ENS 52630: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) Tag: Reverted |
StriderTol (talk | contribs) (Undo revision 3717259 by StriderTol (talk)) Tag: Undo |
||
Line 1: | Line 1: | ||
{{ENS notification | {{ENS notification | ||
| event number = 52630 | | event number = 52630 | ||
| facility = Watts Bar | | facility = Watts Bar | ||
| Organization = | | Organization = | ||
| license number = | | license number = | ||
Line 10: | Line 10: | ||
| utype = W-4-LP, W-4-LP | | utype = W-4-LP, W-4-LP | ||
| cfr = 10 CFR 50.72(b)(3)(iv)(A) | | cfr = 10 CFR 50.72(b)(3)(iv)(A) | ||
| emergency class = Non Emergency | | emergency class = Non Emergency | ||
| notification date = 03/23/2017 02:48 | | notification date = 03/23/2017 02:48 | ||
| notification by = Damon Fegley | | notification by = Damon Fegley | ||
Line 16: | Line 16: | ||
| event date = 03/23/2017 00:14 EDT | | event date = 03/23/2017 00:14 EDT | ||
| last update date = 03/23/2017 | | last update date = 03/23/2017 | ||
| title = | | title = Automatic Start of Auxiliary Feed Water | ||
| event text = | | event text = On March 23, 2017, at 0014 EDT, Watts Bar Nuclear Plant Unit 2 (WBN2) experienced an unplanned trip of both Turbine Driven Main Feed Pumps (TDMFP) following a loss of Main Condenser Vacuum. The trip of both TDMFPs caused an automatic start of both Motor Driven Auxiliary Feed Water Pumps and the Turbine Driven Auxiliary Feed Water Pump. [The] cause of the loss of Main Condenser Vacuum is currently under investigation. | ||
The plant was performing a normal startup, and had just synced the main generator to the grid. Subsequent to the event, the plant was transitioned to Mode 3. All rods are fully inserted. Decay heat is being removed via the atmospheric relief valves. | |||
Unit 1 remains in Mode 5 for a refueling outage. | |||
The licensee has notified the NRC Resident Inspector. | |||
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2017/20170324en.html#en52630 | | URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2017/20170324en.html#en52630 | ||
}}{{unit info | |||
| Unit = 2 | |||
| type = W-4-LP | |||
| Scram code = N | |||
| Reactor critical = Y | |||
| Initial power = 16 | |||
| Initial reactor mode = Power Operation | |||
| Current power = 3 | |||
| Current reactor mode = Startup | |||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Latest revision as of 03:12, 16 November 2024
Where | |
---|---|
Watts Bar Tennessee (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-1.43 h-0.0596 days <br />-0.00851 weeks <br />-0.00196 months <br />) | |
Opened: | Damon Fegley 02:48 Mar 23, 2017 |
NRC Officer: | Karl Diederich |
Last Updated: | Mar 23, 2017 |
52630 - NRC Website
| |