ENS 57194: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 23: Line 23:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
A normal shutdown is expected to be completed by 0900 EDT. There are no radiological releases.  Unit 1 was not affected.  There is no estimate for the time of the repairs.
A normal shutdown is expected to be completed by 0900 EDT. There are no radiological releases.  Unit 1 was not affected.  There is no estimate for the time of the repairs.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240628en.html#en57194
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240701en.html#en57194
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 06:20, 1 July 2024

ENS 57194 +/-
Where
Cook American Electric Power icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-1.48 h-0.0617 days <br />-0.00881 weeks <br />-0.00203 months <br />)
Opened: Ted Dey
04:30 Jun 27, 2024
NRC Officer: Natalie Starfish
Last Updated: Jun 28, 2024
57194 - NRC Website
Loading map...