{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of:
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
 
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
 
In the matter of:
Docket No. 70-143-LA NUCLEAR FUEL SERVICES, INC.
Docket No. 70-143-LA NUCLEAR FUEL SERVICES, INC.
December 9, 2022 (License Amendment Application)
December 9, 2022 (License Amendment Application)
NUCLEAR FUEL SERVICES, INC.S MOTION TO STRIKE PORTIONS OF THE REPLY FILED BY ERWIN CITIZENS AWARENESS NETWORK I.       INTRODUCTION In accordance with 10 C.F.R. § 2.323(a),1 Nuclear Fuel Services, Inc. (NFS) moves to strike portions of the Reply filed on December 2, 2022, by Erwin Citizen Awareness Network, Inc. (ECAN)2 related to their October 31, 2022, Amended Petition to Intervene and Request for a Hearing (Petition)3 and the Answers thereto filed by NFS and the U.S. Nuclear Regulatory Commission (NRC) Staff.4 The Petition concerns NFSs license amendment request submitted to the NRC on November 18, 2021 (LAR) asking the NRC to amend NFSs 1
 
Pursuant to 10 C.F.R. § 2.323(b), NFS counsel certifies that a sincere effort was made to contact the other participants in the proceeding and resolve the issues raised in this motion, and those efforts to resolve the issues have been unsuccessful. ECAN stated that they oppose the motion. The NRC Staff takes no position on the motion at this time and will evaluate whether to respond upon review.
NUCLEAR FUEL SERVICES, INC.S MOTION TO STRIKE PORTIONS OF THE REPLY FILED BY ERWIN CITIZENS AWARENESS NETWORK
2
 
[ECAN]s Combined Reply in Support of Petition for Leave to Intervene (Dec. 2, 2022) (ML22336A251)
I. INTRODUCTION
 
In accordance with 10 C.F.R. § 2.323(a),1 Nuclear Fuel Services, Inc. (NFS) moves to
 
strike portions of the Reply filed on December 2, 2022, by Erwin Citizen Awareness Network,
 
Inc. (ECAN)2 related to their October 31, 2022, Amended Petition to Intervene and Request
 
for a Hearing (Petition)3 and the Answers thereto filed by NFS and the U.S. Nuclear
 
Regulatory Commission (NRC) Staff.4 The Petition concerns NFSs license amendment
 
request submitted to the NRC on November 18, 2021 (LAR) asking the NRC to amend NFSs
 
1 Pursuant to 10 C.F.R. § 2.323(b), NFS counsel certifies that a sincere effort was made to contact the other participants in the proceeding and resolve the issues raised in this motion, and those efforts to resolve the issues have been unsuccessful. ECAN stated that they oppose the motion. The NRC Staff takes no position on the motion at this time and will evaluate whether to respond upon review.
 
2 [ECAN]s Combined Reply in Support of Petition for Leave to Intervene (Dec. 2, 2022) (ML22336A251)
(Reply).
(Reply).
3 Amended Petition of Erwin Citizens Awareness Network for Leave to Intervene in Nuclear Fuel Services, Inc.
3 Amended Petition of Erwin Citizens Awareness Network for Leave to Intervene in Nuclear Fuel Services, Inc.
License Amendment Proceeding, and Request for a Hearing (Oct. 31, 2022) (ML22304A709) (Petition).
License Amendment Proceeding, and Request for a Hearing (Oct. 31, 2022) (ML22304A709) (Petition).
4
 
[NFS]s Answer to [ECAN]s Hearing Request and Petition for Leave to Intervene (Nov. 25, 2022)
4 [NFS]s Answer to [ECAN]s Hearing Request and Petition for Leave to Intervene (Nov. 25, 2022)
(ML22329A376) (NFS Answer); NRC Staff Answer to [ECAN]s Petition to Intervene and Request for Hearing (Nov. 23, 2023) (ML22327A214) (NRC Staff Answer).
(ML22329A376) (NFS Answer); NRC Staff Answer to [ECAN]s Petition to Intervene and Request for Hearing (Nov. 23, 2023) (ML22327A214) (NRC Staff Answer).
existing special nuclear materials (SNM) license (SNM-124) to authorize new activities
associated with uranium purification and conversion (informally called the U-Metal process).5
The portions of the Reply identified below should be stricken because they exceed the
authorized scope of a reply pleading and impermissibly introduce new and untimely arguments
into the proceeding without satisfying the late-filing criteria in 10 C.F.R. § 2.309(c). Those
arguments neither legitimately amplify arguments raised in the Petition, nor focus narrowly on
the legal or factual arguments raised in the Answers. 6 By presenting new information and
arguments in their Reply, ECAN has denied NFS and the NRC Staff a full and fair opportunity to
address those arguments in their respective Answer pleadings.


existing special nuclear materials (SNM) license (SNM-124) to authorize new activities associated with uranium purification and conversion (informally called the U-Metal process).5 The portions of the Reply identified below should be stricken because they exceed the authorized scope of a reply pleading and impermissibly introduce new and untimely arguments into the proceeding without satisfying the late-filing criteria in 10 C.F.R. § 2.309(c). Those arguments neither legitimately amplify arguments raised in the Petition, nor focus narrowly on the legal or factual arguments raised in the Answers.6 By presenting new information and arguments in their Reply, ECAN has denied NFS and the NRC Staff a full and fair opportunity to address those arguments in their respective Answer pleadings.
II. LEGAL STANDARDS
II.     LEGAL STANDARDS It is well established in NRC proceedings that a reply cannot expand the scope of the arguments set forth in the original hearing request. Replies must focus narrowly on the legal or factual arguments first presented in the original petition or raised in the answers to it.7 Moreover, [t]he Commission will not permit, in a reply, the filing of new arguments or new legal theories that opposing parties have not had an opportunity to address.8 Rather, NRC contention admissibility and timeliness requirements demand a level of discipline and preparedness on the part of petitioners, who must . . . set forth their claims . . . at the outset of 5
 
Letter from T. Knowles, NFS, to NRC Document Control Desk, License Amendment Request for U-Metal at the NFS Site (Nov. 18, 2021) (ML21327A099) (public version) (LAR). The LAR also includes the Supplement to Applicants Environmental Report (ML22066B005) (SAER), and NFSs response to requests for additional information from the NRC Staff, Letter from T. Knowles, NFS, to NRC Document Control Desk, Response to NRC Request for Additional Information to Support Environmental Review of NFS Application to Amend SNM-124 to Construct and Operate a Uranium Metal Process at 1 (Jun. 30, 2022)
It is well established in NRC proceedings that a reply cannot expand the scope of the
 
arguments set forth in the original hearing request. Replies must focus narrowly on the legal or
 
factual arguments first presented in the origin al petition or raised in the answers to it.7
 
