ML23150A181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PROCEDURE REVIEW FORM (PRF) 1.0      Initiation Initiator: Joseph Fortman                                                              Date: 0511 8/2023                    Procedure Dept              EP Document #: EIP-ZZ-00201 Addendum A                                                    New Rev,        #      040            (3 digtt.c reqzit,ed
{{#Wiki_filter:}}
 
==Title:==
Control Room Notification Flowchart Level ofUse:            Utontinuous                        Refcrence                  1nforrnation              EjMultipIe                  EN/A 2.0 Reason for Change/Description of Change (List commitments, IRs, eB Change Itequests, OERs, P/ant Alods etc. and record numbers here.)
CR 202301 986 Updated Senior Resident information on Note I of the Communicator Flowchart and Note 1 of the Telephone Flowchart for Second Communicator in accordance with NRC organizational change.
Continued:  U 3.0. Document Disposition Temp Change                    New l)ocufqn                        Miot Revision                    üMinor Revision              Cancel1ation Adrninitiatwe CoirLctlon                                  i-P      LJ          i Dept. HeadorI)csinated Approver requiredforAdrninistrativc Corrections (Signaturc/PIN/Date)- iioothersnauresrequired 4.0      Interim Approval (Temp. Change Only)                                  Temp. Change #:                                Expiration Date:
Cogniiant Supuvisoi (Signature/PIN/Date)                                                      SRO (SgnaturJPlN/I)ate)
 
==5.0 Comments==
Continued:  U 6.0      Reviews and Signatures (P.JOT requiredjar AdminI.ctraiit Corrections)
Revhnis !?eqiired          I    I.kpt      I      pjj.,r J                          S?flttt1trL                                  Daie          CA0139 Allached Preparer                                                                                                                                              N/A f..clmical Review                                                                                                          I                                Yes    LI No I echnical Review                                                                                                                                            Yes    Li No Add 1 Review                                                                                                                                            LI  Yes    LI No Add I Review                                                                                                                                          j j Yes            No ElAdditional Reviews (See Attached CAOl39Jbrrns).                                    Number of additional CAO1 39s:
Type                        Coordinator    PIN                          Sigizature                      Date          CA0139 4llached flVahdation Yes    LI No 50.59 Review 1CA25 10 CA25 1 1                                    LCA25 12            /  EN/A er IPA-ZZ-OO43)                    .    .  ...  ..
Screener fnftia!/PBV,      Reviewer Thittat/PIW (Dept Head or Designated Approver) Is a Change Management Plan required? LJYes No (w YiS, attach CA2773 or CA2 774)
Is a Cross-Disciplinary review required? 1Yes EJNo 7.0 Approval (Either approval must be quatfIed as PATAPVR or PAIYGApR in QitatMaster,)
LI SCIW)r Director Nuclear Operations Approval (per APA-ZZ-OO1Ol) El ORC is required in accordance with APA-ZZ-00091 LI Department Head Final Review and Approval                                                            ORC Meeting:
De1)t. Head or [)esignated Approver                                                            Senior Director Nuclear Operations (Signature/PIN/Date)                                                                        (Signattire/PIN/Date)
Aot. F(Jg( 2 prOideS !n.ct;uctic)n.c tc) c:oiitptete thisforta and tucy be c/istarctcd A190OOt)l, 2, 5, 35          -  A210.0062,        65, 69; M190.000l            Page 1 of2                                                                  CA0033 APA-ZZOt)1t)I                                                                                                                                                  Rev. 002}}

Revision as of 13:08, 14 November 2024

EIP-ZZ-00201 Addendum a, Revision 040, Control Room Notification Flowchart
ML23150A181
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/18/2023
From: Fortman J
Ameren Missouri, Callaway Energy Center
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23150A179 List:
References
EIP-ZZ-00201 Addendum A, Rev 040
Download: ML23150A181 (1)


Text