ENS 57305: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
| event date = 09/05/2024 08:00 PDT | | event date = 09/05/2024 08:00 PDT | ||
| last update date = 09/05/2024 | | last update date = 09/05/2024 | ||
| title = Offsite Agency Notification of LOW- | | title = Offsite Agency Notification of LOW-LEVELS of Tritium Detected in Groundwater | ||
| event text = The following information was provided by the licensee via phone and email: | | event text = The following information was provided by the licensee via phone and email: | ||
On September 5, 2024, Southern California Edison reported, as a proactive measure, detectable levels of tritium in onsite groundwater wells to offsite government agencies. The tritium levels do not exceed reporting thresholds in the [Nuclear Energy Institute's] NEI 07-07 communication protocol, the offsite dose calculation manual | On September 5, 2024, Southern California Edison reported, as a proactive measure, detectable levels of tritium in onsite groundwater wells to offsite government agencies. The tritium levels do not exceed reporting thresholds in the [Nuclear Energy Institute's] NEI 07-07 communication protocol, the offsite dose calculation manual, nor the NRC regulations in 10 CFR Part 20. Offsite ocean water samples have not identified the presence of tritium above detectable levels. An investigation is currently ongoing to determine the source of tritium and determine mitigative actions, if any. | ||
This notification is being made solely as a four-hour, non-emergency notification for a notification of another government agency. This event is reportable in accordance with 10 CFR 50.72(b)(2)(xi). | This notification is being made solely as a four-hour, non-emergency notification for a notification of another government agency. This event is reportable in accordance with 10 CFR 50.72(b)(2)(xi). | ||
There was no impact on the health and safety of the public or plant personnel. | There was no impact on the health and safety of the public or plant personnel. | ||
The NRC regional inspector will be notified. | The NRC regional inspector will be notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240909en.html#en57305 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 06:20, 9 September 2024
Where | |
---|---|
Southern California Edison Company San Clemente, California (NRC Region 4) | |
License number: | GL |
Organization: | San Onofre |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-3.9 h-0.163 days <br />-0.0232 weeks <br />-0.00534 months <br />) | |
Opened: | Guadalupe Robles 11:06 Sep 5, 2024 |
NRC Officer: | Robert A. Thompson |
Last Updated: | Sep 5, 2024 |
57305 - NRC Website | |