ENS 56625: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 28: Line 28:
(c) The DG3 train was started and functioned successfully.
(c) The DG3 train was started and functioned successfully.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230718en.html#en56625
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230719en.html#en56625
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 06:30, 19 July 2023

ENS 56625 +/-
Where
Columbia Generating Station Energy Northwest icon.png
Washington (NRC Region 4)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1467.57 h61.149 days <br />8.736 weeks <br />2.01 months <br />)
Opened: Dan Sharpe
14:13 Jul 17, 2023
NRC Officer: Adam Koziol
Last Updated: Jul 17, 2023
56625 - NRC Website
Loading map...