ENS 56252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:
| NRC officer = Ernest West
| NRC officer = Ernest West
| event date = 10/05/2022 00:00 EST
| event date = 10/05/2022 00:00 EST
| last update date = 01/27/2023
| last update date = 03/06/2023
| title = Part 21 - Deviation to Qualified Design
| title = Part 21 - Deviation to Qualified Design
| event text = The following is a summary of information provided by Flowserve - Limitorque via email:
| event text = The following is a summary of information provided by Flowserve - Limitorque via email:
Line 25: Line 25:
Flowserve provided an update to notify that the final evaluation of the safety consequence and reportability, primarily involving seismic qualification, will be delayed until 02/24/2023.
Flowserve provided an update to notify that the final evaluation of the safety consequence and reportability, primarily involving seismic qualification, will be delayed until 02/24/2023.
Notified R4DO (Agrawal) via phone and the Part 21 group via email.
Notified R4DO (Agrawal) via phone and the Part 21 group via email.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230130en.html#en56252
* * * UPDATE ON 03/03/2023 AT 0952 EST FROM CHRIS SHAFFER (FLOWSERVE) TO JOHN RUSSELL* * *
Flowserve has completed the evaluation of the deviation described in the initial notification. Flowserve has concluded that the deviation has no substantial impact to the safety function of the component and/or the associated actuator.
Notified R4DO (Vossmar) via phone and the Part 21 group via email.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230307en.html#en56252
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 15:59, 4 January 2024

ENS 56252 +/-
Where
Flowserve
Lynchburg, Virginia (NRC Region 2)
Organization: Flowserve
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
Time - Person (Reporting Time:+1376.75 h57.365 days <br />8.195 weeks <br />1.886 months <br />)
Opened: Chris Shaffer
14:45 Dec 1, 2022
NRC Officer: Ernest West
Last Updated: Mar 6, 2023
56252 - NRC Website