Moreover, [t]he Commission will not permit, in a reply, the filing of new arguments or new
 
legal theories that opposing parties have not had an opportunity to address.8 Rather, NRC
 
contention admissibility and timeliness requirements demand a level of discipline and
 
preparedness on the part of petitioners, who must... set forth their claims... at the outset of
 
5 Letter from T. Knowles, NFS, to NRC Document Control Desk, License Amendment Request for U-Metal at the NFS Site (Nov. 18, 2021) (ML21327A099) (public version) (LAR). The LAR also includes the Supplement to Applicants Environmental Report (ML22066B005) (SAER), and NFSs response to requests for additional information from the NRC Staff, Letter from T. Knowles, NFS, to NRC Document Control Desk, Response to NRC Request for Additional Information to Support Environmental Review of NFS Application to Amend SNM-124 to Construct and Operate a Uranium Metal Process at 1 (Jun. 30, 2022)
(ML22193A034) (RAI Response).
(ML22193A034) (RAI Response).
6 See NFS Answer; see also NRC Staff Answer Reply.
6 See NFS Answer; see also NRC Staff Answer Reply.
7 Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006).
7 Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006).
8 USEC, Inc. (Am. Centrifuge Plant), CLI-06-9, 63 NRC 433, 439 (2006).
8 USEC, Inc. (Am. Centrifuge Plant), CLI-06-9, 63 NRC 433, 439 (2006).
2


the proceeding.9 As the Commission has explained, [t]here simply would be no end to NRC licensing proceedings if petitioners could disregard our timeliness requirements and add new bases or new issues that simply did not occur to [them] at the outset.10 The Commission demands adherence to this requirement to avoid unnecessary delays and increase the efficiency of NRC adjudication,11 because answering parties are entitled to be told at the outset, with clarity and precision, what arguments are being advanced.12 Thus, the permissible scope of a reply includes only information that (1) legitimately amplifie[s]arguments in the original petition,13 or (2) focus[es] narrowly on the legal or factual arguments first . . . raised in the answers [thereto].14 Ignoring these principles would render the Commissions intentionally-restrictive pleading standard meaninglessas petitioners could simply raise new contentions after the filing deadline, without the need to satisfy the requirements in 10 C.F.R. § 2.309(c) for new or amended contentions filed after the initial deadline for hearing requests and petitions to intervene.15 Among other things, those requirements mandate a demonstration by the petitioner as to why the new claims could not have been raised earlier in the proceeding.
2 the proceeding.9 As the Commission has explained, [t]here simply would be no end to NRC
 
licensing proceedings if petitioners could disregard our timeliness requirements and add new
 
bases or new issues that simply did not occur to [them] at the outset.10
 
The Commission demands adherence to this requirement to avoid unnecessary delays
 
and increase the efficiency of NRC adjudication,11 because answering parties are entitled to be
 
told at the outset, with clarity and precision, what arguments are being advanced.12 Thus, the
 
permissible scope of a reply includes only information that (1) legitimately
 
amplifie[s]arguments in the original petition,13 or (2) focus[es] narrowly on the legal or factual
 
arguments first... raised in the answers [thereto].14 Ignoring these principles would render the
 
Commissions intentionally-restrictive pleading standard meaninglessas petitioners could
 
simply raise new contentions after the filing deadline, without the need to satisfy the
 
requirements in 10 C.F.R. § 2.309(c) for new or amended contentions filed after the initial
 
deadline for hearing requests and petitions to intervene.15 Among other things, those
 
requirements mandate a demonstration by the petitioner as to why the new claims could not have
 
been raised earlier in the proceeding.
 
9 La. Energy Servs., LP (Natl Enrichment Facility), CLI-04-25, 60 NRC 223, 225 (2004) (internal quotation marks omitted), reconsideration denied, CLI-04-35, 60 NRC 619 (2004).
9 La. Energy Servs., LP (Natl Enrichment Facility), CLI-04-25, 60 NRC 223, 225 (2004) (internal quotation marks omitted), reconsideration denied, CLI-04-35, 60 NRC 619 (2004).
10 Id.
10 Id.
11 LES, CLI-04-35, 60 NRC at 622-23.
11 LES, CLI-04-35, 60 NRC at 622-23.
12 Kan. Gas & Elec. Co. & Kan. City Power & Light Co. (Wolf Creek Generating Station, Unit 1), ALAB-279, 1 NRC 559, 576 (1975) (emphasis added).
12 Kan. Gas & Elec. Co. & Kan. City Power & Light Co. (Wolf Creek Generating Station, Unit 1), ALAB-279, 1 NRC 559, 576 (1975) (emphasis added).
13 LES, CLI-04-25, 60 NRC at 224-25.
13 LES, CLI-04-25, 60 NRC at 224-25.
14 Palisades, CLI-06-17, 63 NRC at 732.
14 Palisades, CLI-06-17, 63 NRC at 732.
15 See Consumers Energy Co. (Palisades Nuclear Power Plant), CLI-07-22, 65 NRC 525, 527-28 (2007).
15 See Consumers Energy Co. (Palisades Nuclear Power Plant), CLI-07-22, 65 NRC 525, 527-28 (2007).
3


III.       PORTIONS OF ECANS REPLY SHOULD BE STRICKEN In Proposed Contention Ccaptioned Legacy Contamination Is Understated, Uninvestigated and Missing From Cumulative Effects Analysis in the ERECAN claimed that the SAER fails to disclose or analyze past, present, and future effluents and does not consider the cumulative effects thereof.16 In opposition to ECANs claims of omission, NFS and the NRC Staff explained that ECAN disregarded or overlooked information in the LAR bearing on those very issues. NFS and the NRC Staff also explained that ECANs vague claims of inadequate analysis failed to identify specific alleged deficiencies in the application.
3 III. PORTIONS OF ECANS REPLY SHOULD BE STRICKEN
In its Reply, ECAN no longer argues that the information identified by NFS and the NRC Staff is missing (because it is not), but rather it presents arguments for the first time purporting to show that the information ECAN originally ignored is somehow deficient. Likewise, the Reply attempts to replace ECANs vague assertions of inadequacy with newly supplied challenges and specificity. Furthermore, the Reply presents several other new arguments conjured from whole cloth. As explained below, these new arguments exceed the permissible scope of a reply.
 
