ENS 56252: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 15: | Line 15: | ||
| NRC officer = Ernest West | | NRC officer = Ernest West | ||
| event date = 10/05/2022 00:00 EST | | event date = 10/05/2022 00:00 EST | ||
| last update date = | | last update date = 03/06/2023 | ||
| title = Part 21 - Deviation to Qualified Design | | title = Part 21 - Deviation to Qualified Design | ||
| event text = The following is a summary of information provided by Flowserve - Limitorque via email: | | event text = The following is a summary of information provided by Flowserve - Limitorque via email: | ||
Line 22: | Line 22: | ||
The evaluation is expected to be completed by 01/27/2023. If there are questions, or addition information is required, please contact Chris Shaffer, Quality Assurance Manager, Flowserve Corporation, Ph: (434) 522-4136. | The evaluation is expected to be completed by 01/27/2023. If there are questions, or addition information is required, please contact Chris Shaffer, Quality Assurance Manager, Flowserve Corporation, Ph: (434) 522-4136. | ||
Known affected plant: Waterford 3 Nuclear Generating Station | Known affected plant: Waterford 3 Nuclear Generating Station | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/ | * * * UPDATE ON 01/27/2023 AT 1011 EST FROM FLOWSERVE TO JOHN RUSSELL* * * | ||
Flowserve provided an update to notify that the final evaluation of the safety consequence and reportability, primarily involving seismic qualification, will be delayed until 02/24/2023. | |||
Notified R4DO (Agrawal) via phone and the Part 21 group via email. | |||
* * * UPDATE ON 03/03/2023 AT 0952 EST FROM CHRIS SHAFFER (FLOWSERVE) TO JOHN RUSSELL* * * | |||
Flowserve has completed the evaluation of the deviation described in the initial notification. Flowserve has concluded that the deviation has no substantial impact to the safety function of the component and/or the associated actuator. | |||
Notified R4DO (Vossmar) via phone and the Part 21 group via email. | |||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230307en.html#en56252 | |||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 15:59, 4 January 2024
Where | |
---|---|
Flowserve Lynchburg, Virginia (NRC Region 2) | |
Organization: | Flowserve |
Reporting | |
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
Time - Person (Reporting Time:+1376.75 h57.365 days <br />8.195 weeks <br />1.886 months <br />) | |
Opened: | Chris Shaffer 14:45 Dec 1, 2022 |
NRC Officer: | Ernest West |
Last Updated: | Mar 6, 2023 |
56252 - NRC Website | |