ML22047A270: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000313/2022403]]
| number = ML22047A270
| issue date = 02/23/2022
| title = Security Baseline Inspection Report 05000313/2022403 and 05000368/2022403
| author name = Kellar R
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Sullivan J
| addressee affiliation = Entergy Operations, Inc
| docket = 05000313, 05000368
| license number = DPR 051, NPF-006
| contact person =
| document report number = IR 2022403
| document type = Inspection Report, Letter
| page count = 8
}}
See also: [[see also::IR 05000313/2022403]]
 
=Text=
{{#Wiki_filter:February 23, 2022
Mr. Joseph Sullivan
Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
N-TSB-58
1448 S.R. 333
Russellville, AR 72802-0967
SUBJECT:          ARKANSAS NUCLEAR ONE, Units 1 and 2 - SECURITY BASELINE
                  INSPECTION REPORT 05000313/2022403 AND 05000368/2022403
Dear Mr. Sullivan:
On January 27, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at Arkansas Nuclear One, and the NRC inspectors discussed the results of this inspection with
you and other members of your staff. The results of this inspection are documented in the
enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
                                                  Sincerely,
                                                                  Signed by Kellar, Ray
                                                                  on 02/23/22
                                                  Ray L. Kellar, P.E., Chief
                                                  Plant Support Branch 1
                                                  Division of Reactor Safety
Docket Nos.: 05000313 and 05000368
License Nos.: DPR-51 and NPF-6
Enclosure:
Inspection Report 2022403
cc w/encl: Distribution via Listserv
 
 
ML22047A270
X SUNSI Review    ADAMS:          Sensitive              Non-Publicly Available      Keyword
By: RLK          X Yes  No      X Non-Sensitive        X Publicly Available          NRC-002
OFFICE        PSB1          PSB1              C: PSB1            C:DRPD          C: PSB1
NAME          JBuchanan    WTejada            RKellar            AAgrawal        RKellar
SIGNATURE      /RA/          /RA/              /RA/              /RA/            /RA/
DATE          2/17/2022    2/17/2022          2/16/2022          2/16/2022      2/23/2022
                                 
                          U.S. NUCLEAR REGULATORY COMMISSION
                                        Inspection Report
Docket Numbers:        05000313 and 05000368
License Numbers:      DPR-51 and NPF-6
Report Numbers:        05000313/2022403 and 05000368/2022403
Enterprise Identifier: I-2022-403-0002
Licensee:              Entergy Operations, Inc.
Facility:              Arkansas Nuclear one
Location:              Russellville, Arkansas
Inspection Dates:      January 24, 2022 to January 27, 2022
Inspectors:            J. Buchanan, Physical Security Inspector
                      W. Tejada, Physical Security Inspector
Approved By:          Ray L. Kellar, Chief
                      Plant Support Branch 1
                      Division of Reactor Safety
                                                                Enclosure
 
                                          SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting a security baseline inspection at Arkansas Nuclear one, in
accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs
program for overseeing the safe operation of commercial nuclear power reactors. Refer to
https://www.nrc.gov/reactors/operating/oversight.html for more information.
                                List of Findings and Violations
No findings or violations of more than minor significance were identified.
                                    Additional Tracking Items
None.
                                                2
 
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for
Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and
records, observed activities, and interviewed personnel to assess licensee performance and
compliance with Commission rules and regulations, license conditions, site procedures, and
standards.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following
procedure elements:
Protective Strategy Evaluation (2 Samples)
    (1)          Tier I: All Requirements
                  Tier II: All Requirements
                  Tier III: All Requirements
    (2)    Performance Evaluation Program: Inspectors observed a licensee-conducted annual
            force-on-force exercise on January 25, 2022.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
        On January 27, 2022, the inspectors presented the security baseline inspection results
        to you and other members of your staff.
                                                  3
 
DOCUMENTS REVIEWED
Inspection Type              Designation Description or Title Revision or
Procedure                                                    Date
71130.05  Corrective Action ANO-C-2019-
            Documents        01290,
                              ANO-C-2019-
                              01292,
                              ANO-C-2019-
                              01316,
                              ANO-C-2020-
                              00002,
                              ANO-C-2020-
                              00323,
                              ANO-C-2020-
                              00398,
                              ANO-C-2020-
                              00473,
                              ANO-C-2021-
                              00148,
                              ANO-C-2021-
                              00158,
                              ANO-C-2021-
                              00272,
                              ANO-C-2021-
                              00310,
                              ANO-C-2021-
                              00311,
                              ANO-C-2021-
                              02251,
                              ANO-C-2021-
                              02552, AND
                              ANO-C-2021-
                              03108
            Corrective Action ANO-C-2022-
                                                    4
 
Inspection Type          Designation  Description or Title                              Revision or
Procedure                                                                                  Date
          Documents      00213,
          Resulting from ANO-C-2022-
          Inspection    00214,
                          ANO-C-2022-
                          00215,
                          ANO-C-2022-
                          00216,
                          ANO-C-2022-
                          00217,
                          ANO-C-2022-
                          00218,
                          ANO-C-2022-
                          00219,
                          ANO-C-2022-
                          00236,
                          ANO-C-2022-
                          00227,
                          ANO-C-2022-
                          00230, AND
                          ANO-C-2022-
                          00241
          Miscellaneous                Letter of Agreement, Pope County Sheriff          12/21/2021
                                        Physical Security Plan, Safeguards Contingency and 19
                                        Training & Qualification Plan
                          2021-03108    Security Incident Report
                          2021-0407    Security Incident Report
                          ASLP-SEC-IMP- IMP/Security Patrols
                          SECPTRL
                          ASLP-SEC-    Tampering and Sabotage                            2
                          TAMPSAB-02
                          FLP-JCAF-    Adversary Basic Marksmanship                      2
                          ADVBM
                          FLP-SEC-      Force-on-Force Adversary Controller Training      2
                          ADVCTRL
                                                  5
 
Inspection Type      Designation  Description or Title                                Revision or
Procedure                                                                              Date
                      FLP-SECI-    Force-on-Force Controller Training                  5
                      DRILEX
          Procedures EN-NS-202    Remotely Operated Weapons Systems (ROWS) Operation  0
                                  and Maintenance
                      EN-NS-215    Conduct of Security Force Exercises and Drills      21
                      EN-NS-215-02 Annual Force-on-Force                              0
                      EN-NS-215-03 Triennial Force-on-Force                            0
                      EN-NS-220    Managing the Safety/Security Interface              5
                      EN-NS-229    General Security Strategies                        1
                      EN-NS-234    Force-on-Force Mock Adversary Program              3
                      OP-1000.019  Station Security Requirements                      52
                      OP-1043.002  Access Control                                      95
                      OP-1043.003  ANO-Specific Security Responsibilities and Duties  62
                      OP-1043.014  Patrols and Inspections                            46
                      OP.1043.004  Compensatory Measures for Security System Component 49
                                  Outages
                      OP.1043.042  Response to Contingencies                          22
                      OP.1043.047  Defensive Strategy                                  28
                      OP.1043.048  Law Enforcement Response Plan                      4
                      OP.1043.049  Target Sets                                        12
                                              6
}}

Revision as of 18:00, 18 November 2024