ECAN had an ironclad obligation to raise these arguments in its Petition.17 It did not. And it is too late to do so now. Accordingly, these portions of the Reply should be stricken.
In Proposed Contention Ccaptioned Legacy Contamination Is Understated,
A.       ECANs New Regulatory Capture and Signage Arguments Are Untimely and Improper In its Reply, ECAN makes the generalized assertion that [n]o environmental impact is ever significant enough for the NRC to reject a license amendment.18 It also asserts that certain 16 Petition at 21-22.
 
17 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-5, 75 NRC 301, 312 (2012) (noting a petitioners ironclad obligation to review application materials thoroughly) 18 Reply at 14.
Uninvestigated and Missing From Cumulative Effects Analysis in the ERECAN claimed that
4
 
the SAER fails to disclose or analyze past, present, and future effluents and does not consider the
 
cumulative effects thereof. 16 In opposition to ECANs claims of omission, NFS and the NRC
 
Staff explained that ECAN disregarded or overlooked information in the LAR bearing on those
 
very issues. NFS and the NRC Staff also explained that ECANs vague claims of inadequate
 
analysis failed to identify specific alleged deficiencies in the application.
 
In its Reply, ECAN no longer argues that the information identified by NFS and the NRC
 
Staff is missing (because it is not), but rather it presents arguments for the first time purporting to
 
show that the information ECAN originally ignore d is somehow deficient. Likewise, the Reply
 
attempts to replace ECANs vague assertions of inadequacy with newly supplied challenges
 
and specificity. Furthermore, the Reply presents several other new arguments conjured from
 
whole cloth. As explained below, these new arguments exceed the permissible scope of a reply.
 
ECAN had an ironclad obligation to raise these arguments in its Petition.17 It did not. And it
 
is too late to do so now. Accordingly, these portions of the Reply should be stricken.
 
A. ECANs New Regulatory Capture and Signage Arguments Are Untimely and Improper
 
In its Reply, ECAN makes the generalized assertion that [n]o environmental impact is
 
ever significant enough for the NRC to reject a license amendment.18 It also asserts that certain
 
16 Petition at 21-22.
 
17 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-5, 75 NRC 301, 312 (2012) (noting a petitioners ironclad obligation to review application materials thoroughly)
 
18 Reply at 14.
 
4 signs near the NFS facility have been removed.19 These are wholly new arguments. Neither
 
was presented in the Petition, and neither respondsor even purports to respondto anything in
 
the NFS or NRC Staff Answer pleadings. It is settled law that replies must focus narrowly on
 
the legal or factual arguments first presented in th e original petition or raised in the answers to
 
it.20 Because [t]he Commission will not permit, in a reply, the filing of new arguments or new
 
legal theories that opposing parties have not had an opportunity to address,21 these arguments in
 
Section IV.A of the Reply are impermissible and should be stricken.
 
B. ECANs New Pipe Stream Argument Is Untimely and Improper
 
ECAN also presents for the first time, in its Reply, new criticisms attacking the
 
description of Banner Spring Branch in both the SAER and the RAI Response. Specifically,
 
ECAN challenges the SAERs statement that Banner Spring Branch is classified for fish and
 
aquatic life, livestock watering, irrigation and recreation.22 ECAN also challenges an assertion
 
in the RAI Response that Banner Spring Branch contains several species of minnows where it
 
converges with Martin Creek.23 Both the SAER and the RAI Response were available to ECAN
 
for many months in advance of the hearing re quest deadline. Nevertheless, ECAN did not
 
present these challenges in the Petition. Instead, it waited until its Reply pleading to present
 
them for the first time, without any explanation as to why they could not have been raised earlier.
 
Likewise, this issue was not raised in the NRC Staff or NFS Answer pleadingsand nothing in
 
this section of the Reply even mentions those pleadings. As the Commission has explained,
 
19 Id. at 15.


signs near the NFS facility have been removed.19 These are wholly new arguments. Neither was presented in the Petition, and neither respondsor even purports to respondto anything in the NFS or NRC Staff Answer pleadings. It is settled law that replies must focus narrowly on the legal or factual arguments first presented in the original petition or raised in the answers to it.20 Because [t]he Commission will not permit, in a reply, the filing of new arguments or new legal theories that opposing parties have not had an opportunity to address,21 these arguments in Section IV.A of the Reply are impermissible and should be stricken.
B.        ECANs New Pipe Stream Argument Is Untimely and Improper ECAN also presents for the first time, in its Reply, new criticisms attacking the description of Banner Spring Branch in both the SAER and the RAI Response. Specifically, ECAN challenges the SAERs statement that Banner Spring Branch is classified for fish and aquatic life, livestock watering, irrigation and recreation.22 ECAN also challenges an assertion in the RAI Response that Banner Spring Branch contains several species of minnows where it converges with Martin Creek.23 Both the SAER and the RAI Response were available to ECAN for many months in advance of the hearing request deadline. Nevertheless, ECAN did not present these challenges in the Petition. Instead, it waited until its Reply pleading to present them for the first time, without any explanation as to why they could not have been raised earlier.
Likewise, this issue was not raised in the NRC Staff or NFS Answer pleadingsand nothing in this section of the Reply even mentions those pleadings. As the Commission has explained, 19 Id. at 15.
20 Palisades, CLI-06-17, 63 NRC at 732.
20 Palisades, CLI-06-17, 63 NRC at 732.
21 USEC, CLI-06-9, 63 NRC at 439.
21 USEC, CLI-06-9, 63 NRC at 439.
22 Reply at 16-17 (calling this assertion false and incredible).
22 Reply at 16-17 (calling this assertion false and incredible).
23 Id. at 17 (challenging this assertion as unsupported because a report cited nine sentences later, for a different proposition, does not contain the challenged assertion).
23 Id. at 17 (challenging this assertion as unsupported because a report cited nine sentences later, for a different proposition, does not contain the challenged assertion).
5


