not provide any quantitative credit for condenser holdup, which would change the licensees analysis of record. Quantitative credit for condenser holdup is the purview of RG 1.183.
27
 
Takeaways
* ISG will result in consideration of large holdup volume in future MSIV leakage LARs
      - Offsets uncertainty in input parameter(s) for deterministic calculations
      - Supports reasonable assurance finding during reviews
      - Applicable if quantitative credit is not included in licensees calculations
* ISG does not change licensees responsibility to demonstrate compliance with 10 CFR 50.67
      - Acceptable methods for demonstrating compliance remain unchanged
* ISG is expected to be transitioned to SRP Section 15.0.1
* Formal condenser holdup credit for licensees is being considered in a revision to RG 1.183 28
 
Backup Slides 29
 
Risk Insight References
* U.S. Nuclear Regulatory Commission, NUREG/CR-7110, Volume 1, Peach Bottom SOARCA, May 2013, ML13150A053
* U.S. Nuclear Regulatory Commission, PRAB-02-01, Assessment of BWR Main Steam Line Release Consequences, October 2002, ML062920249
* General BWR plant design regarding Defense-in-Depth to deter the release of iodine 30
 
Iodine Pathway in SOARCA 31
 
Cesium Pathway in SOARCA 32
 
RG 1.183 Source Term (Rev. 0) 33
 
Increased Containment Leakage has Small Impact (SOARCA) 34
 
Realistic SOARCA releases much less than earlier studies 35
 
General Iodine Suppression or Deposition Mechanisms that provide Defense-in-Depth (primarily non-credited)
Flooding or    Spraying    Deposition/Filte Holdup/Decay covering                    ring Reactor    ECCS acceptance HPCS        Dryers          Redundant MSIV Criteria design LPCS        Seperators      Closure Schroud Flooding:
LPCI HPCI RCIC Suppression Pool CTMT or DW                CTMT or DW  Surfaces        Redundant CTMT Spray                        isolation valves MSIVs                                  Large Volume of  Redundant MSIVs piping prior to inboard MSIV Beyond 2nd                Raining, if Various          PCS and Condenser MSIV                      released 36
 
DRA-ISG-2021-01, "Supplemental Guidance for Radiological Consequence Analyses Using Alternative Source Terms" Mark Blumberg, NRR/ARCB Michael Markley, NRR/DORL/LPL2-1 November 2, 2021 DIFFERING VIEWS OF NRC EMPLOYEES:
DO NOT REPRESENT POSITIONS OF NRC MANAGEMENT
 
DIFFERING VIEWS OF NRC EMPLOYEES
* A stated purpose of ISG is to resolve differences between licensees methods and assumptions and those deemed acceptable to the NRC.
* ISG asserts it does not change methods acceptable to demonstrate conformance with 10 CFR 50.67 but uses assumptions that conflict directly with the RG 1.183 methodology.
* The ISG and its engineering insights are based largely on methods used by the NRC staff to approve four license amendment precedents containing numerous errors and do not meet 10 CFR 50.67 based on the licensees submitted analysis.
* The errors in one of these license amendments have been confirmed by an independent panel.
The panel results are not publicly available.
* One of the errors, associated with the main steam line deposition model, involved the NRC staff approving a calculation with a model that is known to be orders of magnitude in the non-conservative direction.
* The ISG engineering insights conflict directly with our knowledge and review of prior issues and phenomena.
* Credited pathways relied upon in the ISG are not required to be used by licensees or be based on docketed information confirming the pathway can be operated in the manner credited.
* Non-industry public comments raise valid technical and regulatory concerns and are not addressed sufficiently by NRC staff.
DIFFERING VIEWS OF NRC EMPLOYEES:
DO NOT REPRESENT POSITIONS OF NRC MANAGEMENT
 
ACRS Meeting on DRA-ISG-2021-01 Greg Broadbent, Entergy Frankie Pimentel, Sr. Project Manager - Engineering and Risk November 2, 2021
 
Risk-Informed Regulation Industry supports NRC efforts to risk-inform regulatory approaches
* Risk-informing allows licensees to spend resources in areas that are most important to safety
* Recent successes include GSI-191 resolution and 50.46 using risk-informed or statistical approaches This ISG is the first step to risk-informing deterministic radiological analyses Industry supports including these approaches in Reg Guide 1.183, Rev. 1
                                                                    &#xa9;2021 Nuclear Energy Institute 2
 
ISG Conclusions Power Conversion Systems (PCS) highly likely to remain intact post-accident
* PCS is built to high standards
* High confidence in the SSCs in the PCS to provide sufficient volume for holdup and retention of fission products
* Important system for plant operation Approximately half of plants have already demonstrated structural integrity with rigorous analyses
* Validates current regulatory PCS credit for other accident analyses Control Rod Drop Accident - no additional analysis related to seismic robustness at a plants SSE is needed for this deterministic dose analysis
                                                                &#xa9;2021 Nuclear Energy Institute 3
 
ISG Conclusions ISG incorporates relevant operating experience as well as recent post-Fukushima seismic risk insights and walkdowns
* NEDC-31858P used earthquake experience data, primarily from nonnuclear facilities Recommend that explicit credit for the conclusions of this ISG approach is included in Reg Guide 1.183, Rev. 1
                                                                &#xa9;2021 Nuclear Energy Institute 4
 
Steamline Deposition Credit Realistic modeling of the deposition in the steamline is important for BWRs
* Directly coupled to the reactor vessel
* Calculated dose for MSL is significant due to very conservative assumptions Significant regulatory uncertainty regarding acceptable models in RG 1.183 Revision 0
* Revision 0 of RG 1.183 does not contain an aerosol deposition model for the main steam lines
                                                                  &#xa9;2021 Nuclear Energy Institute 5
 
Conclusions Industry concurs that:
* The PCS is a realistic and available hold-up volume for fission products
* There is high confidence in the SSCs in the PCS to provide a volume for holdup and retention of fission products Industry comments provided application of ISG
* Applicability to new plants
* Application in RG 1.183 Rev. 1 Suggest credit for PCS with little or no additional analysis consistent with the approved approach for the control rod drop accident
* Staff deferred all comments to RG 1.183 decision-making
                                                                          &#xa9;2021 Nuclear Energy Institute 6}}

Latest revision as of 11:50, 19 November 2024

Transcript of the Advisory Committee on Reactor Safeguards 690th Full Committee Meeting, November 2, 2021, Pages 1-320 (Open)
ML21321A161
Person / Time
Issue date: 11/02/2021
From:
Advisory Committee on Reactor Safeguards
To:
Snodderly, M. ACRS
References
NRC-1734
Download: ML21321A161 (320)


Text