NRC contention admissibility and timeliness requirements demand a level of discipline and preparedness on the part of petitioners, who must . . . set forth their claims . . . at the outset of the proceeding.24 Because ECAN did not do so with these arguments in Section IV.B of the Reply, and because they do not narrowly focus on the Petition or the Answers, they are untimely, impermissible, and should be stricken.
5 NRC contention admissibility and timeliness requirements demand a level of discipline and
C.       ECANs New Drinking Water System Argument is Untimely and Improper ECANs Reply also asserts that the LAR improperly omitted a discussion of drinking water for Greeneville and other communities in Greene County, TN.25 However, this line of argument exceeds the permissible scope of a reply pleading and does not otherwise satisfy the requirements for a new or amended contention out-of-time. This argument was not raised in the Petition, despite the LAR being available for months before the Petition was filed. And ECAN does not identify any portion of any Answer pleading to which it purports to respond. Because this criticism was not raised at the outset, it is untimely, improper, and Section IV.D of the Reply should be stricken.26 D.       ECANs Attempt to Reinvigorate Its Contention By Curing Deficiencies Identified by Other Parties Exceeds the Permissible Scope of a Reply In its original Petition, ECAN made numerous vague and conclusory assertions regarding alleged omissions and insufficiencies in the LAR. In their respective Answer pleadings, NFS and the NRC Staff explained numerous reasons those claims failed to raise an admissible contention, largely because they were unsupported and failed to dispute, with requisite specificity, the relevant analyses in the LAR. In its Reply, ECAN responds to those criticisms, 24 LES, CLI-04-25, 60 NRC at 224-25.
 
preparedness on the part of petitioners, who must... set forth their claims... at the outset of
 
the proceeding.24 Because ECAN did not do so with these arguments in Section IV.B of the
 
Reply, and because they do not narrowly focus on the Petition or the Answers, they are untimely,
 
impermissible, and should be stricken.
 
C. ECANs New Drinking Water System Argument is Untimely and Improper
 
ECANs Reply also asserts that the LAR improperly omitted a discussion of drinking
 
water for Greeneville and other communities in Greene County, TN.25 However, this line of
 
argument exceeds the permissible scope of a reply pleading and does not otherwise satisfy the
 
requirements for a new or amended contention out-of-time. This argument was not raised in the
 
Petition, despite the LAR being available for months before the Petition was filed. And ECAN
 
does not identify any portion of any Answer pleading to which it purports to respond. Because
 
this criticism was not raised at the outset, it is untimely, improper, and Section IV.D of the Reply
 
should be stricken.26
 
D. ECANs Attempt to Reinvigorate Its Contention By Curing Deficiencies Identified by Other Parties Exceeds the Permissible Scope of a Reply
 
In its original Petition, ECAN made numerous vague and conclusory assertions regarding
 
alleged omissions and insufficiencies in the LAR. In their respective Answer pleadings, NFS
 
and the NRC Staff explained numerous reasons those claims failed to raise an admissible
 
contention, largely because they were unsupported and failed to dispute, with requisite
 
specificity, the relevant analyses in the LAR. In its Reply, ECAN responds to those criticisms,
 
24 LES, CLI-04-25, 60 NRC at 224-25.
 
25 Reply at 17.
25 Reply at 17.
26 LES, CLI-04-25, 60 NRC at 224-25.
26 LES, CLI-04-25, 60 NRC at 224-25.
6


not by rebutting them, but by attempting to cure them through presentation of new, specific criticisms of the relevant analyses they previously ignored.
6 not by rebutting them, but by attempting to cure them through presentation of new, specific
That is impermissible. The Commission has long held that reply briefs cannot be used to cure or reinvigorate thinly supported contentions by presenting entirely new arguments.27 Yet, as explained below, that is precisely what ECAN has done here. Accordingly, these improper attempts to cure the numerous admissibility defects identified by NFS and the NRC Staff should be stricken.
 
: 1.       ECANs Attempt to Cure Defects Identified by the NRC Staff In the Petition, ECAN raised several vague criticisms related to the analysis of groundwater contamination in the LAR.28 In its Answer pleading, the NRC Staff pointed to the sections of the LAR that analyze that topic,29 and explained that, because the Petition d[id] not address that information information, ECAN had failed to identify a genuine dispute.30 The Reply does not challenge that assertion. ECAN glosses right over itapparently conceding the point. Instead, ECAN quibbles with the Staffs characterization of that information as extensive,31 and attempts to cure its failure by offeringfor the first timea critique of the information that it originally ignored.32 Likewise, ECAN attacks plutonium contamination data presented in the SAER and RAI Response, which was referenced in the NRC Staff Answer, 27 La. Energy Servs. LP (Natl Enrichment Facility), CLI-04-32, 60 NRC 223, 224 (2004).
criticisms of the relevant analyses they previously ignored.
 
That is impermissible. The Commission has long held that reply briefs cannot be used to
 
cure or reinvigorate thinly supported contentions by presenting entirely new arguments.27 Yet,
 
as explained below, that is precisely what ECAN has done here. Accordingly, these improper
 
attempts to cure the numerous admissibility defects identified by NFS and the NRC Staff should
 
be stricken.
: 1. ECANs Attempt to Cure Defects Identified by the NRC Staff
 
In the Petition, ECAN raised several vague criticisms related to the analysis of
 
groundwater contamination in the LAR.28 In its Answer pleading, the NRC Staff pointed to the
 
sections of the LAR that analyze that topic,29 and explained that, because the Petition d[id] not
 
address that information information, ECAN had failed to identify a genuine dispute.30 The
 
Reply does not challenge that assertion. ECAN glosses right over itapparently conceding the
 
point. Instead, ECAN quibbles with the Staffs characterization of that information as
 
extensive,31 and attempts to cure its failure by offeringfor the first timea critique of the
 
information that it originally ignored.32 Likewise, ECAN attacks plutonium contamination data
 
presented in the SAER and RAI Response, which was referenced in the NRC Staff Answer,
 
27 La. Energy Servs. LP (Natl Enrichment Facility), CLI-04-32, 60 NRC 223, 224 (2004).
 
28 See generally Petition at 21-35; see also generally NRC Staff Answer at 18-25; NFS Answer at 16-25.
28 See generally Petition at 21-35; see also generally NRC Staff Answer at 18-25; NFS Answer at 16-25.
29 E.g., NRC Staff Answer at 20 (citing Table 22B).
29 E.g., NRC Staff Answer at 20 (citing Table 22B).
30 NRC Staff Answer at 22 (emphasis added).
30 NRC Staff Answer at 22 (emphasis added).
31 Petition at 18 (criticizing the NRC Staffs characterization of the information as extensive).
31 Petition at 18 (criticizing the NRC Staffs characterization of the information as extensive).
32 Petition at 17-19 (criticizing the legibility of charts, criticizing the length of the discussion, criticizing statements as squishy, criticizing data as not new, criticizing the NRC Staff for not requesting additional information, criticizing a data table as needing explanation, and criticizing the NRC Staffs characterization of this information as extensive).
32 Petition at 17-19 (criticizing the legibility of charts, criticizing the length of the discussion, criticizing statements as squishy, criticizing data as not new, criticizing the NRC Staff for not requesting additional information, criticizing a data table as needing explanation, and criticizing the NRC Staffs characterization of this information as extensive).
7


purporting to identifyfor the first timeways in which that data falls short.33 However, the Staffs Answer merely noted that ECAN had failed to engage with or dispute that data. These new and untimely criticisms are not narrowly focused on Staffs observation that ECAN disregarded that information in the first instance. Instead, ECAN makes a thinly veiled attempt to reinvigorate its inadmissible contention through presentation of new specificity, and freshly conjured disputes, not presented in the Petition. As a matter of law, these claims in Section IV.C and the first paragraph of Section IV.G of the Replyto which NFS and the NRC Staff have not had an opportunity to respondshould be stricken.34
7 purporting to identifyfor the first timeways in which that data falls short.33 However, the
: 2.       ECANs Attempt to Cure Defects Identified by NFS In its Answer pleading, NFS similarly noted that ECANs Petition disregards the multiple portions of the application that present updated disclosures and analyses regarding the presence and quantity of facility effluents.35 The Reply does not challenge the overarching assertion that ECAN failed to engage with or dispute the information. Instead, ECAN attempts to dispute that information for the first time by (1) republishing its new arguments related to Banner Spring Branch, and (2) raising wholly new criticisms of the LARs discussion of groundwater plumes.36 As noted above, ECANs new criticisms of NFSs description of Banner Spring Branch arguments are untimely and impermissible.37 Duplicating those arguments in a separate part of the Reply,38 under the guise of responding to a statement in the NFS Answer, does not change 33 Reply at 24-25.
 
Staffs Answer merely noted that ECAN had failed to engage with or dispute that data. These
 
new and untimely criticisms are not narrowl y focused on Staffs observation that ECAN
 
disregarded that information in the first instan ce. Instead, ECAN makes a thinly veiled attempt
 
to reinvigorate its inadmissible contention through presentation of new specificity, and freshly
 
conjured disputes, not presented in the Petition. As a matter of law, these claims in Section IV.C
 
and the first paragraph of Section IV.G of the Replyto which NFS and the NRC Staff have not
 
had an opportunity to respondshould be stricken.34
: 2. ECANs Attempt to Cure Defects Identified by NFS
 
In its Answer pleading, NFS similarly noted that ECANs Petition disregards the
 
multiple portions of the application that presen t updated disclosures and analyses regarding the
 
presence and quantity of facility effluents.35 The Reply does not challenge the overarching
 
assertion that ECAN failed to engage with or dispute the information. Instead, ECAN attempts
 
to dispute that information for the first time by (1) republishing its new arguments related to
 
Banner Spring Branch, and (2) raising wholly new criticisms of the LARs discussion of
 
groundwater plumes.36
 
As noted above, ECANs new criticisms of NFSs description of Banner Spring Branch
 
arguments are untimely and impermissible.37 Duplicating those arguments in a separate part of
 
the Reply,38 under the guise of responding to a statement in the NFS Answer, does not change
 
33 Reply at 24-25.
 
34 LES, CLI-04-32, 60 NRC at 224.
34 LES, CLI-04-32, 60 NRC at 224.
35 NFS Answer at 16.
35 NFS Answer at 16.
36 Reply at 20-24.
36 Reply at 20-24.
37 See supra Section III.B.
37 See supra Section III.B.
38 Reply at 20-21.
38 Reply at 20-21.
8


that. So too with ECANs fresh criticisms regarding groundwater plumes.39 The Reply does not focus narrowly on NFSs observation that ECAN did not dispute this information to begin with. In fact, it does not engage with that assertion at all. As a matter of settled law, Petitioners cannot file thinly supported contentions, wait for other parties to flag their deficiencies, and then cure those defects in a reply. That is a textbook example of impermissible reinvigoration.40 Accordingly, these new arguments in Section IV.F of the Reply should be stricken.
8 that. So too with ECANs fresh criticisms regarding groundwater plumes.39 The Reply does
IV.       CONCLUSION Sections IV.A through IV.D, Section IV.F, and the first paragraph of Section IV.G of the Reply exceed the authorized scope of a reply pleading and do not satisfy the requirements in 10 C.F.R. § 2.309(c) for new or amended contentions out of time. Accordingly, the appropriate remedy is to strike those portions of the Reply.
 
Respectfully submitted, Signed (electronically) by Ryan K. Lighty         Executed in accord with 10 C.F.R. § 2.304(d)
not focus narrowly on NFSs observation that ECAN did not dispute this information to begin
Ryan K. Lighty, Esq.                               Molly R. Mattison, Esq.
 
MORGAN, LEWIS & BOCKIUS LLP                       MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.                     1111 Pennsylvania Avenue, N.W.
with. In fact, it does not engage with that assertion at all. As a matter of settled law, Petitioners
Washington, D.C. 20004                             Washington, D.C. 20004 (202) 739-5274                                     (202) 739-5540 ryan.lighty@morganlewis.com                       molly.mattison@morganlewis.com Counsel for Nuclear Fuel Services, Inc.
 
cannot file thinly supported contentions, wait for other parties to flag their deficiencies, and then
 
cure those defects in a reply. That is a textbook example of impermissible reinvigoration.40
 
Accordingly, these new arguments in Section IV.F of the Reply should be stricken.
 
IV. CONCLUSION
 
Sections IV.A through IV.D, Section IV.F, and the first paragraph of Section IV.G of the
 
Reply exceed the authorized scope of a reply pleading and do not satisfy the requirements in
 
10 C.F.R. § 2.309(c) for new or amended contentions out of time. Accordingly, the appropriate
 
remedy is to strike those portions of the Reply.
 
Respectfully submitted,
 
Signed (electronically) by Ryan K. Lighty Executed in accord with 10 C.F.R. § 2.304(d)
Ryan K. Lighty, Esq. Molly R. Mattison, Esq.
MORGAN, LEWIS & BOCKIUS LLP MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W. 1111 Pennsylvania Avenue, N.W.
Washington, D.C. 20004 Washington, D.C. 20004 (202) 739-5274 (202) 739-5540 ryan.lighty@morganlewis.com molly.mattison@morganlewis.com Counsel for Nuclear Fuel Services, Inc.
Dated in Washington, D.C.
Dated in Washington, D.C.
This 9th day of December 2022 39 Id. at 22-24.
This 9th day of December 2022
 
39 Id. at 22-24.
 
40 LES, CLI-04-32, 60 NRC at 224.
40 LES, CLI-04-32, 60 NRC at 224.
9


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of:
9 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
 
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
 
In the matter of:
Docket No. 70-143-LA NUCLEAR FUEL SERVICES, INC.
Docket No. 70-143-LA NUCLEAR FUEL SERVICES, INC.
December 9, 2022 (License Amendment Application)
December 9, 2022 (License Amendment Application)
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, a copy of the foregoing Nuclear Fuel Services, Inc.s Motion to Strike Portions of the Reply Filed by Erwin Citizens Awareness Network was served upon the Electronic Information Exchange (the NRCs E-Filing System), in the above-captioned docket.
 
CERTIFICATE OF SERVICE
 
Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, a copy of the foregoing
 
Nuclear Fuel Services, Inc.s Motion to Strike Portions of the Reply Filed by Erwin Citizens
 
Awareness Network was served upon the Electronic Information Exchange (the NRCs E-Filing
 
System), in the above-captioned docket.
 
Signed (electronically) by Ryan K. Lighty Ryan K. Lighty, Esq.
Signed (electronically) by Ryan K. Lighty Ryan K. Lighty, Esq.
MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.
MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.
Washington, D.C. 20004 (202) 739-5274 ryan.lighty@morganlewis.com Counsel for Nuclear Fuel Services, Inc.
Washington, D.C. 20004 (202) 739-5274 ryan.lighty@morganlewis.com
 
Counsel for Nuclear Fuel Services, Inc.
 
DB1/ 134465396}}
DB1/ 134465396}}

Revision as of 15:33, 15 November 2024

Nuclear Fuel Services, Inc Motion to Strike Portions of Ecan Reply
ML22343A142
Person / Time
Site: Erwin
Issue date: 12/09/2022
From: Lighty R, Mattison M
Morgan, Morgan, Lewis & Bockius, LLP, Nuclear Fuel Services
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
ASLBP 23-976-01-LA-BD02, RAS 56554, 70-143-LA
Download: ML22343A142 (10)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the matter of:

Docket No. 70-143-LA NUCLEAR FUEL SERVICES, INC.

December 9, 2022 (License Amendment Application)

NUCLEAR FUEL SERVICES, INC.S MOTION TO STRIKE PORTIONS OF THE REPLY FILED BY ERWIN CITIZENS AWARENESS NETWORK

I. INTRODUCTION

In accordance with 10 C.F.R. § 2.323(a),1 Nuclear Fuel Services, Inc. (NFS) moves to

strike portions of the Reply filed on December 2, 2022, by Erwin Citizen Awareness Network,

Inc. (ECAN)2 related to their October 31, 2022, Amended Petition to Intervene and Request

for a Hearing (Petition)3 and the Answers thereto filed by NFS and the U.S. Nuclear

Regulatory Commission (NRC) Staff.4 The Petition concerns NFSs license amendment

request submitted to the NRC on November 18, 2021 (LAR) asking the NRC to amend NFSs

1 Pursuant to 10 C.F.R. § 2.323(b), NFS counsel certifies that a sincere effort was made to contact the other participants in the proceeding and resolve the issues raised in this motion, and those efforts to resolve the issues have been unsuccessful. ECAN stated that they oppose the motion. The NRC Staff takes no position on the motion at this time and will evaluate whether to respond upon review.

2 [ECAN]s Combined Reply in Support of Petition for Leave to Intervene (Dec. 2, 2022) (ML22336A251)

(Reply).

3 Amended Petition of Erwin Citizens Awareness Network for Leave to Intervene in Nuclear Fuel Services, Inc.

License Amendment Proceeding, and Request for a Hearing (Oct. 31, 2022) (ML22304A709) (Petition).

4 [NFS]s Answer to [ECAN]s Hearing Request and Petition for Leave to Intervene (Nov. 25, 2022)

(ML22329A376) (NFS Answer); NRC Staff Answer to [ECAN]s Petition to Intervene and Request for Hearing (Nov. 23, 2023) (ML22327A214) (NRC Staff Answer).

existing special nuclear materials (SNM) license (SNM-124) to authorize new activities

associated with uranium purification and conversion (informally called the U-Metal process).5

The portions of the Reply identified below should be stricken because they exceed the

authorized scope of a reply pleading and impermissibly introduce new and untimely arguments

into the proceeding without satisfying the late-filing criteria in 10 C.F.R. § 2.309(c). Those

arguments neither legitimately amplify arguments raised in the Petition, nor focus narrowly on

the legal or factual arguments raised in the Answers. 6 By presenting new information and

arguments in their Reply, ECAN has denied NFS and the NRC Staff a full and fair opportunity to

address those arguments in their respective Answer pleadings.

II. LEGAL STANDARDS

It is well established in NRC proceedings that a reply cannot expand the scope of the

arguments set forth in the original hearing request. Replies must focus narrowly on the legal or

factual arguments first presented in the origin al petition or raised in the answers to it.7

Moreover, [t]he Commission will not permit, in a reply, the filing of new arguments or new

legal theories that opposing parties have not had an opportunity to address.8 Rather, NRC

contention admissibility and timeliness requirements demand a level of discipline and

preparedness on the part of petitioners, who must... set forth their claims... at the outset of

5 Letter from T. Knowles, NFS, to NRC Document Control Desk, License Amendment Request for U-Metal at the NFS Site (Nov. 18, 2021) (ML21327A099) (public version) (LAR). The LAR also includes the Supplement to Applicants Environmental Report (ML22066B005) (SAER), and NFSs response to requests for additional information from the NRC Staff, Letter from T. Knowles, NFS, to NRC Document Control Desk, Response to NRC Request for Additional Information to Support Environmental Review of NFS Application to Amend SNM-124 to Construct and Operate a Uranium Metal Process at 1 (Jun. 30, 2022)

(ML22193A034) (RAI Response).

6 See NFS Answer; see also NRC Staff Answer Reply.

7 Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006).

8 USEC, Inc. (Am. Centrifuge Plant), CLI-06-9, 63 NRC 433, 439 (2006).

2 the proceeding.9 As the Commission has explained, [t]here simply would be no end to NRC

licensing proceedings if petitioners could disregard our timeliness requirements and add new

bases or new issues that simply did not occur to [them] at the outset.10

The Commission demands adherence to this requirement to avoid unnecessary delays

and increase the efficiency of NRC adjudication,11 because answering parties are entitled to be

told at the outset, with clarity and precision, what arguments are being advanced.12 Thus, the

permissible scope of a reply includes only information that (1) legitimately

amplifie[s]arguments in the original petition,13 or (2) focus[es] narrowly on the legal or factual

arguments first... raised in the answers [thereto].14 Ignoring these principles would render the

Commissions intentionally-restrictive pleading standard meaninglessas petitioners could

simply raise new contentions after the filing deadline, without the need to satisfy the

requirements in 10 C.F.R. § 2.309(c) for new or amended contentions filed after the initial

deadline for hearing requests and petitions to intervene.15 Among other things, those

requirements mandate a demonstration by the petitioner as to why the new claims could not have

been raised earlier in the proceeding.

9 La. Energy Servs., LP (Natl Enrichment Facility), CLI-04-25, 60 NRC 223, 225 (2004) (internal quotation marks omitted), reconsideration denied, CLI-04-35, 60 NRC 619 (2004).

10 Id.

11 LES, CLI-04-35, 60 NRC at 622-23.

12 Kan. Gas & Elec. Co. & Kan. City Power & Light Co. (Wolf Creek Generating Station, Unit 1), ALAB-279, 1 NRC 559, 576 (1975) (emphasis added).

13 LES, CLI-04-25, 60 NRC at 224-25.

14 Palisades, CLI-06-17, 63 NRC at 732.

15 See Consumers Energy Co. (Palisades Nuclear Power Plant), CLI-07-22, 65 NRC 525, 527-28 (2007).

3 III. PORTIONS OF ECANS REPLY SHOULD BE STRICKEN

In Proposed Contention Ccaptioned Legacy Contamination Is Understated,

Uninvestigated and Missing From Cumulative Effects Analysis in the ERECAN claimed that

the SAER fails to disclose or analyze past, present, and future effluents and does not consider the

cumulative effects thereof. 16 In opposition to ECANs claims of omission, NFS and the NRC

Staff explained that ECAN disregarded or overlooked information in the LAR bearing on those

very issues. NFS and the NRC Staff also explained that ECANs vague claims of inadequate

analysis failed to identify specific alleged deficiencies in the application.

In its Reply, ECAN no longer argues that the information identified by NFS and the NRC

Staff is missing (because it is not), but rather it presents arguments for the first time purporting to

show that the information ECAN originally ignore d is somehow deficient. Likewise, the Reply

attempts to replace ECANs vague assertions of inadequacy with newly supplied challenges

and specificity. Furthermore, the Reply presents several other new arguments conjured from

whole cloth. As explained below, these new arguments exceed the permissible scope of a reply.

ECAN had an ironclad obligation to raise these arguments in its Petition.17 It did not. And it

is too late to do so now. Accordingly, these portions of the Reply should be stricken.

A. ECANs New Regulatory Capture and Signage Arguments Are Untimely and Improper

In its Reply, ECAN makes the generalized assertion that [n]o environmental impact is

ever significant enough for the NRC to reject a license amendment.18 It also asserts that certain

16 Petition at 21-22.

17 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-5, 75 NRC 301, 312 (2012) (noting a petitioners ironclad obligation to review application materials thoroughly)

18 Reply at 14.

4 signs near the NFS facility have been removed.19 These are wholly new arguments. Neither

was presented in the Petition, and neither respondsor even purports to respondto anything in

the NFS or NRC Staff Answer pleadings. It is settled law that replies must focus narrowly on

the legal or factual arguments first presented in th e original petition or raised in the answers to

it.20 Because [t]he Commission will not permit, in a reply, the filing of new arguments or new

legal theories that opposing parties have not had an opportunity to address,21 these arguments in

Section IV.A of the Reply are impermissible and should be stricken.

B. ECANs New Pipe Stream Argument Is Untimely and Improper

ECAN also presents for the first time, in its Reply, new criticisms attacking the

description of Banner Spring Branch in both the SAER and the RAI Response. Specifically,

ECAN challenges the SAERs statement that Banner Spring Branch is classified for fish and

aquatic life, livestock watering, irrigation and recreation.22 ECAN also challenges an assertion

in the RAI Response that Banner Spring Branch contains several species of minnows where it

converges with Martin Creek.23 Both the SAER and the RAI Response were available to ECAN

for many months in advance of the hearing re quest deadline. Nevertheless, ECAN did not

present these challenges in the Petition. Instead, it waited until its Reply pleading to present

them for the first time, without any explanation as to why they could not have been raised earlier.

Likewise, this issue was not raised in the NRC Staff or NFS Answer pleadingsand nothing in

this section of the Reply even mentions those pleadings. As the Commission has explained,

19 Id. at 15.

20 Palisades, CLI-06-17, 63 NRC at 732.

21 USEC, CLI-06-9, 63 NRC at 439.

22 Reply at 16-17 (calling this assertion false and incredible).

23 Id. at 17 (challenging this assertion as unsupported because a report cited nine sentences later, for a different proposition, does not contain the challenged assertion).

5 NRC contention admissibility and timeliness requirements demand a level of discipline and

preparedness on the part of petitioners, who must... set forth their claims... at the outset of

the proceeding.24 Because ECAN did not do so with these arguments in Section IV.B of the

Reply, and because they do not narrowly focus on the Petition or the Answers, they are untimely,

impermissible, and should be stricken.

C. ECANs New Drinking Water System Argument is Untimely and Improper

ECANs Reply also asserts that the LAR improperly omitted a discussion of drinking

water for Greeneville and other communities in Greene County, TN.25 However, this line of

argument exceeds the permissible scope of a reply pleading and does not otherwise satisfy the

requirements for a new or amended contention out-of-time. This argument was not raised in the

Petition, despite the LAR being available for months before the Petition was filed. And ECAN

does not identify any portion of any Answer pleading to which it purports to respond. Because

this criticism was not raised at the outset, it is untimely, improper, and Section IV.D of the Reply

should be stricken.26

D. ECANs Attempt to Reinvigorate Its Contention By Curing Deficiencies Identified by Other Parties Exceeds the Permissible Scope of a Reply

In its original Petition, ECAN made numerous vague and conclusory assertions regarding

alleged omissions and insufficiencies in the LAR. In their respective Answer pleadings, NFS

and the NRC Staff explained numerous reasons those claims failed to raise an admissible

contention, largely because they were unsupported and failed to dispute, with requisite

specificity, the relevant analyses in the LAR. In its Reply, ECAN responds to those criticisms,

24 LES, CLI-04-25, 60 NRC at 224-25.

25 Reply at 17.

26 LES, CLI-04-25, 60 NRC at 224-25.

6 not by rebutting them, but by attempting to cure them through presentation of new, specific

criticisms of the relevant analyses they previously ignored.

That is impermissible. The Commission has long held that reply briefs cannot be used to

cure or reinvigorate thinly supported contentions by presenting entirely new arguments.27 Yet,

as explained below, that is precisely what ECAN has done here. Accordingly, these improper

attempts to cure the numerous admissibility defects identified by NFS and the NRC Staff should

be stricken.

1. ECANs Attempt to Cure Defects Identified by the NRC Staff

In the Petition, ECAN raised several vague criticisms related to the analysis of

groundwater contamination in the LAR.28 In its Answer pleading, the NRC Staff pointed to the

sections of the LAR that analyze that topic,29 and explained that, because the Petition d[id] not

address that information information, ECAN had failed to identify a genuine dispute.30 The

Reply does not challenge that assertion. ECAN glosses right over itapparently conceding the

point. Instead, ECAN quibbles with the Staffs characterization of that information as

extensive,31 and attempts to cure its failure by offeringfor the first timea critique of the

information that it originally ignored.32 Likewise, ECAN attacks plutonium contamination data

presented in the SAER and RAI Response, which was referenced in the NRC Staff Answer,

27 La. Energy Servs. LP (Natl Enrichment Facility), CLI-04-32, 60 NRC 223, 224 (2004).

28 See generally Petition at 21-35; see also generally NRC Staff Answer at 18-25; NFS Answer at 16-25.

29 E.g., NRC Staff Answer at 20 (citing Table 22B).

30 NRC Staff Answer at 22 (emphasis added).

31 Petition at 18 (criticizing the NRC Staffs characterization of the information as extensive).

32 Petition at 17-19 (criticizing the legibility of charts, criticizing the length of the discussion, criticizing statements as squishy, criticizing data as not new, criticizing the NRC Staff for not requesting additional information, criticizing a data table as needing explanation, and criticizing the NRC Staffs characterization of this information as extensive).

7 purporting to identifyfor the first timeways in which that data falls short.33 However, the

Staffs Answer merely noted that ECAN had failed to engage with or dispute that data. These

new and untimely criticisms are not narrowl y focused on Staffs observation that ECAN

disregarded that information in the first instan ce. Instead, ECAN makes a thinly veiled attempt

to reinvigorate its inadmissible contention through presentation of new specificity, and freshly

conjured disputes, not presented in the Petition. As a matter of law, these claims in Section IV.C

and the first paragraph of Section IV.G of the Replyto which NFS and the NRC Staff have not

had an opportunity to respondshould be stricken.34

2. ECANs Attempt to Cure Defects Identified by NFS

In its Answer pleading, NFS similarly noted that ECANs Petition disregards the

multiple portions of the application that presen t updated disclosures and analyses regarding the

presence and quantity of facility effluents.35 The Reply does not challenge the overarching

assertion that ECAN failed to engage with or dispute the information. Instead, ECAN attempts

to dispute that information for the first time by (1) republishing its new arguments related to

Banner Spring Branch, and (2) raising wholly new criticisms of the LARs discussion of

groundwater plumes.36

As noted above, ECANs new criticisms of NFSs description of Banner Spring Branch

arguments are untimely and impermissible.37 Duplicating those arguments in a separate part of

the Reply,38 under the guise of responding to a statement in the NFS Answer, does not change

33 Reply at 24-25.

34 LES, CLI-04-32, 60 NRC at 224.

35 NFS Answer at 16.

36 Reply at 20-24.

37 See supra Section III.B.

38 Reply at 20-21.

8 that. So too with ECANs fresh criticisms regarding groundwater plumes.39 The Reply does

not focus narrowly on NFSs observation that ECAN did not dispute this information to begin

with. In fact, it does not engage with that assertion at all. As a matter of settled law, Petitioners

cannot file thinly supported contentions, wait for other parties to flag their deficiencies, and then

cure those defects in a reply. That is a textbook example of impermissible reinvigoration.40

Accordingly, these new arguments in Section IV.F of the Reply should be stricken.

IV. CONCLUSION

Sections IV.A through IV.D,Section IV.F, and the first paragraph of Section IV.G of the

Reply exceed the authorized scope of a reply pleading and do not satisfy the requirements in

10 C.F.R. § 2.309(c) for new or amended contentions out of time. Accordingly, the appropriate

remedy is to strike those portions of the Reply.

Respectfully submitted,

Signed (electronically) by Ryan K. Lighty Executed in accord with 10 C.F.R. § 2.304(d)

Ryan K. Lighty, Esq. Molly R. Mattison, Esq.

MORGAN, LEWIS & BOCKIUS LLP MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W. 1111 Pennsylvania Avenue, N.W.

Washington, D.C. 20004 Washington, D.C. 20004 (202) 739-5274 (202) 739-5540 ryan.lighty@morganlewis.com molly.mattison@morganlewis.com Counsel for Nuclear Fuel Services, Inc.

Dated in Washington, D.C.

This 9th day of December 2022

39 Id. at 22-24.

40 LES, CLI-04-32, 60 NRC at 224.

9 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the matter of:

Docket No. 70-143-LA NUCLEAR FUEL SERVICES, INC.

December 9, 2022 (License Amendment Application)

CERTIFICATE OF SERVICE

Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, a copy of the foregoing

Nuclear Fuel Services, Inc.s Motion to Strike Portions of the Reply Filed by Erwin Citizens

Awareness Network was served upon the Electronic Information Exchange (the NRCs E-Filing

System), in the above-captioned docket.

Signed (electronically) by Ryan K. Lighty Ryan K. Lighty, Esq.

MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.

Washington, D.C. 20004 (202) 739-5274 ryan.lighty@morganlewis.com

Counsel for Nuclear Fuel Services, Inc.

DB1/ 134465396